Tabulation_of_Bids_-_VI_38(2)_C1.pdf
PDF 290 KB Posted
- Solicitation number
- DTFH71-16-B-00002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_opening_results_-_VI_38(2)_C1.ppt | PPT presentation | |
| Amendment_0002_-_VI_38(2)_C1.pdf | ||
| Amendment_0001_-_VI_38(2)_C1.pdf | ||
| SSP_2_Video_Detection_System.pdf | ||
| SSP_1_VI_WAPA_Power_ _Water.pdf | ||
| FP03_Eng_.pdf | ||
| Plans_-_VI_38(2)_C1.pdf | ||
| Categorical_Exclusion_Form_(NEPA).pdf | ||
| VETS-100A-Form.pdf | ||
| IFB_Solicitation_-_VI_38(2)_C1.pdf | ||
| FP03_Errata.pdf | ||
| Synopsis_VI_38(2)_C1.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T A B U L A T I O N O F B I D S Schedule A
Project No : VI-38(2) C1
Project Name : Raphune Hill Intersection Improvements Solcitation No:
State : USVI County : St. Thomas Federal Location :
Opened at: St. Thomas, VI Opened by: Shirley A. Anderson Date: 11/5/2015
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed:
Title:
Date: 11/11/2015
Contract Awarded to: Award Date:
Contract Number: Data is Public
Contractor Comment Bid Amount Responsive
Engineer's Estimate 3,500,000.00$
Island Roads Corporati 1,971,890.00$ 6501 Red Hook Plaza, St. Thomas, VI 00802
Virgin Island Paving, In 2,587,964.00$ P.O. Box 4720 Kingshill, VI 00851
A.T. Construction Solut 2,882,998.00$ 119 Tuque Ind. Park Ponce, PR 00731
Custom Builders 3,397,710.00$ 4028 Anna's Retreat St. Thomas, VI 00802
Tip Top Construction C 3,669,265.00$ 5064 Mt. Welcome Christiansted, VI 00820
$ 2,587,964.00
$ 2,883,000.00
$ 3,397,710.00
$ 3,669,265.00
$ 1,971,890.00
DTFH71-16-B-00002
Shirley A. Anderson
Contract Specialist
Schedule A Project No: USVI VI-38(2) C1
Project Name: Raphune Hill Intersection Improvements
Item No. Quantity Unit Unit Price Amount Unit Price Amount
15101-0000 Line A0020 ALL LPSM 243,410.00$ 243,410.00$ 197,000.00$
15201-0000 Line A0040 ALL LPSM 65,000.00$ 65,000.00$ 7,000.00$
15401-0000 Line A0060 ALL LPSM 55,000.00$ 55,000.00$ 20,000.00$
15705-0100 Line A0080 350 LNFT 9.00$ 3,150.00$ 1,750.00$
15706-1000 Line A0100 20 EACH 750.00$ 15,000.00$ 6,000.00$
15801-0000 Line A0120 150 MGAL 300.00$ 45,000.00$ 3,750.00$
20103-0000 Line A0140 550 SQYD 4.50$ 2,475.00$ 2,750.00$
20220-1000 Line A0160 3 EACH 2,200.00$ 6,600.00$ 1,500.00$
20301-0500 Line A0180 7 EACH 1,000.00$ 7,000.00$ 7,000.00$
20301-1500 Line A0200 2 EACH 1,200.00$ 2,400.00$ 3,000.00$
20301-2400 Line A0220 10 EACH 180.00$ 1,800.00$ 1,000.00$
20301-3100 Line A0240 2 EACH 1,500.00$ 3,000.00$ 1,000.00$
20302-0300 Line A0260 500 LNFT 30.00$ 15,000.00$ 10,000.00$
20302-0500 Line A0280 170 LNFT 30.00$ 5,100.00$ 2,550.00$
20302-0900 Line A0300 250 LNFT 15.00$ 3,750.00$ 2,500.00$
SOIL EROSION CONTROL, SILT FENCE
5.00$
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR TESTING
CLEARING AND GRUBBING
REMOVAL, INDIVIDUAL TREE
REMOVAL OF CATCH BASIN
REMOVAL OF LIGHT POLE
REMOVAL OF SIGN
REMOVAL OF UTILITY POLE
SOIL EROSION CONTROL, INLET PROTECTION (TEMPORARY CATCH BASIN FILTER)
WATERING FOR DUST CONTROL
REMOVAL OF CURB AND GUTTER, CONCRETE
REMOVAL OF CURB, CONCRETE
REMOVAL OF FENCE, CHAIN LINK
Island Roads Corporation
7,000.00$
197,000.00$
300.00$
20,000.00$
500.00$
5.00$
25.00$
1,500.00$
