BRIDGE INSPECTION REPORT
FORT PULASKI BRIDGE
ENTRANCE ROAD OVER SOUTH CHANNEL-SAVANNAH RIVER
FORT PULASKI NATIONAL MONUMENT
LN
STRUCTURE NO. 5420-001P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 5/20/14
Report prepared by: WU
Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP http://www.efl.fhwa.dot.gov/FLHBO/BIP
STRUCTURE SUMMARY STRUCTURE NO. 5420-001P
FORT PULASKI BRIDGE INSPECTION DATE: 5/20/14
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... STEEL NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... NO. OF APPR. SPANS: ........ STRINGER/MULTI-BEAM or GIRDER 62
# OF BEAMS, MAIN SPAN: .. 5 STRUCT. TOTAL LENGTH: .. 1,283.0 FT (391.1 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 40.0 FT (12.2 M)
WEARING SURFACE: .......... BITUMINOUS DECK W IDTH: ...................... 24.8 FT (7.6 M)
ABUT. FOUNDATIONS: ........ PILE BENT CURB TO CURB W IDTH: ..... 20.0 FT (6.1 M)
PIER FOUNDATION(S): ........ PILE BENT YEAR BUILT:
ABUTMENT / PIER MAT'L: ... WOOD OR TIMBER YEAR RECONSTRUCTED: .. 1965
PROJ./PLAN REF. NO: ......... *1------A1 / 3014A SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 1984-JOINT REPAIR. 1996-PILE JACKETING, RIPRAP PLACED. 1999-JOINT REPAIR.
2008-PILE REPLACEMENT/REPAIR, PILE JACKETING, JOINT REPAIR.
LOCATION
FORT PULASKI NATIONAL MONUMENT MILE POINT: ..................... 0.16 (KM PT 0.26)
STATE: ................................. GEORGIA LOCATION: 1.0 mile from Fort Pulaski.
FACILITY CARRIED: ............ ENTRANCE ROAD
FEATURE INTERSECTED: .. SOUTH CHANNEL-SAVANNAH RIVER
STRUCTURE EVALUATION SUMMARY
See next page for Structure Evaluation Summary.
INSPECTION TEAM: J. THOMAS, T. POW ELL, M. HAND (VOLKERT, INC.)
CONDITION ASSESSMENT:
JOE THOMAS, P.E., FIELD TEAM LEADER
REPORT REVIEW :
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 9/24/14
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
STRUCTURE SUMMARY STRUCTURE NO. 5420-001P
STRUCTURE EVALUATION SUMMARY CONTINUED
This bridge provides access to Fort Pulaski from U.S. Route 80. The bridge was constructed in 1938 and underwent rehabilitation projects in 1965, 1996, and 2008. The superstructure is comprised of 62 composite timber/concrete "corduroy" spans, and one steel beam span over the main channel. The substructure units (pile bents) are each comprised of 5 timber piles with a timber or concrete beam cap. The existing concrete/timber composite deck is part of the original 1938 construction. The bridge is currently posted for weight restrictions.
Several measures have recently been taken to keep the bridge operating in a satisfactory manner. Extensive structural repairs were made to the substructure in 2008 under Project PRA-FOPU 10(2). The scope of work for the repair project included replacement, splicing, and/or jacketing of a number of timber piles that had exhibited significant deterioration, and replacement of deteriorated cross-bracing members. Since the previous inspection, a new horizontal timber brace has been installed on the south face of Bent #32. In addition, the rails and curbs have been painted.
However, serious problems with the bridge persist, including extensive decay of the timber decking adjacent to the concrete bent caps, where many of the deck timbers and timber shims have lost bearing. In addition, the steel beams and bearings in the main span are exhibiting widespread rusting with substantial section loss in some key locations, and deterioration of the remaining unjacketed pile timber is rapidly progressing. It should also be noted that the existing riprap on the embankment slopes is undersized and gradually washing away, and the concrete bank protection is partially undermined. Due to the age of the structure, the widespread deterioration, and high cost of continued repairs, the bridge has been scheduled for replacement in FY 16 under Project PRA-FOPU 10(3).
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5420-001P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
B226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
58.8 REALIGN LEANING UTILITY POLE AT SOUTHWEST APPROACH. 1 EA
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ...
TOTAL ITEMIZED COSTS:
$0
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Bridge is scheduled for replacement in FY 16 under Project PRA-FOPU 10(3).
Bridge was repaired in 2008 under Project PRA-FOPU 10(2). South approach has been reposted for the original 18T-22T-34T load limit, reflecting the current Inventory Ratings for the H, Type 3, and Type 3S2 trucks respectively.
North approach remains posted for 18 tons.
Maintenance cost estimate is based on historical data, including costs for similar projects when available.
