BRIDGE INSPECTION REPORT

FORT PULASKI BRIDGE

ENTRANCE ROAD OVER SOUTH CHANNEL-SAVANNAH RIVER

FORT PULASKI NATIONAL MONUMENT

LN

STRUCTURE NO. 5420-001P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 5/20/14

Report prepared by: WU

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP http://www.efl.fhwa.dot.gov/FLHBO/BIP

STRUCTURE SUMMARY STRUCTURE NO. 5420-001P

FORT PULASKI BRIDGE INSPECTION DATE: 5/20/14

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... STEEL NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... NO. OF APPR. SPANS: ........ STRINGER/MULTI-BEAM or GIRDER 62

# OF BEAMS, MAIN SPAN: .. 5 STRUCT. TOTAL LENGTH: .. 1,283.0 FT (391.1 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 40.0 FT (12.2 M)

WEARING SURFACE: .......... BITUMINOUS DECK W IDTH: ...................... 24.8 FT (7.6 M)

ABUT. FOUNDATIONS: ........ PILE BENT CURB TO CURB W IDTH: ..... 20.0 FT (6.1 M)

PIER FOUNDATION(S): ........ PILE BENT YEAR BUILT:

ABUTMENT / PIER MAT'L: ... WOOD OR TIMBER YEAR RECONSTRUCTED: .. 1965

PROJ./PLAN REF. NO: ......... *1------A1 / 3014A SKEW ANGLE: ..................... 0 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1984-JOINT REPAIR. 1996-PILE JACKETING, RIPRAP PLACED. 1999-JOINT REPAIR.

2008-PILE REPLACEMENT/REPAIR, PILE JACKETING, JOINT REPAIR.

LOCATION

FORT PULASKI NATIONAL MONUMENT MILE POINT: ..................... 0.16 (KM PT 0.26)

STATE: ................................. GEORGIA LOCATION: 1.0 mile from Fort Pulaski.

FACILITY CARRIED: ............ ENTRANCE ROAD

FEATURE INTERSECTED: .. SOUTH CHANNEL-SAVANNAH RIVER

STRUCTURE EVALUATION SUMMARY

See next page for Structure Evaluation Summary.

INSPECTION TEAM: J. THOMAS, T. POW ELL, M. HAND (VOLKERT, INC.)

CONDITION ASSESSMENT:

JOE THOMAS, P.E., FIELD TEAM LEADER

REPORT REVIEW :

MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 9/24/14

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

STRUCTURE SUMMARY STRUCTURE NO. 5420-001P

STRUCTURE EVALUATION SUMMARY CONTINUED

This bridge provides access to Fort Pulaski from U.S. Route 80. The bridge was constructed in 1938 and underwent rehabilitation projects in 1965, 1996, and 2008. The superstructure is comprised of 62 composite timber/concrete "corduroy" spans, and one steel beam span over the main channel. The substructure units (pile bents) are each comprised of 5 timber piles with a timber or concrete beam cap. The existing concrete/timber composite deck is part of the original 1938 construction. The bridge is currently posted for weight restrictions.

Several measures have recently been taken to keep the bridge operating in a satisfactory manner. Extensive structural repairs were made to the substructure in 2008 under Project PRA-FOPU 10(2). The scope of work for the repair project included replacement, splicing, and/or jacketing of a number of timber piles that had exhibited significant deterioration, and replacement of deteriorated cross-bracing members. Since the previous inspection, a new horizontal timber brace has been installed on the south face of Bent #32. In addition, the rails and curbs have been painted.

However, serious problems with the bridge persist, including extensive decay of the timber decking adjacent to the concrete bent caps, where many of the deck timbers and timber shims have lost bearing. In addition, the steel beams and bearings in the main span are exhibiting widespread rusting with substantial section loss in some key locations, and deterioration of the remaining unjacketed pile timber is rapidly progressing. It should also be noted that the existing riprap on the embankment slopes is undersized and gradually washing away, and the concrete bank protection is partially undermined. Due to the age of the structure, the widespread deterioration, and high cost of continued repairs, the bridge has been scheduled for replacement in FY 16 under Project PRA-FOPU 10(3).

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5420-001P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

B226 PRIORITY OF IMPROVEMENT

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

58.8 REALIGN LEANING UTILITY POLE AT SOUTHWEST APPROACH. 1 EA

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL:

PRELIM. REHABILITATION TOTAL:

PRELIM. RECONSTRUCTION TOTAL: ...

TOTAL ITEMIZED COSTS:

$0

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Bridge is scheduled for replacement in FY 16 under Project PRA-FOPU 10(3).

Bridge was repaired in 2008 under Project PRA-FOPU 10(2). South approach has been reposted for the original 18T-22T-34T load limit, reflecting the current Inventory Ratings for the H, Type 3, and Type 3S2 trucks respectively.

North approach remains posted for 18 tons.

Maintenance cost estimate is based on historical data, including costs for similar projects when available.

