Plans_ERFO-UOC 118(1).pdf
PDF 15 MB Posted
- Attached to
- Upper Ouachita National Wildlife Refuge
- Solicitation number
- DTFH71-12-B-00020
About this file
Plans_ERFO-UOC 118(1)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VETS-100A Form rev 2011.pdf | ||
| FP03_Eng .pdf | ||
| IFB Solicitation - ERFO-UOC 118(1).pdf | ||
| FP03 Errata.pdf | ||
| Soils and Foundation Report.pdf | ||
| Bidder's Qualifications Form.doc | DOC document | |
| Certification Program for Bridge Temporary Works.pdf | ||
| Synopsis Notice - ERFO-UOC 118(1).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R01R01
M P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
LASE
MOLLICY BAYOU BRIDGE
Hratch Pakhchanian
STATE PROJECT
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
REGION
December 2011
ERFO-UOC 118(1)
-J a n -2
:3
P
M A
C T
U A
L F I L E G
N
D
-J a n -2
:3
P
M M P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
REGION
SHEET
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
No scale YM LN LN
GENERAL NOTES
GENERAL NOTES AND INDEX
BRIDGE DRAWING NO.
INDEX OF DRAWINGS
DRAWING TITLE
Cast-in-place Concrete:
Reinforcing Steel:
GEOTECHNICAL REPORT:
MATERIALS:
Live loads:
Dead loads:
DESIGN LOADS:
Construction:
Design:
SPECIFICATIONS:
Concrete: 150 pcf.
Future Wearing Surface: 25 psf.
f’c = 4000 psi at 28 days.
Furnish reinforcing steel conforming to AASHTO M31, Grade 60 deformed.
Provide 2" cover for reinforcing steel unless otherwise noted.
f’c = 6,000 psi at 28 days f’c = 5,000 psi at release
HL-93.
" unless noted otherwise on the plans.4 3Chamfer exposed edges of all concrete
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 (U.S. Customary Units).
AASHTO LRFD Bridge Design Specifications, Fifth Edition, 2010 and Interim Revisions
Prestressed Concrete:
Furnish class HPC concrete for prestressed girders
Prestressed Girders:
Prestressed girders are AASHTO I-Beam - Type II prestressing strands conforming to AASHTO M203.
" diameter, seven-wire, uncoated, low-relaxation,2 1Prestressing steel shall be furnish Grade 270, Boring Location Plan
Reinforcing Steel Bar List
Miscellaneous Details
Bridge Rail Details
Slab Reinforcement
Girder Details
Girder Layout
Abutment and Wingwall Reinforcement - 2
Abutment and Wingwall Reinforcement - 1
Abutment Layout
Foundation Layout
Plan and Elevation
Site Plan
General Notes and Index f’c = 3000 psi at 28 days.
Furnish Class A(AE) for wingwalls, abutments, and pile caps
For boring logs and other geotechnical information, see Geotechnical Report No. 08-11, dated July 2011.
Furnish Class D(AE) for deck slab, curbs, and diaphragms
LASE
STATE PROJECT
SHEET
NO.
REGION
ERFO-UOC 118(1)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
BRIDGE DRAWING
DATE DRAWING NO.
MOLLICY BAYOU BRIDGE
14 Hratch Pakhchanian
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
December 2011
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
R02
P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
LASE
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
REGION
December 2011
ERFO-UOC 118(1)
-J a n -2
:3
P
M A
C T
U A
L F I L E S I T
E
D a n -2
:3
P
M M P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
2 " = 1’-0" YM BSK LN
SITE PLAN
N
CL Structure
Existing bridge
End Bridge
Elev. 73.20
Sta. 102+28
Begin Bridge
Elev. 73.70
Sta. 101+76
LASE
STATE PROJECT
SHEET
NO.
REGION
ERFO-UOC 118(1)
DATE DRAWING NO.
MOLLICY BAYOU BRIDGE
14 Hratch Pakhchanian
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
December 2011
R03
P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
LASE
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
REGION
December 2011
ERFO-UOC 118(1)
-J a n -2
:3
P
M A
C T
U A
L F I L E P
E a n -2
:3
P
M M P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
" = 1’-0" YM LN/ BSK LN
PLAN AND ELEVATION
Bridge length = 52’-0"
N
52’-0"
C u r b
C u r b
CL Structure
Wingwall B
Wingwall A to be removed
Existing bridge
CL
Profile grade
PLAN
ELEVATION
4’-0"
(Typ.)