FIELD INSPECTION REPORT STRUCTURE NO. 5420-001P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
P F G N N F P F G
N G
N G G N N N N N G G N N
N P F N G G N
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
58.1, 59.3 MODERATE TO SEVERE DETERIORATION OF TIMBER DECKING AND
2"X2" SHIMS ADJACENT TO CONCRETE BENT CAPS UNDER DECK
JOINTS; SEVERAL TIMBER SHIMS FALLING OUT OR MISSING. NO
BEARING REMAINS AT BENTS #8 AND #24 FOR MANY DECK TIMBERS
DUE TO DECAY. MODERATE WHITE MOLD ON TIMBERS ALONG
BENT #41 CAP. MINOR DETERIORATION OF TIMBERS ALONG EDGES
OF NEW CORBELS AT BENT #16 (SEE 60.15); SEVERAL ARE SOFT.
WIDESPREAD WHITE MOLD THROUGHOUT TIMBER DECKING
UNDERSIDE; MAINLY IN SPANS AROUND DECK JOINTS. NUMEROUS
DECK TIMBERS ARE SPLIT AT ENDS WHERE CROSS NAILED.
SEVERAL CRACKED DECK TIMBERS. SEVERAL SPLIT DECK
TIMBERS IN SPANS #33, #37, #45, AND #46; ONE IS LOOSE.
DETERIORATED DECK TIMBERS IN VICINITY OF NORTHWEST
SCUPPER, SPAN #29 AND AT ENDS OF SPAN #24.
CONCRETE DECK IN MAIN SPAN. MINOR TO MODERATE SPALLING
WITH EXPOSED REBAR ON DECK UNDERSIDE; MINOR
DELAMINATION AND POPOUTS THROUGHOUT. MODERATE
CRACKING AT NORTHWEST CORNER. NUMEROUS SPALLS WITH
EXPOSED REBAR ON EAST OVERHANG UNDERSIDE.
58.2,3 JOINT OVER BENT #8 PREVIOUSLY NOTED TO BE SUPPLYING MOST
OF EXPANSION ROOM FOR STRUCTURE. COMPOSITE JOINTS AT
BENTS #8 AND #16; SEVERAL BOLTS PROTRUDE FROM JOINTS
CAUSING TIRE HAZARD. WEST SIDE OF JOINT OVER BENT #8 HAS 2'
LONG SECTION WHICH HAS SETTLED, RESULTING FROM
DETERIORATION OF DECK TIMBERS; ANCHOR BOLTS ARE LOOSE.
CURB JOINTS AT BENT #8 ARE OPEN; CURB JOINT SEALED AT BENT
#16. GRAVEL AND DEBRIS ACCUMULATION AT ENDS OF JOINTS AT
BENTS #8 AND #16.
AGGREGATE BINDER MATRIX AT REMAINING DECK EXPANSION
JOINTS; CRACKING, UP TO 1/2" WIDE, IN JOINT MATRIX AT BENT #33;
HOLE IN WEST SIDE UP TO 2" DEEP. SEVERAL SMALLER CRACKS IN
JOINT MATRIX AT BENT #32. MINOR CRACKING OF JOINT MATRIX IN
REMAINING DECK EXPANSION JOINTS AND ADJACENT AREAS OF
WEARING SURFACE. MINOR TRANSVERSE CRACKING OF WEARING
SURFACE IN SEVERAL OTHER LOCATIONS, MAINLY AT CENTER OF
SPANS.
G G G F G F
N
F
G
F
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 7
G G F G N
MED
SUFF
12 FT.
SAND, SILT
222. APPROACHES 6
OTHER 9.
ALIGNMENT 8.
SIGNS 7.
SETTLEMENT 6.
EROSION 5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS 2.
1. APPROACH SLABS
(GATE)
G N G F F F G G G
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION 5.
EROSION AND/OR SCOUR 4.
FOUNDATION 3.
WEEP HOLES 2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 0
N N N
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
58.5 MINOR CRACKING THROUGHOUT CURBS. PATCHED AREA OF EAST
CURB AT NORTH ABUTMENT JOINT IN GOOD CONDITION. CURBS
HAVE BEEN REPAINTED SINCE PREVIOUS INSPECTION. SURVEY
MARKER IN NORTHEAST APPROACH CURB. MINOR VEGETATION
GROWTH ALONG CURBLINES. SEVERAL VEHICLE SCRAPES ALONG
CURBS.
58.6 NUMEROUS AREAS OF MINOR CRACKING WITH DELAMINATION AND
SPALLING WITH EXPOSED REBAR ON CONCRETE RAILS.
MODERATE DELAMINATION AND SPALLING WITH EXPOSED REBAR
ON SEVERAL RAILINGS. RAILINGS HAVE BEEN PAINTED SINCE
PREVIOUS INSPECTION; MINOR RUST SHOWING THROUGH PAINT IN
SPALLED AREAS. MINOR CRACKING AT TOPS OF MOST RAIL POSTS.