1,000.00$
500.00$
100.00$
15.00$
20.00$
10.00$
Engineer's Estimate
Schedule A Project No: USVI VI-38(2) C1
Project Name: Raphune Hill Intersection Improvements
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Island Roads CorporationEngineer's Estimate
20302-2100 Line A0320 130 LNFT 60.00$ 7,800.00$ 6,500.00$
20303-0300 Line A0340 180 SQYD 50.00$ 9,000.00$ 7,200.00$
20303-1600 Line A0360 950 SQYD 35.00$ 33,250.00$ 14,250.00$
20303-3200 Line A0380 350 SQYD 25.00$ 8,750.00$ 7,000.00$
20303-3500 Line A0400 90 SQYD 50.00$ 4,500.00$ 3,600.00$
20303-3600 Line A0420 160 SQYD 40.00$ 6,400.00$ 6,400.00$
20304-5000 Line A0440 ALL LPSM 25,000.00$ 25,000.00$ 15,000.00$
20305-1000 Line A0460 2 CUYD 400.00$ 800.00$ 400.00$
20401-0000 Line A0480 220 CUYD 105.00$ 23,100.00$ 22,000.00$
30101-4000 Line A0500 800 TON 90.00$ 72,000.00$ 48,000.00$
40201-0800 Line A0520 420 TON 350.00$ 147,000.00$ 147,000.00$
40201-1300 Line A0540 370 TON 350.00$ 129,500.00$ 129,500.00$
40202-2000 Line A0560 45 TON 300.00$ 13,500.00$ 15,750.00$
41301-0600 Line A0580 3,200 SQYD 40.00$ 128,000.00$ 48,000.00$
42801-0200 Line A0600 200 SQYD 180.00$ 36,000.00$ 10,000.00$
FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE 3
REMOVAL OF PIPE CULVERT
REMOVAL OF CONCRETE
REMOVAL OF PAVEMENT, ASPHALT
AGGREGATE BASE GRADING C OR D
HOT ASPHALT CONCRETE PAVEMENT, MARSHALL TEST, CLASS B, GRADING C
HOT ASPHALT CONCRETE PAVEMENT, MARSHALL TEST, CLASS A, GRADING E
HOT ASPHALT CONCRETE PAVEMENT, MARSHALL TEST, CLASS B, GRADING B OR D, WEDGE OR LEVELING COURSE
ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
REMOVAL OF SIDEWALK, CONCRETE
REMOVAL OF STONE MASONRY
REMOVAL OF WALL
REMOVAL OF BUILDING
REMOVAL OF CONCRETE (STAIRS)
ROADWAY EXCAVATION
50.00$
15.00$
40.00$
40.00$
20.00$
15,000.00$
40.00$
100.00$
200.00$
350.00$
60.00$
350.00$
350.00$
50.00$
15.00$
Schedule A Project No: USVI VI-38(2) C1
Project Name: Raphune Hill Intersection Improvements
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Island Roads CorporationEngineer's Estimate
50201-0000 Line A0620 6,000 SQFT 65.00$ 390,000.00$ 90,000.00$
60101-0000 Line A0640 90 CUYD 700.00$ 63,000.00$ 31,500.00$
60201-0600 Line A0660 580 LNFT 350.00$ 203,000.00$ 101,500.00$
60201-0800 Line A0680 80 LNFT 480.00$ 38,400.00$ 20,000.00$
60401-3000 Line A0700 8 EACH 9,000.00$ 72,000.00$ 40,000.00$
60403-1400 Line A0720 2 EACH 8,000.00$ 16,000.00$ 6,000.00$
60404-3000 Line A0740 8 EACH 7,500.00$ 60,000.00$ 40,000.00$
60405-0000 Line A0760 6 EACH 700.00$ 4,200.00$ 3,000.00$
60703-0000 Line A0780 620 LNFT 30.00$ 18,600.00$ 12,400.00$
60705-0000 Line A0800 5 EACH 1,700.00$ 8,500.00$ 5,000.00$
60901-1700 Line A0820 350 LNFT 160.00$ 56,000.00$ 17,500.00$
60902-1300 Line A0840 750 LNFT 130.00$ 97,500.00$ 56,250.00$
61108-1000 Line A0860 3 EACH 500.00$ 1,500.00$ 900.00$
61109-4000 Line A0880 1 EACH 2,500.00$ 2,500.00$ 2,000.00$
61501-0100 Line A0900 330 SQYD 300.00$ 99,000.00$ 29,700.00$
CATCH BASIN, TYPE 3
MANHOLE ADJUSTMENT
CLEANING CULVERTS IN PLACE
RECONDITIONING DRAINAGE STRUCTURE
CURB, CONCRETE, 18-INCH DEPTH
CURB AND GUTTER, CONCRETE, 15-INCH DEPTH
RIGID PAVEMENT PATCH
CONCRETE, CONDUIT ENCASEMENT
18-INCH PIPE CULVERT