FIELD INSPECTION REPORT STRUCTURE NO. 5420-001P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

OTHER

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

FOUNDATIONS

CAPS AND/OR BEARING SEATS

PILE BENTS

WALLS AND/OR COLUMNS

PIER(S)

OTHER

SLOPE PROTECTION

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

EXPANSION JOINTS

WEEP HOLES

WINGWALLS

FOUNDATIONS

BACKWALLS AND/OR BULKHEADS

CAPS AND/OR BEARING SEATS

PILE BENTS

BREASTWALLS OR COLUMNS

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

P F G N N F P F G

N G

N G G N N N N N G G N N

N P F N G G N

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

12.

13.

14.

15.

16.

17.

18.

19.

58.1, 59.3 MODERATE TO SEVERE DETERIORATION OF TIMBER DECKING AND

2"X2" SHIMS ADJACENT TO CONCRETE BENT CAPS UNDER DECK

JOINTS; SEVERAL TIMBER SHIMS FALLING OUT OR MISSING. NO

BEARING REMAINS AT BENTS #8 AND #24 FOR MANY DECK TIMBERS

DUE TO DECAY. MODERATE WHITE MOLD ON TIMBERS ALONG

BENT #41 CAP. MINOR DETERIORATION OF TIMBERS ALONG EDGES

OF NEW CORBELS AT BENT #16 (SEE 60.15); SEVERAL ARE SOFT.

WIDESPREAD WHITE MOLD THROUGHOUT TIMBER DECKING

UNDERSIDE; MAINLY IN SPANS AROUND DECK JOINTS. NUMEROUS

DECK TIMBERS ARE SPLIT AT ENDS WHERE CROSS NAILED.

SEVERAL CRACKED DECK TIMBERS. SEVERAL SPLIT DECK

TIMBERS IN SPANS #33, #37, #45, AND #46; ONE IS LOOSE.

DETERIORATED DECK TIMBERS IN VICINITY OF NORTHWEST

SCUPPER, SPAN #29 AND AT ENDS OF SPAN #24.

CONCRETE DECK IN MAIN SPAN. MINOR TO MODERATE SPALLING

WITH EXPOSED REBAR ON DECK UNDERSIDE; MINOR

DELAMINATION AND POPOUTS THROUGHOUT. MODERATE

CRACKING AT NORTHWEST CORNER. NUMEROUS SPALLS WITH

EXPOSED REBAR ON EAST OVERHANG UNDERSIDE.

58.2,3 JOINT OVER BENT #8 PREVIOUSLY NOTED TO BE SUPPLYING MOST

OF EXPANSION ROOM FOR STRUCTURE. COMPOSITE JOINTS AT

BENTS #8 AND #16; SEVERAL BOLTS PROTRUDE FROM JOINTS

CAUSING TIRE HAZARD. WEST SIDE OF JOINT OVER BENT #8 HAS 2'

LONG SECTION WHICH HAS SETTLED, RESULTING FROM

DETERIORATION OF DECK TIMBERS; ANCHOR BOLTS ARE LOOSE.

CURB JOINTS AT BENT #8 ARE OPEN; CURB JOINT SEALED AT BENT

#16. GRAVEL AND DEBRIS ACCUMULATION AT ENDS OF JOINTS AT

BENTS #8 AND #16.

AGGREGATE BINDER MATRIX AT REMAINING DECK EXPANSION

JOINTS; CRACKING, UP TO 1/2" WIDE, IN JOINT MATRIX AT BENT #33;

HOLE IN WEST SIDE UP TO 2" DEEP. SEVERAL SMALLER CRACKS IN

JOINT MATRIX AT BENT #32. MINOR CRACKING OF JOINT MATRIX IN

REMAINING DECK EXPANSION JOINTS AND ADJACENT AREAS OF

WEARING SURFACE. MINOR TRANSVERSE CRACKING OF WEARING

SURFACE IN SEVERAL OTHER LOCATIONS, MAINLY AT CENTER OF

SPANS.

G G G F G F

N

F

G

F

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

ALIGNMENT 1.

61. CHANNEL 7

G G F G N

MED

SUFF

12 FT.

SAND, SILT

222. APPROACHES 6

OTHER 9.

ALIGNMENT 8.

SIGNS 7.

SETTLEMENT 6.

EROSION 5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS 2.

1. APPROACH SLABS

(GATE)

G N G F F F G G G

223. RETAINING WALL N

OTHER 6.

SETTLEMENT OR DEFLECTION 5.

EROSION AND/OR SCOUR 4.

FOUNDATION 3.

WEEP HOLES 2.

1. WALL

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDS D.

APPROACH GUARDRAILS C.

TRANSITIONS B.

BRIDGE RAILINGSA. 0

N N N

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

58.5 MINOR CRACKING THROUGHOUT CURBS. PATCHED AREA OF EAST

CURB AT NORTH ABUTMENT JOINT IN GOOD CONDITION. CURBS

HAVE BEEN REPAINTED SINCE PREVIOUS INSPECTION. SURVEY

MARKER IN NORTHEAST APPROACH CURB. MINOR VEGETATION

GROWTH ALONG CURBLINES. SEVERAL VEHICLE SCRAPES ALONG

CURBS.

