IFB Solicitation.pdf

PDF 3 MB Posted

Attached to
Noxubee National Wildlife Refuge Federal contract opportunity
Solicitation number
DTFH71-09-B-00015
Issued by
Department of Transportation Federal Highway Administration

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Noxubee National Wildlife Refuge, newest first.
File Type Posted
Amendmet 002.pdf PDF
Amendment 001.pdf PDF
REV__SB subcontract plan revised.doc DOC document
FP03_Eng .pdf PDF
Pavement Report.pdf PDF
ARRA Sign Pictographs.pdf PDF
FP03 Errata.pdf PDF
ADV_Bidder's Qualifications Form.doc DOC document
Plans.pdf PDF
FBO Ready Synopsis.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No.:

U S DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT FWS - NXB 10(1)

Noxubee National Wildlife Refuge

SOLICITATION

IFB NO. DTFH71-09-B-00015

This Contract Cites Standard Specifications FP- 03

English or U.S. Customary

CONTRACTOR:

ADDRESS:

STATE: Mississippi

COUNTY: Oktibbeha, Noxubee and Winston

PARK / REFUGE / NF: Noxubee National Wildlife Refuge

ROADWAYS: STATIONS FEET

Bluff Lake Road 953+00 to 1158+00 20500

Brooksville-Louisville Road 1200+00 to 1683+00 48300

Section Line Road 350+00 to 624+43 27443

PROJECT LENGTH TOTAL: 96243

TYPE OF IMPROVEMENT:

Roadway resurfacing, full depth reconstruction, culvert and sign replacement and drainage improvement on Bluff Lake Road and Brooksville Louisville Road. Widening of roadway, culvert replacement, surface reconditioning and drainage improvement on Section Line Road.

TABLE OF CONTENTS

Page

Notice to Bidders 1 through 2

Checklist for Bidders Submission 1 through 2

*Bidders Qualification Questionnaire regarding the preparation of the Bid for Time 1 Page

Monthly Employment Report (with instructions) – ARRA Projects 1 through 3

*SF-1442 Solicitation, Offer, and Award A-1 through A-2

Continuation of SF 1442 A-3 through A-5

Bid Schedule Instructions 1 through 4

*Bid Schedule B-1 through B-13

*SF-24 Bid Bond C-1 through C-2

FEDERAL ACQUISITION REGULATION & TRANSPORTATION ACQUISITION

REGULATION SOLICITATION PROVISIONS & CONTRACT CLAUSES

Index to Federal and Transportation Acquisition Regulations 1 through 6

Representations and Certifications (OCRA online) D-1 through D-3

Instructions to Bidders E-1

*Socioeconomic Program Requirements F-1 through F-6

Minimum Wage Schedule F-7 through F-16

*General Contract Requirements G-1 through G-4

Construction Contract Requirements H-1

SPECIFICATIONS

Special Contract Requirements J-1 through J-28

Permits Obtained for this Project 1 through 51

Plans 1 through 56

Pavement Report 1 through 75

ARRA – Sign Pictographs 1 through 5

* Bidder’s Qualifications Form 1 through 7

*BOLD FACED ITEMS ARE TO BE INCLUDED WITH THE BID SUBMITTAL PACKAGE

NOTICE TO BIDDERS

CONTRACT FORMAT:

Bidders should note that the format of this contract is in accordance with Federal Acquisition Regulations (FAR), promulgated by the General Services Administration (GSA), effective April 1, 1984, including all applicable revisions. Applicable FAR provisions and clauses are incorporated in this contract by reference or full text as indicated in the INDEX before the D-page in this booklet.

FAR provisions and clauses incorporated by reference can be accessed on the Internet on the GSA website at www.arnet.gov/far/. Bidders are encouraged to review the documents thoroughly before bidding.

PROPOSAL BOOKLET AND OFFER SUBMITTAL:

It is the responsibility of the Bidder to verify that this proposal is complete as listed in the Table of Contents. The Bidder is responsible for submitting all required forms and documents with the offer.

Offerors should use the Checklist for Bid Submittal included in this booklet to check that their bids are complete. New Questionnaire Form on Calendar Days with required signature.

CONSTRUCTION CONTRACTS:

As stated in FAR Clause 52.236-1, the Contractor shall perform on the site, and with its own organization, work equivalent to at least 50%. Additional guidance is given in FAR Subpart

35.005 where the majority of the project work is complex and specialized such as restoration work, bridge painting, and proprietary construction techniques (i.e. proprietary Cintec arch strengthening.)

There are exceptions and they will be reviewed on a case-by-case basis.

HAZARDOUS MATERIALS IDENTIFICATION AND MATERIAL SAFETY DATA:

As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data, the apparent low Offeror must submit prior to award a Material Safety Data Sheet (MSDS's) for all hazardous materials that the Offeror identifies in paragraph (b) of this clause in the D-pages of this booklet. Failure to submit MSDS's may render the Offeror ineligible for award of contract. The apparent low Offeror should submit their MSDS's within two weeks after bid opening.

ATTENTION LARGE BUSINESSES - UTILIZATION OF SMALL BUSINESS CONCERNS:

Large business Offerors should note their responsibilities in the awarding of subcontracts in accordance with FAR Clause 52.219-8, Utilization of Small Business Concerns. The offeror, if a large business concern, should note its responsibility to establish and conduct a Subcontracting Plan in accordance with FAR Clause 52.219-9, Alternate I, Small Business Subcontracting Plan. If the apparent Low Offeror is a LARGE BUSINESS it will be required to submit a Subcontracting Plan within 2 weeks of receipt of request from the Contracting Officer. If the apparent low offeror fails to submit a subcontracting plan acceptable to the Contracting Officer within the allowable time, the offeror may be ineligible for award of the contract. PLEASE NOTE: A sample plan is included in this solicitation package as a separate document for your use.