T y p
(Typ.)
End Bridge
Elev. 73.20
Sta. 102+28
Begin Bridge
Elev. 73.70
Sta. 101+76
Abutment 2 Abutment 1
Wingwall B
Wingwall D
5’-0" 3’-0" left of ground line @ 10’-10"
Approximate existing roadway
ExistingCL
1.0%
(Typ.)
Metal curb drain
DETAILS" sheet for details)
(See "MISCELLANEOUS
12’-6"12’-6"
6"
(Typ.)(Typ.)
(see Note 1) fabric for slope protection with Type IV-D geotextile
Proposed ground line (see Note 1) fabric slope protection with Type IV-D geotextile for
Proposed ground line
"STANDARD AND DETAILS" sheets
See "EROSION CONTROL PLANS" and1.
Note:
Direction of flow
Direction of flow
LASE
STATE PROJECT
SHEET
NO.
REGION
ERFO-UOC 118(1)
DATE DRAWING NO.
MOLLICY BAYOU BRIDGE
14 Hratch Pakhchanian
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
December 2011
R04 R04
P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
LASE
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
REGION
December 2011
ERFO-UOC 118(1)
-J a n -2
:3
P
M A
C T
U A
L F I L E F
L a n -2
:3
P
M M P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
As shown YM BSK LN
FOUNDATION LAYOUT
CL Structure
Elev. 64.50 Elev. 64.50
T y p
CL
CL
CL
CL
N
PLAN
ELEVATION
Location
Abutment 1
Abutment 2
95 kips 52 ft
95 kips 52 ft
1’-4" 1’-4"
M in
H-Pile pile cap beam
Bottom of
T y p
A
A
ELEVATION VIEW A-A
CONNECTION DETAIL
HP-PILE-TO-PILE CAP
#7 Bar
End Bridge
Sta. 102+28
Begin Bridge
Sta. 101+76
NO SCALE
3 SCALE: " = 1’-0"
3 SCALE: " = 1’-0"
1’-6" 1’-6"
" dia.16
Oversized hole
S p a
S p a
S p a
S p a
HP 14x89
Abutment 1 &
HP 14x89
Abutment 2 &
(Each Pile)
Estimated Pile Length
150 kips
150 kips
(Each Pile)
Nominal Capacity
(Each Pile)
Factored Capacity
Note:
Pile installation is in accordance to Section 551.2.
installation process for test piles.
Use pile driving analysis (PDA) during1.
(see Note 1)
Test pile
(see Note 1)
Test pile
LASE
STATE PROJECT
SHEET
NO.
REGION
ERFO-UOC 118(1)
DATE DRAWING NO.
MOLLICY BAYOU BRIDGE
14 Hratch Pakhchanian
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
December 2011
R05 R05
P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
LASE
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
REGION
December 2011
ERFO-UOC 118(1)
-J a n -2
:3
P
M A
C T
U A
L F I L E A
B U
T
D a n -2
:3
P
M M P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
ABUTMENT LAYOUT
6’-0"6’-0"
6’-0" 6’-0"3’-0"3’-0"
T y p .)1’-0"
(Typ.)
Begin/End Bridge
CLStructure
CL
CL
(Typ.)
Girder
Bearing &
2’-0" 1’-0"
CL
A
A Elev. B Elev. B
Elev. D Elev. C Elev. C Elev. D
BearingsCL
HP 14x89
Bearing &
CL
CL
(Typ.)
HP 14x89
Elev. E
Pt. D Pt. C Pt. C Pt. D
Pt. B
Elev. A
Pt. B
Pt. A
PLAN
ELEVATION
SECTION A-A
N
Abutment 2
Abutment 1
(Abutment 2 shown, Abutment 1 similar)
(Abutment 2 shown, Abutment 1 similar)
Wingwall A or C
Wingwall B or D
Bridge deck
Girder
ELEVATIONS
ELEV.
A
B
C
D
E
73.70
73.41
64.50
SCALE: " = 1’-0"
SCALE: " = 1’-0"
SCALE: " = 1’-0"
1’-0 "
Geocomposite sheet drain plastic pipe
(collector pipe) plastic pipe
CL
plastic pipe
DETAIL A
Proposed ground line
CL
T y p
(See Detail A)
4" Drain pipe and glue or tape to back perforated discharge pipe
Wrap filter fabric around aggregate base course at approaches.
the top of weepholes to the bottom of proposed
Geocomposite sheet drains should extend from
Weephole Note:
sheet drain
Geocomposite sheet drain
Geocomposite
6" Drain pipe
73.20
72.91
64.50
ABUT. 1 ABUT. 2
23’-0"
5’-6"5’-6"
2’-0"
(Typ.)
