IFB Solicitation.pdf

PDF 1 MB Posted

Attached to
Recovery, CT VI-0A30(035) C3 - Contract 3, located on St. Thomas Island, USVI
Solicitation number
DTFH71-09-B-00022
Issued by

About this file

IFB Solicitation

View the file

Other files

File Type Posted
SF 30 Amendment 002.pdf PDF
SF 30 Amend 001.pdf PDF
ADV_Bidder's Qualifications Form.doc DOC document
FP03_Eng .pdf PDF
FP03 Errata.pdf PDF
Geotechnical Report.pdf PDF
Plans.pdf PDF
ARRA Sign Pictographs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No.:

U S DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT: CT VI-0A30(035)

CONTRACT 3

LONG BAY ROAD (ROUTE 30)

IMPROVEMENTS

SOLICITATION

IFB NO: DTFH71-09-B-00022

This Contract Cites Standard Specifications FP-03

U.S. Customary

CONTRACTOR:

ADDRESS:

TERRITORY: VIRGIN ISLANDS OF THE UNITED STATES

ISLAND: ST. THOMAS, USVI

PARK / REFUGE / NF: VIRGIN ISLANDS DEPARTMENT

OF PUBLIC WORKS

ROADWAYS: STATIONS

LONG BAY ROAD 17+00 TO 31+50

PROJECT LENGTH TOTAL: 0.28 MILES

TYPE OF IMPROVEMENT:

Widen and reconstruct Long Bay Road (Route 30) with asphalt pavement, relocate utilities, drainage, signal system, street lighting and other miscellaneous work.

TABLE OF CONTENTS

Page

Notice to Bidders 1 through 2

Checklist for Bidders Submittal 1 through 2

*Bidders Qualification Questionnaire regarding the preparation of the Bid for Time 1 Page

Monthly Employment Report (with instructions) – ARRA Projects 1 through 3

DBE Commitment Form 1 through 8

*SF-1442 Solicitation, Offer, and Award A-1 through A-2

Continuation of SF 1442 A-3 through A-4

Bid Schedule Instructions 1 through 2

*Bid Schedule B-1 through B-10

*SF-24 Bid Bond C-1 through C-2

FEDERAL ACQUISITION REGULATION & TRANSPORTATION ACQUISITION

REGULATION SOLICITATION PROVISIONS & CONTRACT CLAUSES

Index to Federal and Transportation Acquisition Regulations 1 through 6

Representations and Certifications (OCRA online) D-1 through D-3

Instructions to Bidders E-1

*Socioeconomic Program Requirements F-1 through F-12

Minimum Wage Schedule F-13 through F-15

*General Contract Requirements G-1 through G-4

Construction Contract Requirements H-1

SPECIFICATIONS

Special Contract Requirements J-1 through J-55

Permits Obtained for this Project 1 through 15

Plans 1 through 149

Geotechnical Report 1 through 58

ARRA – Sign Pictographs 1 through 5

* Bidders’s Qualifications Form 1 through 7

*BOLD FACED ITEMS ARE TO BE INCLUDED WITH THE BID SUBMITTAL PACKAGE

NOTICE TO BIDDERS

CONTRACT FORMAT:

Bidders should note that the format of this contract is in accordance with Federal Acquisition Regulations (FAR), promulgated by the General Services Administration (GSA), effective April 1, 1984, including all applicable revisions. Applicable FAR provisions and clauses are incorporated in this contract by reference or full text as indicated in the INDEX before the D-page in this booklet.

FAR provisions and clauses incorporated by reference can be accessed on the Internet on the GSA website at www.arnet.gov/far/. Bidders are encouraged to review the documents thoroughly before bidding.

PROPOSAL BOOKLET AND OFFER SUBMITTAL:

It is the responsibility of the bidder to verify that this proposal is complete as listed in the Table of Contents. The bidder is responsible for submitting all required forms and documents with the offer.

Bidders should use the Checklist for Bid Submittal included in this booklet to check that their bids are complete.

CONSTRUCTION CONTRACTS:

As stated in FAR Clause 52.236-1, the Contractor shall perform on the site, and with its own organization, work equivalent to at least 25%. Additional guidance is given in FAR Subpart 35.5 where the majority of the project work is complex and specialized such as restoration work, bridge painting, and proprietary construction techniques (i.e. proprietary Cintec arch strengthening.) There are exceptions and they will be reviewed on a case-by-case basis.

BID GUARANTEE:

A bid guarantee in the amount of not less than 20 percent of the bid price or $3 million, whichever is less, is required with this bid. If the bidder fails to provide the required bid guarantee, such failure may require rejection of the bid. Reference FAR Provision 52.228-1, Bid Guarantee. A bid bond from a corporate surety must be from a surety acceptable to the Government as appearing on the Department of the Treasury’s list of approved sureties. The bid bond must have an original signature and an embossed seal for the surety. If a Power of Attorney is required with the bid bond, the Power of Attorney should have an original signature of the surety or, an embossed seal for the surety company in the certification section. If the Power of Attorney form contains any language stating that the Power of Attorney can be revoked at any time, the document must contain an original signature or an embossed seal in the certification section.

HAZARDOUS MATERIALS IDENTIFICATION AND MATERIAL SAFETY DATA:

As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS's) for all hazardous materials that the bidder identifies in paragraph (b) of this clause in the D-pages of this booklet. Failure to submit MSDS's may render the bidder ineligible for award of contract. The apparent low bidder should submit their MSDS's within two weeks after bid opening.

BONDING:

Small business concerns and disadvantaged business enterprises may obtain assistance in securing necessary bonding for this project by contacting the office of the Small Business Administration located in their State.

FINANCING ASSISTANCE: - Minority, Women-owned, and Disadvantaged Business Enterprises (DBE's). The Department of Transportation (DOT) offers working capital financing assistance for transportation related contracts. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $750,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address: http://osdbuweb.dot.gov.

NOTICE TO BIDDERS - (CONT'D.)