24-INCH PIPE CULVERT
MANHOLE, TYPE 3
INLET, TYPE 5B
ADJUST WATER VALVE
RELOCATE FIRE HYDRANT
SIDEWALK, CONCRETE
350.00$
15.00$
250.00$
175.00$
3,000.00$
5,000.00$
500.00$
5,000.00$
1,000.00$
20.00$
75.00$
50.00$
2,000.00$
300.00$
90.00$
Schedule A Project No: USVI VI-38(2) C1
Project Name: Raphune Hill Intersection Improvements
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Island Roads CorporationEngineer's Estimate
61502-1000 Line A0920 90 SQYD 200.00$ 18,000.00$ 13,500.00$
61504-1000 Line A0940 35 SQYD 400.00$ 14,000.00$ 7,000.00$
62405-0100 Line A0960 125 SQYD 20.00$ 2,500.00$ 1,250.00$
62502-0000 Line A0980 125 SQYD 25.00$ 3,125.00$ 1,250.00$
63304-0900 Line A1000 120 SQFT 150.00$ 18,000.00$ 12,000.00$
63401-1500 Line A1020 7,300 LNFT 6.00$ 43,800.00$ 43,800.00$
63401-1600 Line A1040 630 LNFT 6.00$ 3,780.00$ 3,780.00$
63502-1300 Line A1060 50 EACH 160.00$ 8,000.00$ 7,500.00$
63502-1700 Line A1080 12 EACH 200.00$ 2,400.00$ 1,200.00$
63502-2000 Line A1100 3 EACH 40,000.00$ 120,000.00$ 45,000.00$
63503-0450 Line A1120 500 LNFT 140.00$ 70,000.00$ 25,000.00$
63503-0550 Line A1140 750 LNFT 40.00$ 30,000.00$ 15,000.00$
63503-0700 Line A1160 13,000 LNFT 3.00$ 39,000.00$ 13,000.00$
63503-0800 Line A1180 13,000 LNFT 3.00$ 39,000.00$ 6,500.00$
63503-1000 Line A1200 700 LNFT 15.00$ 10,500.00$ 3,500.00$
TURF ESTABLISHMENT
SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
PAVEMENT MARKINGS, TYPE H, SOLID
PAVEMENT MARKINGS, TYPE H, BROKEN
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
DRIVE PAD, CONCRETE
ACCESSIBILITY RAMP, CONCRETE
PLACING CONSERVED TOPSOIL, 2-INCH DEPTH
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY TRAFFIC CONTROL, WATER-FILLED BARRIER
TEMPORARY TRAFFIC CONTROL, MOVING WATER-FILLED BARRIER
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
150.00$
10.00$
200.00$
100.00$
10.00$
6.00$
6.00$
100.00$
150.00$
50.00$
15,000.00$
1.00$
20.00$
5.00$
0.50$
Schedule A Project No: USVI VI-38(2) C1
Project Name: Raphune Hill Intersection Improvements
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Island Roads CorporationEngineer's Estimate
63504-1000 Line A1220 180 SQFT 60.00$ 10,800.00$ 14,400.00$
63506-0400 Line A1240 170 HOUR 70.00$ 11,900.00$ 5,100.00$
63506-0500 Line A1260 400 HOUR 14.90$ 5,960.00$ 5,960.00$
63601-1000 Line A1280 ALL LPSM 245,000.00$ 245,000.00$ 150,000.00$
63601-2000 Line A1300 ALL LPSM 125,000.00$ 125,000.00$ 100,000.00$
63610-2800 Line A1320 5,500 LNFT 50.00$ 275,000.00$ 220,000.00$
63610-3200 Line A1340 650 LNFT 75.00$ 48,750.00$ 32,500.00$
63620-0000 Line A1360 5 EACH 2,000.00$ 10,000.00$ 13,500.00$
63623-2000 Line A1380 1 EACH 20,000.00$ 20,000.00$ 12,000.00$
63701-0000 Line A1400 1 EACH 60,000.00$ 60,000.00$ 15,000.00$
64501-0000 Line A1420 ALL LPSM 17,000.00$ 17,000.00$ 1,000.00$ 1,000.00$
15,000.00$
12,000.00$
2,700.00$
50.00$
40.00$
100,000.00$
150,000.00$
14.90$
30.00$
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, POLICE OFFICER
TEMPORARY TRAFFIC CONTROL, FLAGGER
SYSTEM INSTALLATION, TRAFFIC SIGNAL
SYSTEM INSTALLATION, LIGHTING
CONDUIT, 4-INCH, PVC
CONDUIT, 6-INCH, PVC
POLE (RISER)
MANHOLE, TELEPHONE
FIELD OFFICE
LOCATE UTILITIES
80.00$
Schedule A Project No: USVI VI-38(2) C1
