Plans.pdf
PDF 5 MB Posted
- Solicitation number
- DTFH71-09-B-00007
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 - Amendment 003.pdf | ||
| SF 30 - Amendment 002.pdf | ||
| SF 30 - Amendment 001.pdf | ||
| IFB Solicitation.pdf | ||
| FP03_Eng .pdf | ||
| ADV_Bidder's Qualifications Form.doc | DOC document | |
| Geotechnical Report.pdf | ||
| FP03 Errata.pdf | ||
| SB subcontracting plan.doc | DOC document | |
| FBO - Synopsis.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLAN AND ELEVATION
1’ -6
1’
-6
PLAN
3’ -4
/4
(T y p
22’-3" 10’-0" 10’-0" 26’-3"
68’-6"
2’-0"
(Typ.)
SOUTH ELEVATION
R
CulvertCL
A
A
N Headwall
Wingwall (Typ.)
Edge of shoulder
(Typ.)
CulvertCL
Wingwall (Typ.)
GENERAL NOTES
SPECIFICATIONS:
Construction:
Design:
SCOPE OF WORK:
G1
S p o u t R u n
See typical section for riprap details.
See ’’SCOUR REPAIRS’’ sheet for section A-A.
Notes:
1.
2.
CLSpout Run Parkway
Eastbound to
G. W. Mem. Prkwy
Eastbound to
G. W. Mem. Prkwy
Eastbound to
G. W. Mem. Prkwy
A C
T U
A L
F
IL
E N
A M
E
P E
.D G
N Remove and reset capstone
15’-6" 16’-9" 20’-9" 15’-6"
68’-6"
10’-0" 10’-0"
N/A
For wingwall scour repair, see Roadway
Sheet B1
For wingwall scour repair, see Roadway
Sheet B1
Standard Specifications for Construction Roads and
Bridges on Federal Highway Projects, FP 03.
Structural Specifications for Highway Bridges AASHTO 1996 with current interim specifications.
Backfill the culvert footing scour areas with concrete and repair undermining of southeast wingwall.
Remove and reset capstone at the southeast wingwall.
NO.
REGION STATE PROJECT
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
EASTERN FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
VA NC
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
Mark Clabaugh MRC
GEORGE WASHINGTON MEMORIAL PARKWAY
NPS
41,992
/2
/2
No Scale EMA/BK/JG
:2
:2
A
M M
P ro je c ts
\g w m p
\4 (1
)5 (1 b ri d g e \M ic ro s ta
\S T
R -3
P
\P E
.D G
N of 2
SPOUT RUN PARKWAY STRUCTURE NO. 3300-039P
GWMP 4(1),5(1)
BA0 N/A
EASTBOUND ARCH CULVERT
SEPTEMBER 2008
REGION STATE PROJECT
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
EASTERN FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
41,992
/2
/2
No Scale EMA/BK/JG
:4
:4
A
M M
P ro je c ts
\g w m p
\4 (1
)5 (1 b ri d g e \M ic ro s ta
\S T
R -3
P
\O p lo tS .d g n of 2
SPOUT RUN PARKWAY STRUCTURE NO. 3300-039P
GWMP 4(1),5(1)
BA0 N/A
EASTBOUND ARCH CULVERT
SCOUR REPAIRS
Spout Run Pkwy.
South FaceNorth Face
(Typ.)
Top of existing footing
SECTION A-A
B
B
REPAIRED CONDITION
SECTION B-B
Stream face
Fill face
Remove protruding concrete sections
1’-0"
#5 Bar @ 6"
Top of footing
Water tight formwork header
Existing ground
Scour area
G2
Stone Masonry
4’-0’’
CLEastbound
A C
T U
A L
F
IL
E N
A M
E
S C
O U
R R
E P
A
IR
S .D
G N Stream Flow
(Existing conditions)
Structural concrete, Class Seal
61’-0"
1’-3"
Competent soil or rock
#5 Bar
(Typ.)