INTERNET BASED DATA BASES - REQUIRED INPUT must be completed at time of bid:

According to the FAR Subpart 4.1102 contractors MUST be registered in Central Contractor Registration (CCR) prior to the award of any contract. Access the following web site to register:

www.ccr.gov

According to the FAR Subpart 4.1201 contractors MUST complete their Online Annual Representations and Certifications Application (ORCA) prior to the closing date of the bid on line at http://orca.bpn.gov/.

According to the FAR Subpart 22.1302 (b) contractors and sub-contractors MUST complete the required Annual Vets-100 Form in order to be eligible for a contract award. It can be completed on-line at https://vets100.vets.dol.gov/.

PAYMENT:

Bidders are advised to review the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP), subsection 109.05, concerning direct and indirect payment included under a pay item in the bid schedule.

PROGRESS PAYMENTS:

ALL payments will be made via Electronic Funds Transfer (EFT) as such; the payment information in the CCR must be accurate in order for contractors' invoices to be considered proper invoices for the purpose of prompt payment under DOT contracts. Contractors must input and maintain (update as necessary) their EFT information in the CCR database. Offerors are advised that under FAR Clause 52.232-5, Payments Under Fixed Price Construction Contracts, upon request, progress payments will include premiums paid by the Contractor to obtain performance and payment bonds as required under this contract. These payments shall not be made in addition to the contract price. As specified in the FP, “Section 151 - MOBILIZATION", payments for performance and payment bond premiums shall be included in mobilization.

WELFARE-TO-WORK INITIATIVE:

The President’s Welfare Reform Bill was initiated to assist welfare recipients and hopefully aid welfare recipients to find gainful employment. In support of this bill, Contractors are encouraged to hire welfare recipients whenever possible and to use welfare recipients in performance of duties on Government contracts.

INCREASING SEAT BELT USE IN THE UNITED STATES:

The President’s Executive Order 13043 dated April 16, 1997, was issued to increase the use of seat belts in the United States. In support of this Order, contractors and subcontractors are encouraged to adopt and enforce on-the-job seat belt policies for their employees when operating company-owned, rented, or personally owned vehicles.

OBTAINING BID DOCUMENTS:

Bid documents will not be mailed. All bid documents are available for direct download from the Federal Business Opportunities (FBO) website:

http://www.fbo.gov/spg/DOT/FHWA/71/postdatePrevDays_1.html or the Eastern Federal Lands Highway Division website: http://www.efl.fhwa.dot.gov/contracting/Documents.aspx. Contractors are encouraged to register on the FBO website (for this specific project) in order to receive Email Notifications automatically when a document is added or updated for this specific project. All questions about this construction project must be emailed to the following address:

eflhd.contracts@fhwa.dot.gov.

http://www.ccr.gov/� http://orca.bpn.gov/� https://vets100.vets.dol.gov/� http://www.fbo.gov/spg/DOT/FHWA/71/postdatePrevDays_1.html� http://www.efl.fhwa.dot.gov/contracting/Documents.aspx� mailto:eflhd.contracts@fhwa.dot.gov�

THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MONITORING THE WEB PAGES

NOTED ABOVE FOR ALL CHANGES TO THE SOLICITATION AND ACTING ON SAID

CHANGES.

SELECTED DBE PROGRAM PROVISIONS FOR THE VIRGIN ISLANDS –

DISADVANTAGED BUSINESS ENTERPRISE (DBE) PARTICIPATION IN USDOT

ASSISTED CONTRACTS (EFLHD – ADMINISTERED CONTRACTS)

POLICY:

It is the policy of the United States that small business concerns, including small disadvantaged business concerns, shall have the maximum practicable opportunity to participate in performing contracts. It is further the policy of the United States that its prime contractors establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts with small business concerns, including small disadvantaged business concerns.

The Contractor hereby agrees, by signature on this Contract, to carry out this policy in the awarding of subcontracts to the fullest extent consistent with efficient contract performance. The Contractor further agrees to cooperate in any studies or surveys as may be conducted by the United States Small Business Administration, the Federal Highway Administration (FHWA), or the Virgin Islands, as may be necessary to determine the extent of the Contractor’s compliance with this policy.

DBE PARTICIPATION/CONTRACT GOAL AND GOOD FAITH EFFORTS:

For purposes of this Contract, the DBE subcontracting goal is 25 percent of the total contract amount, as determined by the Virgin Islands Department of Public Works with the concurrence of the Contracting Officer When the contract goal DBE participation is zero percent (0%), the contractor, if not an approved DBE, must still submit a small business subcontracting plan prior to award identifying all DBE’s which the contractor intends to use on the project.

This Contract will be awarded only to the low responsive and responsible bidder who meets this goal or who demonstrates good faith efforts to do so. Failure to make a good faith effort is defined as willful or intentional failure to perform in accordance with the requirements of this Contract, or willful or intentional action to frustrate the achievement of the Subcontracting Plan, if applicable.

Guidance on what constitutes good faith efforts is described in the Virgin Islands Department of Public Works’ (VIDPW) approved DBE Program. Copies of the program can be obtained from the VIDPW’s DBE Program Coordinator.

TERMINATION / SUBSTITUTION / REPLACEMENT OF LISTED DBE FIRMS:

The Prime contractor may not terminate for convenience a DBE subcontractor without the Contracting Officer’s prior written consent. The prime contractor will be expected to identify an acceptable certified DBE subcontractor replacement in that event, or demonstrate good faith efforts to do so. This restriction does not prohibit termination for default or for failure to perform adequately. If a DBE subcontractor is unwilling or unable to perform the work of the commitment made to the prime contractor, the prime contractor shall immediately notify in writing the Contracting Officer, and request to be relieved of the commitment to use the named DBE.