58.6 NUMEROUS AREAS OF MINOR CRACKING WITH DELAMINATION AND

SPALLING WITH EXPOSED REBAR ON CONCRETE RAILS.

MODERATE DELAMINATION AND SPALLING WITH EXPOSED REBAR

ON SEVERAL RAILINGS. RAILINGS HAVE BEEN PAINTED SINCE

PREVIOUS INSPECTION; MINOR RUST SHOWING THROUGH PAINT IN

SPALLED AREAS. MINOR CRACKING AT TOPS OF MOST RAIL POSTS.

THREE DAMAGED SECTIONS OF RIGHT RAIL IN SPANS #49 TO #50

HAVE BEEN REPLACED BY W-BEAM AND WEATHERING STEEL

POSTS SINCE PREVIOUS INSPECTION. EAST BASE PLATE NUTS

2ND POST ARE NOT FULLY THREADED OR ARE LOOSE. MISSING

RAIL TO RAIL CONNECTION BOLT FROM THIS LOCATION.

58.7 MODERATE RUSTING OF DECK SCUPPERS; ASPHALT PRESENT IN

SEVERAL SCUPPERS.

58.8 LIGHT POLE AT WEST SIDE OF SOUTH APPROACH LEANING

TOWARD ROADWAY 8 DEGREES. POLE IS TETHERED TO WEST END

OF BENT CAP #2.

59.1 NEARLY 100% SECTION LOSS FROM WEST ANCHOR BOLT FOR

BEAM #3 BEARING AT BENT #32. MODERATE TO SEVERE RUSTING

WITH MINOR SECTION LOSS FROM REMAINING BOLTS AND

BEARINGS; PACK RUST IN SEVERAL LOCATIONS.

59.2,7 MODERATE SPOT RUSTING OF STEEL BEAMS IN MAIN SPAN,

ESPECIALLY ON FLANGES. SECTION LOSS ON BEAM #5 BOTTOM

FLANGE AT MIDSPAN DIAPHRAGM; ORIGINAL THICKNESS 7/8"; 5/8"

THICK SECTION REMAINING.

SEVERE RUSTING AND SECTION LOSS FROM NORTH END OF BEAM

#1 AND #5, AND SOUTH END OF BEAMS #4 AND #5 BOTTOM

FLANGES AT BEARING INTERFACE; AS LITTLE AS 1/4" THICKNESS

REMAINING. MODERATE SECTION LOSS AT REMAINING BEAM

ENDS. SEVERE RUSTING AND SECTION LOSS FROM NORTH END

WEB OF BEAM #1; AS LITTLE AS 3/8" REMAINING.

WIDESPREAD PAINT FAILURE AND RUSTING THROUGHOUT MAIN

SPAN BEAMS AND BEARINGS.

59.6 WIDESPREAD MODERATE SPALLING AND CRACKING OF CONCRETE

DIAPHRAGMS AT BENTS #32 AND #33; REBAR EXPOSED AND

RUSTED IN SOME LOCATIONS.

ADDITIONAL ITEM REFERENCE AND REMARKS

59.8 MINOR TO MODERATE DELAMINATION AND SPALLING THROUGHOUT CONCRETE DECK FASCIAE; SHALLOW SPALLS WITH REBAR EXPOSED IN NUMEROUS LOCATIONS. SEVERE SPALLING WITH EXPOSED REBAR ON WEST DECK FASCIA OVER BENT #24. PATCHES PRESENT IN SEVERAL AREAS. FASCIA FORM LEFT IN PLACE IN SPANS

#3 AND #4, WEST SIDE.

60.2,3 BENT #64, PILE #5 DOES NOT PROVIDE PILE TO CAP BEARING (UP TO 1.5" GAP).

60.14 12 PILES WERE FITTED WITH FIBERGLASS JACKETS IN 1996 (SEE APPENDIX); HOWEVER, SOME JACKETS DID NOT EXTEND DOWN BELOW LOW WATER MARK. JACKET EXTENSIONS AND JACKETING OF ADDITIONAL DETERIORATED PILES COMPLETED IN 2008 (55 PILES TOTAL AS NOTED IN AS-BUILT PLANS); SPLICE REPAIRS COMPLETED AT 12 PILES. EXTERIOR PILES REPLACED IN 6 LOCATIONS. (SEE APPENDIX FOR DETAILS.)

POCKETS OF GROUT MISSING IN SEVERAL JACKETS; TRAPPED WATER IN SEVERAL LOCATIONS (SEE APPENDIX).

NUMEROUS JACKETS ARE NOT FILLED TO TOP WITH GROUT; WATER PONDS IN TOP PORTION. STRAP PLACED

AROUND JACKET AT BENT #27, PILE #1 SINCE PREVIOUS INSPECTION.