Pt. B
Pt. B
T y p
Bridge
Begin/End
Constr. jt. (Typ.)
4" x 4" Fillet
1’-6" Bearing
Abutment &CL
CL
7 days.
Backfill abutment backwalls after the backwalls have cured for to top of girders after deck slab has cured for 3 days.
Place abutment backwall and remaining portion of deck concrete
4’-0" of end of superstructure slab.
At each end of the bridge, place concrete for deck slab within
Erect girders and place diaphragm concrete.
cured for 7 days.
Backfill of the abutment is allowed after the abutments have
Backfill abutment stems to 6" below the bridge seat elevation.
Place abutment stem concrete to bridge seat elevation.
"FOUNDATION LAYOUT" sheet.
Drive piles and cut off piles at length shown on
7.
6.
5.
4.
3.
2.
1.
INTEGRAL ABUTMENT CONSTRUCTION PROCEDURE
(Typ.)
68.92 68.47
(Typ.)
vent hole pipe
3" Dia. PVC schedule 40
(Typ.)
pipe vent hole schedule 40
3" dia. PVC
4"
(Typ.)
T y p
"2 17’-10 "2
17’-10
68.82 68.32
jt. (Typ.)
Constr.
T y p
CL
(Typ.)
DETAIL B
SCALE: 3" = 1’-0"
45 "2 1L 4"x4"x concrete anchor stud
" dia. x 6" long2
Notes:
"8 shown on plan.
" as2 1and welded to L4"x4"x
Concrete anchor studs are 6" long3.
of ASTM A108.
diameter and meet the requirements
" 2 1Concrete anchor studs are 2.
anchor studs spacing is 12" o.c.
Maximum spacing of concrete 1.
17’-0"
"2 1L4"x4"x
"2 1L4"x4"x
AbutmentCL
CLStructure vent hole pipe schedule 40
3" Dia. PVC
See Detail B
4’-9" Const. jt.
0.5%
M in
LASE
STATE PROJECT
SHEET
NO.
REGION
ERFO-UOC 118(1)
DATE DRAWING NO.
MOLLICY BAYOU BRIDGE
14 Hratch Pakhchanian
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
December 2011
R06 R06
P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
LASE
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
REGION
December 2011
ERFO-UOC 118(1)
-J a n -2
:3 a n -2
:3
P
M M P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
YM LN
CLStructure
BearingsCL
PLAN
ELEVATION
LN
REINFORCEMENT - 1
ABUTMENT AND WINGWALL
E
E
A
A
B
B
D
D
3 " = 1’-0"
6" 6"1’-0" 1’-0"1’-0" 1’-0" 1’-0" 1’-0" 1’-0" 1’-0" 1’-0" 1’-0"4 Spa. @ 1’-0" = 4’-0" 4 Spa. @ 1’-0" = 4’-0" 4 Spa. @ 1’-0" = 4’-0"
#5A6 #5A6
#5A2 #5A2 and #5A6 #5A2 and #5A6 #5A2 and #5A6 #5A2
#5A1 #5A1 #5A1 #5A1
(T y p
M in
T y p
M in
’-8
A
S p a
A
T y p
A
S p a
A e .f
Key:
n.f. = near face f.f. = far face e.f. = each face
5’-0" lap (Typ.)
#5A8 (Typ.)
A
T y p
#5A11 #5A11 #5A11
#5A11 #5A11 #5A11#5A13 #5A13 #5A13
See Note 5 (Typ.)
#5A4 #5A4 #5A4
#5A3 (at pile locations)
#5A5 #5A5 #5A5 #5A5
6"1’-0"1’-0"1’-0" l a p
M in T y p
5.
4.
3.
2.
1.
A C
T U
A L F I L E A
B U
T R
E I N
F
D G
N
Constr. joint
(see Note 3) (Typ.)
Threaded insert
(T y p
A
F
F
Notes:
C
C
1’-0" 1’-0"1’-0"1’-0"2’-0"
2 Spa. @ 1’-0" 2 Spa. @ 1’-0"
6" 1’-0" 1’-0" 1’-0" 1’-0"1’-0" 1’-0" 1’-0" 2’-0"
#5A4
2 Spa. @ 1’-0"
#5A4
2 Spa. @ 1’-0"
#5A4
2’-0"
(Typ.)