FINANCING ASSISTANCE: Minority, Women-owned, and Disadvantaged Business Enterprises (DBE's). The Department of Transportation (DOT) offers working capital financing assistance for transportation related contracts. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $750,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address: http://osdbuweb.dot.gov.

INTERNET BASED DATA BASES - REQUIRED INPUT: According to the FAR Subpart

4.1102 contractors MUST be registered in Central Contractor Registration (CCR) prior to the award of any contract. Access the following web site to register: www.ccr.gov According to the FAR Subpart 4.1201 contractors MUST complete their Online Annual Representations and Certifications Application (ORCA) prior to the closing date of the bid on line at http://orca.bpn.gov/.

According to the FAR Subpart 22.1302 (b) contractors and sub-contractors MUST complete the required Annual Vets-100 Form in order to be eligible for a contract award. It can be completed on-line at https://vets100.vets.dol.gov/.

NOTICE TO BIDDERS - (CONT'D.)

This should be completed before submitting a bid package.

PAYMENT:

Offerors are advised to review the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP), subsection 109.05, concerning direct and indirect payment included under a pay item in the bid schedule.

PROGRESS PAYMENTS:

ALL payments will be made via Electronic Funds Transfer (EFT) as such; the payment information in the CCR must be accurate in order for contractors' invoices to be considered proper invoices for the purpose of prompt payment under DOT contracts. Contractors must input and maintain (update as necessary) their EFT information in the CCR database. Offerors are advised that under FAR Clause 52.232-5, Payments Under Fixed Price Construction Contracts, upon request, progress payments will include premiums paid by the Contractor to obtain performance and payment bonds as required under this contract. These payments shall not be made in addition to the contract price. As specified in the FP, “Section 151 - MOBILIZATION", payments for performance and payment bond premiums shall be included in mobilization.

WELFARE-TO-WORK INITIATIVE:

The President’s Welfare Reform Bill was initiated to assist welfare recipients and hopefully aid welfare recipients to find gainful employment. In support of this bill, Contractors are encouraged to hire welfare recipients whenever possible and to use welfare recipients in performance of duties on Government contracts.

INCREASING SEAT BELT USE IN THE UNITED STATES:

The President’s Executive Order 13043 dated April 16, 1997, was issued to increase the use of seat belts in the United States. In support of this Order, contractors and subcontractors are encouraged to adopt and enforce on-the-job seat belt policies for their employees when operating company-owned, rented, or personally owned vehicles.

OBTAINING BID DOCUMENTS:

Bid documents will not be mailed. All bid documents are available for direct download from the Federal Business Opportunities (FBO) website:

https://www.fbo.gov/index?s=opportunity&mode=list&tab=list&cck=1&au=&ck= Type DTFH71 in Keywords/Sol. # Block then click on GO, or the Eastern Federal Lands Highway Division website: http://www.efl.fhwa.dot.gov/contracting/Documents.aspx Contractors are encouraged to register on the FBO website (for this specific project) in order to receive Email Notifications automatically when a document is added or updated for this specific project. All questions about this construction project must be emailed to the following address:

eflhd.contracts@fhwa.dot.gov.

THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MONITORING THE WEB PAGES

NOTED ABOVE FOR ALL CHANGES TO THE SOLICITATION AND ACTING ON SAID

CHANGES.

PLEASE NOTE: for security reasons, individuals requiring access to all government buildings must present a valid photo ID and be escorted to their destination by a Government employee.

All visitors attending bid openings are urged to arrive at least 1 hour prior to schedule bid opening. All visitors must register with the receptionist in Room 100. A Government employee will collect all bids. Prior to bid opening, a Government employee will escort all bidders to the bid opening. Unescorted visitors will be denied entry and no exceptions will be made.

CHECKLIST FOR BID SUBMISSION

The following is a checklist of items included in the proposal/bid package that are required to be completed and returned (or filled in on-line) to the address in Block 8 of the Standard Form 1442, Solicitation, Offer, and Award (page A-1). This checklist is for informational purposes only and is not required to be filled out by the bidder. Failure to submit a complete bid may be cause to reject your bid.

Revision Date: 09/06/07

1. Bid Envelope:

a. Addressed as shown in Block 8 of Page A-1

b. In lower left corner, indicate Solicitation No., Project Name & Number, time for Receipt of Offers and send to Room 105.

2. Standard Form 1442: Solicitation, Offer and Award (Pages A-1 and A-2)

a. Block 14: Name and Address of Bidder.

b. Block 15: Telephone Number of Bidder.

c. Block 16: Remittance Address if different from Block 14.

d. Block 19: All Amendments Acknowledged, with dates of Amendments.

e. Block 20: Bid is signed and dated.

3. Bid Schedule - (Pages B-1 through B-13)

a. Unit bid price and bid amount provided for each pay item in numbers.

b. Corrections initialed.

c. Price Evaluation eligibility is indicated on the Bid Summary page.

4. Standard Form 24, Bid Bond (Pages C-1 through C-2) (Required if bid guarantee is bid bond)

a. Date executed

b. Legal name and address of bidder.

c. Type of organization.

d. State of incorporation (if applicable).

e. Name and business address of Treasury approved surety.

f. Penal sum of bond (not less than 20% of bid total).

g. Bid identification.

h. Signature of Bidder

i. Seal, if corporation

j. Signature of Surety

k. Seal, if corporation

BIDS RECEIVED WITHOUT A VALID BID BOND WILL BE REJECTED.

5. Power of Attorney.

a. Dated on or before execution date of bond

b. Power has original signature of surety, or is embossed with surety's seal in the certification section

BIDS RECEIVED WITHOUT A VALID POWER OF ATTORNEY WILL BE REJECTED.

CHECKLIST FOR BID SUBMISSION

6. Fill In's. The following full text Clauses and/or Provision numbers shall be checked or filled in and return with the bid package:

a. 52.219-4 – HubZone ONLY - See Section F, Clause 52-219-4, paragraph "C", check block if wavier is applicable.