SEVERE DETERIORATION OF BENT #35, PILE #4, APPROXIMATELY 10' BELOW CAP; BENT #52, PILE #3, APPROXIMATELY 6' BELOW CAP; AND BENT #58, PILE #5, APPROXIMATELY 5' BELOW CAP. DEEP CHECKS IN SEVERAL PILES UP TO 5" DEEP; MOST ARE SLIGHTLY SOFT ON OUTER LAYERS. SEVERAL OLD BOLT HOLES THROUGH PILES REMAIN OPEN. SEVERAL PILES SOUND HOLLOW IN LOCAL AREAS; SMALL AREAS OF DECAY IN

PILES AT BENTS #31, #35, #56, #61, AND #62. (SEE APPENDIX FOR DETAILS.)

SEVERE RUSTING OF METAL FLASHING BETWEEN TIMBER PILES AND CAPS WITH EXTENSIVE SECTION LOSS.

MODERATE TO SEVERE RUSTING OF CROSS BRACING HARDWARE. SEVERE RUSTING OF NUMEROUS BOLTS;

SEVERAL ARE LOOSE. BOLT NOT FULLY THREADED FOR BRACING "A" AT BENT #21 CAP.

SEVERE DETERIORATION OF CROSS BRACING "A" AND "B" FOR BENT #5, CROSS BRACING "B" FOR BENTS #6, #13, #17, #32, #33, #46, #48 AND #59; MINOR TO MODERATE DETERIORATION OF REMAINING CROSS BRACING MEMBERS. SPLIT IN TOP OF CROSS BRACING AT BENT #22. BOTTOM SPACER FOR BRACING "A" AT PILE #5, BENT #30, IS MISSING. MODERATE SPLITS IN CROSS BRACING AT BENTS #47 AND #49. 2" GAP BETWEEN CROSS BRACING AND PILE #4 AT BENT #54. SEVERE DECAY OF HORIZONTAL BRACING MEMBERS AT BOTH MAIN SPAN

(SPAN #32) BENTS.

60.14,15 SEVERAL PILES PROVIDE POINT BEARING ONLY; MAINLY AT CONCRETE CAPS. BENT #41, PILE #4 DOES NOT

PROVIDE PILE TO CAP BEARING (3/8" GAP).

ADDITIONAL ITEM REFERENCE AND REMARKS

60.15 CONCRETE CAPS AT BENTS #8, #16, #24, #41, #49, AND #57, BELOW DECK JOINTS; MINOR TO MODERATE SPALLING AT SEVERAL CONCRETE CAP ENDS. 12"HX8"W TIMBER CORBELS ADDED AT EITHER SIDE OF BENT CAP #16 TO SUPPORT DECK IN AREAS OF DETERIORATION; NUTS AND WASHERS MISSING FOR VERTICAL BOLTS

AT ENDS OF CORBELS.

TIMBER CAPS AT REMAINING BENTS: SEVERE FULL LENGTH SPLIT IN BOTTOM FACE OF BENT CAP #13. SEVERE DECAY AT BOTH ENDS OF BENT CAP #32 (NORTH) AND EAST END OF BENT CAP #33 (SOUTH). BENT CAP #33

(NORTH) SOUNDS HOLLOW OVER PILE #2; HOWEVER, NO DECAY WAS FOUND.

MINOR TO MODERATE WEATHERING AT TIMBER BENT CAP ENDS. MINOR SPLITTING IN EAST END OF BENT CAP #34 AND BENT CAP #51. CHECK ALONG BENT CAP #56, SOUTH SIDE NEAR PILE #4; CAP SOUNDS HOLLOW IN VICINITY AND AT EAST END. EAST END OF BENT #60 CAP SOUNDS SLIGHTLY HOLLOW. NORTH SIDE OF BENT #61

CAP SOUNDS HOLLOW ALONG CHECK BETWEEN PILES #2 AND #3.

MODERATE TO SEVERE RUSTING OF HOLD-DOWN BOLTS THROUGH BENT CAPS WITH SEVERE SECTION LOSS;

NUMEROUS BOLTS HAVE LARGE GAP BETWEEN WASHER AND CAP.

60.18 NUMEROUS BENTS, ESPECIALLY AT NORTH END OF BRIDGE, ARE LEANING TOWARD NORTH. PILES WERE APPARENTLY ORIGINALLY DRIVEN OUT-OF-PLUMB. CONDITION WILL CONTINUE TO BE MEASURED AND MONITORED FOR MOVEMENT DURING FUTURE INSPECTIONS. PILES AT BENT #53 ARE 7 DEGREES

OUT-OF-PLUMB.

61.3 RIPRAP ON EMBANKMENT SLOPES IS UNDERSIZED AND GRADUALLY WASHING AWAY. MINOR UNDERMINING OF

CONCRETE BANK PROTECTION AT SOUTHWEST AND NORTHEAST EMBANKMENTS.

222.1,6 MODERATE SPALLING AT NORTHEAST CORNER OF NORTH APPROACH SLAB AND SOUTHEAST CORNER OF SOUTH APPROACH SLAB DUE TO MINOR SETTLEMENT OF APPROACH IN VICINITY. UP TO 1" SETTLEMENT OF

SOUTH APPROACH.