COUNTING DBE PARTICIPATION:

When a DBE participates in a contract, only the value of the work actually performed by the DBE will be counted toward performance of the goal. The entire amount of that portion of a construction contract or other contract that is performed by the DBE’s own forces will be credited. Included are the costs of supplies and materials obtained by the DBE for the work of the contract (DBE manufacturer 100 percent of the cost of the materials or supplies may be counted & DBE regular dealer 60 percent of the cost of the materials or supplies), including supplies purchased or equipment leased by the DBE (except supplies and equipment the DBE subcontractor purchases or leases from the prime contractor or its affiliate). Credit will be allowed for the entire amount of fees or commissions charged by a DBE firm for providing a bona fide service, such as professional, technical, consultant, or managerial services, or for providing bonds or insurance specifically required for the performance of a USDOT-assisted contract. Credit will be allowed for fees considered reasonable and not excessive as compared with fees customarily allowed for similar services.

Credit to a DBE contractor will be allowed only if the DBE is performing a commercially useful function on the contract. A DBE performs a commercially useful function when it is responsible for execution of the work of the contract and is carrying out its responsibilities by actually performing, managing, and supervising the work involved.

When a DBE subcontracts part of the work of its contract to another firm, the value of the subcontracted work may be counted only if the DBE’s subcontractor is itself a certified DBE. Work that a DBE subcontracts to a non-DBE firm does not count.

When a DBE performs as a participant in a joint venture, credit for a portion of the total dollar value of the contract equal to the distinct, clearly defined portion of the work of the contract that the DBE performs with its own forces will be allowed.

The Prime Contractor may not count the participation of a DBE subcontractor toward its DBE achievements or the overall goal until the amount being counted toward the goal has been paid to the

DBE.

PROMPT PAYMENT:

This Contract includes Prompt Payment for Construction Contracts, which requires payment to the subcontractor for satisfactory performance under its subcontract not later than 7 days from receipt of payment from the United States for work performed by the subcontractor. If retainage is withheld the prime contractor shall be required to release such retainage to subcontractors within thirty (30) calendar days of satisfactory completion, i.e. according to the specifications, of the entire subcontractor’s work.

LIQUIDATED DAMAGES:

If at the completion of the project, the prime contractor has failed to meet the established goal/commitment, or has not demonstrated good faith efforts to do so, the prime contractor shall be assessed liquidated damages for the difference between the established goal/commitment and the actual DBE participation achieved.

RECORD KEEPING REQUIREMENTS:

The Prime Contractor shall keep such records as necessary to ensure compliance with its DBE utilization obligations. The Prime contractor must retain all such records for at least three (3) years after project acceptance by the Contracting Officer following the completion of the contract. These records shall be available for inspection by the Virgin Islands Department of Public Works, the

FHWA, the USDOT, or other appropriately sanctioned Virgin Islands State Agencies or Federal Agencies or Departments, to determine the Prime Contractor’s good faith effort to meet the established DBE subcontracting goal. The prime contractor’s DBE liaison officer or designee shall complete the top half of Form A-644, Monthly Contractor DBE Participation, and submit the form or its facsimile to the VIDPW’s DBE Program Coordinator and the Contracting Officer monthly.

COMPLIANCE PROCEDURES:

Whenever it appears that the Prime Contractor or any subcontractor or supplier may not be operating in compliance with the terms, conditions or requirements of this Contract, including but not limited to, encouraging fronting, brokering or the circumstance of a DBE not performing a commercially useful function as defined, an investigation will be conducted. If it is found that the contractor or any subcontractor or supplier is not in compliance with these Special Provisions, the party in non-compliance will be notified in writing.

If the deficiencies are not corrected, the Contracting Officer reserves the right to initiate administrative action against the party or parties in non-compliance, which may include but not be limited to:

1. Termination of the contract for Default, which is a part of this Contract.

2. Withholding an appropriate percentage of partial payments pursuant to Section 109 of the

Standard Specifications for Highway and Bridge Construction. This appropriate percentage may be the amount of any proposed monetary sanction.

3. Initiation of appropriate debarment proceedings.

4. Referral of any unlawful actions to the appropriate enforcement agencies.

5. Other actions as appropriate, at the discretion of the Contracting Officer.

CHECKLIST FOR BID SUBMITTAL

1. Bid Envelope:

a. Addressed as shown in Block 8 of Page A-1

b. In lower left corner, indicate Solicitation No., Project Name & Number, time for Receipt of Offers and send to Mr. Wystan Benjamin, Highway Program Manager, Office of Highway Engineering, Virgin Islands Public Works Department, 6002 Estate Anna’s Hope, Christiansted, St. Croix, VI 00820-4428.

2. Standard Form 1442: Solicitation, Offer and Award (Pages A-1 and A-2)

a. Block 14: Name and Address of Bidder.

b. Block 15: Telephone Number of Bidder.

c. Block 16: Remittance Address if different from Block 14.

d. Block 19: All Amendments Acknowledged, with dates of Amendments.

e. Block 20: Bid is signed and dated.

3. Bid Schedule - (Pages B-1 through B-10)

a. Unit bid price and bid amount provided for each pay item in numbers.

b. Corrections initialed.

c. Price Evaluation eligibility is indicated on the Bid Summary page.

4. Disadvantaged Business Enterprise (DBE) Program Forms, to be completed within 5 business days after bid opening by the apparent low bidder.

a. Form A-585 (Appendix A)

b. BL-DBE Revised (Appendix B)

c. BL-DBE Revised (Appendix C)

d. Form (Appendix D)

e. Form A-644 (Appendix E)

5. Standard Form 24, Bid Bond (Pages C-1 through C-2) (Required if bid guarantee is bid bond)

a. Date executed

b. Legal name and address of bidder.

c. Type of organization.

d. State of incorporation (if applicable).

e. Name and business address of Treasury approved surety.

f. Penal sum of bond (not less than 20% of bid total).

g. Bid identification.

h. Signature of Bidder

i. Seal, if corporation

j. Signature of Surety

k. Seal, if corporation

BIDS RECEIVED WITHOUT A VALID BID BOND WILL BE REJECTED.