7. Bidder's Qualifications form (provided separately as part of the Bid Documents Package).

Form completed, signed and submitted with bid

8. Bidder's Qualifications questionnaire regarding the preparation of the bid for time.

Form completed, signed and submitted with bid.

9. Sub-Contracting Plan - Large Businesses Only: Submittal with the bid is not mandatory, but it is encouraged, as it will speed up the award process should your firm be the apparent low bid.

Legislated subcontracting goals: (15 USC 644 (g)(1)

• 24% - Small Businesses (SB)

• 5% - Small Disadvantaged Businesses (SDB)

• 3% - HUBzones

• 5% - Small Woman Owned Business Entities (SWBE)

• 3% - Service-Disabled Veteran-Owned Small Businesses (SDVOSB)

THE FOLLOWING THREE ITEMS ARE NOT TO BE SUBMITTED WITH THE

BID; BUT FAILURE TO COMPLETE THE REQUIREMENTS WILL BE CAUSE

TO REJECT THE BID.

10. Central Contractor Registration (CCR): The Contractor is currently registered in the Internet-Based CCR database at http://www.ccr.gov.

11. Online Representations and Certifications Application (ORCA): The Contractor's Representations and Certifications have been input online via the Internet-Based ORCA electronic database at http://orca.bpn.gov.

12. Vets100 Reporting: The Contractor has completed the annual Internet-Based reporting requirement online at https://vets100.vets.dol.gov.

NOTE: THE CONTRACTOR IS FULLY RESPONSIBLE TO VERIFY THAT ALL

DATA IN THE THREE DATABASES IS CORRECT EACH TIME A BID

PACKAGE IS SUBMITTED. FAILURE PROPERLY INPUT AND/OR UPDATE

YOUR DATA MAY CAUSE THE BID TO BE REJECTED.

Revision Date: 09/06/07

Bidders Qualification questionnaire regarding the preparation of the bid for time:

1) Does the bid for time include the impact of normal weather conditions on the work of the Contract?

2) Does the bid for time include the impact of the terms of the Contract Specifications regarding work restrictions - including all identified delays, suspensions, and shut-downs?

3) Does the bid for time include sufficient time to allow that all contract work can be completed within contract time without the imposition of liquidated damages?

4) Does the bid for time include time for the review and approval process for all submittals required by the Contract?

5) Does the bid for time include time for the review and approval process for required drawings submitted under Subsection 104.03 of the Specifications?

6) Does the bid for time include the lead time required for the procurement, manufacture, and delivery of materials that are to be incorporated into the Contract work?

7) Does the bid for time include sufficient time to accommodate the fact that the date of Notice to Proceed is conditional upon the Government awarding the contract up to 60 days after the bid opening?

8) Does the bid for time include the 14 days after the award of the Contract that the Contractor has to provide Performance and Payment bonds?

9) Does the bid for time include sufficient time to accommodate the fact that the Contracting Officer has up to 30 days after receipt of acceptable Performance and Payment bonds to issue the Notice to Proceed?

I hereby certify that the answer to each and every one of the questions listed above is yes.

Signature of Authorized Representative Title Date

Note: If the questionnaire is not signed the bid shall be found non-responsive and rejected.

1. First day of reporting period (mm/dd/yyyy):

4. Federal-Aid Project NO.

7. CONTRACTOR NAME

8. Contractor/Subcontractor DUNS number:

NUMBER OF

EMPLOYEES

TOTAL

HOURS

TOTAL

PAYROLL

Prime Contractor

DATE

MONTHLY EMPLOYMENT REPORT

AMERICAN RECOVERY AND REINVESTMENT ACT

Eastern Federal Lands Highway Division

Federal Highway Administration

2. Report Month (mm/yyyy) 3. Contracting Agency

5. State Project Number or ID Number 6. Project Location: State, County, or FLH Division

Prime and Subcontractor Totals

10. PREPARED BY CEO or Payroll Official: (Signature and Title)

Subcontractor(s):

9. Employment Data

Monthly Employment Report Instructions

BOX 1. First day of reporting period: The first day of reporting period is the first day of the first payroll period of the month. If the beginning of the month splits the payroll period then the report will include dates from the prior month as necessary to complete the payroll period. Use the format, mm/dd/yyyy (e.g.

“May 1, 2009” would be coded as “05/01/2009”).

BOX 2. Report Month: The month and year covered by the report. Use the format, mm/yyyy (e.g. “May 2009” would be coded as “05/2009”).

BOX 3. Contracting agency: The name of the contracting agency, “Federal Highway Administration”.

BOX 4. Federal-aid project number: Will be provided by the CO (last seven digits of “PROJ” number within the Accounting and Appropriation Data shown on Standard Form 1442, block 23, of the contract; e.g. “0SNT001”).

BOX 5. State project number or identification number: The Project Number as given in Block 6 of Standard Form 1442 of the Contract.

BOX 6. Project location: Provide the Federal Lands Highway Division.

BOX 7. Contractor name and address: Include the name, street address, city, state, and zip code of the Contractor.

BOX 8. Contractor DUNS number: The unique nine-digit number issued by the

Department of the Treasury. Followed by the optional 4 digit DUNS Plus number. Leave blank if Contractor does not have one.

BOX 9. Employment data: Report the direct, on-project jobs for prime contractor workforce as well as the workforce of all subcontractors active that month.

Include employees who work on the jobsite, the project office, the home office or telework from a home or other alternative office location. Include any engineering personnel, inspectors, sampling and testing technicians and lab technicians. Do NOT include material suppliers (i.e. steel and guardrail suppliers etc.). One line for the prime Contractor, and one line for each subcontractor. Specifically identify:

a. Subcontractor name: The name of each subcontractor that was active on the project for the reporting month.

b. Employees: The number of employees on the Contractor’s workforce that month, and the number of employees for each of the active subcontractors that month.

c. Hours: The total hours on the specified project for all employees on the contractor’s workforce that month, and the total hours for all employees for each of the active subcontractors that month.

d. Payroll: The total dollar amount of wages paid that month for employees on the specified project, and the total dollar amount of wages paid by each of the active subcontractors that month. Include only wages; do NOT include overhead or indirect costs. Round to the nearest whole dollar.