Project Name: Raphune Hill Intersection Improvements
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15201-0000 Line A0040 ALL LPSM
15401-0000 Line A0060 ALL LPSM
15705-0100 Line A0080 350 LNFT
15706-1000 Line A0100 20 EACH
15801-0000 Line A0120 150 MGAL
20103-0000 Line A0140 550 SQYD
20220-1000 Line A0160 3 EACH
20301-0500 Line A0180 7 EACH
20301-1500 Line A0200 2 EACH
20301-2400 Line A0220 10 EACH
20301-3100 Line A0240 2 EACH
20302-0300 Line A0260 500 LNFT
20302-0500 Line A0280 170 LNFT
20302-0900 Line A0300 250 LNFT
SOIL EROSION CONTROL, SILT FENCE
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR TESTING
CLEARING AND GRUBBING
REMOVAL, INDIVIDUAL TREE
REMOVAL OF CATCH BASIN
REMOVAL OF LIGHT POLE
REMOVAL OF SIGN
REMOVAL OF UTILITY POLE
SOIL EROSION CONTROL, INLET PROTECTION (T
WATERING FOR DUST CONTROL
REMOVAL OF CURB AND GUTTER, CONCRETE
REMOVAL OF CURB, CONCRETE
REMOVAL OF FENCE, CHAIN LINK
Unit Price Amount Unit Price Amount
249,451.00$ 428,565.00$
30,000.00$ 30,875.00$
40,000.00$ 14,993.00$
2,450.00$ 6,720.00$
4,000.00$ 12,560.00$
21,000.00$ 17,250.00$
4,400.00$ 22,000.00$
9,000.00$ 3,429.00$
10,500.00$ 8,001.00$
4,000.00$ 7,802.00$
2,000.00$ 2,290.00$
5,000.00$ 7,802.00$
7,500.00$ 12,570.00$
2,550.00$ 3,910.00$
2,500.00$ 1,500.00$
7.00$ 19.20$
249,451.00$ 428,565.00$
Virgin Island Paving, Inc. A.T. Construction Solutions, LLC
200.00$ 628.00$
30,000.00$ 30,875.00$
40,000.00$ 14,993.00$
3,000.00$ 1,143.00$
8.00$ 40.00$
140.00$ 115.00$
2,000.00$ 3,901.00$
1,500.00$ 1,143.00$
2,500.00$ 3,901.00$
200.00$ 229.00$
15.00$ 23.00$
15.00$ 25.14$
10.00$ 6.00$
Schedule A Project No: USVI VI-38(2) C1
Project Name: Raphune Hill Intersection Improvements
Item No. Quantity Unit
20302-2100 Line A0320 130 LNFT
20303-0300 Line A0340 180 SQYD
20303-1600 Line A0360 950 SQYD
20303-3200 Line A0380 350 SQYD
20303-3500 Line A0400 90 SQYD
20303-3600 Line A0420 160 SQYD
20304-5000 Line A0440 ALL LPSM
20305-1000 Line A0460 2 CUYD
20401-0000 Line A0480 220 CUYD
30101-4000 Line A0500 800 TON
40201-0800 Line A0520 420 TON
40201-1300 Line A0540 370 TON
40202-2000 Line A0560 45 TON
41301-0600 Line A0580 3,200 SQYD
42801-0200 Line A0600 200 SQYD
FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE
REMOVAL OF PIPE CULVERT
REMOVAL OF CONCRETE
REMOVAL OF PAVEMENT, ASPHALT
AGGREGATE BASE GRADING C OR D
HOT ASPHALT CONCRETE PAVEMENT, MARSHAL
HOT ASPHALT CONCRETE PAVEMENT, MARSHAL
HOT ASPHALT CONCRETE PAVEMENT, MARSHALL TEST, CLA
ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
REMOVAL OF SIDEWALK, CONCRETE
REMOVAL OF STONE MASONRY
REMOVAL OF WALL
REMOVAL OF BUILDING
REMOVAL OF CONCRETE (STAIRS)
ROADWAY EXCAVATION
Unit Price Amount Unit Price Amount
Virgin Island Paving, Inc. A.T. Construction Solutions, LLC
6,500.00$ 7,410.00$
13,500.00$ 5,130.00$
17,100.00$ 21,850.00$
8,750.00$ 8,050.00$
4,050.00$ 4,500.00$
9,600.00$ 4,576.00$
38,000.00$ 34,283.00$
2,400.00$ 571.00$
9,900.00$ 18,920.00$
60,000.00$ 87,200.00$
119,700.00$ 166,740.00$
105,450.00$ 146,890.00$
13,500.00$ 17,865.00$
28,800.00$ 52,000.00$
13,000.00$ 37,200.00$
50.00$ 57.00$
18.00$ 23.00$
75.00$ 28.50$
45.00$ 50.00$
25.00$ 23.00$
38,000.00$ 34,283.00$
60.00$ 28.60$
45.00$ 86.00$