THREE DAMAGED SECTIONS OF RIGHT RAIL IN SPANS #49 TO #50
HAVE BEEN REPLACED BY W-BEAM AND WEATHERING STEEL
POSTS SINCE PREVIOUS INSPECTION. EAST BASE PLATE NUTS
2ND POST ARE NOT FULLY THREADED OR ARE LOOSE. MISSING
RAIL TO RAIL CONNECTION BOLT FROM THIS LOCATION.
58.7 MODERATE RUSTING OF DECK SCUPPERS; ASPHALT PRESENT IN
SEVERAL SCUPPERS.
58.8 LIGHT POLE AT WEST SIDE OF SOUTH APPROACH LEANING
TOWARD ROADWAY 8 DEGREES. POLE IS TETHERED TO WEST END
OF BENT CAP #2.
59.1 NEARLY 100% SECTION LOSS FROM WEST ANCHOR BOLT FOR
BEAM #3 BEARING AT BENT #32. MODERATE TO SEVERE RUSTING
WITH MINOR SECTION LOSS FROM REMAINING BOLTS AND
BEARINGS; PACK RUST IN SEVERAL LOCATIONS.
59.2,7 MODERATE SPOT RUSTING OF STEEL BEAMS IN MAIN SPAN,
ESPECIALLY ON FLANGES. SECTION LOSS ON BEAM #5 BOTTOM
FLANGE AT MIDSPAN DIAPHRAGM; ORIGINAL THICKNESS 7/8"; 5/8"
THICK SECTION REMAINING.
SEVERE RUSTING AND SECTION LOSS FROM NORTH END OF BEAM
#1 AND #5, AND SOUTH END OF BEAMS #4 AND #5 BOTTOM
FLANGES AT BEARING INTERFACE; AS LITTLE AS 1/4" THICKNESS
REMAINING. MODERATE SECTION LOSS AT REMAINING BEAM
ENDS. SEVERE RUSTING AND SECTION LOSS FROM NORTH END
WEB OF BEAM #1; AS LITTLE AS 3/8" REMAINING.
WIDESPREAD PAINT FAILURE AND RUSTING THROUGHOUT MAIN
SPAN BEAMS AND BEARINGS.
59.6 WIDESPREAD MODERATE SPALLING AND CRACKING OF CONCRETE
DIAPHRAGMS AT BENTS #32 AND #33; REBAR EXPOSED AND
RUSTED IN SOME LOCATIONS.
ADDITIONAL ITEM REFERENCE AND REMARKS
59.8 MINOR TO MODERATE DELAMINATION AND SPALLING THROUGHOUT CONCRETE DECK FASCIAE; SHALLOW SPALLS WITH REBAR EXPOSED IN NUMEROUS LOCATIONS. SEVERE SPALLING WITH EXPOSED REBAR ON WEST DECK FASCIA OVER BENT #24. PATCHES PRESENT IN SEVERAL AREAS. FASCIA FORM LEFT IN PLACE IN SPANS
#3 AND #4, WEST SIDE.
60.2,3 BENT #64, PILE #5 DOES NOT PROVIDE PILE TO CAP BEARING (UP TO 1.5" GAP).
60.14 12 PILES WERE FITTED WITH FIBERGLASS JACKETS IN 1996 (SEE APPENDIX); HOWEVER, SOME JACKETS DID NOT EXTEND DOWN BELOW LOW WATER MARK. JACKET EXTENSIONS AND JACKETING OF ADDITIONAL DETERIORATED PILES COMPLETED IN 2008 (55 PILES TOTAL AS NOTED IN AS-BUILT PLANS); SPLICE REPAIRS COMPLETED AT 12 PILES. EXTERIOR PILES REPLACED IN 6 LOCATIONS. (SEE APPENDIX FOR DETAILS.)
POCKETS OF GROUT MISSING IN SEVERAL JACKETS; TRAPPED WATER IN SEVERAL LOCATIONS (SEE APPENDIX).
NUMEROUS JACKETS ARE NOT FILLED TO TOP WITH GROUT; WATER PONDS IN TOP PORTION. STRAP PLACED
AROUND JACKET AT BENT #27, PILE #1 SINCE PREVIOUS INSPECTION.
SEVERE DETERIORATION OF BENT #35, PILE #4, APPROXIMATELY 10' BELOW CAP; BENT #52, PILE #3, APPROXIMATELY 6' BELOW CAP; AND BENT #58, PILE #5, APPROXIMATELY 5' BELOW CAP. DEEP CHECKS IN SEVERAL PILES UP TO 5" DEEP; MOST ARE SLIGHTLY SOFT ON OUTER LAYERS. SEVERAL OLD BOLT HOLES THROUGH PILES REMAIN OPEN. SEVERAL PILES SOUND HOLLOW IN LOCAL AREAS; SMALL AREAS OF DECAY IN
PILES AT BENTS #31, #35, #56, #61, AND #62. (SEE APPENDIX FOR DETAILS.)