222.4 WIDESPREAD MODERATE MAP CRACKING OF SOUTH APPROACH PAVEMENT. SEVERAL AREAS OF PATCHING AT

SOUTH APPROACH. MINOR TRANSVERSE CRACKING OF NORTH APPROACH PAVEMENT.

222.5 MINOR EROSION (1.7'L X 0.3' DEEP) ALONG WEST SIDE OF SOUTH APPROACH SLAB WITH UP TO 2.0' OF

UNDERMINING.

222.7 "WEIGHT LIMIT 18 TONS" IN PLACE AT RIGHT SHOULDER OF NORTH APPROACH; SOUTH APPROACH POSTED FOR 18T-22T-34T.

222.9 GATE AT SOUTH APPROACH.

36.A BRIDGE RAILINGS DO NOT APPEAR TO HAVE SUFFICIENT STRENGTH TO REDIRECT ERRANT VEHICLES.

STRUCTURE LOAD RATING STRUCTURE NO. 5420-001P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 18 16 24 22

HS 24 22 33 30

TYPE 3 22 20 30 27

TYPE 3S2 34 31 46 42

TYPE 3-3 43 39 58 53

DESIGN LOADING: H15 (M13.5)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

X ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 1/81

LOAD RATING CONTROLLED BY: MOMENT CAPACITY OF STEEL BEAMS

REMARKS: ORIGINAL LOAD RATING IS AGAIN VALID FOLLOWING REPAIRS TO STRUCTURE MADE UNDER PROJECT

PRA-FOPU 10(2).

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5420-001P

STRUCTURE IDENTIFICATION

(201) PARK: FORT PULASKI NATIONAL MONUMENT (1) STATE: ....................................... 134 - GEORGIA (GA)

(202) STRUCTURE NAME: .......... FORT PULASKI BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 051 - CHATHAM

(204) STRUCTURE NUMBER: ..... 5420-001P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 10 (6) FEATURES INTERSECTED:....... SOUTH CHANNEL-SAVANNA

(207) ROAD SECTION NO: .......... 001P (7) FACILITY CARRIED: .................. ENTRANCE ROAD

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5420001P0000000

(209) WITHIN NPS BNDRY?: ....... NO (9) LOCATION: ................................ 1.0 mile from Fort Pulask

(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................ *1------A1 (11) MILE POINT: ............................. 0.16 (KM PT 0.26)

(212) DRAWING NUMBERS: ....... 3014A (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

3 - STEEL

02 - STRINGER/MULTI-BEAM or GIRDER

40.0 FT (12.2 M)

1,283.0 FT (391.1 M)

4 - PILE BENT

4 - PILE BENT

4 - PILE BENT

4 - PILE BENT

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 7 - WOOD or TIMBER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 62

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 24.0 TONS (21.8 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 32.6 TONS (29.6 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 5/14 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. YES

(221) SPECIAL STUDY DATE: INSP. EVERY: 60 MONTHS - LAST INSP. : 5/13

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5420-001P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 32°01'15.10" (51) CURB TO CURB WIDTH: ........... 20.0 FT (6.1 M)

(17) LONGITUDE: ......................... 80°53'56.40" (52) DECK WIDTH: ............................ 24.8 FT (7.6 M)

(19) DETOUR LENGTH: ............... 99 MI (159 KM) (32) APPR. ROADWAY WIDTH: ........ 32.0 FT (9.8 M)

(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 20.0 FT (6.1 M)

(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 6.0 FT (1.8 M)

(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 6.0 FT (1.8 M)

(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN

(29) AVG. DAILY TRAFFIC: .......... 163 (34) SKEW ANGLE: ............................ 0 °

(30) YEAR OF ADT: ...................... 2014 (35) DECK FLARE?: ........................... NO

(114) FUTURE ADT: ..................... 180 (47) TOTAL HORIZ. CLEARANCE: .... 20.0 FT (6.1 M)

(115) YEAR OF FUTURE ADT: ..... 2034 (50) SIDEWALKS:

(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)

(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE

(111) ABUT. OR PIER PROT: ....... 1 - NAV PROTECTION NOT REQUIRED MATERIAL: .............................. 1 - CONCRETE

DESIGN TYPE: ........................ 3 - SIMPLE RAIL (joints at each

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.42 FT (0.74 M)

(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 0NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

T - Tidal. Low risk. Not yet evalu

1 - MAINTENANCE

B - MAJOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1984-JOINT REPAIR. 1996-PILE JACKETING, RIPRAP PLACED. 1999-JOINT REPAIR. 2008-PILE REPLACEMENT/REPAIR, PILE

JACKETING, JOINT REPAIR.

(231) ADDITIONAL CONSIDERATIONS:

BOAT OR UBIV REQUIRED FOR INSPECTION.

