Amendment_0001_-_NH_FH_47-1(001).pdf
PDF 316 KB Posted
- Attached to
- White Mountain National Forest 47-1(001)
- Solicitation number
- DTFH71-14-B-00029
About this file
The Bid Opening date remains July 2 2014 at 2 00 p.m.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VETS-100A-Form.pdf | ||
| FP03_Errata.pdf | ||
| IFB_Solicitation_NH_FH_47-1(001).pdf | ||
| Categorical_Exclusion_Form_(NEPA).pdf | ||
| FP03_Eng_.pdf | ||
| Stormwater_Pollution_Prevention_Plan_Report.pdf | ||
| Best_Management_Practices_Report.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Plans_NH_FH_47-1(001).pdf | ||
| Synopsis_NH_FH_47-1(001).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment No. 0001
Info Page 1 of 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Project NH FH 47-1(001)
White Mountain National Forest Solicitation: DTFH71-14-B-00029
The purpose of this Amendment is to:
1) Revise the Plans to correct a note relating to roadway reconditioning.
2) Provide a summary of responses to questions/clarifications asked by potential bidders.
The Bid Opening date remains July 2, 2014, at 2:00 p.m.
Plan Sheet changes
1. Delete Plan Sheet B01, and substitute the amended Plan Sheet B01.
• Sheet B01 (Plan) updated to correct the “Recondition roadbed. 6’ depth” callout to indicate “6” depth” instead of “6’ depth”.
Questions / Clarifications
The following questions and issues were submitted via email at eflhd.contracts@dot.gov. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.
1. Can the existing pavement be ground with a reclaimer?
Response: Yes, a reclaimer may be used for grounding the existing pavement. Milling was specified as opposed to reclamation, because of the presence of boulders in the area, some which cannot be seen. Boulders could damage the reclaimer.
2. Aggregate base grading is listed as 1300 tons. How do we weight what we are grading, or we importing in the 1300 tons?
Response: Pay Item 30101-4000, AGGREGATE BASE GRADING C OR D, is for furnishing and placing aggregate material according to Section 301. The 1300 tons of aggregate base course is the amount of additional material that we calculated that is needed for the leveling course between the milled surface and the Suparpave pavement layer. This quantity also includes the material to be used to build the shoulders of the roadway.” The aggregate base will be measured by the ton according to Subsections 109.02(o) and 109.03.
mailto:eflhd.contracts@dot.gov
Info Page 2 of 2
3. The boulder removal is priced by the each. In the roadway reconditioning pay item, it says to remove boulders in that item. Are boulders paid by each boulder or in the roadway reconditioning item?
Response: Removal of individual boulders 6 inches or larger in diameter will be measured and paid according to Section 203, under Pay Items 20301-0200, REMOVAL OF BOULDER (DIAMETER 6 INCHES TO 2 FEET) and 20301-0200, REMOVAL OF
BOULDER (DIAMETER LARGER THAN 2 FEET).
B01
TYPICAL SECTIONS
NO SCALE
Normal edge of travel lane
" Elevation difference2
Type IV pavement roughness (2 equal lifts)
Size aggregate, <0.3 Million ESAL, -inch Nominal Maximum 2
3" Superpave pavement
Asphalt pavement grade
Profile
2%
LLC
Tripoli Road ground
Existing grading C or D (typ.)
Aggregate base
1:2 or flatter1:2 or fl atte r
2%
Travel lane
10’
Travel lane
10’
Ditch
3’ to 8’
Shoulder
1’ to 3’
Shoulder
1’ to 3’
Limit of construction
25 to 34’
TANGENT SECTION
grade
Profile
LLC
Tripoli Road ground
Existing grading C or D (typ.)
Aggregate base
1:2 or flatter
1:2 or fl atte r
Travel lane
10’
Travel lane
10’
Ditch
3’ to 8’
Shoulder
1’ to 3’
Shoulder
1’ to 3’
Limit of construction
25 to 34’
SUPERELEVATED SECTION
2.
1.
Notes:
grading C or D (Leveling course)
Aggregate base e e and leave in place
Mill asphalt pavement
1.5" and varies depth concrete pavement, Existing asphalt
Aggregate base
Shoulder
1’ to 3’
See Detail A (typ.)
Construct safety edge.
SAFETY EDGE
DETAIL A
PROPOSED PAVEMENT STRUCTURE
EXISTING PAVEMENT STRUCTURE
(Same as tangent section)
PROPOSED PAVEMENT STRUCTURE
(Same as tangent section)
EXISTING PAVEMENT STRUCTURE
See Detail A (typ.)
Construct safety edge.
in the plans at locations shown existing ditch
Recondition in the plans at locations shown existing ditch
Recondition
Recondition roadbed. 6" depth surfaces.
Establish turf on all disturbed areas except paved and rock surface of the roadway.
For larger boulders, remove to a minimum 2 feet below the to performing the asphalt pavement milling as directed by the CO.
Remove completely boulders less than 2 feet in diameter prior
REVISIONS
No. By DateDescription
KA
AMENDMENT #001
06/27/14Changed 6’ to 6"1 e f l-f il e s h a r e .f lh d .f h w a .d o t.
g o v D a ta P
R O J E
C T
S F
H N
H -1 (0
1) P r o j
D e v C
A D
D B 1- F
H
-1 (0
1) ty p .d g n
:5
:4
A M
-J u n -2
:5
A M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
WHITE MOUNTAIN NATIONAL FOREST
NH FH 47-1(001)
TRIPOLI ROAD
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0001 |
| Project NH FH 47-1(001) |
| Solicitation: DTFH71-14-B-00029 |
File details come from the government source that posted it. Updated .