Sum up the total at the bottom. Report as a whole number.

BOX 10. Prepared by:

a. Name: Indicate the person responsible for preparation of the form. By completing the form the person certifies that they are knowledgeable of the hours worked and employment status for all the employees. Maintain data to support the employment report, and make the data available, if requested by the CO.

b. Date: The date that the Contractor completed the Monthly Employment Report. Use the format, mm/dd/yyyy.

A-1

1. Solicitation No. 2. Type of Solicitation 3. Date Issued Page of Pages SOLICITATION, OFFER, AND AWARD

(Construction, Alteration, or Repair)

DTFH71-09-B-00015 Sealed Bid (IFB) Negotiated (RFP) 05/05/09 1 OF 5

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. Contract No. 5. Requisition/Purchase Request No. 6. Project No.

FWS-NXB 10(1)

7. Issued By: CODE: N/A: 8. Address Offer To:

Federal Highway Administration Eastern Federal Lands Highway Division Loudoun Tech Center, Room 105 21400 Ridgetop Circle Sterling, Virginia 20166-6511

See Block 7

9. FOR INFORMATION A. Name: B. Telephone No. (Include area code) (NO COLLECT CALLS) See Blocks 9A & 9B Shirley A. Anderson Email All Questions/Inquiries To: eflhd.contracts@fhwa.dot.gov

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder"

10. The Government requires performance of the work described in these documents (title, identifying no., date):

This Invitation for Bids is for the Noxubee National Wildlife Refuge, located in Oktibbeha, Noxubee, and Winston Counties, Mississippi in strict accordance with the Solicitation/Contract instructions, notices, clauses, provisions, items listed below, and for the quantities of work actually performed at the unit prices as bid in the Bid Schedule, including all applicable Federal, State, and local taxes.

FP - Standard Specification for Construction of Roads & Bridges on Federal Highway Projects.

Bid Schedule, Section B - pages B-1 through B-13.

Special Contract Requirements, Section J - pages J-1 through J-28.

Plans (Drawings), Sheets 1 through 56.

Pavement Report, Sheets 1 through 75.

11. The Contractor shall begin performance within 10 calendar days and complete it within calendar days after receiving

Award, Notice to Proceed. This performance period is mandatory, negotiable. (See Continuation Sheet)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND

PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item

12B.) YES NO SEE SUBSECTION 102.06 OF FP.

12B. CALENDAR DAYS

Within 14 calendar days after Notice of Award

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 2:00 PM local time 06/09/09. If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 STANDARD FORM 1442 (REV. 4-85)

Help Desk

See Continuation of SF 1442

A-2 OFFER (Must be fully completed by offeror)

15. Telephone No. (Include area code) 14. Name and Address of Offeror (Include ZIP code)

DUN: FACILITY CODE

16. Remittance Address (Include only if different than Item 14)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation if this offer is accepted by the Government in writing within _ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS See Bid Schedule - Section "B" Pages

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20a. Name and title of person authorized to sign offer (Type or print)

20B. Signature 20C. Offer Date

AWARD (To be completed by Government)

21. Items Accepted:

22. Amount

23. Accounting and appropriation data

24. SUBMIT INVOICES

TO ADDRESS SHOWN

IN (4 copies unless otherwise specified)

ITEM

See Block 26

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

15 USC 637(a) ) 41 USC 253(c) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY:

Federal Highway Administration Eastern Federal Lands Highway Division 21400 Ridgetop Circle Sterling, Virginia 20166-6511

Federal Highway Administration Eastern Federal Lands Highway Division Finance Division, Room 357 21400 Ridgetop Circle Sterling, Virginia 20166-6511

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed.

This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. Name and Title of Contractor or Person Authorized to Sign (Type or print)

31a. Name of Contracting Officer (Type or print)

30b. Signature

30C. Date 31b. United States of America

BY

31C. Date

GPO : 1985 0 - 469-796 STANDARD FORM 1442 BACK (REV. 4-85)

CONTINUATION OF SF 1442 A-3

Revised 05/07/09

Block 2:

This project is UN-RESTRICTED - Bids will be accepted from ALL eligible business concerns.

This procurement falls under North American Industry Classification System (NAICS) code 237310 - Highway, Street, and Bridge Construction (see FAR Subpart 19.10)

The award of this project is subject to a 10% price evaluation preference for eligible HubZone Small Business Concerns (must be on the SBA listing) (see FAR Clause 52.219-4).

Facsimile and electronic bids will not be accepted.

PHYSICAL DATA AVAILABLE FOR REVIEW

1. Manual on Uniform Traffic Control Devices for Streets and Highways, 2003 Edition, published by the Federal Highway Administration. http://mutcd.fhwa.dot.gov.

2. Pavement Report

3. Permits

4. ARRA Signs - Pictographs

Block 9:

In accordance with FAR Provision 52.236-27, Site Visit, a Government representative can be available to show the project to prospective bidders. All requests for site visits see Section E of the solicitation and e-mail all questions concerning this construction project to the following e-mail address eflhd.contracts@fhwa.dot.gov. Interested parties must provide the Solicitation Number and the relevant project name with all requests and questions.

Block 11:

The maximum time for Schedule A (Phase I) is 254 calendar days, Schedule B (Phase II) is 34 calendar days, Option 1 is 36 calendar days and Option 2 is 56 calendar days shall not exceed 380 calendar days. No work shall be performed between November 15 through March 31 due to the Wet Season.