SEVERE RUSTING OF METAL FLASHING BETWEEN TIMBER PILES AND CAPS WITH EXTENSIVE SECTION LOSS.
MODERATE TO SEVERE RUSTING OF CROSS BRACING HARDWARE. SEVERE RUSTING OF NUMEROUS BOLTS;
SEVERAL ARE LOOSE. BOLT NOT FULLY THREADED FOR BRACING "A" AT BENT #21 CAP.
SEVERE DETERIORATION OF CROSS BRACING "A" AND "B" FOR BENT #5, CROSS BRACING "B" FOR BENTS #6, #13, #17, #32, #33, #46, #48 AND #59; MINOR TO MODERATE DETERIORATION OF REMAINING CROSS BRACING MEMBERS. SPLIT IN TOP OF CROSS BRACING AT BENT #22. BOTTOM SPACER FOR BRACING "A" AT PILE #5, BENT #30, IS MISSING. MODERATE SPLITS IN CROSS BRACING AT BENTS #47 AND #49. 2" GAP BETWEEN CROSS BRACING AND PILE #4 AT BENT #54. SEVERE DECAY OF HORIZONTAL BRACING MEMBERS AT BOTH MAIN SPAN
(SPAN #32) BENTS.
60.14,15 SEVERAL PILES PROVIDE POINT BEARING ONLY; MAINLY AT CONCRETE CAPS. BENT #41, PILE #4 DOES NOT
PROVIDE PILE TO CAP BEARING (3/8" GAP).
ADDITIONAL ITEM REFERENCE AND REMARKS
60.15 CONCRETE CAPS AT BENTS #8, #16, #24, #41, #49, AND #57, BELOW DECK JOINTS; MINOR TO MODERATE SPALLING AT SEVERAL CONCRETE CAP ENDS. 12"HX8"W TIMBER CORBELS ADDED AT EITHER SIDE OF BENT CAP #16 TO SUPPORT DECK IN AREAS OF DETERIORATION; NUTS AND WASHERS MISSING FOR VERTICAL BOLTS
AT ENDS OF CORBELS.
TIMBER CAPS AT REMAINING BENTS: SEVERE FULL LENGTH SPLIT IN BOTTOM FACE OF BENT CAP #13. SEVERE DECAY AT BOTH ENDS OF BENT CAP #32 (NORTH) AND EAST END OF BENT CAP #33 (SOUTH). BENT CAP #33
(NORTH) SOUNDS HOLLOW OVER PILE #2; HOWEVER, NO DECAY WAS FOUND.
MINOR TO MODERATE WEATHERING AT TIMBER BENT CAP ENDS. MINOR SPLITTING IN EAST END OF BENT CAP #34 AND BENT CAP #51. CHECK ALONG BENT CAP #56, SOUTH SIDE NEAR PILE #4; CAP SOUNDS HOLLOW IN VICINITY AND AT EAST END. EAST END OF BENT #60 CAP SOUNDS SLIGHTLY HOLLOW. NORTH SIDE OF BENT #61
CAP SOUNDS HOLLOW ALONG CHECK BETWEEN PILES #2 AND #3.
MODERATE TO SEVERE RUSTING OF HOLD-DOWN BOLTS THROUGH BENT CAPS WITH SEVERE SECTION LOSS;
NUMEROUS BOLTS HAVE LARGE GAP BETWEEN WASHER AND CAP.
60.18 NUMEROUS BENTS, ESPECIALLY AT NORTH END OF BRIDGE, ARE LEANING TOWARD NORTH. PILES WERE APPARENTLY ORIGINALLY DRIVEN OUT-OF-PLUMB. CONDITION WILL CONTINUE TO BE MEASURED AND MONITORED FOR MOVEMENT DURING FUTURE INSPECTIONS. PILES AT BENT #53 ARE 7 DEGREES
OUT-OF-PLUMB.
61.3 RIPRAP ON EMBANKMENT SLOPES IS UNDERSIZED AND GRADUALLY WASHING AWAY. MINOR UNDERMINING OF
CONCRETE BANK PROTECTION AT SOUTHWEST AND NORTHEAST EMBANKMENTS.
222.1,6 MODERATE SPALLING AT NORTHEAST CORNER OF NORTH APPROACH SLAB AND SOUTHEAST CORNER OF SOUTH APPROACH SLAB DUE TO MINOR SETTLEMENT OF APPROACH IN VICINITY. UP TO 1" SETTLEMENT OF
SOUTH APPROACH.
222.4 WIDESPREAD MODERATE MAP CRACKING OF SOUTH APPROACH PAVEMENT. SEVERAL AREAS OF PATCHING AT
SOUTH APPROACH. MINOR TRANSVERSE CRACKING OF NORTH APPROACH PAVEMENT.
222.5 MINOR EROSION (1.7'L X 0.3' DEEP) ALONG WEST SIDE OF SOUTH APPROACH SLAB WITH UP TO 2.0' OF
UNDERMINING.