(330) ADDITIONAL CONFIG. INFO.:

APPENDIX STRUCTURE NO. 5420-001P

PHOTOGRAPHS STRUCTURE NO. 5420-001P

PHOTO #1 - LOOKING SOUTH TOWARD U.S. ROUTE 80

FLOW

PHOTO #2 - EAST (DOWNSTREAM) SIDE

PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING NORTH

PHOTO #4 - GENERAL UNDERSIDE VIEW OF MAIN SPAN LOOKING

NORTH

PHOTO #5 - POSTING SIGN AT SOUTH APPROACH

PHOTO #6 - MAP CRACKING OF SOUTH APPROACH PAVEMENT; NOTE

PATCHING

PHOTO #7 - SETTLEMENT OF SOUTH

APPROACH SLAB

PHOTO #8 - TYPICAL CRACKING AND

SPALLING OF APPROACH SLABS DUE TO

SETTLEMENT, SOUTHEAST CORNER SHOWN

PHOTO #9 - GENERAL VIEW OF DECK JOINT

OVER SOUTH ABUTMENT; NOTE TRANSVERSE

CRACKING AND DETERIORATION

PHOTO #10 - DEPRESSED AREA OF DECK

JOINT OVER BENT #8 AT WEST SIDE; NOTE

LOOSE ANCHOR BOLT

PHOTO #11 - DETERIORATION OF WEST CURB

JOINT AT BENT #8

PHOTO #12 - OPEN EAST CURB JOINT AT BENT

#8; NOTE DEBRIS ACCUMULATION

PHOTO #13 - GENERAL VIEW OF DECK JOINT

OVER BENT #16; NOTE TRANSVERSE

CRACKING OF WEARING SURFACE

PHOTO #14 - PROTRUDING BOLT FROM DECK

JOINT OVER BENT #16

PHOTO #15 - TYPICAL CRACKING AND

SPALLING WITH EXPOSED REBAR ALONG

RAILS, EAST RAIL NEAR BENT #20 SHOWN

PHOTO #16 - DETERIORATION AT DECK JOINT

OVER BENT #32 ON WEST SIDE

PHOTO #17 - GENERAL VIEW OF DECK JOINT

OVER BENT #33; NOTE TRANSVERSE

CRACKING AND DETERIORATION

PHOTO #18 - TYPICAL TRANSVERSE

CRACKING OF WEARING SURFACE, SPAN #33

SHOWN

PHOTO #19 - SECTION OF EAST BRIDGE RAIL

IN SPANS #49 AND #50 HAS BEEN REPLACED

SINCE PREVIOUS INSPECTION

PHOTO #20 - LOOSE AND NOT FULLY

THREADED ANCHOR BOLT NUT ON SECOND

POST OF REPLACED SECTION

PHOTO #21 - RETAINING BOLT MISSING FROM

REPLACED SECTION OF RAIL AT SECOND

POST

PHOTO #22 - TYPICAL CRACKING AND

SPALLING WITH EXPOSED REBAR ALONG

RAILS, WEST RAIL IN SPAN #62 SHOWN

PHOTO #23 - TYPICAL VEGETATION GROWTH

ALONG CURBLINES, EAST CURBLINE IN SPAN

#63 SHOWN

PHOTO #24 - TRANSVERSE CRACKING OF

NORTH APPROACH PAVEMENT; NOTE

SETTLEMENT

PHOTO #25 - SETTLEMENT AT NORTHEAST CORNER

PHOTO #26 - POSTING SIGN AT NORTH APPROACH

PHOTO #27 - LIGHT POLE LEANING OVER

ROAD AT SOUTHWEST CORNER

PHOTO #28 - LIGHT POLE LEANING OVER

ROAD AT SOUTHWEST CORNER

PHOTO #29 - ANCHOR AT WEST END OF BENT CAP #2 FOR LIGHT POLE

AT SOUTHWEST CORNER; NOTE SPALLING OF FASCIA

PHOTO #30 - GENERAL VIEW OF SOUTH ABUTMENT

PHOTO #31 - EROSION AND UNDERMINING

ALONG WEST SIDE OF SOUTH APPROACH

AND SOUTHWEST WINGWALL

PHOTO #32 - VOID BENEATH WEST END OF

SOUTH ABUTMENT CAP

PHOTO #33 - TYPICAL COLLAR AT TOP OF REPLACED PILES, BENT #4,

PILE #1 SHOWN

PHOTO #34 - GENERAL VIEW OF BENT #6

PHOTO #35 - TYPICAL WEATHERING OF BENT CAP, EAST END OF BENT

CAP #4 SHOWN; NOTE SPALLING OF DECK FASCIA

PHOTO #36 - TYPICAL RUSTING OF DECK TIE-DOWN HARDWARE

THROUGH BENT CAPS, BENT CAP #5 SHOWN

PHOTO #37 - TYPICAL DETERIORATION OF CROSS BRACING, CROSS

BRACING "A" AT BENT #5 SHOWN

PHOTO #38 - TYPICAL DETERIORATION OF CROSS BRACING ENDS,

CROSS BRACING "B" AT BENT #6 SHOWN