The completion time for the contract will be the time offered by the successful bidder, not to exceed the maximum time above. Work restrictions can be found in SCR Sections 108 and 156.

Notice to Proceed will be issued within 30 days following receipt of acceptable performance and payment bonds. (Actual Notice to Proceed date will be 10 days from issuance or the date specified in the Notice.)

Schedule A (Phase I) - Notice To Proceed will be issued with an effective starting date of on or about July 20, 2009.

Schedule B (Phase II) - Notice To Proceed will be issued with an effective starting date of on or about April 1, 2010.

mailto:eflhd.contracts@fhwa.dot.gov�

A-4

CONTINUATION OF SF 1442

Government Option 1 - Notice To Proceed will be issued no later than 30 calendar days prior to the contract performance period completion date of the Base Contract (Schedules A (Phase I ) and B (Phase II)).

Government Option 2 - Notice To Proceed will be issued with an effective starting date of on or after June 2, 2010.

107.12 Reporting Requirements Under the American Recovery and Reinvestment Act (ARRA). Provide the CO with an employment summary for all employees working on the project as of the notice-to-proceed date. Include the total number of employees and the total hours worked for all employees. As a separate subtotal, report each subcontractor and lower-tier subcontractor who are working on a full-time or part-time basis during the reporting period. The reporting period is one month. Do not include hours worked for material suppliers, services provided by purchase orders or other informal agreements. Report the data on the “Monthly Employment Report” form provided in the contract. Submit the report within ten (10) calendar days after the end of each month. Additional reports may be required for ARRA funded projects.

109.08(a). Add the following: Full or partial progress payment will be withheld until the ARRA Monthly Employment Report has been submitted according to Subsection 107.12.

Note: Only report Options 1 & 2 which fall under the American Recovery and Reinvestment Act (ARRA) Stimulus Package Requirements.

Block 12A:

Furnish performance and payment bonds in accordance with FAR Clause 52.228-15.

Block 13:

A bid guarantee in the amount of not less than 20 percent of the bid price or $3 million, whichever is less, is required with this bid. If the bidder fails to provide the required bid guarantee, such failure may require rejection of the bid. Reference FAR Provision 52.228-1, Bid Guarantee.

Other:

The estimated price is expected to fall within the price range of $2,000,000 to $6,000,000.

Responsibility of bidders shall be evaluated in accordance with the information provided on the Bidder's Qualification Form, which can be downloaded from FHWA web site. FP-03 versions can be downloaded at the FHWA web site. FHWA web site is http://www.efl.fhwa.dot.gov/contracting-manuals-guides.aspx then click on Construction Specifications.

http://www.efl.fhwa.dot.gov/contracting/Documents.aspx�

CONTINUATION OF SF 1442 A-5

Subcontracting Goals

Required from all other than Small business when the requirement is expected to exceed $550,000 ($1,000,000 for Construction) [FAR 19.702]. The Contracting Officer, along review and advisory comments from the Office of Small Disadvantaged Business Utilization (OSDBU), is responsible for approving a reasonable and realistic plan [FAR 19.705-4] [TAM 1219.201(e)(6)]. The legislated subcontracting goals are as shown below. A copy of each subcontracting plan (or contractor statement that no subcontracts are to be awarded) must be provided to OSDBU prior to close of negotiations [TAM 1219.705-5 and - 6].

Legislated subcontracting goals: (15 USC 644 (g)(1)

• 24% - Small Businesses (SB)

• 5% - Small Disadvantaged Businesses (SDB)

• 3% - HUBZones

• 5% - Small Woman Owned Business Entities (SWBE)

• 3% - Service-Disabled Veteran-Owned Small Businesses (SDVOSB)

BID SCHEDULE INSTRUCTIONS

PROJECT: FWS-NXB 10(1)

BIDDERS PLEASE NOTE: Before preparing the bid, carefully read the Instructions to

Bidders. While preparing the bid, comply with the following:

COMPLETING THE BID SCHEDULE

Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit Bid Price and Amount Bid for the pay item. Determine the Bid Total by adding the amounts of the several items, and show in the block provided on Page B-4 for Schedule A, Page B-6 for Schedule B, Page B-9 for Option 1, and Page B-11 for Option 2. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.

To be eligible for award, bidders must submit prices for each pay item.

Review Subsection 109.05 of the FP regarding scope of payment for direct and indirect payment work.

SCHEDULES OF WORK

The Bid Schedule is comprised of the following separate schedules and options of work:

Base Contract – Phase 1 (Schedule A) – Resurfacing Bluff Lake Road (± 3.88 miles) and Brooksville-Louisville Road (± 3.74 mi).

Base Contract – Phase 2 (Schedule B) – Rehabilitation Brooksville-Louisville Road (± 1.38 mi).

Government Option 1 – Rehabilitation Brooksville-Louisville Road (± 4.02 mi).

Government Option 2 – Resurfacing Section Line Road (± 5.20 mi).

The Government will award the project as a Base Contract (Schedules A (Phase I) and B (Phase II)) with the option to award any, all, or no combinations of the Government Option(s) (1 and 2); see FAR Clauses 52.217-4 and 52.217-5.

The purpose of the multiple schedules and options is to give the Government maximum flexibility in completing the project in a timely manner and at a cost-effective price, by proper utilization of available funds and upon receipt of all required funding. If complete funding is in place at the time of award of the Base Contract (Schedules A (phase I) and B (Phase II)), the Government may award all or any combination of the Government Option(s) (1 and 2) at that time.

If funding for the Government Option(s) is received after award of the Base Contract, the Government has the right to exercise the Government Option(s) at the unit prices bid according to the following schedule:

Government Option 1: No later than 45 calendar days prior to the contract performance period completion date of the Base Contract (Schedules A and B).

Government Option 2: No later than 45 calendar days prior to the contract performance period completion date of the Base Contract (Schedules A and B).

