Plans_FW-GRS_10(2).pdf
PDF 7 MB Posted
- Attached to
- Great Swamp National Wildlife 10(2)
- Solicitation number
- DTFH71-15-B-00020
About this file
Plans FW-GRS 10(2)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ROBO_FW-GRS_10(2).pdf | ||
| ROBO_FW-GRS_10(2).pdf | ||
| FP03_Eng_.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| FP03_Errata.pdf | ||
| SWPPP_Application_Report.pdf | ||
| IFB_Solicitation_FW-GRS_10(2).pdf | ||
| Categorical_Exlusion_Form_(NEPA).pdf | ||
| VETS-100A-Form.pdf | ||
| Synopsis_-_FW-GRS_10(2).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ESTIMATED QUANTITIES
Line Item
No.
ITEM DESCRIPTION UNIT PLAN BID SCHEDULE
A0100 15101‐0000 MOBILIZATION LPSM ALL ALL
A0120 15201‐0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL ALL
A0140 15401‐0000 CONTRACTOR TESTING LPSM ALL ALL
A0160 15705‐0100 SOIL EROSION CONTROL, SILT FENCE LNFT 740 800
A0180 15720‐0000 STORM WATER POLLUTION PREVENTION PLAN LPSM ALL ALL
A0200 20101‐0000 CLEARING AND GRUBBING ACRE 0.19 0.2
A0220 20301‐1200 REMOVAL OF HEADWALL EACH 1 1
A0240 20302‐2100 REMOVAL OF PIPE CULVERT LNFT 172 180
A0260 20820‐0000 DEWATERING (HEADWALL INSTALLATION) LPSM ALL ALL
A0280 25101‐3000 PLACED RIPRAP, CLASS 3 CUYD 6 7
A0300 30302‐1000 DITCH RECONDITIONING LNFT 4,049 4,500
A0320 30405‐1200
CEMENT AGGREGATE STABILIZATION, IN PLACE AGGREGATE,
10‐INCH DEPTH SQYD 8,098 8,500
A0340 30416‐0000 CEMENT TON 264 290
A0360 40101‐0500
SUPERPAVE PAVEMENT, 1/2‐INCH NOMINAL MAXIMUM SIZE
AGGREGATE, <0.3 MILLION ESAL, TYPE IV ROUGHNESS
TON 996 1,100
A0380 60103‐0180 CONCRETE, HEADWALL FOR 36‐INCH PIPE CULVERT EACH 1 1
A0400 60201‐0400 12‐INCH PIPE CULVERT LNFT 92 92
A0420 60201‐0600 18‐INCH PIPE CULVERT LNFT 28 28
A0440 60704‐0000 CLEANING CULVERTS IN PLACE EACH 2 2
A0460 61701‐1200 GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS LNFT 25 25
A0480 61702‐0800 TERMINAL SECTION TYPE TANGENT EACH 4 4
A0500 62403‐0000 FURNISHING AND PLACING TOPSOIL CUYD 50 60
A0520 62501‐0000 TURF ESTABLISHMENT ACRE 0.19 0.2
A0540 63401‐0100 PAVEMENT MARKINGS, TYPE A, SOLID LNFT 8,170 8,500
A0560 63503‐0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 LNFT 36 40
A0580 63504‐1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 195 200
A0600 63701‐0000 FIELD OFFICE EACH 1 1
PLAN SHEET SECTION ‐‐‐‐‐‐‐‐>>
Pay Item 63504-1000
W
ID
T H
H E
IG
H
T
A R
E A Temp. Traffic
Control, Construction
Signs
(in) (in) (sqft) Sqft
N1 M4-8a END DETOUR 24 18 3.00 Black on Orange 2 6
N1 M4-9L DETOUR
<-- 30 24 5.00 Black on Orange 4 20
N1 M4-9R DETOUR
--> 30 24 5.00 Black on Orange 3 15
N1 R11-2 ROAD CLOSED 48 30 10.00 Black on White 2 20 Install sign on barricade Type 3, otherwise as directed by the CO.