222.7 "WEIGHT LIMIT 18 TONS" IN PLACE AT RIGHT SHOULDER OF NORTH APPROACH; SOUTH APPROACH POSTED FOR 18T-22T-34T.
222.9 GATE AT SOUTH APPROACH.
36.A BRIDGE RAILINGS DO NOT APPEAR TO HAVE SUFFICIENT STRENGTH TO REDIRECT ERRANT VEHICLES.
STRUCTURE LOAD RATING STRUCTURE NO. 5420-001P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 18 16 24 22
HS 24 22 33 30
TYPE 3 22 20 30 27
TYPE 3S2 34 31 46 42
TYPE 3-3 43 39 58 53
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
X ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 1/81
LOAD RATING CONTROLLED BY: MOMENT CAPACITY OF STEEL BEAMS
REMARKS: ORIGINAL LOAD RATING IS AGAIN VALID FOLLOWING REPAIRS TO STRUCTURE MADE UNDER PROJECT
PRA-FOPU 10(2).
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5420-001P
STRUCTURE IDENTIFICATION
(201) PARK: FORT PULASKI NATIONAL MONUMENT (1) STATE: ....................................... 134 - GEORGIA (GA)
(202) STRUCTURE NAME: .......... FORT PULASKI BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 051 - CHATHAM
(204) STRUCTURE NUMBER: ..... 5420-001P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 10 (6) FEATURES INTERSECTED:....... SOUTH CHANNEL-SAVANNA
(207) ROAD SECTION NO: .......... 001P (7) FACILITY CARRIED: .................. ENTRANCE ROAD
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5420001P0000000
(209) WITHIN NPS BNDRY?: ....... NO (9) LOCATION: ................................ 1.0 mile from Fort Pulask
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ *1------A1 (11) MILE POINT: ............................. 0.16 (KM PT 0.26)
(212) DRAWING NUMBERS: ....... 3014A (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
3 - STEEL
02 - STRINGER/MULTI-BEAM or GIRDER
40.0 FT (12.2 M)
1,283.0 FT (391.1 M)
4 - PILE BENT
4 - PILE BENT
4 - PILE BENT
4 - PILE BENT
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 7 - WOOD or TIMBER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 62
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 24.0 TONS (21.8 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 32.6 TONS (29.6 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 5/14 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. YES
(221) SPECIAL STUDY DATE: INSP. EVERY: 60 MONTHS - LAST INSP. : 5/13
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5420-001P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 32°01'15.10" (51) CURB TO CURB WIDTH: ........... 20.0 FT (6.1 M)
(17) LONGITUDE: ......................... 80°53'56.40" (52) DECK WIDTH: ............................ 24.8 FT (7.6 M)
(19) DETOUR LENGTH: ............... 99 MI (159 KM) (32) APPR. ROADWAY WIDTH: ........ 32.0 FT (9.8 M)
(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 20.0 FT (6.1 M)
(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 6.0 FT (1.8 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 6.0 FT (1.8 M)
(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 163 (34) SKEW ANGLE: ............................ 0 °
(30) YEAR OF ADT: ...................... 2014 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 180 (47) TOTAL HORIZ. CLEARANCE: .... 20.0 FT (6.1 M)
(115) YEAR OF FUTURE ADT: ..... 2034 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE
(111) ABUT. OR PIER PROT: ....... 1 - NAV PROTECTION NOT REQUIRED MATERIAL: .............................. 1 - CONCRETE
DESIGN TYPE: ........................ 3 - SIMPLE RAIL (joints at each
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.42 FT (0.74 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 0NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
T - Tidal. Low risk. Not yet evalu
1 - MAINTENANCE
B - MAJOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1984-JOINT REPAIR. 1996-PILE JACKETING, RIPRAP PLACED. 1999-JOINT REPAIR. 2008-PILE REPLACEMENT/REPAIR, PILE
JACKETING, JOINT REPAIR.
(231) ADDITIONAL CONSIDERATIONS:
BOAT OR UBIV REQUIRED FOR INSPECTION.