#5A16
A
T y p
S p a
(Typ.)
#5A17
Single straight bars are to be placed within 3" of the flanges.
flanges (including haunched areas) of the girders.
Threaded inserts are not to be used in the top or bottom
The minimum concrete cover is 3", otherwise noted.
sheet for locations of threaded inserts.
See "ABUTMENT AND WINGWALL REINFORCEMENT - 2"
". 8 1Length of threaded insert is 2 sheet for Sections A-A through C-C and Views D-D & E-E.
See "ABUTMENT AND WINGWALL REINFORCEMENT - 2"
Abutment 1 shown, Abutment 2 similar.
2’-0"
(Typ.)
#5A9
B
B
(Typ.)
#5A15 e.f.
N
Abutment 2
Abutment 1
N
LASE
STATE PROJECT
SHEET
NO.
REGION
ERFO-UOC 118(1)
DATE DRAWING NO.
MOLLICY BAYOU BRIDGE
14 Hratch Pakhchanian
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
December 2011
R07 R07
P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
LASE
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
REGION
December 2011
ERFO-UOC 118(1)
-J a n -2
:3 a n -2
:3
P
M M P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
YM LN
Girder
LN
REINFORCEMENT - 2
ABUTMENT AND WINGWALL
3 " = 1’-0"
SECTION A-A
SECTION B-B
SECTION C-C
THREADED INSERT LOCATIONS
#5S3#5S3
5 - #5A7
(Typ.)
4 - #5A7
(Typ.)
for #5 bar
Threaded insert
A
S p a
A
S p a
T y p e .f
#5A7
#5A1
#5A5
#5A3
(Typ.)
#5A2
T y p
M in
#5S3#5S3
#5A7
T y p
#5A6
#5A4#5A4
#5A6
#5A8
#5A13
#5A11
#5A2
#5A3
#5A7
#5S3#5S3
Threaded insertCL
End of girder
Face of web
Abutment n.f.
"2
End of girder
S p a
SECTION G-G G VIEW E-E
G 3" 5"11 Spa. @ 8" = 7’-4""
A e .f
#5A14
S p a
L a p
Constr. joint
"2 11’-6
A C
T U
A L F I L E A
B U
T R
E I N
F .D
G N
A
S p a
"2 12 "2
#5A12
SECTION F-F
spa.
2 Eq.
details)
DETAILS" sheet for
(see "MISCELLANEOUS
Water stop
#5A5
#5A1 #5S3#5S3
Girder
#5A7
SECTION D-D
wingwall
Top of abutment
Top of
(Typ.)
#5A4 #5A4
A e .f
#5A14
PLAN VIEW
ELEVATION
#5A17
#5A13 or
#5A10
#5A8 or
#5A9
#5A11 or
LASE
STATE PROJECT
SHEET
NO.
REGION
ERFO-UOC 118(1)
DATE DRAWING NO.
MOLLICY BAYOU BRIDGE
14 Hratch Pakhchanian
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
December 2011
R08 R08
P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
LASE
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
REGION
December 2011
ERFO-UOC 118(1)
-J a n -2
:3 a n -2
:3
P
M M P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
GIRDER LAYOUT
CL
diaphragm
Intermediate
52’-0"
25’-0" 25’-0"
CLStructure
CL
(Typ.)
Girder
FRAMING PLAN
A C
T U
A L F I L E G
I R
D L
A Y
O U
T .D
G N
Deck
Diaphragm Diaphragm
Girder
T y p .)(Typ.)
3"
CL3" Dia. vent hole
(Typ.)
A
A
SECTION A-A
SCALE: " = 1’-0" 8
SCALE: " = 1’-0" 4
1’-0"1’-0"
CL
Abutment 1
Bearing &
CL
CL
Abutment 2
Bearing &
CL
abutment construction procedure.
See "ABUTMENT LAYOUT" sheet for integral of 3" PVC vent pipes.
See "ABUTMENT LAYOUT" sheet for locations
2.
1.
Notes:
(Typ.)
vent hole pipe
3" PVC schedule 40
Begin Bridge End Bridge
LASE
STATE PROJECT
SHEET
NO.
REGION
ERFO-UOC 118(1)
DATE DRAWING NO.