6. Power of Attorney.

a. Dated on or before execution date of bond

CHECKLIST FOR BID SUBMITTAL - (CONT'D.)

b. Power has original signature of surety, or is embossed with surety's seal in the certification section

BIDS RECEIVED WITHOUT A VALID POWER OF ATTORNEY WILL BE REJECTED.

7. Fill In's. The following full text Clauses and/or Provision numbers shall be checked or filled in and return with the bid package:

a. 52.219-4 – HubZone ONLY - See Section F, Clause 52-219-4, paragraph "C", check block if wavier is applicable.

8. Bidder's Qualifications questionnaire regarding the preparation of the bid for time.

Form completed, signed and submitted with bid.

9. Disadvantaged Business Enterprise (DBE) Program Forms: Submittal with the bid is not mandatory, but it is encouraged, as it will speed up the award process should your firm be the apparent low bid. (If not submitted with your bid package the apparent low bidder will have five working days to submit).

THE FOLLOWING THREE ITEMS ARE NOT TO BE SUBMITTED WITH THE

BID; BUT FAILURE TO COMPLETE THE REQUIREMENTS WILL BE CAUSE

TO REJECT THE BID.

10. Central Contractor Registration (CCR): The Contractor is currently registered in the Internet-Based CCR database at http://www.ccr.gov.

11. Online Representations and Certifications Application (ORCA): The Contractor's Representations and Certifications have been input online via the Internet-Based ORCA electronic database at http://orca.bpn.gov.

12. Vets100 Reporting: The Contractor has completed the annual Internet-Based reporting requirement online at https://vets100.vets.dol.gov.

NOTE: THE CONTRACTOR IS FULLY RESPONSIBLE TO VERIFY THAT ALL

DATA IN THE THREE DATABASES IS CORRECT EACH TIME A BID

PACKAGE IS SUBMITTED. FAILURE PROPERLY INPUT AND/OR UPDATE

YOUR DATA MAY CAUSE THE BID TO BE REJECTED.

Bidders Qualification questionnaire regarding the preparation of the bid for time:

1) Does the bid for time include the impact of normal weather conditions on the work of the Contract?

2) Does the bid for time include the impact of the terms of the Contract Specifications regarding work restrictions - including all identified delays, suspensions, and shut-downs?

3) Does the bid for time include sufficient time to allow that all contract work can be completed within contract time without the imposition of liquidated damages?

4) Does the bid for time include time for the review and approval process for all submittals required by the Contract?

5) Does the bid for time include time for the review and approval process for required drawings submitted under Subsection 104.03 of the Specifications?

6) Does the bid for time include the lead time required for the procurement, manufacture, and delivery of materials that are to be incorporated into the Contract work?

7) Does the bid for time include sufficient time to accommodate the fact that the date of Notice to Proceed is conditional upon the Government awarding the contract up to 60 days after the bid opening?

8) Does the bid for time include the 14 days after the award of the Contract that the Contractor has to provide Performance and Payment bonds?

9) Does the bid for time include sufficient time to accommodate the fact that the Contracting Officer has up to 30 days after receipt of acceptable Performance and Payment bonds to issue the Notice to Proceed?

I hereby certify that the answer to each and every one of the questions listed above is yes.

Signature of Authorized Representative Title Date

Note: If the questionnaire is not signed the bid shall be found non-responsive and rejected.

1. First day of reporting period (mm/dd/yyyy):

4. Federal-Aid Project NO.

7. CONTRACTOR NAME

8. Contractor/Subcontractor DUNS number:

NUMBER OF

EMPLOYEES

TOTAL

HOURS

TOTAL

PAYROLL

Prime Contractor

DATE

MONTHLY EMPLOYMENT REPORT

AMERICAN RECOVERY AND REINVESTMENT ACT

Eastern Federal Lands Highway Division

Federal Highway Administration

2. Report Month (mm/yyyy) 3. Contracting Agency

5. State Project Number or ID Number 6. Project Location: State, County, or FLH Division

Prime and Subcontractor Totals

10. PREPARED BY CEO or Payroll Official: (Signature and Title)

Subcontractor(s):

9. Employment Data

Monthly Employment Report Instructions

BOX 1. First day of reporting period: The first day of reporting period is the first day of the first payroll period of the month. If the beginning of the month splits the payroll period then the report will include dates from the prior month as necessary to complete the payroll period. Use the format, mm/dd/yyyy (e.g.

“May 1, 2009” would be coded as “05/01/2009”).

BOX 2. Report Month: The month and year covered by the report. Use the format, mm/yyyy (e.g. “May 2009” would be coded as “05/2009”).

BOX 3. Contracting agency: The name of the contracting agency, “Federal Highway Administration”.

BOX 4. Federal-aid project number: Will be provided by the CO (last seven digits of “PROJ” number within the Accounting and Appropriation Data shown on Standard Form 1442, block 23, of the contract; e.g. “0SNT001”).

BOX 5. State project number or identification number: The Project Number as given in Block 6 of Standard Form 1442 of the Contract.

BOX 6. Project location: Provide the Federal Lands Highway Division.

BOX 7. Contractor name and address: Include the name, street address, city, state, and zip code of the Contractor.

BOX 8. Contractor DUNS number: The unique nine-digit number issued by the

Department of the Treasury. Followed by the optional 4 digit DUNS Plus number. Leave blank if Contractor does not have one.

BOX 9. Employment data: Report the direct, on-project jobs for prime contractor workforce as well as the workforce of all subcontractors active that month.