1,200.00$ 285.50$
285.00$ 397.00$
75.00$ 109.00$
300.00$ 397.00$
285.00$ 397.00$
65.00$ 186.00$
9.00$ 16.25$
Schedule A Project No: USVI VI-38(2) C1
Project Name: Raphune Hill Intersection Improvements
Item No. Quantity Unit
50201-0000 Line A0620 6,000 SQFT
60101-0000 Line A0640 90 CUYD
60201-0600 Line A0660 580 LNFT
60201-0800 Line A0680 80 LNFT
60401-3000 Line A0700 8 EACH
60403-1400 Line A0720 2 EACH
60404-3000 Line A0740 8 EACH
60405-0000 Line A0760 6 EACH
60703-0000 Line A0780 620 LNFT
60705-0000 Line A0800 5 EACH
60901-1700 Line A0820 350 LNFT
60902-1300 Line A0840 750 LNFT
61108-1000 Line A0860 3 EACH
61109-4000 Line A0880 1 EACH
61501-0100 Line A0900 330 SQYD
CATCH BASIN, TYPE 3
MANHOLE ADJUSTMENT
CLEANING CULVERTS IN PLACE
RECONDITIONING DRAINAGE STRUCTURE
CURB, CONCRETE, 18-INCH DEPTH
CURB AND GUTTER, CONCRETE, 15-INCH DEPTH
RIGID PAVEMENT PATCH
CONCRETE, CONDUIT ENCASEMENT
18-INCH PIPE CULVERT
24-INCH PIPE CULVERT
MANHOLE, TYPE 3
INLET, TYPE 5B
ADJUST WATER VALVE
RELOCATE FIRE HYDRANT
SIDEWALK, CONCRETE
Unit Price Amount Unit Price Amount
Virgin Island Paving, Inc. A.T. Construction Solutions, LLC
138,000.00$ 103,200.00$
22,500.00$ 41,130.00$
200,100.00$ 198,360.00$
28,000.00$ 45,680.00$
70,400.00$ 59,424.00$
14,300.00$ 10,286.00$
57,200.00$ 41,920.00$
15,000.00$ 3,429.00$
31,000.00$ 36,270.00$
10,000.00$ 14,285.00$
26,250.00$ 31,990.00$
56,250.00$ 77,250.00$
3,000.00$ 1,200.00$
6,000.00$ 4,000.00$
46,200.00$ 37,785.00$
250.00$ 457.00$
23.00$ 17.20$
350.00$ 571.00$
345.00$ 342.00$
7,150.00$ 5,143.00$
8,800.00$ 7,428.00$
2,500.00$ 571.50$
7,150.00$ 5,240.00$
2,000.00$ 2,857.00$
50.00$ 58.50$
75.00$ 103.00$
75.00$ 91.40$
6,000.00$ 4,000.00$
1,000.00$ 400.00$
140.00$ 114.50$
Schedule A Project No: USVI VI-38(2) C1
Project Name: Raphune Hill Intersection Improvements
Item No. Quantity Unit
61502-1000 Line A0920 90 SQYD
61504-1000 Line A0940 35 SQYD
62405-0100 Line A0960 125 SQYD
62502-0000 Line A0980 125 SQYD
63304-0900 Line A1000 120 SQFT
63401-1500 Line A1020 7,300 LNFT
63401-1600 Line A1040 630 LNFT
63502-1300 Line A1060 50 EACH
63502-1700 Line A1080 12 EACH
63502-2000 Line A1100 3 EACH
63503-0450 Line A1120 500 LNFT
63503-0550 Line A1140 750 LNFT
63503-0700 Line A1160 13,000 LNFT
63503-0800 Line A1180 13,000 LNFT
63503-1000 Line A1200 700 LNFT
TURF ESTABLISHMENT
SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
PAVEMENT MARKINGS, TYPE H, SOLID
PAVEMENT MARKINGS, TYPE H, BROKEN
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, WARNING LIGH
DRIVE PAD, CONCRETE
ACCESSIBILITY RAMP, CONCRETE
PLACING CONSERVED TOPSOIL, 2-INCH DEPTH
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
TEMPORARY TRAFFIC CONTROL, WATER-FILLED
TEMPORARY TRAFFIC CONTROL, MOVING WATE
TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR
TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
Unit Price Amount Unit Price Amount
Virgin Island Paving, Inc. A.T. Construction Solutions, LLC
17,550.00$ 10,305.00$
10,500.00$ 8,015.00$
3,125.00$ 2,125.00$
3,125.00$ 1,750.00$
7,800.00$ 11,640.00$
32,850.00$ 35,040.00$
2,835.00$ 3,654.00$
12,500.00$ 9,000.00$
3,000.00$ 3,552.00$
15,000.00$ 53,070.00$
15,000.00$ 31,000.00$
5,625.00$ 42,750.00$