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5420-001P
PHOTOGRAPHS STRUCTURE NO. 5420-001P
PHOTO #1 - LOOKING SOUTH TOWARD U.S. ROUTE 80
FLOW
PHOTO #2 - EAST (DOWNSTREAM) SIDE
PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING NORTH
PHOTO #4 - GENERAL UNDERSIDE VIEW OF MAIN SPAN LOOKING
NORTH
PHOTO #5 - POSTING SIGN AT SOUTH APPROACH
PHOTO #6 - MAP CRACKING OF SOUTH APPROACH PAVEMENT; NOTE
PATCHING
PHOTO #7 - SETTLEMENT OF SOUTH
APPROACH SLAB
PHOTO #8 - TYPICAL CRACKING AND
SPALLING OF APPROACH SLABS DUE TO
SETTLEMENT, SOUTHEAST CORNER SHOWN
PHOTO #9 - GENERAL VIEW OF DECK JOINT
OVER SOUTH ABUTMENT; NOTE TRANSVERSE
CRACKING AND DETERIORATION
PHOTO #10 - DEPRESSED AREA OF DECK
JOINT OVER BENT #8 AT WEST SIDE; NOTE
LOOSE ANCHOR BOLT
PHOTO #11 - DETERIORATION OF WEST CURB
JOINT AT BENT #8
PHOTO #12 - OPEN EAST CURB JOINT AT BENT
#8; NOTE DEBRIS ACCUMULATION
PHOTO #13 - GENERAL VIEW OF DECK JOINT
OVER BENT #16; NOTE TRANSVERSE
CRACKING OF WEARING SURFACE
PHOTO #14 - PROTRUDING BOLT FROM DECK
JOINT OVER BENT #16
PHOTO #15 - TYPICAL CRACKING AND
SPALLING WITH EXPOSED REBAR ALONG
RAILS, EAST RAIL NEAR BENT #20 SHOWN
PHOTO #16 - DETERIORATION AT DECK JOINT
OVER BENT #32 ON WEST SIDE
PHOTO #17 - GENERAL VIEW OF DECK JOINT
OVER BENT #33; NOTE TRANSVERSE
CRACKING AND DETERIORATION
PHOTO #18 - TYPICAL TRANSVERSE
CRACKING OF WEARING SURFACE, SPAN #33
SHOWN
PHOTO #19 - SECTION OF EAST BRIDGE RAIL
IN SPANS #49 AND #50 HAS BEEN REPLACED
SINCE PREVIOUS INSPECTION
PHOTO #20 - LOOSE AND NOT FULLY
THREADED ANCHOR BOLT NUT ON SECOND
POST OF REPLACED SECTION
PHOTO #21 - RETAINING BOLT MISSING FROM
REPLACED SECTION OF RAIL AT SECOND
POST
PHOTO #22 - TYPICAL CRACKING AND
SPALLING WITH EXPOSED REBAR ALONG
RAILS, WEST RAIL IN SPAN #62 SHOWN
PHOTO #23 - TYPICAL VEGETATION GROWTH
ALONG CURBLINES, EAST CURBLINE IN SPAN
#63 SHOWN
PHOTO #24 - TRANSVERSE CRACKING OF
NORTH APPROACH PAVEMENT; NOTE
SETTLEMENT
PHOTO #25 - SETTLEMENT AT NORTHEAST CORNER
PHOTO #26 - POSTING SIGN AT NORTH APPROACH
PHOTO #27 - LIGHT POLE LEANING OVER
ROAD AT SOUTHWEST CORNER
PHOTO #28 - LIGHT POLE LEANING OVER
ROAD AT SOUTHWEST CORNER
PHOTO #29 - ANCHOR AT WEST END OF BENT CAP #2 FOR LIGHT POLE
AT SOUTHWEST CORNER; NOTE SPALLING OF FASCIA
PHOTO #30 - GENERAL VIEW OF SOUTH ABUTMENT
PHOTO #31 - EROSION AND UNDERMINING
ALONG WEST SIDE OF SOUTH APPROACH
AND SOUTHWEST WINGWALL
PHOTO #32 - VOID BENEATH WEST END OF
SOUTH ABUTMENT CAP
PHOTO #33 - TYPICAL COLLAR AT TOP OF REPLACED PILES, BENT #4,
PILE #1 SHOWN
PHOTO #34 - GENERAL VIEW OF BENT #6
PHOTO #35 - TYPICAL WEATHERING OF BENT CAP, EAST END OF BENT
CAP #4 SHOWN; NOTE SPALLING OF DECK FASCIA
PHOTO #36 - TYPICAL RUSTING OF DECK TIE-DOWN HARDWARE
THROUGH BENT CAPS, BENT CAP #5 SHOWN
PHOTO #37 - TYPICAL DETERIORATION OF CROSS BRACING, CROSS
BRACING "A" AT BENT #5 SHOWN
PHOTO #38 - TYPICAL DETERIORATION OF CROSS BRACING ENDS,
CROSS BRACING "B" AT BENT #6 SHOWN