MOLLICY BAYOU BRIDGE
14 Hratch Pakhchanian
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
December 2011
R09 R09
P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
LASE
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
REGION
December 2011
ERFO-UOC 118(1)
-J a n -2
:3
P
M A
C T
U A
L F I L E G
I R
D E
R
D a n -2
:3
P
M M P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
As shown LN BSK YM
GIRDER DETAILS
1’-0"
1’-6"
2"2"
3"
6"
6"
2" = 1’-2"
7 Spa. @
1’-0"
6"
2 Draped
4 Straight
8 Straight
2 Draped
Lbs.
Concrete
Reinf. Steel
Cu. Yds.
Lin. Ft." Strands2
ITEM UNIT QUANTITY
PRESTRESSED GIRDER ESTIMATE
Note: Quantities shown are for one girder only girder
Symmetrical about
CL
5.0
S p a
" at 2,000 lbs.
strands pulled
Full lengthat 2,000 lbs.
strands pulled
Full length
#5G1 #5G1
Min. lap
1’-3"
#5G2
#5G2
1’-6"
2"2" 2" = 1’-2"
7 Spa. @
Min. lap
1’-3"
#5G2 #5G2
G
END SECTION MID SECTION
1 SCALE: 1 " = 1’-0" 2
1 SCALE: 1 " = 1’-0"
2" 10 Spa. @ 4" = 3’-4"
#5G1
16 Spa. @ 6" = 8’-0"
#5G1
13 Spa. @ 1’-0" = 13’-0"
#5G1
6"
G
2" 9 Spa. @ 6" = 4’-6"
#5G3 (2 each)
20’-0" (Tie down for draped strands)
25’-0"
ELEVATION
SCALE: 1" = 1’-0"
" 2
4"
6 " 8
6 " 4
1’-3 " 4
" 43
2’-10"
#5G3
#5G1
#5G2
" Dia. Prestressed strands (Typ.) 2
CL
girders) tubing (interior with non-rigid hole formed
2" Dia. openCL
Threaded inserts
" 2
T y p
Required Actions:
forms. If this exceeds the estimated gdr. camber
", the fillet will have to be8 3("A") by more than increased by raising profile grade as directed by machine screed rails to offset the gdr. deflections due to deck & diaph. placement ("B") as shown in the diagram.
1. Measure girder camber prior to setting deck
2. Set the deck forms and camber the deck
Deflection Equation
=Deflection, in inches, of girder at any point caused by the weight of deck and diaphragm.
X=Distance, in feet, measured from midspan (See diagram).
where:
Note:
Span
Gdr.
Brg.Brg.
the CO.
A=Estimated girder camber before placement of deck and diaphragm (inches)
B=Deflection due to placement of deck and diaphragm (inches) max = B @ x=0 (midspan) min = 0 @ x=L/2
C
A
CAMBER TABLE (INCHES)
SPAN BEAM A C
Exterior
Interior
B
DECK FORM SETTING DIAGRAM
NO SCALE
X
2B (L/2)
1 -of deck
Final position parallel to this curve (parabola).
deck machine screed rails
Set deck forms and
CL
D e c k
CL
of girder
Final position diaph. concrete of deck and before placement
Gdr. position
CL
CL
L=Distance, in feet, measured from to of bearings
C=Fillet at of bearing at of girder (inches)
B B
B and diaphragm concrete.
before placement of deck
Position of deck forms
25’-0" 25’-0"
CL CL
CL CL
"16 71 "16
5 "16
"16 71 "16
7 3"
LASE
STATE PROJECT
SHEET
NO.
REGION
ERFO-UOC 118(1)
DATE DRAWING NO.
MOLLICY BAYOU BRIDGE
14 Hratch Pakhchanian
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
December 2011
R10
P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
LASE
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
REGION
December 2011
ERFO-UOC 118(1)
-J a n -2
:3 a n -2
:3
P
M M P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
CLStructure
4 Eq. spa. = 3’-10" 1’-1"1’-1"
#7D1 e.f.
#7D1 e.f.
3’-3"
(Typ.)
#8D3 (Typ.)
6’-0"6’-0" 3’-0" 3’-0"
CLType II AASHTO Girder
(Typ.)
12 Spa. @ 10" = 10’-0"12 Spa. @ 10" = 10’-0"
#5SE1
#5SE3 (Top & bottom) #5SE3 (Top & bottom)
T y p
Clr.