BIDDING OF CALENDAR DAYS

For each schedule or option of work shown on the Bid Summary page(s), determine the number of calendar days necessary to complete that schedule or option of work from Notice To Proceed of that schedule or option of work to the completion of that schedule or option of work. Specify the number of calendar days (NOT to exceed the maximum number of calendar days shown in Block 11 of the SF-1442) in the space provided on the Bid Summary page(s).

Failure to specify a number of calendar days for contract completion indicates the bidder accepts the maximum contract time provided in Block 11 of the SF-1442.

In developing a construction schedule to determine the number of calendar days included in their bid, bidders should consider and include any work limitations shown in Sections 108 and 156 of the FP and Special Contract Requirements (SCR’s). Specific work limitations may be (but are not limited to): National legal holidays, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. Bidders are advised to consider those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry, etc); those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting, etc); and those that have specific planting seasons (turf establishment, sod, trees, plants, etc). Bidders are also advised to consider time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the FP and SCR’s). The total calendar days bid should also include any work limitations and any delay days or Contractor/supplier winter shutdowns required due to weather sensitive work items.

When evaluating the bids, the Government will consider the Contract Administrative Cost for the project to be $2,200 per calendar day bid. The Contract Administrative Cost is only used to determine the Evaluation Total Price of Project.

For the purposes of calculating calendar days, bidders are to assume the following:

Base Contract – Phase 1 (Schedule A)

- Notice To Proceed will be issued with an effective starting date of on or about July 20, 2009.

Base Contract – Phase 2 (Schedule B)

- Notice To Proceed will be issued with an effective starting date of on or about April 1, 2010.

Government Option 1 - Notice To Proceed will be issued no later than 30 calendar days prior to the contract performance period completion date of the Base Contract (Schedules A (Phase I) and B (Phase II)).

Government Option 2 - Notice To Proceed will be issued with an effective starting date of on or after June 2, 2010.

See Subsection 108.01 of the SCR’s for additional details.

Add the Bid Total(s) and the Contract Administrative Cost(s) for each schedule or option of work as directed on the Bid Summary page(s). Show the Evaluation Total Price of Project in the space provided on the Bid Summary page(s).

BASIS FOR AWARD

The contract will be awarded to the responsive, responsible bidder with the lowest Evaluation Total Price of Project, which is defined as:

Bid Total of Base Contract Phase 1 (Schedule A) + Contract Administrative Cost of Base Contract Phase 1 (Schedule A) + Bid Total of Base Contract Phase 2 (Schedule B) + Contract Administrative Cost of Base Contract Phase 2 (Schedule B) + Bid Total of Government Option 1 + Contract Administrative Cost of Government Option 1 + Bid Total of Government Option 2 + Contract Administrative Cost of Government Option 2.

The number of calendar days specified by the successful bidder for the completion of the awarded combination of the Base Contract (Schedule A (Phase I) and B (Phase II)) and Government Option(s) will become the performance period for the contract.

If the Government Option(s) are exercised after the award of the Base Contract (Schedule A and B), the number of calendar days specified by the successful bidder for that Government Option(s) will become the performance period for that Government Option(s).

NOTE: Contract Administration Cost is used for evaluation and ranking purposes only.

Project: FWS - NXB 10(1)

NOXUBEE NWR REHABILITATION

B- 1

Bid Schedule A

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

15101-0000 MOBILIZATION

ALL Lump Sum $___________________

15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL Lump Sum $___________________

15401-0000 CONTRACTOR TESTING

ALL Lump Sum $___________________

15705-0100 SOIL EROSION CONTROL, SILT FENCE

13,400

LNFT $_______________ $___________________

15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL

LNFT $_______________ $___________________

15706-0200 SOIL EROSION CONTROL, CHECK DAM

EACH $_______________ $___________________

20101-0000 CLEARING AND GRUBBING

0.1

ACRE $_______________ $___________________

20301-2400 REMOVAL OF SIGN

EACH $_______________ $___________________

20302-2100 REMOVAL OF PIPE CULVERT

LNFT $_______________ $___________________

20303-1600 REMOVAL OF PAVEMENT, ASPHALT

15,000

SQYD $_______________ $___________________

20401-0000 ROADWAY EXCAVATION

3,300

CUYD $_______________ $___________________

Project: FWS - NXB 10(1)

Bid Schedule A - Base Contract Phase 1

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

B- 2

30101-0000 AGGREGATE BASE

8,500

TON $_______________ $___________________

30301-3000 SHOULDER AND DITCH RECONDITIONING

805.00

STA $_______________ $___________________

40101-0500 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, <0.3 MILLION ESAL

TYPE IV SMOOTHNESS

7,900

TON $_______________ $___________________

40101-0500 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, <0.3 MILLION ESAL

6,600

TON $_______________ $___________________

40101-0900 SUPERPAVE PAVEMENT, 3/4-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, <0.3 MILLION ESAL

2,100

TON $_______________ $___________________

41301-0000 ASPHALT PAVEMENT MILLING

1,470

SQYD $_______________ $___________________

60103-0720 CONCRETE, HEADWALL FOR DOUBLE 54-INCH PIPE CULVERT

EACH $_______________ $___________________

60201-0600 18-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-0900 30-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-1300 54-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-1400 60-INCH PIPE CULVERT

LNFT $_______________ $___________________

Project: FWS - NXB 10(1)

Estimated Quantity Unit Bid Price Amount Bid

B- 3

60210-0600 END SECTION FOR 18-INCH PIPE CULVERT

EACH $_______________ $___________________

60210-0900 END SECTION FOR 30-INCH PIPE CULVERT

EACH $_______________ $___________________

60501-0000 STANDARD UNDERDRAIN SYSTEM

6,300

LNFT $_______________ $___________________

60703-0000 CLEANING CULVERTS IN PLACE

LNFT $_______________ $___________________

62501-0000 TURF ESTABLISHMENT

9.3

ACRE $_______________ $___________________

62901-1000 ROLLED EROSION CONTROL PRODUCT, TYPE 3.B

SQYD $_______________ $___________________

63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING

SQFT $_______________ $___________________

63316-1000 REMOVE AND RESET SIGN

EACH $_______________ $___________________

63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

126,800

LNFT $_______________ $___________________

63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN

42,300

LNFT $_______________ $___________________

63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

EACH $_______________ $___________________

63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

SQFT $_______________ $___________________

Project: FWS - NXB 10(1)