PHOTO #39 - GENERAL VIEW OF BENT #8; NOTE SPALLING OF BENT
CAP
PHOTO #40 - TYPICAL DETERIORATION OF DECK TIMBERS AT
EXPANSION JOINTS, SOUTH SIDE OF BENT #8 SHOWN
PHOTO #41 - TYPICAL JACKETED PILE, BENT
#8, PILE #3 SHOWN
PHOTO #42 - WHITE MOLD AND EXTERIOR
DECAY BETWEEN PILE #4 AND BENT CAP #9
PHOTO #43 - JACKET FOR PILE #5 AT BENT #10
SOUNDS HOLLOW NEAR TOP
PHOTO #44 - SHIMS IN PLACE BETWEEN PILE
#2 AND BENT CAP #13
PHOTO #45 - GENERAL VIEW OF BENT #16; NOTE TIMBER CORBELS IN
PLACE
PHOTO #46 - TIMBER CORBELS IN PLACE AT BOTH SIDES OF BENT CAP
#16; NOTE NUTS MISSING FROM DECK TIE-DOWN BOLTS
PHOTO #47 - TYPICAL DETERIORATION OF DECK TIMBERS ADJACENT
TO CONCRETE BENT CAPS, NORTH SIDE OF BENT CAP #16 SHOWN
PHOTO #48 - SPLITTING OF CROSS BRACING "A" AT BENT #22, PILE #1
PHOTO #49 - SPALLING WITH EXPOSED REBAR ON WEST FASCIA OVER
BENT #24
PHOTO #50 - TYPICAL DETERIORATION OF DECK SCUPPERS, EAST
SIDE OF SPAN #24 SHOWN
PHOTO #51 - CHECKING AT TOP OF PILE #5 AT BENT #25; NOTE PILE
SOUNDS AT TOP
PHOTO #52 - TYPICAL PATCHING OF DECK FASCIA, EAST END OF BENT
#25 SHOWN
PHOTO #53 - AREA OF DECAY AT TOP OF PILE #5 AT BENT #26
PHOTO #54 - TYPICAL LACK OF GROUT AT TOP OF JACKET, BENT #27,
PILE #1 SHOWN
PHOTO #55 - TYPICAL SPALLING WITH EXPOSED REBAR ALONG DECK
FASCIAE, WEST FASCIA SHOWN
PHOTO #56 - GENERAL UNDERSIDE VIEW OF TIMBER SPANS, SPAN #27
PHOTO #57 - CRACKED DECK TIMBER AT MIDSPAN OF SPAN #27
PHOTO #58 - SPACER MISSING FROM CROSS BRACING "A" AT PILE #5,
BENT #30
PHOTO #59 - DECAY ADJACENT TO HOLES IN PILE #4 AT BENT #31
PHOTO #60 - TYPICAL RUSTING OF CROSS BRACING HARDWARE,
BENT #31, PILE #4 SHOWN
PHOTO #61 - GENERAL VIEW OF BENT #32, SOUTH SIDE; NOTE TOP
HORIZONTAL MEMBER HAS BEEN REPLACED SINCE PREVIOUS
INSPECTION
PHOTO #62 - SPALLING WITH EXPOSED REBAR ON SOUTH SIDE OF
DIAPHRAGM IN BAY #4 OVER BENT #32
PHOTO #63 - DECAY OF HORIZONTAL MEMBER FOR BENT #32
PHOTO #64 - DECAY AT WEST END OF BENT CAP #32 NORTH
PHOTO #65 - RUSTING OF BEARING AND BEAM #1 AT BENT #32; NOTE
SECTION LOSS FROM ANCHOR BOLTS AND SPALLING WITH EXPOSED
REBAR OF DIAPHRAGM
PHOTO #66 - RUSTING OF BEARING AND BEAM #3 WITH SECTION LOSS
AT BENT #32, EAST SIDE SHOWN; NOTE ANCHOR BOLT HAS FULL
THICKNESS SECTION LOSS
PHOTO #67 - RUSTING OF BEARING AND BEAM #3 WITH SECTION LOSS
AT BENT #32, WEST SIDE SHOWN
PHOTO #68 - SPALLING WITH EXPOSED REBAR ON DECK UNDERSIDE
IN BAY #3 OF SPAN #32
PHOTO #69 - SPALLING WITH EXPOSED REBAR ON DIAPHRAGM IN BAY
#4 AT BENT #32
PHOTO #70 - RUSTING WITH SECTION LOSS FROM BEAM #5 AT
BEARING AT BENT #32
PHOTO #71 - SPALLING WITH EXPOSED
REBAR ON EAST EXTERIOR DIAPHRAGM AT
BENT #32
PHOTO #72 - TYPICAL SPALLING WITH
EXPOSED REBAR ON MAIN SPAN DECK
OVERHANGS, WEST DECK OVERHANG
PHOTO #73 - RUSTING WITH SECTION LOSS FROM EAST SIDE OF
BEAM #5 AT MIDSPAN OF MAIN SPAN
PHOTO #74 - TYPICAL RUSTING OF MAIN SPAN BEAMS AT MIDSPAN,
BEAM #3 SHOWN
PHOTO #75 - RUSTING WITH SECTION LOSS FROM EAST SIDE OF
BEAM #2 AT MIDSPAN OF MAIN SPAN; NOTE CRACKED DIAPHRAGM