PHOTO #39 - GENERAL VIEW OF BENT #8; NOTE SPALLING OF BENT

CAP

PHOTO #40 - TYPICAL DETERIORATION OF DECK TIMBERS AT

EXPANSION JOINTS, SOUTH SIDE OF BENT #8 SHOWN

PHOTO #41 - TYPICAL JACKETED PILE, BENT

#8, PILE #3 SHOWN

PHOTO #42 - WHITE MOLD AND EXTERIOR

DECAY BETWEEN PILE #4 AND BENT CAP #9

PHOTO #43 - JACKET FOR PILE #5 AT BENT #10

SOUNDS HOLLOW NEAR TOP

PHOTO #44 - SHIMS IN PLACE BETWEEN PILE

#2 AND BENT CAP #13

PHOTO #45 - GENERAL VIEW OF BENT #16; NOTE TIMBER CORBELS IN

PLACE

PHOTO #46 - TIMBER CORBELS IN PLACE AT BOTH SIDES OF BENT CAP

#16; NOTE NUTS MISSING FROM DECK TIE-DOWN BOLTS

PHOTO #47 - TYPICAL DETERIORATION OF DECK TIMBERS ADJACENT

TO CONCRETE BENT CAPS, NORTH SIDE OF BENT CAP #16 SHOWN

PHOTO #48 - SPLITTING OF CROSS BRACING "A" AT BENT #22, PILE #1

PHOTO #49 - SPALLING WITH EXPOSED REBAR ON WEST FASCIA OVER

BENT #24

PHOTO #50 - TYPICAL DETERIORATION OF DECK SCUPPERS, EAST

SIDE OF SPAN #24 SHOWN

PHOTO #51 - CHECKING AT TOP OF PILE #5 AT BENT #25; NOTE PILE

SOUNDS AT TOP

PHOTO #52 - TYPICAL PATCHING OF DECK FASCIA, EAST END OF BENT

#25 SHOWN

PHOTO #53 - AREA OF DECAY AT TOP OF PILE #5 AT BENT #26

PHOTO #54 - TYPICAL LACK OF GROUT AT TOP OF JACKET, BENT #27,

PILE #1 SHOWN

PHOTO #55 - TYPICAL SPALLING WITH EXPOSED REBAR ALONG DECK

FASCIAE, WEST FASCIA SHOWN

PHOTO #56 - GENERAL UNDERSIDE VIEW OF TIMBER SPANS, SPAN #27

PHOTO #57 - CRACKED DECK TIMBER AT MIDSPAN OF SPAN #27

PHOTO #58 - SPACER MISSING FROM CROSS BRACING "A" AT PILE #5,

BENT #30

PHOTO #59 - DECAY ADJACENT TO HOLES IN PILE #4 AT BENT #31

PHOTO #60 - TYPICAL RUSTING OF CROSS BRACING HARDWARE,

BENT #31, PILE #4 SHOWN

PHOTO #61 - GENERAL VIEW OF BENT #32, SOUTH SIDE; NOTE TOP

HORIZONTAL MEMBER HAS BEEN REPLACED SINCE PREVIOUS

INSPECTION

PHOTO #62 - SPALLING WITH EXPOSED REBAR ON SOUTH SIDE OF

DIAPHRAGM IN BAY #4 OVER BENT #32

PHOTO #63 - DECAY OF HORIZONTAL MEMBER FOR BENT #32

PHOTO #64 - DECAY AT WEST END OF BENT CAP #32 NORTH

PHOTO #65 - RUSTING OF BEARING AND BEAM #1 AT BENT #32; NOTE

SECTION LOSS FROM ANCHOR BOLTS AND SPALLING WITH EXPOSED

REBAR OF DIAPHRAGM

PHOTO #66 - RUSTING OF BEARING AND BEAM #3 WITH SECTION LOSS

AT BENT #32, EAST SIDE SHOWN; NOTE ANCHOR BOLT HAS FULL

THICKNESS SECTION LOSS

PHOTO #67 - RUSTING OF BEARING AND BEAM #3 WITH SECTION LOSS

AT BENT #32, WEST SIDE SHOWN

PHOTO #68 - SPALLING WITH EXPOSED REBAR ON DECK UNDERSIDE

IN BAY #3 OF SPAN #32

PHOTO #69 - SPALLING WITH EXPOSED REBAR ON DIAPHRAGM IN BAY

#4 AT BENT #32

PHOTO #70 - RUSTING WITH SECTION LOSS FROM BEAM #5 AT

BEARING AT BENT #32

PHOTO #71 - SPALLING WITH EXPOSED

REBAR ON EAST EXTERIOR DIAPHRAGM AT

BENT #32

PHOTO #72 - TYPICAL SPALLING WITH

EXPOSED REBAR ON MAIN SPAN DECK

OVERHANGS, WEST DECK OVERHANG

PHOTO #73 - RUSTING WITH SECTION LOSS FROM EAST SIDE OF

BEAM #5 AT MIDSPAN OF MAIN SPAN

PHOTO #74 - TYPICAL RUSTING OF MAIN SPAN BEAMS AT MIDSPAN,

BEAM #3 SHOWN

PHOTO #75 - RUSTING WITH SECTION LOSS FROM EAST SIDE OF