1 "
NEAR MIDSPAN
TYPICAL SECTION
C lr
C lr
21’-8"
2.5% 2.5%
Key:
n.f. = near face f.f. = far face e.f. = each face
C lr
#7D1
#7D1
#8D3
#4D2
8"
SECTION A-A
INTERMEDIATE DIAPHRAGM
(Typ.)
(Typ.)
Clr.
1 " 2
#4D2 (Typ.)
DECK REINFORCEMENT
SLAB REINFORCEMENT
S
E
T o p b o tt o m
CLStructure
74 Spa. @ 8" = 49’-4"
NO SCALE
SCALE: " = 1’-0"
SCALE: 1" = 1’-0"
#8D3
#5D4
#5D4
#5D4 (Typ.)
T y p
DETAIL A
see Detail A)
(exterior girders, with coil insert
All thread rod
1" Dia. x 3’-2"
All thread rod
1" Dia. x 3’-2"
2"
4"
1" Dia. x 4" coil insert
A C
T U
A L F I L E S
L A
B R
E I N
F .D
G N
10’-10"10’-10"
S
E e .f
S p a
1’-2"1’-2"
(Typ.)
A
A
(Typ.)
#5SE4
(Typ.)
#5SE2
4 Eq. spa. = 3’-10" 1’-1"1’-1"
#4D2 (Typ.)
4 Eq. spa. = 3’-10" 1’-1"1’-1"
#4D2 (Typ.)
T y p
Notes:
"8
T y p
1’-6"
(Typ.)
3’-0" Min. lap
(Typ.)
(Typ.)
1’-6"
"8 19 "8
3.
2.
1.
#5SE1 (Top and Bot.), 5SE2, and #5SE4
(See Note 3) aggregrate (Typ.)
6" Surface course
(See Note 3)
Type D (Typ.)
gradation
2" Aggregate (See Note 3)
(Typ.)
geotextile fabric
Type IV-D
See "TYPICAL SECTIONS" sheet for details.
for details of bridge rail.
See "BRIDGE RAIL DETAILS" sheet for details of end diaphragm.
REINFORCEMENT - 1 and 2" sheets
See "ABUTMENT AND WINGWALL
LASE
STATE PROJECT
SHEET
NO.
REGION
ERFO-UOC 118(1)
DATE DRAWING NO.
MOLLICY BAYOU BRIDGE
14 Hratch Pakhchanian
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
December 2011
R11 R11
P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
LASE
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
REGION
December 2011
ERFO-UOC 118(1)
-J a n -2
:3
P
M A
C T
U A
L F I L E R
A I L
D a n -2
:3
P
M M P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
11 As shown BSK
BRIDGE RAIL DETAILS
(Typ.)
PostCL
ELEVATION
1 " 2
1 " 16
3 "
3 "
4 " 5"
PL x 2 x 0’-3 " 2
CL 8
7 " Dia. anchor bolts
2 Places
3See Section A-A
3web weld not
Do
9 "
2 " 4
1 "5"
CL
(Typ.)
1" x 1 " Slotted holes 2
" 2
5 " 8
3 "
" 8
PL x 2 x 0’-3 " 2
Post
W6 x 8.5
PL 4
PL x 2 x 0’-3 " 2
Top of baseplate
Stop welds baseplate from top of welds "
Terminate
3 "
C
C
W-BEAM
SECTION B-B
VIEW D-D
D
D
SECTION THRU RAIL
POST MOUNTING DETAIL
VIEW C-C
3 "
BB
A
A
VIEW A-A
CL
CL
CL
"16 31 "16
91 "16
9 Spa. @ 6’-3" = 56’-3"
Notes:
6’-3"6’-3" sawing)
(no head cutting or holes machine cut
" slotted2 1" x 4
"8
(Typ.)
Top of curb
Top of curb
2"2" 4 " 4
4 " 4
CL
in post flange vertical slot
" 2 1" x 14
3& head bolt with washer
" Dia. A307 hex 8
W-beam
29 8
1" x 1 " SlotsCL
W6 x 8.5 Post
3 2 in W-beam
" x 2 " Slot
W-BEAM SPLICE DETAIL
SCALE: 1 " = 1’-0" 2
SCALE: 1 " = 1’-0" 2
SCALE: 1 " = 1’-0" 2
SCALE: 1 " = 1’-0" 2
1SCALE: " = 1’-0"
SCALE: 3" = 1’-0"
SCALE: 3" = 1’-0" SCALE: 3" = 1’-0"
NO SCALE
post
First soil embeddedCL post
First soil embeddedCL manufacturer.
may vary slightly with coating. Actual section exclusive of protective thickness = 0.1046"
12 gage steel. Nominal
W-beam member is
Note:
W6x9 post can be used in place of W6x8.5 with nominal 25’-0" W-beam sections (26’-0 " overall).
