The Bid Opening date remains July 2 2014 at 2 00 p.m.

View the file

Other files

File Type Posted
VETS-100A-Form.pdf PDF
FP03_Errata.pdf PDF
IFB_Solicitation_NH_FH_47-1(001).pdf PDF
Categorical_Exclusion_Form_(NEPA).pdf PDF
FP03_Eng_.pdf PDF
Stormwater_Pollution_Prevention_Plan_Report.pdf PDF
Best_Management_Practices_Report.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
Plans_NH_FH_47-1(001).pdf PDF
Synopsis_NH_FH_47-1(001).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment No. 0001

Info Page 1 of 2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Project NH FH 47-1(001)

White Mountain National Forest Solicitation: DTFH71-14-B-00029

The purpose of this Amendment is to:

1) Revise the Plans to correct a note relating to roadway reconditioning.

2) Provide a summary of responses to questions/clarifications asked by potential bidders.

The Bid Opening date remains July 2, 2014, at 2:00 p.m.

Plan Sheet changes

1. Delete Plan Sheet B01, and substitute the amended Plan Sheet B01.

• Sheet B01 (Plan) updated to correct the “Recondition roadbed. 6’ depth” callout to indicate “6” depth” instead of “6’ depth”.

Questions / Clarifications

The following questions and issues were submitted via email at eflhd.contracts@dot.gov. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.

1. Can the existing pavement be ground with a reclaimer?

Response: Yes, a reclaimer may be used for grounding the existing pavement. Milling was specified as opposed to reclamation, because of the presence of boulders in the area, some which cannot be seen. Boulders could damage the reclaimer.

2. Aggregate base grading is listed as 1300 tons. How do we weight what we are grading, or we importing in the 1300 tons?

Response: Pay Item 30101-4000, AGGREGATE BASE GRADING C OR D, is for furnishing and placing aggregate material according to Section 301. The 1300 tons of aggregate base course is the amount of additional material that we calculated that is needed for the leveling course between the milled surface and the Suparpave pavement layer. This quantity also includes the material to be used to build the shoulders of the roadway.” The aggregate base will be measured by the ton according to Subsections 109.02(o) and 109.03.

mailto:eflhd.contracts@dot.gov

Info Page 2 of 2

3. The boulder removal is priced by the each. In the roadway reconditioning pay item, it says to remove boulders in that item. Are boulders paid by each boulder or in the roadway reconditioning item?

Response: Removal of individual boulders 6 inches or larger in diameter will be measured and paid according to Section 203, under Pay Items 20301-0200, REMOVAL OF BOULDER (DIAMETER 6 INCHES TO 2 FEET) and 20301-0200, REMOVAL OF

BOULDER (DIAMETER LARGER THAN 2 FEET).

B01

TYPICAL SECTIONS

NO SCALE

Normal edge of travel lane

" Elevation difference2

Type IV pavement roughness (2 equal lifts)

Size aggregate, <0.3 Million ESAL, -inch Nominal Maximum 2

3" Superpave pavement

Asphalt pavement grade

Profile

2%

LLC

Tripoli Road ground

Existing grading C or D (typ.)

Aggregate base

1:2 or flatter1:2 or fl atte r

2%

Travel lane

10’

Travel lane

10’

Ditch

3’ to 8’

Shoulder

1’ to 3’

Shoulder

1’ to 3’

Limit of construction

25 to 34’

TANGENT SECTION

grade

Profile

LLC

Tripoli Road ground

Existing grading C or D (typ.)

Aggregate base

1:2 or flatter

1:2 or fl atte r

Travel lane

10’

Travel lane

10’

Ditch

3’ to 8’

Shoulder

1’ to 3’

Shoulder

1’ to 3’

Limit of construction

25 to 34’

SUPERELEVATED SECTION

2.

1.

Notes:

grading C or D (Leveling course)

Aggregate base e e and leave in place

Mill asphalt pavement

1.5" and varies depth concrete pavement, Existing asphalt

Aggregate base

Shoulder

1’ to 3’

See Detail A (typ.)

Construct safety edge.

SAFETY EDGE

DETAIL A

PROPOSED PAVEMENT STRUCTURE

EXISTING PAVEMENT STRUCTURE

(Same as tangent section)

PROPOSED PAVEMENT STRUCTURE

(Same as tangent section)

EXISTING PAVEMENT STRUCTURE

See Detail A (typ.)

Construct safety edge.

in the plans at locations shown existing ditch

Recondition in the plans at locations shown existing ditch

Recondition

Recondition roadbed. 6" depth surfaces.

Establish turf on all disturbed areas except paved and rock surface of the roadway.

For larger boulders, remove to a minimum 2 feet below the to performing the asphalt pavement milling as directed by the CO.

Remove completely boulders less than 2 feet in diameter prior

REVISIONS

No. By DateDescription

KA

AMENDMENT #001

06/27/14Changed 6’ to 6"1 e f l-f il e s h a r e .f lh d .f h w a .d o t.

g o v D a ta P

R O J E

C T

S F

H N

H -1 (0

1) P r o j

D e v C

A D

D B 1- F

H

-1 (0

1) ty p .d g n

:5

:4

A M

-J u n -2

:5

A M

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

WHITE MOUNTAIN NATIONAL FOREST

NH FH 47-1(001)

TRIPOLI ROAD

U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001
Project NH FH 47-1(001)
Solicitation: DTFH71-14-B-00029

File details come from the government source that posted it. Updated .