N1 R11-3a ROAD CLOSED __ MILES AHEAD LOCAL TRAFFIC ONLY 60 30 12.50 Black on White 1 12.5
N1 W20-2 DETOUR AHEAD 36 36 9.00 Black on Orange 2 18
N1 W20-3 ROAD CLOSED AHEAD 36 36 9.00 Black on Orange 1 9
N1 Special PLEASANT PLAINS RD CLOSED AHEAD 54 24 9.00 Black on Orange 1 9 4" Letter height
N1 Special PLEASANT PLAINS RD 42 18 5.25 Black on Orange 12 63 4" Letter height
N2 Special ROAD WORK BEGINNING _____ 66 24 11.00 Black on Orange 2 22 4" Letter height
Subtotal this Sheet 194.5
Rounded Total 200
NOTES:
1. Construct and erect all signs in accordance with the "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition.
2. See Detail E633-01 for sign post supports.
3. See Location Map and Temporary Traffic Control sheet for sign locations. Adjust location to meet field conditions as approved by the CO
CONSTRUCTION SIGNS
SHEET NO.
MUTCD
NO. SIGN TEXT
PANEL SIZE
COLOR
COMBINATION Q
U A
N T
IT
Y
REMARKS
D1 - D4 10+00 to 50+49.07
D3 42+00 12' x 24" Wide stop bar on
Visitors Center driveway - white
LNFT
Pavement marking, type
A, Solid
63401-1500 Pay Item
Yellow
Subtotal This sheet
S H
E E
T
Rounded Total
PAVEMENT STRIPING SUMMARY
REMARKSSTATION
Pay Item Pay Item Pay Item Pay Item Pay Item Pay Item 20301-2100 25101-3000 60103-0180 60201-0400 60201-0600 60704-0000
Removal of Pipe Culvert
Placed Riprap, Class 3
Concrete, Headwall for 36"
Pipe Culvert
12" Pipe Culvert
18" Pipe Culvert
Cleaning Culverts in
Place
LNFT CUYD EACH LNFT LNFT EACH
RT
11+65
LT 24.0 24
RT
17+20
LT 16.0
RT 1
21+90
LT
RT
22+55
LT 11.0 20
RT 1
22+85
LT
RT 5.0
24+84.07
LT 1
RT
33+40
LT 16.0
RT
42+05
LT 48.0 1.0 48
RT
44+10
LT 10.0
RT
45+11.42 26.0 28
LT
RT 21.0
49+10
LT
172.0 6.0 1.0 92.0 28.0 2.0
180.0 7 1 92 28 2
D3
D3
D4
D1
D3
D1
D2
D2
D2
D2
DRAINAGE SUMMARY
STATION
S
ID
E
S H
E E
T
D1
REMARKS
Subtotal this Sheet Rounded Total
| A01-grs10(2)_ttl |
| A02-grs10(2)_sym |
| A03-grs10(2)_loc |
| A04-grs10(2)_sur |
| A05-grs10(2)_sur |
| B01-B02-grs10(2)_typ |
| D01-D04_grs10(2)_pp1 |
| D01-D04_grs10(2)_pp2 |
| D01-D04_grs10(2)_pp3 |
| D01-D04_grs10(2)_pp4 |
| D07_grs10(2)_p&p5 |
| M01-grs10(2)_e&sc |
| N01-grs10(2)_ttc |
| S01_st15701_detail |
| S02_st15702_detail |
| S03_st25101_detail |
| S04_st40101_detail |
| S05-S401-B |
| S06_st60104_detail |
| S07_st60205_EFL_TEMP |
| S08_st61711_detail |
| S11_st63301_detail |
| S12_st63501_detail |
| S13_st63514_detail |
File details come from the government source that posted it. Updated .