Amendment 002.pdf

PDF 99 KB Posted

Attached to
Okefenokee National Wildlife Refuge
Solicitation number
DTFH71-10-B-00025
Issued by

About this file

The purpose of this Amendment is to 1) Replace the Solicitation Page B-10 to correct a typographical error. 2) Bid Opening Date remains June 24 2010 at 2 00 pm EST.

View the file

Other files

File Type Posted
Amendment 001.pdf PDF
Plans.pdf PDF
FP03_Eng .pdf PDF
IFB Solicitation - RRP-OKF 10(3).pdf PDF
FP03 Errata.pdf PDF
REV__SB subcontract plan revised.doc DOC document
ADV_Bidder's Qualifications Form.doc DOC document
ARRA Sign Pictographs.pdf PDF
ARRA Sign Placement Guidance.pdf PDF
Pavement Report.pdf PDF
Synopsis.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTFH7110B00025

x x

0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

RRP-OKF 10(3)06/17/2010002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/25/2010

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment is to:

1) Replace the Solicitation Page B-10 to correct a typographical error.

2) Bid Opening Date remians June 24, 2010 at 2:00 pm EST.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Amendment No. 002

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 002 Project RRP-OKF 10(3)

Okefenokee National Wildlife Refuge Solicitation: DTFH71-10-B-00025

The purpose of this Amendment is to:

1) Replace the Solicitation Page B-10 to correct a typographical error.

Solicitation Provision changes

1. Delete the Solicitation Bid Schedule page B-10 and substitute the amended Bid Schedule page B-10.

B - 10

BID SUMMARY

Project RRP-OKF 10(3)

(Complete for Pages B-1 through B-9)

(1) Schedule A (Base Contract) Bid Total (from Page B-3) $__________________

(2) Schedule B (Government Option 1) Bid Total (from Page B-6) $__________________

(3) Schedule C (Government Option 2) Bid Total (from Page B-9) $__________________

Contract Administrative Cost for Total Calendar Days Bid* If Schedule A (Base Contract), Schedule B (Government Option 1), and Schedule C (Government Option 2) are awarded at the same time, the number of calendar days necessary to complete all contract work (Schedules A, B, and C) from Notice to Proceed (or date specified in the Notice to Proceed) to completion of all contract work.

(4) calendar days x $1,100 per calendar day =

Total Price of Project (for evaluation purposes only)

(1) Bid Total for Schedule A (Base Contract) . . . . . . . . . . . . . . . . . . . . (1) + (2) Bid Total for Schedule B (Gov’t Option 1) . . . . . . . . . . . . . . . . . . . (2) + (3) Bid Total for Schedule C (Gov’t Option 2) . . . . . . . . . . . . . . . . . . . (3) + (4) Contract Administrative Cost for Total Calendar Days Bid . . . . . . (4)

= EVALUATION TOTAL PRICE OF PROJECT

DO NOT INCLUDE ANY CONTRACT ADMINISTRATION COSTS IN BLOCK 17 OF SF-1442

Calendar Days Bid for Schedules of Work*

If Schedule A (Base Contract), Schedule B (Gov’t Option 1), and Schedule C (Gov’t Option 2) are NOT awarded at the same time, the number of calendar days necessary to complete each schedule of work:

Schedule A (Base Contract) = __________ calendar days Schedule B (Government Option 1) = __________ calendar days Schedule C (Government Option 2) = __________ calendar days

*See Block 11 of the SF-1442 for allowable maximum/minimum calendar days.

Does the Bidder claim the Price Evaluation Preference for HUBZone Small Business Concerns as defined in FAR Clause 52.219-4?

Yes No

Amendment 2 info.pdf
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 002
Project RRP-OKF 10(3)
Okefenokee National Wildlife Refuge
Solicitation: DTFH71-10-B-00025

File details come from the government source that posted it. Updated .