45,500.00$ 84,500.00$
26,000.00$ 101,400.00$
7,000.00$ 8,400.00$
195.00$ 114.50$
25.00$ 17.00$
300.00$ 229.00$
65.00$ 97.00$
25.00$ 14.00$
4.50$ 5.80$
4.50$ 4.80$
250.00$ 296.00$
250.00$ 180.00$
30.00$ 62.00$
5,000.00$ 17,690.00$
3.50$ 6.50$
7.50$ 57.00$
10.00$ 12.00$
2.00$ 7.80$
Schedule A Project No: USVI VI-38(2) C1
Project Name: Raphune Hill Intersection Improvements
Item No. Quantity Unit
63504-1000 Line A1220 180 SQFT
63506-0400 Line A1240 170 HOUR
63506-0500 Line A1260 400 HOUR
63601-1000 Line A1280 ALL LPSM
63601-2000 Line A1300 ALL LPSM
63610-2800 Line A1320 5,500 LNFT
63610-3200 Line A1340 650 LNFT
63620-0000 Line A1360 5 EACH
63623-2000 Line A1380 1 EACH
63701-0000 Line A1400 1 EACH
64501-0000 Line A1420 ALL LPSM
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
TEMPORARY TRAFFIC CONTROL, POLICE OFFICE
TEMPORARY TRAFFIC CONTROL, FLAGGER
SYSTEM INSTALLATION, TRAFFIC SIGNAL
SYSTEM INSTALLATION, LIGHTING
CONDUIT, 4-INCH, PVC
CONDUIT, 6-INCH, PVC
POLE (RISER)
MANHOLE, TELEPHONE
FIELD OFFICE
LOCATE UTILITIES
Unit Price Amount Unit Price Amount
Virgin Island Paving, Inc. A.T. Construction Solutions, LLC
11,700.00$ 11,340.00$
14,450.00$ 9,010.00$
5,960.00$ 5,960.00$
238,293.00$ 247,168.00$
185,000.00$ 46,577.00$
220,000.00$ 140,800.00$
51,350.00$ 39,845.00$
50,000.00$ 10,170.00$
12,000.00$ 21,592.00$
20,000.00$ 20,112.00$
3,000.00$ 24,562.00$ 3,000.00$ 24,562.00$
20,000.00$ 20,112.00$
12,000.00$ 21,592.00$
10,000.00$ 2,034.00$
79.00$ 61.30$
40.00$ 25.60$
185,000.00$ 46,577.00$
238,293.00$ 247,168.00$
14.90$ 14.90$
85.00$ 53.00$
65.00$ 63.00$
Schedule A Project No: USVI VI-38(2) C1
Project Name: Raphune Hill Intersection Improvements
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15201-0000 Line A0040 ALL LPSM
15401-0000 Line A0060 ALL LPSM
15705-0100 Line A0080 350 LNFT
15706-1000 Line A0100 20 EACH
15801-0000 Line A0120 150 MGAL
20103-0000 Line A0140 550 SQYD
20220-1000 Line A0160 3 EACH
20301-0500 Line A0180 7 EACH
20301-1500 Line A0200 2 EACH
20301-2400 Line A0220 10 EACH
20301-3100 Line A0240 2 EACH
20302-0300 Line A0260 500 LNFT
20302-0500 Line A0280 170 LNFT
20302-0900 Line A0300 250 LNFT
SOIL EROSION CONTROL, SILT FENCE
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR TESTING
CLEARING AND GRUBBING
REMOVAL, INDIVIDUAL TREE
REMOVAL OF CATCH BASIN
REMOVAL OF LIGHT POLE
REMOVAL OF SIGN
REMOVAL OF UTILITY POLE
SOIL EROSION CONTROL, INLET PROTECTION (T
WATERING FOR DUST CONTROL
REMOVAL OF CURB AND GUTTER, CONCRETE
REMOVAL OF CURB, CONCRETE
REMOVAL OF FENCE, CHAIN LINK
Unit Price Amount Unit Price Amount
323,675.00$ 320,000.00$
10,358.00$ 55,000.00$
29,778.00$ 30,000.00$
3,500.00$ 4,200.00$
12,940.00$ 15,000.00$
56,250.00$ 52,500.00$
5,500.00$ 46,750.00$
2,718.00$ 7,500.00$
9,065.00$ 14,000.00$
4,660.00$ 3,600.00$
1,000.00$ 1,500.00$
1,580.00$ 6,000.00$
19,500.00$ 27,500.00$
5,270.00$ 9,350.00$
1,500.00$ 5,000.00$
10.00$ 12.00$
323,675.00$
Custom Builders Tip Top Construction Corporation
647.00$ 750.00$
320,000.00$
10,358.00$ 55,000.00$
29,778.00$ 30,000.00$
906.00$ 2,500.00$
10.00$ 85.00$
375.00$ 350.00$
2,330.00$ 1,800.00$
1,295.00$ 2,000.00$
790.00$ 3,000.00$
100.00$ 150.00$
31.00$ 55.00$
39.00$ 55.00$