Estimated Quantity Unit Bid Price Amount Bid

B- 4

63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

HOUR $ 16.90 $ 14,534.00

63701-0000 FIELD OFFICE

EACH $_______________ $___________________

$_____________________TOTAL

Submitted by:

Name of Bidder

Project: FWS - NXB 10(1)

NOXUBEE NWR REHABILITATION - 3" OVERLAY - BROOKSVILLE

B- 5

Bid Schedule B

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL Lump Sum $___________________

15401-0000 CONTRACTOR TESTING

ALL Lump Sum $___________________

30101-0000 AGGREGATE BASE

TON $_______________ $___________________

30301-3000 SHOULDER AND DITCH RECONDITIONING

66.00

STA $_______________ $___________________

40101-0500 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, <0.3 MILLION ESAL

TYPE IV SMOOTHNESS

1,500

TON $_______________ $___________________

40101-0500 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, <0.3 MILLION ESAL

1,500

TON $_______________ $___________________

62501-0000 TURF ESTABLISHMENT

0.8

ACRE $_______________ $___________________

63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

23,000

LNFT $_______________ $___________________

63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN

7,700

LNFT $_______________ $___________________

Project: FWS - NXB 10(1)

Bid Schedule B - Base Contract Phase 2

Estimated Quantity Unit Bid Price Amount Bid

B- 6

63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

HOUR $ 16.90 $ 1,690.00

$_____________________TOTAL

Submitted by:

Name of Bidder

Project: FWS - NXB 10(1)

Bid Schedule B - Base Contract Phase 2

NOXUBEE NWR REHABILITATION - 2" OVERLAY - BROOKSVILE

B- 7

Government Option 1

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL Lump Sum $___________________

15401-0000 CONTRACTOR TESTING

ALL Lump Sum $___________________

15705-0100 SOIL EROSION CONTROL, SILT FENCE

LNFT $_______________ $___________________

15706-0200 SOIL EROSION CONTROL, CHECK DAM

EACH $_______________ $___________________

20302-2100 REMOVAL OF PIPE CULVERT

LNFT $_______________ $___________________

20303-1600 REMOVAL OF PAVEMENT, ASPHALT

SQYD $_______________ $___________________

20401-0000 ROADWAY EXCAVATION

CUYD $_______________ $___________________

30101-0000 AGGREGATE BASE

1,260

TON $_______________ $___________________

30301-3000 SHOULDER AND DITCH RECONDITIONING

425.00

STA $_______________ $___________________

40101-0500 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, <0.3 MILLION ESAL

TYPE IV SMOOTHNESS

5,700

TON $_______________ $___________________

Project: FWS - NXB 10(1)

Government Option 1

Estimated Quantity Unit Bid Price Amount Bid

B- 8

40101-0900 SUPERPAVE PAVEMENT, 3/4-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, <0.3 MILLION ESAL

TON $_______________ $___________________

60201-0600 18-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-0800 24-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-1000 36-INCH PIPE CULVERT

LNFT $_______________ $___________________

60210-0600 END SECTION FOR 18-INCH PIPE CULVERT

EACH $_______________ $___________________

60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

EACH $_______________ $___________________

60210-1000 END SECTION FOR 36-INCH PIPE CULVERT

EACH $_______________ $___________________

60501-0000 STANDARD UNDERDRAIN SYSTEM

LNFT $_______________ $___________________

62501-0000 TURF ESTABLISHMENT

5.0

ACRE $_______________ $___________________

62901-1000 ROLLED EROSION CONTROL PRODUCT, TYPE 3.B

SQYD $_______________ $___________________

63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

66,900

LNFT $_______________ $___________________

63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN

22,300

LNFT $_______________ $___________________

Project: FWS - NXB 10(1)

Estimated Quantity Unit Bid Price Amount Bid

B- 9

63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

HOUR $ 16.90 $ 4,901.00

$_____________________TOTAL

Submitted by:

Name of Bidder

Project: FWS - NXB 10(1)

NOXUBEE NWR REHABILITATION - SECTION LINE ROAD (OPTION-2)

B- 10

Government Option 2

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

15101-0000 MOBILIZATION

ALL Lump Sum $___________________

15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL Lump Sum $___________________

15401-0000 CONTRACTOR TESTING

ALL Lump Sum $___________________

15705-0100 SOIL EROSION CONTROL, SILT FENCE

8,600

LNFT $_______________ $___________________

15706-0200 SOIL EROSION CONTROL, CHECK DAM

EACH $_______________ $___________________

20101-0000 CLEARING AND GRUBBING

15.0

ACRE $_______________ $___________________

20302-2100 REMOVAL OF PIPE CULVERT

LNFT $_______________ $___________________

20401-0000 ROADWAY EXCAVATION

5,000

CUYD $_______________ $___________________

30110-0000 AGGREGATE SURFACE COURSE

18,200

TON $_______________ $___________________

30301-5000 AGGREGATE SURFACE RECONDITIONING

275.00

STA $_______________ $___________________

60201-0800 24-INCH PIPE CULVERT

LNFT $_______________ $___________________

Project: FWS - NXB 10(1)