Include employees who work on the jobsite, the project office, the home office or telework from a home or other alternative office location. Include any engineering personnel, inspectors, sampling and testing technicians and lab technicians. Do NOT include material suppliers (i.e. steel and guardrail suppliers etc.). One line for the prime Contractor, and one line for each subcontractor. Specifically identify:

a. Subcontractor name: The name of each subcontractor that was active on the project for the reporting month.

b. Employees: The number of employees on the Contractor’s workforce that month, and the number of employees for each of the active subcontractors that month.

c. Hours: The total hours on the specified project for all employees on the contractor’s workforce that month, and the total hours for all employees for each of the active subcontractors that month.

d. Payroll: The total dollar amount of wages paid that month for employees on the specified project, and the total dollar amount of wages paid by each of the active subcontractors that month. Include only wages; do NOT include overhead or indirect costs. Round to the nearest whole dollar.

Sum up the total at the bottom. Report as a whole number.

BOX 10. Prepared by:

a. Name: Indicate the person responsible for preparation of the form. By completing the form the person certifies that they are knowledgeable of the hours worked and employment status for all the employees. Maintain data to support the employment report, and make the data available, if requested by the CO.

b. Date: The date that the Contractor completed the Monthly Employment Report. Use the format, mm/dd/yyyy.

A-1

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

1. Solicitation No.

DTFH71-09-B-00022

2. Type of Solicitation Sealed Bid (IFB)

Negotiated (RFP)

3.Date Issued

07/10/09

Page of Pages

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. Contract No.

5. Requisition/Purchase Request No.

6. Project No.

CT VI 0A30(35) C3

7. Issued By: |CODE: N/A______ Federal Highway Administration Eastern Federal Lands Highway Division Loudoun Tech Center 21400 Ridgetop Circle, Room 105 Sterling, Virginia 20166- 511 6

8. Address Offer To:

Deputy Commissioner of Engineering Public Works Department U.S. Virgin Islands 8244 Sub Base Charlotte Amalie, St. Thomas, VI 00802-5805

9. FOR INFORMATION

See 9A & 9B

A. Name:

Peggy L. Schaad

B. Telephone No. (Include area code) (NO COLLECT

CALLS)

Email eflhd.contracts@fhwa.dot.gov

___________________________________________SOLICITATION___________ _____________________________ NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder"_____________________________________

10. The Government requires performance of the work described in these documents (title, identifying no., date):

This solicitation is for the construction of U.S. Virgin Islands Department of Public Works Project CT VI 0A30(35) C3, in strict accordance with the Contract Clauses and the below listed specifications, schedules, drawings, and conditions for the quantities of work actually performed at the unit prices as bid in the Bid Schedule, including all applicable Federal, State, and local taxes.

FP - Standard Specification for Construction of Roads and Bridges on Federal Highway Projects.

Bid Schedule, Pages B-1 through B-10.

Special Contract Requirements, pages J-1 through J-55.

Plans, Sheets 1 through 149.

Permits, Pages 1 through 15.

Geotechnical Report, 1 through 58.

ARRA Sign Pictographs, 1 through 5.

11. The Contractor shall begin performance within 10 calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See Continuation Sheet)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND

PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO SEE SUBSECTION 102.06 OF FP-96

12B. CALENDAR DAYS

Within 14 calendar days after Notice of Award

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 10:00 am local time 08/11/09. If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)

Help Desk

See Continuation of SF 1442

A-2 OFFER (Must be fully completed by offeror)

15. Telephone No. (Include area code) 14. Name and Address of Offeror (Include ZIP code)

DUN: FACILITY CODE

16. Remittance Address (Include only if different than Item 14)

17. The offeror agrees to perform the w ork required at the prices s pecified below in strict accordance with the terms of this soli citation if this offer is accepted by the Government in writing within _ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS See Bid Schedule - Section "B" Pages

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20a. Name and title of person authorized to sign offer (Type or print)

20B. Signature 20C. Offer Date

AWARD (To be completed by Government)

21. Items Accepted:

22. Amount

23. Accounting and appropriation data

24. SUBMIT INVOICES TO

ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

See Block 26

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

15 USC 637(a) ) 41 USC 253(c) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY:

Federal Highway Administration Eastern Federal Lands Highway Division 21400 Ridgetop Circle Sterling, Virginia 20166-6511

Federal Highway Administration Eastern Federal Lands Highway Division Finance Division, Room 357 21400 Ridgetop Circle Sterling, Virginia 20166-6511

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed.

This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. Name and Title of Contractor or Person Authorized to Sign (Type or print)

31a. Name of Contracting Officer (Type or print)

30b. Signature

30C. Date 31b. United States of America

BY

31C. Date

GPO : 1985 0 - 469-796 S TANDARD FORM 1442 BACK (REV. 4-85)

CONTINUATION OF SF 1442 A-3

Block 2:

This project is UN-RESTRICTED - Bids will be accepted from ALL eligible business concerns.

This procurement falls under North American Industry Classification System (NAICS) code 237310 - Highway, Street, and Bridge Construction (see FAR Subpart 19.10)

The award of this project is subject to a 10% price evaluation preference for eligible HubZone Small Business Concerns (must be on the SBA listing) (see FAR Clause 52.219-4).

Facsimile and electronic bids will not be accepted.

PHYSICAL DATA AVAILABLE FOR REVIEW

1. Manual on Uniform Traffic Control Devices for Streets and Highways, 2003 Edition, published by the Federal Highway Administration. http://mutcd.fhwa.dot.gov.

2. Geotechnical Report

3. Permits

4. ARRA Signs - Pictographs

Block 9:

In accordance with FAR Provision 52.236-27, Site Visit, a Government representative can be available to show the project to prospective bidders. All requests for site visits see Section E of the solicitation and e-mail all questions concerning this construction project to the following e-mail address eflhd.contracts@fhwa.dot.gov. Interested parties must provide the Solicitation Number and the relevant project name with all requests and questions.

Block 11:

The maximum time for completion of the contract is 362 calendar days.

The completion time for the contract will be the time offered by the successful bidder, not to exceed the maximum time above. Work restrictions can be found in SCR Sections 108 and

156. See the SCR (J pages) Sections 107 and 109 for ARRA reporting requirements.

Notice to Proceed will be issued within 30 days following receipt of acceptable performance and payment bonds. (Actual Notice to Proceed date will be 10 days from issuance or the date specified in the Notice.)