Place temporary diversion berm
Limit of work zone
NOTES:
Submit plans for a temporary diversion berm to the CO for approval prior to installation per Special Contract Requirement 157.09.
Inspect the temporary diversion berm daily and maintain while in use;
repairing as needed after rainfall events or as directed by the CO.
Drill and grout #5 Bar @ 36" o.c.
Embed 24" into rock and 12" into concrete.
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
EASTERN FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
41,992
/2
/2
No Scale EMA/BK/JG
:5
:0
A
M M
P ro je c ts
\g w m p
\4 (1
)5 (1 b ri d g e \M ic ro s ta
\S tr
-2
P \O p lo tS .d g n of 5
SPOUT RUN PARKWAY STRUCTURE NO.3300-029P
GWMP 4(1),5(1)
N/ABAO
WESTBOUND BRIDGE
PLAN AND ELEVATION
SOUTH ELEVATION
NORTH ELEVATION
N
PLAN
S p o u t R u n
A
A B
B
StructureCL
See ’’WEST ABUTMENT DETAILS’’ sheet for View B-B.
See ’’EAST ABUTMENT DETAILS’’ sheet for View A-A.
Face of West
Abutment.
Face of East
Abutment
West Abutment East Abutment
West AbutmentEast Abutment
Spout Run ParkwayCL
Masonry parapet
Masonry parapet
GENERAL NOTES
SPECIFICATIONS:
Construction:
Design:
SCOPE OF WORK:
G3
CC
NOTES
3. See ’’CONCRETE REPAIRS’’ sheet for Section C-C.
Westbound to U.S. 29
Westbound to U.S. 29
Westbound to U.S. 29
Westbound to U.S. 29
Standard Specifications for Construction Roads and
Bridges on Federal Highway Projects, FP 03.
Structural Specifications for Highway Bridges AASHTO 1996 with current interim specifications.
Backfill the bridge footing scour areas with concrete, repair deteriorated concrete on arch soffit, and clean and seal vertical masonry joints.
A C
T U
A L
F
IL
E N
A M
E
P E
S H
T .D
G N
C C
Clean & seal vertical joint
(Typ.)
Clean & seal vertical joint
(Typ.)
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
EASTERN FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
41,992
/2
/2
No Scale EMA/BK/JG
:4
:5
A
M M
P ro je c ts
\g w m p \4
(1 )5
(1 b ri d g e \M ic ro s ta
\S tr
-2 P
\O p lo tS .d g n of 5
SPOUT RUN PARKWAY STRUCTURE NO.3300-029P
GWMP 4(1),5(1)
N/ABAO
WESTBOUND BRIDGE
EAST ABUTMENT
EAST ABUTMENT ELEVATION
VIEW A-A
Stone masonry
(Typ.)
North face
CL
Spout Run Parkway Westbound
South face
Scour area
Existing ground line
Bottom of existing footing
Top of existing footing
25’-5 3/4 "32’-6"
Stream Flow
A C
T U
A L
F
IL
E N
A M
E
E A
S T
A B
T D
T .D
G N
(Roadway section not shown in view)
(Existing conditions)
G4
WEST ABUTMENT ELEVATON
CL
Stone masonry
(Typ.)
VIEW B-B
North face
Spout Run Parkway Westbound
Scour area
Scour area
Scour area Bottom of existing footing
See ’’SCOUR REPAIRS’’ sheet for Section D-D.
D
D
Top of existing footing
South face
Note:
WEST ABUTMENT
23’-0" 18’-0" 21’-8 3/8 "
G5
Existing ground line
Stream Flow
(Existing conditions)
(Roadway section not shown in view)
A C
T U
A L
F
IL
E N
A M
E
W E
S T
A B
T D
T .D
G N
See ’’CONCRETE REPAIRS’’ SHEET for overhead concrete repair detail
See ’’CONCRETE REPAIRS’’ SHEET for overhead concrete repair detail
NO.