Government Option 2

Estimated Quantity Unit Bid Price Amount Bid

B- 11

60201-1000 36-INCH PIPE CULVERT

LNFT $_______________ $___________________

60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

EACH $_______________ $___________________

60210-1000 END SECTION FOR 36-INCH PIPE CULVERT

EACH $_______________ $___________________

62501-0000 TURF ESTABLISHMENT

6.4

ACRE $_______________ $___________________

62901-1000 ROLLED EROSION CONTROL PRODUCT, TYPE 3.B

SQYD $_______________ $___________________

63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

EACH $_______________ $___________________

63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A

EACH $_______________ $___________________

63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

EACH $_______________ $___________________

63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

SQFT $_______________ $___________________

64501-0000 LOCATE UTILITIES

ALL Lump Sum $___________________

$_____________________TOTAL

Submitted by:

Name of Bidder

Project: FWS - NXB 10(1)

Government Option 2

B-12

BID SUMMARY

Project FWS-NXB 10(1) (Complete for Pages B-1 through B-11)

(1) Base Contract Phase 1 (Schedule A) Bid Total (from Page B-4) $__________________

Contract Administrative Cost for Base Contract Phase 1 (Schedule A) Number of calendar days necessary to complete all Base Contract Phase 1(Schedule A) work from Notice to Proceed (or date specified in the Notice to Proceed) to completion of Schedule A.

(2) calendar days x $2,200 per calendar day =

(3) Base Contract Phase 2 (Schedule B) Bid Total (from Page B-6) $__________________

Contract Administrative Cost for Base Contract Phase 2 (Schedule B) Number of calendar days necessary to complete all Base Contract Phase 1 (Schedule B) work from Notice to Proceed (or date specified in the Notice to Proceed) to completion of Schedule B.

(4) calendar days x $2,200 per calendar day =

(5) Government Option 1 Bid Total (from Page B-9) $__________________

Contract Administrative Cost for Government Option 1 Number of calendar days necessary to complete all Government Option 1 work from Notice to Proceed for Government Option 1 (or date specified in the Notice to Proceed) to completion of Government Option 1.

(6) calendar days x $2,200 per calendar day =

(7) Government Option 2 Bid Total (from Page B-11) $__________________

Contract Administrative Cost for Government Option 2 Number of calendar days necessary to complete all Government Option 2 work from Notice to Proceed for Government Option 2 (or date specified in the Notice to Proceed) to completion of Government Option 2.

(8) calendar days x $2,200 per calendar day =

(continued)

B-13

BID SUMMARY

Project FWS-NXB 10(1) (Complete for Pages B-1 through B-11)

Total Price of Project (for evaluation purposes only)

(1) Bid Total for Base Contract Phase 1 (Sch A) . . . . . . . . . . . . . . . . . (1) + (2) Contract Administrative Cost for Base Contract Phase 1 (Sch A) . .(2) + (3) Bid Total for Base Contract Phase 2 (Sch B) . . . . . . . . . . . . . . . . . . (3) + (4) Contract Administrative Cost for Base Contract Phase 2 (Sch B) . . (4) + (5) Bid Total for Government Option 1 . . . . . . . . . . . . . . . . . . . . . . . . (5) + (6) Contract Administrative Cost for Government Option 1 . . . . . . . . (6) + (7) Bid Total for Government Option 2 . . . . .. . . . . . . . . . . . . . . . . . . . (7) + (8) Contract Administrative Cost for Government Option 2 . . . . . . . . (8)

= EVALUATION TOTAL PRICE OF PROJECT

Does the Bidder claim the Price Evaluation Preference for HUBZone Small Business Concerns as defined in FAR Clause 52.219-4?

Yes No

20%�12�� ���������

2%/,*$7,21�

:H�� WKH�3ULQFLSDO� DQG�6XUHW\�LHV�� DUH� ILUPO\�ERXQG�WR�WKH�8QLWHG�6WDWHV�RI�$PHULFD��KHUHLQDIWHU�FDOOHG�WKH�*RYHUQPHQW��LQ�WKH�DERYH�SHQDO�VXP���)RU SD\PHQW� RI� WKH� SHQDO� VXP�� ZH� ELQG� RXUVHOYHV�� RXU� KHLUV�� H[HFXWRUV�� DGPLQLVWUDWRUV�� DQG� VXFFHVVRUV�� MRLQWO\� DQG� VHYHUDOO\�� � +RZHYHU�� ZKHUH� WKH 6XUHWLHV�DUH�FRUSRUDWLRQV�DFWLQJ�DV�FR�VXUHWLHV��ZH��WKH�6XUHWLHV��ELQG�RXUVHOYHV�LQ�VXFK�VXP��MRLQWO\�DQG�VHYHUDOO\��DV�ZHOO�DV��VHYHUDOO\��RQO\�IRU�WKH SXUSRVH�RI�DOORZLQJ�D� MRLQW�DFWLRQ�RU�DFWLRQV�DJDLQVW�DQ\�RU�DOO� RI�XV�� �)RU�DOO�RWKHU�SXUSRVHV��HDFK�6XUHW\�ELQGV�LWVHOI��MRLQWO\�DQG�VHYHUDOO\�ZLWK�WKH 3ULQFLSDO��IRU�WKH�SD\PHQW�RI�WKH�VXP�VKRZQ�RSSRVLWH�WKH�QDPH�RI�WKH�6XUHW\�� �,I�QR�OLPLW�RI�OLDELOLW\�LV�LQGLFDWHG��WKH�OLPLW�RI�OLDELOLW\�LV�WKH�IXOO�DPRXQW

RI�WKH�SHQDO�VXP�

&21',7,216�

7KH�3ULQFLSDO�KDV�VXEPLWWHG�WKH�ELG�LGHQWLILHG�DERYH�

7+(5()25(�

7KH�DERYH�REOLJDWLRQ�LV�YRLG�LI�WKH�3ULQFLSDO����D��XSRQ�DFFHSWDQFH�E\�WKH�*RYHUQPHQW�RI�WKH�ELG�LGHQWLILHG�DERYH��ZLWKLQ�WKH�SHULRG�VSHFLILHG�WKHUHLQ�IRU DFFHSWDQFH�…