6.00$ 20.00$
Schedule A Project No: USVI VI-38(2) C1
Project Name: Raphune Hill Intersection Improvements
Item No. Quantity Unit
20302-2100 Line A0320 130 LNFT
20303-0300 Line A0340 180 SQYD
20303-1600 Line A0360 950 SQYD
20303-3200 Line A0380 350 SQYD
20303-3500 Line A0400 90 SQYD
20303-3600 Line A0420 160 SQYD
20304-5000 Line A0440 ALL LPSM
20305-1000 Line A0460 2 CUYD
20401-0000 Line A0480 220 CUYD
30101-4000 Line A0500 800 TON
40201-0800 Line A0520 420 TON
40201-1300 Line A0540 370 TON
40202-2000 Line A0560 45 TON
41301-0600 Line A0580 3,200 SQYD
42801-0200 Line A0600 200 SQYD
FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE
REMOVAL OF PIPE CULVERT
REMOVAL OF CONCRETE
REMOVAL OF PAVEMENT, ASPHALT
AGGREGATE BASE GRADING C OR D
HOT ASPHALT CONCRETE PAVEMENT, MARSHAL
HOT ASPHALT CONCRETE PAVEMENT, MARSHAL
HOT ASPHALT CONCRETE PAVEMENT, MARSHALL TEST, CLA
ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
REMOVAL OF SIDEWALK, CONCRETE
REMOVAL OF STONE MASONRY
REMOVAL OF WALL
REMOVAL OF BUILDING
REMOVAL OF CONCRETE (STAIRS)
ROADWAY EXCAVATION
Unit Price Amount Unit Price Amount
Custom Builders Tip Top Construction Corporation
6,370.00$ 8,450.00$
10,080.00$ 17,100.00$
25,650.00$ 71,250.00$
13,650.00$ 26,250.00$
2,880.00$ 6,750.00$
7,200.00$ 16,000.00$
17,867.00$ 30,000.00$
1,166.00$ 3,000.00$
16,500.00$ 33,000.00$
72,800.00$ 220,000.00$
190,260.00$ 159,600.00$
167,610.00$ 140,600.00$
20,385.00$ 17,100.00$
156,800.00$ 160,000.00$
51,800.00$ 69,000.00$
49.00$ 65.00$
27.00$ 75.00$
56.00$ 95.00$
32.00$ 75.00$
39.00$ 75.00$
17,867.00$ 30,000.00$
45.00$ 100.00$
75.00$ 150.00$
583.00$ 1,500.00$
453.00$ 380.00$
91.00$ 275.00$
453.00$ 380.00$
453.00$ 380.00$
259.00$ 345.00$
49.00$ 50.00$
Schedule A Project No: USVI VI-38(2) C1
Project Name: Raphune Hill Intersection Improvements
Item No. Quantity Unit
50201-0000 Line A0620 6,000 SQFT
60101-0000 Line A0640 90 CUYD
60201-0600 Line A0660 580 LNFT
60201-0800 Line A0680 80 LNFT
60401-3000 Line A0700 8 EACH
60403-1400 Line A0720 2 EACH
60404-3000 Line A0740 8 EACH
60405-0000 Line A0760 6 EACH
60703-0000 Line A0780 620 LNFT
60705-0000 Line A0800 5 EACH
60901-1700 Line A0820 350 LNFT
60902-1300 Line A0840 750 LNFT
61108-1000 Line A0860 3 EACH
61109-4000 Line A0880 1 EACH
61501-0100 Line A0900 330 SQYD
CATCH BASIN, TYPE 3
MANHOLE ADJUSTMENT
CLEANING CULVERTS IN PLACE
RECONDITIONING DRAINAGE STRUCTURE
CURB, CONCRETE, 18-INCH DEPTH
CURB AND GUTTER, CONCRETE, 15-INCH DEPTH
RIGID PAVEMENT PATCH
CONCRETE, CONDUIT ENCASEMENT
18-INCH PIPE CULVERT
24-INCH PIPE CULVERT
MANHOLE, TYPE 3
INLET, TYPE 5B
ADJUST WATER VALVE
RELOCATE FIRE HYDRANT
SIDEWALK, CONCRETE
Unit Price Amount Unit Price Amount
Custom Builders Tip Top Construction Corporation
144,000.00$ 135,000.00$
69,930.00$ 45,000.00$
174,000.00$ 220,400.00$
26,640.00$ 33,600.00$
66,288.00$ 60,000.00$
14,058.00$ 7,000.00$
51,784.00$ 40,000.00$
5,436.00$ 9,000.00$
38,440.00$ 46,500.00$
12,945.00$ 10,000.00$
27,300.00$ 105,000.00$
53,250.00$ 187,500.00$
1,749.00$ 7,500.00$
3,101.00$ 5,000.00$
55,440.00$ 66,000.00$
777.00$ 500.00$
24.00$ 22.50$
333.00$ 420.00$
300.00$ 380.00$
7,029.00$ 3,500.00$
8,286.00$ 7,500.00$
906.00$ 1,500.00$
6,473.00$ 5,000.00$
