Amendment 002.pdf
PDF 99 KB Posted
- Attached to
- Okefenokee National Wildlife Refuge
- Solicitation number
- DTFH71-10-B-00025
About this file
The purpose of this Amendment is to 1) Replace the Solicitation Page B-10 to correct a typographical error. 2) Bid Opening Date remains June 24 2010 at 2 00 pm EST.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 001.pdf | ||
| Plans.pdf | ||
| FP03_Eng .pdf | ||
| IFB Solicitation - RRP-OKF 10(3).pdf | ||
| FP03 Errata.pdf | ||
| REV__SB subcontract plan revised.doc | DOC document | |
| ADV_Bidder's Qualifications Form.doc | DOC document | |
| ARRA Sign Pictographs.pdf | ||
| ARRA Sign Placement Guidance.pdf | ||
| Pavement Report.pdf | ||
| Synopsis.doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DTFH7110B00025
x x
0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sterling VA 20166-6511
EFLHD-CO
21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.
Federal Highway Administration
Sterling VA 20166-6511
EFLHD-AC
21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.
Federal Highway Administration
RRP-OKF 10(3)06/17/2010002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/25/2010
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment is to:
1) Replace the Solicitation Page B-10 to correct a typographical error.
2) Bid Opening Date remians June 24, 2010 at 2:00 pm EST.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Amendment No. 002
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 002 Project RRP-OKF 10(3)
Okefenokee National Wildlife Refuge Solicitation: DTFH71-10-B-00025
The purpose of this Amendment is to:
1) Replace the Solicitation Page B-10 to correct a typographical error.
Solicitation Provision changes
1. Delete the Solicitation Bid Schedule page B-10 and substitute the amended Bid Schedule page B-10.
B - 10
BID SUMMARY
Project RRP-OKF 10(3)
(Complete for Pages B-1 through B-9)
(1) Schedule A (Base Contract) Bid Total (from Page B-3) $__________________
(2) Schedule B (Government Option 1) Bid Total (from Page B-6) $__________________
(3) Schedule C (Government Option 2) Bid Total (from Page B-9) $__________________
Contract Administrative Cost for Total Calendar Days Bid* If Schedule A (Base Contract), Schedule B (Government Option 1), and Schedule C (Government Option 2) are awarded at the same time, the number of calendar days necessary to complete all contract work (Schedules A, B, and C) from Notice to Proceed (or date specified in the Notice to Proceed) to completion of all contract work.
(4) calendar days x $1,100 per calendar day =
Total Price of Project (for evaluation purposes only)
(1) Bid Total for Schedule A (Base Contract) . . . . . . . . . . . . . . . . . . . . (1) + (2) Bid Total for Schedule B (Gov’t Option 1) . . . . . . . . . . . . . . . . . . . (2) + (3) Bid Total for Schedule C (Gov’t Option 2) . . . . . . . . . . . . . . . . . . . (3) + (4) Contract Administrative Cost for Total Calendar Days Bid . . . . . . (4)
= EVALUATION TOTAL PRICE OF PROJECT
DO NOT INCLUDE ANY CONTRACT ADMINISTRATION COSTS IN BLOCK 17 OF SF-1442
Calendar Days Bid for Schedules of Work*
If Schedule A (Base Contract), Schedule B (Gov’t Option 1), and Schedule C (Gov’t Option 2) are NOT awarded at the same time, the number of calendar days necessary to complete each schedule of work:
Schedule A (Base Contract) = __________ calendar days Schedule B (Government Option 1) = __________ calendar days Schedule C (Government Option 2) = __________ calendar days
*See Block 11 of the SF-1442 for allowable maximum/minimum calendar days.
Does the Bidder claim the Price Evaluation Preference for HUBZone Small Business Concerns as defined in FAR Clause 52.219-4?
Yes No
| Amendment 2 info.pdf |
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 002 |
| Project RRP-OKF 10(3) |
| Okefenokee National Wildlife Refuge |
| Solicitation: DTFH71-10-B-00025 |
File details come from the government source that posted it. Updated .