Block 12A:

Furnish performance and payment bonds in accordance with FAR Clause 52.228-15.

Block 13:

A bid guarantee in the amount of not less than 20 percent of the bid price or $3 million, whichever is less, is required with this bid. If the bidder fails to provide the required bid

A-4

CONTINUATION OF SF 1442

guarantee, such failure may require rejection of the bid. Reference FAR Provision 52.228-1, Bid Guarantee.

Other:

The estimated price is expected to fall within the price range of $5,000,000 to $10,000,000.

Responsibility of bidders shall be evaluated in accordance with the information provided on the Bidder's Qualification Form, which can be downloaded from FHWA web site. FP-03 versions can be downloaded at the FHWA web site. FHWA web site is http://www.efl.fhwa.dot.gov/contracting-manuals-guides.aspx then click on Construction Specifications.

BID SCHEDULE INSTRUCTIONS

PROJECT: CT VI-0A30(035) C3

BIDDERS PLEASE NOTE: Before preparing the bid, carefully read the Instructions to

Bidders. While preparing the bid, comply with the following:

COMPLETING THE BID SCHEDULE

Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit Bid Price and Amount Bid for the pay item. Determine the Bid Total by adding the amounts of the several items, and show in the block provided on Page B-9. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.

To be eligible for award, bidders must submit prices for each pay item.

Review Subsection 109.05 of the FP regarding scope of payment for direct and indirect payment work.

SCHEDULE OF WORK

The Bid Schedule is comprised of the following:

Schedule A – Rehabilitation of approximately 0.23 miles of Long Bay Road (Route 30) from the Lover’s Lane/Veterans Drive intersection to the Centerline Road Extension/Frenchman’s Bay Road intersection.

BIDDING OF CALENDAR DAYS

Determine the number of calendar days necessary to complete Schedule A work from Notice To Proceed to contract completion. Specify the number of calendar days (NOT to exceed the maximum number of calendar days shown in Block 11 of the SF-1442) in the space provided on the Bid Summary page. Failure to specify a number of calendar days for contract completion indicates the bidder accepts the maximum contract completion time provided in Block 11 of the SF-1442.

In developing a construction schedule to determine the number of calendar days included in their bid, bidders should consider and include any work limitations shown in Sections 108 and 156 of the FP and Special Contract Requirements (SCR’s). Specific work limitations may be (but are not limited to): National legal holidays, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. Bidders are advised to consider those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry, etc); those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting, etc); and those that have specific planting seasons (turf establishment, sod, trees, plants, etc). Bidders are also advised to consider time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the FP and SCR’s). The total calendar days bid should also include any work limitations and any delay days or Contractor/supplier winter shutdowns required due to weather sensitive work items.

When evaluating the bids, the Government will consider the Contract Administrative Cost for the project to be $2,700 per calendar day bid. The Contract Administrative Cost is only used to determine the Evaluation Total Price of Project.

Add the Bid Total and the Contract Administrative Cost for Schedule A as directed on the Bid Summary page. Show the Evaluation Total Price of Project in the space provided on the Bid Summary page.

BASIS FOR AWARD

The contract will be awarded to the responsive, responsible bidder with the lowest Evaluation Total Price of Project, which is defined as:

Bid Total of Schedule A + Contract Administrative Cost of Schedule A.

The number of calendar days specified by the successful bidder for the completion of Schedule A work will become the performance period for the contract.

NOTE: Contract Administration Cost is used for evaluation and ranking purposes only.

Project: CT VI 0A30(035) C3

LONG BAY ROAD - CONTRACT 3

B- 1

Bid Schedule

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

15101-0000 MOBILIZATION

ALL Lump Sum $___________________

15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL Lump Sum $___________________

15401-0000 CONTRACTOR TESTING

ALL Lump Sum $___________________

15705-0100 SOIL EROSION CONTROL, SILT FENCE (WIRE BACKED)

1,300

LNFT $_______________ $___________________

15706-1100 SOIL EROSION CONTROL, INLET PROTECTION TYPE A

EACH $_______________ $___________________

15801-0000 WATERING FOR DUST CONTROL (1000 gal per mgal)

MGAL $_______________ $___________________

20102-0000 CLEARING AND GRUBBING

ALL Lump Sum $___________________

20220-1000 REMOVAL, INDIVIDUAL TREE

EACH $_______________ $___________________

20301-0900 REMOVAL OF FIRE HYDRANT (UTILITY)

EACH $_______________ $___________________

20301-1400 REMOVAL OF INLET

EACH $_______________ $___________________

20301-2400 REMOVAL OF SIGN

EACH $_______________ $___________________

Project: CT VI 0A30(035) C3

Bid Schedule A

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

B- 2

20301-2700 REMOVAL OF STRUCTURE , BUS SHELTER

EACH $_______________ $___________________

20302-0100 REMOVAL OF BOX CULVERT

LNFT $_______________ $___________________

20302-0200 REMOVAL OF CURB , CONCRETE (AND GUTTER)

LNFT $_______________ $___________________

20302-0900 REMOVAL OF FENCE, CHAIN LINK

1,000

LNFT $_______________ $___________________

20302-2100 REMOVAL OF PIPE CULVERT

LNFT $_______________ $___________________

20302-2300 REMOVAL OF WATERLINE (SALT WATER)

