Bid Opening Date Remains at August 18 2009 at 2 00 pm est.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 30 - Amendment 005.pdf | ||
| SF 30 - Amendment 004.pdf | ||
| SF 30 - Amendment 003.pdf | ||
| SF 30 - Amendment 002.pdf | ||
| Plans.pdf | ||
| FP03_Eng .pdf | ||
| ADV_Bidder's Qualifications Form.doc | DOC document | |
| IFB Solicitation.pdf | ||
| FP03 Errata.pdf | ||
| Geotechnical Report.pdf | ||
| Subcontracting plans.doc | DOC document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable debbie debbie pschaad Line
Amendment No. 001 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 001 Project ERFO-IL-FSR 220(1)
Shawnee National Forest Solicitation: DTFH71-09-B-00021
The purpose of this Amendment is to:
1) Revise the Special Contract Requirements (J-pages) as follows:
a) Section 207 to revise material requirements.
2) Provide a summary of responses to questions/clarifications asked by potential bidders.
Special Contract Requirement changes
1. Delete Section 207 of the Special Contract Requirements, page J-13, and substitute the following:
Section 207.—EARTHWORK GEOTEXTILES
207.02 Conform the following Subsections:
Geogrid 714.03 Geotextile 714.01
Questions/Clarifications
All questions should be submitted as early as possible so bid opening will not be delayed.
Questions submitted within 3 days of the bid opening have the potential of not being answered with enough time for bidders of finalizing their bids. The followings are responses to questions/clarifications asked by potential bidders.
1. Table 714-7 on page J-24 of the subject specs identifies two different products as acceptable. Sinkhole requires 3760 lb/ft and Slide 1-4 requires 6800 lb/ft. Yet the bid schedule line item 20703-0000 requires 48,000 sq yds for a single item. Please verify quantity for each of the two different products.
Response: The sink hole is located at Reconstruction Site 1 shown on Plan Sheet E1.
Slides 1-4 are located at Sites 2-5 shown on plan sheets F1, G1, H1, and J1. These locations are also described in the Geotechnical Report.
Amendment No. 001 3
Plan sheet C1 states that 960 sqyd of geogrid is required at Site 1 (the sinkhole location) and that the remainder will be required at Sites 2-5 (Slides 1-4).
Please price the geogrid accordingly.
2. There appears to be no line item for "barrow dirt". The job appears to require a sizable quantity of this. Will there be a line item for this? If not, what line item should we use to include this cost?
Response: The intent is to use the excavated material as fill in the stabilized slope. The Government's calculations indicate that there will be sufficient material and that there should be no need to bring any in from offsite. If any additional material is required, it will be paid for as Embankment Construction. Please see Subsection 109.05 of the FP for further information regarding scope of payment for direct and indirect work. Each bidder will have to determine where they absorb their indirect costs.
3. The bid line for Geotextile is confusing. Specifications section 207 says to delete [geotextiles] Subsection and substitute the following: Conform the following Subsection:
Geogrid 714.03.
Response: The Subsection 207.02 of the SCR’s will be revised to include both materials Geogrid and Geotextile.
4. E605-A note 4 says Geotextile paid for under under drain system. What goes on Geotextile line - 1700lf?
Response: Note 4 on Plan Sheet S9 refers to the geotextile and granular backfill located in the underdrain triangle (shown in Detail A). It does not refer to the geotextile and granular backfill shown in the typical sections Plan Sheets B1 to B6. The bid items include the quantity of geotextile Type I-C and granular backfill shown in the typical section.
All questions received before 8/11/2009 via email at eflhd.contracts@fhwa.dot.gov have been included above. Any questions received after this time will be answered on an individual response basic, unless another amendment is required.
mailto:eflhd.contracts@fhwa.dot.gov
| Amendment 1.pdf |
| Amendment No. 1 |
| Fire Island National Seashore |
| J Pages.pdf |
| Special Contract Requirements |
| Division 100 |
| Division 150 |
| Division 200 |
| Division 301 |
| Division 600 |
| Division 700 |
| Amendment #2.pdf |
| Amendment No. 2 |
| Natchez Trace Parkway |
| Amendment #1.pdf |
| Amendment No. 1 |
| Great Smoky Mountains National Park |
| Solicitation Provision changes |
| Special Contract Requirements changes |
| Amendment 2_Final (4).pdf |
| Section 705.—ROCK |
| Amendment 001_Final.pdf |
| June 3, 2008 Pre-Proposal Meeting and Field Review |
| Part 5. Add the following to the Special Contract Requirements: |
| 109.06. Delete Price Form 02A, 02B, 02C, and 02D of the Special Contract Requirements and substitute the attached forms (See attached files). |
| BK_1442 for VI John 001.pdf |
| Amendment 001 A-1 |
| AND AWARD |
| DTFH71-09-B-00017 |
| Amendment 1.pdf |
| Section 207.—EARTHWORK GEOTEXTILES |
| IDCode: |
| Page: 1 |
| Pages: 3 |
| AmendNo: 001 |
| EffDate: 8/11/09 |
| ReqNo: |
| ProjNo: ERFO-IL-FSR 220(1) |
| IssCode: |
| IssuedBy: Eastern Federal Lands Highway Division |
21400 Ridgetop Circle Sterling, VA 20166
| AdmCode: |
| AdminBy: |
| ContName: |
| ContStrt: |
| ContCnty: |
| ContSt: |
| ContZIP: |
| Code: |
| FacCode: |
| SolAmdNo: |
| AmendDate: 07/01/09 |
| ModNo: |
| ModDate: |
| NoCopies: |
| Amended: Off |
| ApprData: |
| ChgeOrder: |
| Modify: Off |
| SuppAuth: |
| OthrSpec: |
| Require: Off |
| Copies: |
| Descript: The purpose of this Amendment is to: |
1)Revise the Special Contract Requirements (J-pages) as follows:
a)Section 207 to revise material requirements.
2)Provide a summary of responses to questions/clarifications asked by potential bidders.
Bid opening date remains August 18, 2009 at 2:00 pm.
| SignName: |
| SignTitl: |
| ContDate: |
| CoName: |
| CoTitle: |
| CODate: |
| SolChgYs: Yes |
| SolChgNo: Off |
| OffrExt: Off |
| OffrNoEx: No |
| ChgeOrd: Off |
| SuppAgre: Off |
| ModOthr: Off |
| NoReq: Yes |
| Text1: |
| Text2: |
File details come from the government source that posted it. Updated .