2,589.00$ 2,000.00$
62.00$ 75.00$
71.00$ 250.00$
78.00$ 300.00$
3,101.00$ 5,000.00$
583.00$ 2,500.00$
168.00$ 200.00$
Schedule A Project No: USVI VI-38(2) C1
Project Name: Raphune Hill Intersection Improvements
Item No. Quantity Unit
61502-1000 Line A0920 90 SQYD
61504-1000 Line A0940 35 SQYD
62405-0100 Line A0960 125 SQYD
62502-0000 Line A0980 125 SQYD
63304-0900 Line A1000 120 SQFT
63401-1500 Line A1020 7,300 LNFT
63401-1600 Line A1040 630 LNFT
63502-1300 Line A1060 50 EACH
63502-1700 Line A1080 12 EACH
63502-2000 Line A1100 3 EACH
63503-0450 Line A1120 500 LNFT
63503-0550 Line A1140 750 LNFT
63503-0700 Line A1160 13,000 LNFT
63503-0800 Line A1180 13,000 LNFT
63503-1000 Line A1200 700 LNFT
TURF ESTABLISHMENT
SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
PAVEMENT MARKINGS, TYPE H, SOLID
PAVEMENT MARKINGS, TYPE H, BROKEN
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, WARNING LIGH
DRIVE PAD, CONCRETE
ACCESSIBILITY RAMP, CONCRETE
PLACING CONSERVED TOPSOIL, 2-INCH DEPTH
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
TEMPORARY TRAFFIC CONTROL, WATER-FILLED
TEMPORARY TRAFFIC CONTROL, MOVING WATE
TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR
TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
Unit Price Amount Unit Price Amount
Custom Builders Tip Top Construction Corporation
21,600.00$ 45,000.00$
12,705.00$ 17,500.00$
2,250.00$ 15,625.00$
2,125.00$ 6,250.00$
10,080.00$ 5,400.00$
36,500.00$ 80,300.00$
3,780.00$ 6,930.00$
9,050.00$ 12,500.00$
2,796.00$ 8,400.00$
97,101.00$ 60,000.00$
31,000.00$ 50,000.00$
15,750.00$ 22,500.00$
39,000.00$ 78,000.00$
39,000.00$ 130,000.00$
4,200.00$ 8,400.00$
240.00$ 500.00$
18.00$ 125.00$
363.00$ 500.00$
84.00$ 45.00$
17.00$ 50.00$
6.00$ 11.00$
5.00$ 11.00$
233.00$ 700.00$
181.00$ 250.00$
62.00$ 100.00$
32,367.00$ 20,000.00$
3.00$ 6.00$
21.00$ 30.00$
6.00$ 12.00$
3.00$ 10.00$
Schedule A Project No: USVI VI-38(2) C1
Project Name: Raphune Hill Intersection Improvements
Item No. Quantity Unit
63504-1000 Line A1220 180 SQFT
63506-0400 Line A1240 170 HOUR
63506-0500 Line A1260 400 HOUR
63601-1000 Line A1280 ALL LPSM
63601-2000 Line A1300 ALL LPSM
63610-2800 Line A1320 5,500 LNFT
63610-3200 Line A1340 650 LNFT
63620-0000 Line A1360 5 EACH
63623-2000 Line A1380 1 EACH
63701-0000 Line A1400 1 EACH
64501-0000 Line A1420 ALL LPSM
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
TEMPORARY TRAFFIC CONTROL, POLICE OFFICE
TEMPORARY TRAFFIC CONTROL, FLAGGER
SYSTEM INSTALLATION, TRAFFIC SIGNAL
SYSTEM INSTALLATION, LIGHTING
CONDUIT, 4-INCH, PVC
CONDUIT, 6-INCH, PVC
POLE (RISER)
MANHOLE, TELEPHONE
FIELD OFFICE
LOCATE UTILITIES
Unit Price Amount Unit Price Amount
Custom Builders Tip Top Construction Corporation
12,600.00$ 4,500.00$
12,070.00$ 12,750.00$
5,960.00$ 5,960.00$
253,437.00$ 214,000.00$
104,649.00$ 40,000.00$
528,000.00$ 165,000.00$
63,700.00$ 29,250.00$
18,125.00$ 12,500.00$
9,710.00$ 15,000.00$
51,723.00$ 45,000.00$
18,126.00$ 25,000.00$ 18,126.00$ 25,000.00$
51,723.00$ 45,000.00$
9,710.00$ 15,000.00$
3,625.00$ 2,500.00$
98.00$ 45.00$
96.00$ 30.00$
104,649.00$ 40,000.00$
253,437.00$ 214,000.00$
14.90$ 14.90$
71.00$ 75.00$
70.00$ 25.00$
| Bid Tabs Summary |
| Bid Tabs |