BEAM #2 AT MIDSPAN OF MAIN SPAN; NOTE CRACKED DIAPHRAGM

PHOTO #76 - RUSTING WITH SECTION LOSS FROM EAST SIDE OF

BEAM #2 AT MIDSPAN OF MAIN SPAN

PHOTO #77 - CRACKING OF FASCIA AND DIAPHRAGM AT WEST END OF

BENT #33

PHOTO #78 - RUSTING WITH SECTION LOSS FROM BEARING FOR

BEAM #2 AT BENT #33

PHOTO #79 - RUSTING WITH SECTION LOSS FROM BEAM #3 AT BENT

#33

PHOTO #80 - SPALLING WITH EXPOSED REBAR ON DIAPHRAGM OF

BAY #3 OVER BENT CAP #33

PHOTO #81 - SPALLING WITH EXPOSED REBAR ON DIAPHRAGM IN BAY

#4 SHOWN OVER BENT #33

PHOTO #82 - RUSTING WITH SECTION LOSS FROM BEAM #5 AT

BEARING OVER BENT #33

PHOTO #83 - GENERAL VIEW OF BENT #33, SOUTH SIDE

PHOTO #84 - DECAY OF HORIZONTAL MEMBER FOR BENT #33

PHOTO #85 - BENT #33, PILE #3; VOID IN

JACKET

PHOTO #86 - DECAY OF EAST END OF BENT

CAP #33, SOUTH

PHOTO #87 - SPALLING WITH EXPOSED REBAR ON DIAPHRAGM IN BAY

#2 OVER BENT CAP #33

PHOTO #88 - TYPICAL SPLITTING AT DECK TIMBER ENDS, SPAN #33

PHOTO #89 - CHECK ON NORTH SIDE OF PILE

#4 AT BENT #34; NOTE PILE SOUNDS HOLLOW

IN VICINITY OF CHECK

PHOTO #90 - ADVANCED INTERNAL DECAY OF

PILE #4, BENT #35

PHOTO #91 - ADVANCED INTERNAL DECAY OF PILE #4, BENT #35

PHOTO #92 - LACK OF BEARING AT BENT #41, PILE #4; NOTE TYPICAL

RUSTING OF METAL FLASHING

PHOTO #93 - LACK OF BEARING AT BENT #41, PILE #5; NOTE TYPICAL

RUSTING OF METAL FLASHING

PHOTO #94 - LOOSE SHIMS AT SOUTH SIDE OF BENT CAP #41

PHOTO #95 - SPALL WITH EXPOSED REBAR ON EAST END OF BENT

CAP #41

PHOTO #96 - SPLIT DECK TIMBER IN SPAN #45

PHOTO #97 - DETERIORATION OF DECK TIMBERS AT SOUTH SIDE OF

BENT CAP #49; NOTE LOOSE SHIMS

PHOTO #98 - CRACKED DECK TIMBER IN SPAN #51

PHOTO #99 - DEEP CHECK ON SOUTH SIDE OF

PILE #1, BENT #52

PHOTO #100 - TYPICAL RUSTING OF CROSS

BRACING HARDWARE, BENT #52, PILE #3

PHOTO #101 - ADVANCED INTERNAL DECAY OF

PILE #3, BENT #52

PHOTO #102 - BENT #53 TILTING NORTH

PHOTO #103 - BENT #53 TILTING NORTH

PHOTO #104 - SPALLING WITH EXPOSED

REBAR ON WEST DECK FASCIA UNDERSIDE IN

SPAN #53

PHOTO #105 - SPALLING WITH EXPOSED

REBAR ON EAST DECK FASCIA UNDERSIDE IN

SPAN #53

PHOTO #106 - WATER COLLECTING IN TOP OF

JACKET FOR PILE #3, BENT #54

PHOTO #107 - SPALLING WITH EXPOSED REBAR ON EAST FASCIA AT

BENT #54

PHOTO #108 - ADVANCED INTERNAL DECAY OF PILE #5, BENT #58

PHOTO #109 - CHECKING OF PILE #1, BENT #61

PHOTO #110 - EXTERIOR DECAY ON SOUTH

SIDE OF PILE #1, BENT #61

PHOTO #111 - ADVANCED INTERNAL DECAY OF PILE #4, BENT #61

PHOTO #112 - GENERAL VIEW OF NORTH ABUTMENT

PHOTO #113 - VOID BENEATH NORTH ABUTMENT CAP; NOTE EXPOSED

PILE

PHOTO #114 - LACK OF BEARING OF PILE #5, BENT #65

PHOTO #115 - GENERAL VIEW OF NORTHEAST EMBANKMENT; NOTE

UNDERMINING OF CONCRETE BANK PROTECTION

PHOTO #116 - GENERAL VIEW OF SOUTHWEST EMBANKMENT; NOTE

UNDERMINING OF CONCRETE BANK PROTECTION

PHOTO #117 - GENERAL VIEW OF NORTHWEST EMBANKMENT

PHOTO #118 - GENERAL VIEW OF SOUTHEAST EMBANKMENT

PHOTO #119 - UPSTREAM CHANNEL

PHOTO #120 - DOWNSTREAM CHANNEL