PHOTO #76 - RUSTING WITH SECTION LOSS FROM EAST SIDE OF
BEAM #2 AT MIDSPAN OF MAIN SPAN
PHOTO #77 - CRACKING OF FASCIA AND DIAPHRAGM AT WEST END OF
BENT #33
PHOTO #78 - RUSTING WITH SECTION LOSS FROM BEARING FOR
BEAM #2 AT BENT #33
PHOTO #79 - RUSTING WITH SECTION LOSS FROM BEAM #3 AT BENT
#33
PHOTO #80 - SPALLING WITH EXPOSED REBAR ON DIAPHRAGM OF
BAY #3 OVER BENT CAP #33
PHOTO #81 - SPALLING WITH EXPOSED REBAR ON DIAPHRAGM IN BAY
#4 SHOWN OVER BENT #33
PHOTO #82 - RUSTING WITH SECTION LOSS FROM BEAM #5 AT
BEARING OVER BENT #33
PHOTO #83 - GENERAL VIEW OF BENT #33, SOUTH SIDE
PHOTO #84 - DECAY OF HORIZONTAL MEMBER FOR BENT #33
PHOTO #85 - BENT #33, PILE #3; VOID IN
JACKET
PHOTO #86 - DECAY OF EAST END OF BENT
CAP #33, SOUTH
PHOTO #87 - SPALLING WITH EXPOSED REBAR ON DIAPHRAGM IN BAY
#2 OVER BENT CAP #33
PHOTO #88 - TYPICAL SPLITTING AT DECK TIMBER ENDS, SPAN #33
PHOTO #89 - CHECK ON NORTH SIDE OF PILE
#4 AT BENT #34; NOTE PILE SOUNDS HOLLOW
IN VICINITY OF CHECK
PHOTO #90 - ADVANCED INTERNAL DECAY OF
PILE #4, BENT #35
PHOTO #91 - ADVANCED INTERNAL DECAY OF PILE #4, BENT #35
PHOTO #92 - LACK OF BEARING AT BENT #41, PILE #4; NOTE TYPICAL
RUSTING OF METAL FLASHING
PHOTO #93 - LACK OF BEARING AT BENT #41, PILE #5; NOTE TYPICAL
RUSTING OF METAL FLASHING
PHOTO #94 - LOOSE SHIMS AT SOUTH SIDE OF BENT CAP #41
PHOTO #95 - SPALL WITH EXPOSED REBAR ON EAST END OF BENT
CAP #41
PHOTO #96 - SPLIT DECK TIMBER IN SPAN #45
PHOTO #97 - DETERIORATION OF DECK TIMBERS AT SOUTH SIDE OF
BENT CAP #49; NOTE LOOSE SHIMS
PHOTO #98 - CRACKED DECK TIMBER IN SPAN #51
PHOTO #99 - DEEP CHECK ON SOUTH SIDE OF
PILE #1, BENT #52
PHOTO #100 - TYPICAL RUSTING OF CROSS
BRACING HARDWARE, BENT #52, PILE #3
PHOTO #101 - ADVANCED INTERNAL DECAY OF
PILE #3, BENT #52
PHOTO #102 - BENT #53 TILTING NORTH
PHOTO #103 - BENT #53 TILTING NORTH
PHOTO #104 - SPALLING WITH EXPOSED
REBAR ON WEST DECK FASCIA UNDERSIDE IN
SPAN #53
PHOTO #105 - SPALLING WITH EXPOSED
REBAR ON EAST DECK FASCIA UNDERSIDE IN
SPAN #53
PHOTO #106 - WATER COLLECTING IN TOP OF
JACKET FOR PILE #3, BENT #54
PHOTO #107 - SPALLING WITH EXPOSED REBAR ON EAST FASCIA AT
BENT #54
PHOTO #108 - ADVANCED INTERNAL DECAY OF PILE #5, BENT #58
PHOTO #109 - CHECKING OF PILE #1, BENT #61
PHOTO #110 - EXTERIOR DECAY ON SOUTH
SIDE OF PILE #1, BENT #61
PHOTO #111 - ADVANCED INTERNAL DECAY OF PILE #4, BENT #61
PHOTO #112 - GENERAL VIEW OF NORTH ABUTMENT
PHOTO #113 - VOID BENEATH NORTH ABUTMENT CAP; NOTE EXPOSED
PILE
PHOTO #114 - LACK OF BEARING OF PILE #5, BENT #65
PHOTO #115 - GENERAL VIEW OF NORTHEAST EMBANKMENT; NOTE
UNDERMINING OF CONCRETE BANK PROTECTION
PHOTO #116 - GENERAL VIEW OF SOUTHWEST EMBANKMENT; NOTE
UNDERMINING OF CONCRETE BANK PROTECTION
PHOTO #117 - GENERAL VIEW OF NORTHWEST EMBANKMENT
PHOTO #118 - GENERAL VIEW OF SOUTHEAST EMBANKMENT
PHOTO #119 - UPSTREAM CHANNEL
PHOTO #120 - DOWNSTREAM CHANNEL
File details come from the government source that posted it. Updated .