1,225

LNFT $_______________ $___________________

20303-1600 REMOVAL OF PAVEMENT, ASPHALT

4,500

SQYD $_______________ $___________________

20303-2300 REMOVAL OF PAVEMENT, CONCRETE

4,500

SQYD $_______________ $___________________

20303-3200 REMOVAL OF SIDEWALK, CONCRETE

1,400

SQYD $_______________ $___________________

20303-3600 REMOVAL OF WALL

SQYD $_______________ $___________________

20315-0000 SAWCUTTING PAVEMENT

LNFT $_______________ $___________________

20401-0000 ROADWAY EXCAVATION

3,750

CUYD $_______________ $___________________

Project: CT VI 0A30(035) C3

Estimated Quantity Unit Bid Price Amount Bid

B- 3

20701-1200 EARTHWORK GEOTEXTILE, TYPE IV-A

SQYD $_______________ $___________________

25101-3000 PLACED RIPRAP, CLASS 3

CUYD $_______________ $___________________

30101-4000 AGGREGATE BASE GRADING C OR D

3,300

TON $_______________ $___________________

40201-0800 HOT ASPHALT CONCRETE PAVEMENT, MARSHALL TEST, CLASS B,

GRADING C

2,950

TON $_______________ $___________________

40201-1300 HOT ASPHALT CONCRETE PAVEMENT, MARSHALL TEST, CLASS A,

GRADING E , TYPE 3 PAVEMENT SMOOTHNESS

1,000

TON $_______________ $___________________

50102-0100 PLAIN RIGID PAVEMENT, 6-INCH DEPTH, TYPE A SMOOTHNESS

SQYD $_______________ $___________________

55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (FOR HEADWALL FOR 8 FOOT

X 3 FOOT BOX CULVERT)

CUYD $_______________ $___________________

55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (UTILITY)

CUYD $_______________ $___________________

55401-1000 REINFORCING STEEL

LB $_______________ $___________________

60102-0000 CONCRETE , REINFORCED BLOCK WALL

SQYD $_______________ $___________________

60201-0400 12-INCH PIPE CULVERT

LNFT $_______________ $___________________

Project: CT VI 0A30(035) C3

Estimated Quantity Unit Bid Price Amount Bid

B- 4

60201-0500 15-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-0600 18-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-0800 24-INCH PIPE CULVERT

LNFT $_______________ $___________________

60220-1750 8 FEET SPAN, 3 FEET RISE PRECAST REINFORCED CONCRETE BOX

CULVERT

LNFT $_______________ $___________________

60401-1000 MANHOLE, TYPE 1

EACH $_______________ $___________________

60401-3000 MANHOLE, TYPE 3

EACH $_______________ $___________________

60404-0000 CATCH BASIN (TYPE 2-2B)

EACH $_______________ $___________________

60404-0000 CATCH BASIN (TYPE 5)

EACH $_______________ $___________________

60404-3000 CATCH BASIN, TYPE 3

EACH $_______________ $___________________

60405-0000 MANHOLE ADJUSTMENT (RECONSTRUCT)

EACH $_______________ $___________________

60405-0000 MANHOLE ADJUSTMENT

EACH $_______________ $___________________

60407-0000 CAPPING INLETS AND MANHOLES (UTILITY)

EACH $_______________ $___________________

Project: CT VI 0A30(035) C3

Estimated Quantity Unit Bid Price Amount Bid

B- 5

60413-0000 TRENCH DRAIN

LNFT $_______________ $___________________

60901-1700 CURB, CONCRETE, 18-INCH DEPTH

1,300

LNFT $_______________ $___________________

60902-1300 CURB AND GUTTER, CONCRETE, 15-INCH DEPTH

2,450

LNFT $_______________ $___________________

61102-0450 3/4-INCH WATERLINE, POLYVINYL CHLORIDE (PVC) SCHEDULE 80

(UTILITY)

LNFT $_______________ $___________________

61102-0700 1-INCH WATERLINE, POLYVINYL CHLORIDE (PVC) SCHEDULE 80

(UTILITY)

LNFT $_______________ $___________________

61102-2750 4-INCH WATERLINE, DUCTILE IRON (UTILITY)

LNFT $_______________ $___________________

61102-3000 6-INCH WATERLINE, DUCTILE IRON (UTILITY)

LNFT $_______________ $___________________

61102-3250 8-INCH WATERLINE, DUCTILE IRON (UTILITY)

LNFT $_______________ $___________________

61104-0400 VALVE, GATE W/ CURB STOP

(UTILITY)

EACH $_______________ $___________________

61104-0700 VALVE, GATE, 4-INCH (UTILITY)

EACH $_______________ $___________________

61107-0000 WATER METER (UTILITY)

EACH $_______________ $___________________

Project: CT VI 0A30(035) C3

Estimated Quantity Unit Bid Price Amount Bid

B- 6

61108-1000 ADJUST WATER VALVE (UTILITY)

EACH $_______________ $___________________

61109-4000 RELOCATE FIRE HYDRANT

EACH $_______________ $___________________

61202-4000 21-INCH SEWER LINE, PLASTIC

LNFT $_______________ $___________________

61501-0100 SIDEWALK, CONCRETE

1,900

SQYD $_______________ $___________________

61504-1000 ACCESSIBILITY RAMP, CONCRETE

SQYD $_______________ $___________________

61921-1000 REMOVE AND RESET FENCE (CHAIN LINK)

LNFT $_______________ $___________________

61921-1000 REMOVE AND RESET FENCE (DECORATIVE W/ PILLARS)

LNFT $_______________ $___________________

62405-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH

1,700

SQYD $_______________ $___________________

62502-0000 TURF ESTABLISHMENT

1,700

SQYD $_______________ $___________________

62630-0200 PLANTINGS, SEEDLINGS, BALLED AND BURLAPPED

EACH $_______________ $___________________

63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING

SQFT $_______________ $___________________

63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID

2,000

LNFT $_______________ $___________________

Project: CT VI 0A30(035) C3

Estimated Quantity Unit Bid Price Amount Bid

B- 7

63401-1600 PAVEMENT MARKINGS, TYPE H, BROKEN

2,300

LNFT $_______________ $___________________

63403-0800 PAVEMENT MARKINGS, TYPE H (ARROW / WORD)