REGION STATE PROJECT
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
EASTERN FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
41,992
/2
/2
No Scale EMA/BK/JG
:0
:5
A
M M
P ro je c ts
\g w m p
\4 (1
)5 (1 b ri d g e \M ic ro s ta
\S tr
-2
P \W
E S
T A
B T
D T
.D G
N of 5
SPOUT RUN PARKWAY STRUCTURE NO.3300-029P
GWMP 4(1),5(1)
N/ABAO
WESTBOUND BRIDGE
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
EASTERN FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
41,992
/2
/2
No Scale EMA/BK/JG
:4
:3
A
M M
P ro je c ts
\g w m p \4
(1 )5
(1 b ri d g e \M ic ro s ta
\S tr
-2 P
\O p lo tS .d g n of 5
SPOUT RUN PARKWAY STRUCTURE NO.3300-029P
GWMP 4(1),5(1)
N/ABAO
WESTBOUND BRIDGE
SCOUR REPAIRS
EXISTING CONDITION
SECTION D-D
Scour area
Stream face
Fill face
Top of footing
REPAIRED CONDITION
Stream face
Fill face
1’-0"
Top of footing
Existing ground
Water tight formwork header
G6
SECTION D-D
#5 Bar (Typ.)
A C
T U
A L
F
IL
E N
A M
E
S C
O U
R R
E P
A
IR
S .D
G N
Structural concrete, Class Seal
1’-9 1/2 "+/-
Competent soil or rock
Remove protruding concrete sections
#5 Bar @ 6"
Place temporary diversion berm
Limit of work zone
NOTES:
Submit plans for a temporary diversion berm to the CO for approval prior to installation per Special Contract Requirement 157.09.
Inspect the temporary diversion berm daily and maintain while in use;
repairing as needed after rainfall events or as directed by the CO.
Drill and grout #5 Bar @ 36", Embed 24" into rock and 12" into concrete.
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
EASTERN FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
41,992
/2
/2
No Scale EMA/BK/JG
:5
:2
P
M M
P ro je c ts
\g w m p \4
(1 )5
(1 b ri d g e \M ic ro s ta
\S tr
-2 P
\O p lo tS .d g n of 5
SPOUT RUN PARKWAY STRUCTURE NO.3300-029P
GWMP 4(1),5(1)
N/ABAO
WESTBOUND BRIDGE
Existing reinforcement
Depth of concrete repair
1/2 " Under cut all sides except top cut 3/4 " Saw cut 1" Min. clr.
3.
4.
5.
Remove and replace deteriorated concrete
CONCRETE REPAIR NOTES
SECTION C-C
Silicone Seal1 1/8 ’’ Backer Rod
CL Vertical joint
Stone masonry
(Typ.)
Note:
OVERHEAD CONCRETE REPAIR DETAIL
Arch soffit surface
G7
Existing preformed joint filler
Clean and seal vertical joint using a low-modulus silicone sealant.
CONCRETE REPAIRS
High strength concrete patching compound
(f’c = 4000 psi min.)
Saw cut 3/4 " deep along a square or rectangular perimeter around the designated repair area as approved by the CO.
Remove loose and deteriorated concrete to sound concrete or to a depth of at least 1" clear of existing reinforcement without incurring any damage to structural steel.
Clean existing steel and concrete by wire brush, shot blasting, or water jetting as required.
Fill repair area with high strength concrete patching compound per manufacturer’s recommendations.
Cure and finish surface to match color and texture of existing concrete.
| A1 |
| A2 |
| A3 |
| A4 |
| A5 |
| B1 |
| C1 |
| C2 |
| D1 |
| D2 |
| D3 |
| E1 |
| E2 |
| E3 |
| E4 |
| E5 |
| F1 |
| G 1-7 GWMP 4(1)5(1) Bridge 100% |
| J1 |
| J2 |
| J3 |
| W1 |
| W2 |
| W3 |
| W4 |
| W5 |
| W6 |
| W7 |
File details come from the government source that posted it. Updated .