Maintain 6’-3" post spacing wherever possible for use the structure.
to at least the first soil embedded post at each end of
W-beam rail member must be extended and connected
Use " diameter ASTM A307 Grade A anchor bolts.
galvanized unless otherwise noted.
All steel components except reinforcing steel must be than " exist.
Use epoxy mortar under post base plates if gaps larger
Posts must be perpendicular to adjacent roadway grade.
Face of rail and posts must be vertical transversely.
8.
7.
6.
5.
4.
3.
2.
1.
W6x8.5 PostW6x8.5 Post
W6x8.5 PostW6x8.5 Post
Plate Detail"
See "Masonary See "Masonary
Plate Detail"
SCALE: 1 " = 1’-0" 2
MASONARY PLATE DETAIL
PLAN
VIEW E-E VIEW F-F
F
F
EE
"2 11’-1
(Typ.)
T y p
2" base plate
Top of
LN YM
LASE
STATE PROJECT
SHEET
NO.
REGION
ERFO-UOC 118(1)
DATE DRAWING NO.
MOLLICY BAYOU BRIDGE
14 Hratch Pakhchanian
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
December 2011
R12
P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
LASE
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
REGION
December 2011
ERFO-UOC 118(1)
-J a n -2
:3
P
M A
C T
U A
L F I L E M
I S
C
D a n -2
:3
P
M M P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
No scale YM BSK LN
MISCELLANEOUS DETAILS
8 " 2
8 " 2
CL
Bearings
Abutments &
CL
2 Internal layers at "
(top & bot.) &
2 External layers at " all around
" Clr.
ABUTMENT BEARING PAD DETAIL
(8 Required)
6"
7 17’
3 sides (Typ.)
Depress concrete 1 " 2
1’-0"
6"
Inside curb
7 17’
2’-6 " 8
A A
B
B fabrication galvanize after
Steel tube A 500, 4" x 8" x "4
1 " 2
(Typ.)(Typ.)
Perimeter bar
1 " x "
1 " (Typ.)
METAL CURB DRAIN DETAILS
1’-5"
6"
3"
5 "
" 2
1 " 16
1 " 16
2 " 8 1in this area on each side will only be permitted
Stapling to wood form vertical @ 6" centers
" Long staples, place 8
Wood form - rear face of wall
Notes:
WATERSTOP DETAILS
molded securely to pad
4 - 11 gauge steel shims
ELEVATION
PLAN
PLAN VIEW AT CURB
VIEW A-A
SECTION B-B
GRATE DETAIL
ELEVATION
PLAN
of waterstop.
REINFORCEMENT - 2" for locations
See "ABUTMENT AND WINDWALL in color.
Type D waterstop shall be light gray stapling to forms.
for any purpose except as required for
Holes must not be made in waterstop
3.
2.
1.
aggregrate
6" Surface course gradation Type D
2" Aggregate
"16
Bar (Typ.)
"2 1" x 2
"16
(Typ.)
" Dia. rod8
1’-0"
Grate geotextile fabric
Type IV-D
D ir e c ti o n o f fl o w
LASE
STATE PROJECT
SHEET
NO.
REGION
ERFO-UOC 118(1)
DATE DRAWING NO.
MOLLICY BAYOU BRIDGE
14 Hratch Pakhchanian
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
December 2011
R13
P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
DATE DRAWING NO.SCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
LASE
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
REGION
December 2011
ERFO-UOC 118(1)
-J a n -2
:3
P
M A
C T
U A
L F I L E B
A R
L I S
T .D a n -2
:3
P
M M P
R O J E
C T
S
F W
S \U
P O
U \u o c (1 b r id g e \M ic r o s ta ti o n \B r id g e
D e s ig n
F il e s \0
P
R O J E
C T
S .d
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
No scale YM BSK LN
REINFORCING STEEL BAR LIST
REINFORCING STEEL SCHEDULE DIMENSION TABLE
BAR MK SIZE TYPE PIN SZ LOCATION QTY LENGTH WEIGHT A B C D E F G H J K O R V
ABUTMENT REINFORCEMENT
17 0’-3�"#5A1 5 Stirrups
17 0’-3�"#5A2 5 Stirrups
S2 0’-2�"#5A3 5 Stirrups
17 0’-3�"#5A4 5 Stirrups
17 0’-3�"#5A5 5 Stirrups
17 0’-3�"#5A6 5 Stirrups
STR#5A7 5 Longitudinal
STR#5A8 5
STR#5A9 5
STR#5A10 5
STR#5A11 5
STR#5A12 5 Vert.
STR#5A13 5
STR#5A14 5 Vert. e.f.
STR#5A15 5 Horiz. e.f.
52 0’-3�"#5A16 5 Horiz.
STR#5A17 5
DIAPHRAGM REINFORCEMENT
14 0’-5�"#7D1 7 Vert. e.f.
S4 0’-1�"#4D2 4 Stirrups
STR#8D3 8 Horiz.
STR#5D4 5 Horiz.
LBSSUBTOTAL
SLAB REINFORCEMENT
STR#5S1 5 Trans. top & bot.
65 0’-3�"#5S2 5 Stirrups
STR#5S3 5 Longitudinal
LJ 0’-3�"#5S4 5 Stirrups
LBSSUBTOTAL
A
B C
D
E
O
H H
TYPE 14
B
C
D
OPTIONAL LEG
TYPE 17
A
G
B
C
H
D
TYPE S2
A G
C
D
TYPE S4
B
D
C B
A
TYPE 52
A
B
C
V F
E
D
TYPE 65
LBSSUBTOTAL
LASE
STATE PROJECT
SHEET
NO.
REGION
ERFO-UOC 118(1)
DATE DRAWING NO.
MOLLICY BAYOU BRIDGE
14 Hratch Pakhchanian
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
UPPER OUACHITA NATIONAL WILDLIFE REFUGE
December 2011
R14
MISCELLANEOUS
COMMITMENT TO EXCELLENCE
FEDERAL LANDS HIGHWAY
6. BHR-BORE HOLE REFUSAL
5. BHT-BORE HOLE TERMINATED
4. RQD-ROCK QUALITY DESIGNATION
3. CR%-PERCENT OF RECOVERY
2. R-REFUSAL, SPT 100 BLOWS/300 mm
1. SPT-STANDARD PENETRATION TEST -AASHTO T206-74
SCALE
7. GEOPHYSICAL TEST SITE: SEISMIC RESISTIVITY
S R
TEST BORING
BORING NUMBER B-N
DEPTH MARKS
BHT OR BHR
(TIME OF DRILLING)
WATER LEVEL (WL)
(24 HOURS)
WATER LEVEL (WL)
SHELBY TUBE
SPLIT SPOON
N BLOWS /
TESTS
PENETRATION
STANDARD
300 mm
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BORING LOCATION PLAN
AND SUBSURFACE PROFILE
SYMBOL TYPE OF MATERIAL SYMBOL TYPE OF MATERIAL
FAT CLAY
LEAN CLAY WITH SAND
SANDY CLAY
SANDY SILT SILTY SAND
Upper Ouachita National Wildlife Refuge
ERFO - UOC 118(1)
Mollicy Bayou Bridge
MEDIUM TO COARSE SAND FINE SAND
SAND WITH CLAY
SILT WITH SAND
N
End Bridge
Elev. 73.20
Sta. 102+28
Begin Bridge
Elev. 73.70
Sta. 101+76
CL Structure
52’-0"
1.0%
CLleft of ground line @ 10’-10"
Approximate existing
REGION
SHEET
NO.
LASE
STATE PROJECT
SHEET
NO.
REGIONREGION
NO.
Bridge Drawing 14 of 14
B-1
B-2
B-2B-1
ERFO-UOC 118(1)
NB-1
NB-2
| A01 |
| A02 |
| A03 |
| A04 |
| B01 |
| B02 |
| B03 |
| C01 |
| C02 |
| C03 |
| C04 |
| D01 |
| D02 |
| M01 |
| M02 |
| M03 |
| N01 |
| S01 |
| S02 |
| S03 |
| S04 |
| S05 |
| S06 |
| S07 |
| S08 |
| S09 |
| S10 |
| S11 |
| S12 |
| S13 |
| S14 |
| S15 |
| S16 |
| T01 |
| T02 |
| T03 |
| T04 |
| T05 |
| T06 |
| T07 |
| T08 |
| T09 |
File details come from the government source that posted it. Updated .