SQFT $_______________ $___________________

63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

EACH $_______________ $___________________

63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C

EACH $_______________ $___________________

63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE

SIGN

EACH $_______________ $___________________

63503-0450 TEMPORARY TRAFFIC CONTROL, WATER-FILLED BARRIER

2,800

LNFT $_______________ $___________________

63503-0550 TEMPORARY TRAFFIC CONTROL, MOVING WATER-FILLED BARRIER

3,300

LNFT $_______________ $___________________

63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

17,000

LNFT $_______________ $___________________

63503-0800 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL

17,000

LNFT $_______________ $___________________

63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

SQFT $_______________ $___________________

63506-0400 TEMPORARY TRAFFIC CONTROL, POLICE OFFICER

HOUR $_______________ $___________________

63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

HOUR $ 13.40 $ 12,730.00

Project: CT VI 0A30(035) C3

Estimated Quantity Unit Bid Price Amount Bid

B- 8

63601-1000 SYSTEM INSTALLATION, TRAFFIC SIGNAL (DESIGN \ BUILD)

ALL Lump Sum $___________________

63601-2000 SYSTEM INSTALLATION, LIGHTING

ALL Lump Sum $___________________

63610-1600 CONDUIT, 2-INCH, PVC

2,543

LNFT $_______________ $___________________

63610-2200 CONDUIT, 3-INCH, PVC (SCHEDULE 80)

LNFT $_______________ $___________________

63610-2800 CONDUIT, 4-INCH, PVC (SCHEDULE 80) (UTILITY)

1,490

LNFT $_______________ $___________________

63610-2800 CONDUIT, 4-INCH, PVC (SCHEDULE 40)

LNFT $_______________ $___________________

63610-3200 CONDUIT, 6-INCH, PVC (SCHEDULE 40)

LNFT $_______________ $___________________

63610-3200 CONDUIT, 6-INCH, PVC (SCHEDULE 80)

LNFT $_______________ $___________________

63621-1000 UTILITY BOX, PULLBOX

EACH $_______________ $___________________

63621-3000 UTILITY BOX, JUNCTION BOX (HANDHOLE) (UTILITY)

EACH $_______________ $___________________

63623-1000 MANHOLE, ELECTRICAL (RELOCATE)

(UTILITY)

EACH $_______________ $___________________

63701-0000 FIELD OFFICE

EACH $_______________ $___________________

64501-0000 LOCATE UTILITIES

ALL Lump Sum $___________________

Project: CT VI 0A30(035) C3

Estimated Quantity Unit Bid Price Amount Bid

B- 9

64602-2000 BUILDING, SUPPORT BUILDING (Bus Shelter) ALL Lump Sum $___________________

$_____________________TOTAL

Submitted by:

Name of Bidder

Project: CT VI 0A30(035) C3

B - 10

BID SUMMARY

Project CT VI-0A30(035) C3

(Complete for Pages B-1 through B-9)

(1) Schedule A Bid Total (from Page B-9) $__________________ Contract Administrative Cost for Schedule A

Number of calendar days necessary to complete all Schedule A work from Notice to Proceed (or date specified in the Notice to Proceed) to completion of Schedule A.

(2) calendar days x $2,700 per calendar day =

Total Price of Project (for evaluation purposes only)

(1) Bid Total for Schedule A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (1) + (2) Contract Administrative Cost for Schedule A . . . . . . . . . . . . . . . . . (2)

= EVALUATION TOTAL PRICE OF PROJECT

Does the Bidder claim the Price Evaluation Preference for HUBZone Small Business Concerns as defined in FAR Clause 52.219-4?

Yes No

20%�12�� ���������

2%/,*$7,21�

:H�� WKH�3ULQFLSDO� DQG�6XUHW\�LHV�� DUH� ILUPO\�ERXQG�WR�WKH�8QLWHG�6WDWHV�RI�$PHULFD��KHUHLQDIWHU�FDOOHG�WKH�*RYHUQPHQW��LQ�WKH�DERYH�SHQDO�VXP���)RU SD\PHQW� RI� WKH� SHQDO� VXP�� ZH� ELQG� RXUVHOYHV�� RXU� KHLUV�� H[HFXWRUV�� DGPLQLVWUDWRUV�� DQG� VXFFHVVRUV�� MRLQWO\� DQG� VHYHUDOO\�� � +RZHYHU�� ZKHUH� WKH 6XUHWLHV�DUH�FRUSRUDWLRQV�DFWLQJ�DV�FR�VXUHWLHV��ZH��WKH�6XUHWLHV��ELQG�RXUVHOYHV�LQ�VXFK�VXP��MRLQWO\�DQG�VHYHUDOO\��DV�ZHOO�DV��VHYHUDOO\��RQO\�IRU�WKH SXUSRVH�RI�DOORZLQJ�D� MRLQW�DFWLRQ�RU�DFWLRQV�DJDLQVW�DQ\�RU�DOO� RI�XV�� �)RU�DOO�RWKHU�SXUSRVHV��HDFK�6XUHW\�ELQGV�LWVHOI��MRLQWO\�DQG�VHYHUDOO\�ZLWK�WKH 3ULQFLSDO��IRU�WKH�SD\PHQW�RI�WKH�VXP�VKRZQ�RSSRVLWH�WKH�QDPH�RI�WKH�6XUHW\�� �,I�QR�OLPLW�RI�OLDELOLW\�LV�LQGLFDWHG��WKH�OLPLW�RI�OLDELOLW\�LV�WKH�IXOO�DPRXQW

RI�WKH�SHQDO�VXP�

&21',7,216�

7KH�3ULQFLSDO�KDV�VXEPLWWHG�WKH�ELG�LGHQWLILHG�DERYH�

7+(5()25(�

7KH�DERYH�REOLJDWLRQ�LV�YRLG�LI�WKH�3ULQFLSDO����D��XSRQ�DFFHSWDQFH�E\�WKH�*RYHUQPHQW�RI�WKH�ELG�LGHQWLILHG�DERYH��ZLWKLQ�WKH�SHULRG�VSHFLILHG�WKHUHLQ�IRU DFFHSWDQFH�…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .