PROJECT_DESCRIPTION_Gros_Ventre.pdf

PDF 106 KB Posted

Attached to
WY NPS GRTE 700(4), Improve Safety at Gros Ventre Junction with a Modern Roundabout
Solicitation number
DTFH7017R00009
Issued by

View the file

Other files

File Type Posted
J&A_Gros_Ventre_Redacted.pdf PDF
A001.pdf PDF
Q&A_10-11-17.pdf PDF
Q&A_10-6-17.pdf PDF
Plan_Request_form_Gros_Ventre.pdf PDF
RFP_Gros_Ventre.pdf PDF
SWPPP_WY_NPS_GRTE_700(4)_.pdf PDF
EarthWork_Det_HWy89.pdf PDF
Final_Cross_sections_all_combined.pdf PDF
EarthWork_Det_GV.pdf PDF
_Plans_GRTE_700(4)_100__All_sheets_stamped_082317.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WY NPS GRTE 700(4), Improve Safety at Gros Ventre Junction with a Modern Roundabout, Teton County, Wyoming

The work consists of earthwork, grading, roadway construction, pavement marking, signage and lighting for installation of a roundabout, bike pathway connections, and other small items of work.

Project length: 0.58 miles

Tentative Fixed Completion Date: Fall 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: Between $3-$5 million.

Location: Approximately 5 miles south of Jackson, WY

DESCRIPTION OF WORK in US CUSTOMARY UNITS FP-14 Schedule A

DIVISION 150 – Project Requirements 152 Construction Survey & Staking Yes 153 Contractor Quality Control and Assurance

Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (Fiber Roll) 2,100 LNFT 157 Soil Erosion & Sediment Control (Stabilized Construtction Exit) 2 EACH 157 Soil Erosion & Sediment Control (Temporary Turf Establishment) 5 SLRY 158 Watering for Dust Control LPSM

DIVISION 200 – Earthwork 201 Clearing & Grubbing 5.4 ACRE 203 Removal of Delineator 15 EACH 203 Removal of Sign 9 EACH 203 Removal of Curb & Gutter, Concrete 192 LNFT 203 Removal of Pipe Culvert 66 LNFT 203 Plug, Existing Pipe 1 EACH 204 Roadway Excavation 7,550 CUYD 204 Subexcavation 150 CUYD 204 Unclassified Borrow 11,900 TON 204 Select Borrow 1,350 TON 204 Waste 380 CUYD 211 Roadway Obliteration 700 SQYD

DESCRIPTION OF WORK in US CUSTOMARY

UNITS FP-14

Schedule A

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 28 CUYD 251 Boulder 32 EACH

DIVISION 300 – Aggregate and Base Courses 302 Roadway Aggregate 7,700 TON 313 Aggregate-Topsoil Course 2,580 SQYD

DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete, Type 1 3,350 TON 403 Asphalt Concrete, Type 2 1,100 TON 412 Asphalt Tack Coat (asphalt surface treatment) 4 TON 413 Asphalt Pavement Milling 4,750 SQYD

DIVISION 500 – Rigid Pavement 501 Minor Concrete Pavement, 9-Inch Depth 585 SQYD

DIVISION 550 – Bridge Construction 575 Minor Bridge Work (Gros Ventre Irrigation Bridge) LPSM 575 Minor Bridge Work (Gros Ventre River Bridge) LPSM

DIVISION 600 – Incidental Construction 601 Minor Concrete (4-Inch Depth) 65 SQYD 602 Culverts, 24-Inch 435 LNFT 602 End Section for 24-Inch Pipe Culvert 8 EACH 608 Paved Waterways, Type 4 6 SQYD 609 Curb, Concrete, 10-Inch Depth 195 LNFT 609 Curb, Concrete, 14-Inch Depth 42 LNFT 609 Curb & Gutter, Concrete, 8-Inch Depth 1,235 LNFT 609 Curb & Gutter, Concrete, 12-Inch Depth 2,031 LNFT 609 Gutter, Concrete 40 LNFT 615 Sidewalk, Concrete (4-Inch Depth) 55 SQYD 615 Sidewalk, Exposed Aggregate Concrete (4-Inch Depth) 185 SQYD 615 Median, Concrete (approach nose) 32 SQYD 615 Median, Concrete (colored) 470 SQYD 615 Median, Exposed Aggregate Concrete (4-Inch Depth) 253 SQYD 615 Accessibility Ramp, Concrete 2 EACH 615 Detectable Warning Panels 25 SQYD 617 Remove and Reset, Guardrail 136 LNFT 619 Bollard Posts (removable) 10 EACH 619 Remove and Reset Fence 30 LNFt 620 Stone Masonry (fence) LPSM

DESCRIPTION OF WORK in US CUSTOMARY

UNITS FP-14

Schedule A

621 Monuments & Markers (construction survey & staking) (yes/no) No 622 Rental Equipment Yes 623 General Labor Yes 623 Special Labor, Hired Survey Service Yes 624 Placing Manufactured Topsoild (soild and compost) 8,165 SQYD 624 Placing Government-Furnished topsoil, 5-Inch Depth

5,364 QYD

633 Sign System, Government Furnished Sign 12 EACH 633 Sign System 183 SQFT 633 Remove and Reset Sign 2 EACH 633 Remove Sign 5 EACH 633 Snow Pole Holder 335 EACH 634 Permanent Pavement Markings 26,966 LNFT 634 Permanent Pavement Markings 305 SQFT 634 Permanent Pavement Symbols 17 EACH 635 Temporary Traffic Control – Barricade Type 3 16 EACH 635 Temporary Traffic Control – Portable Changeable Message Sign (government furnished) 2 EACH 635 Temporary Traffic Control – Portable Changeable Message Sign

(YOUR SPEED) 4 EACH

635 Temporary Traffic Control – Crash Cushion 11 EACH 635 Temporary Traffic Control – Concrete Barrier 2,100 LNFT 635 Temporary Traffic Control – Pavement Markings 10,620 LNFT 635 Temporary Traffic Control – Plastic Fence 3,400 LNFT 635 Temporary Traffic Control – Construction Sign 1,000 SQFT 635 Temporary Traffic Control – Pavement Markings 405 SQFT 635 Temporary Traffic Control – Traffic Control Supervisor 150 DAY 635 Temporary Traffic Control – Flagger 1,180 FXHR 636 Lighting System LPSM 636 Traffic Counter System (government furnished) 8 EACH 636 Conduit, ¾-Inch, PVC 330 LNFT 636 Conduit, 2-Inch, PVC 2,750 LNFT 636 Conduit,3-inch, PVC 55 LNFT 636 Wire, Electrical Conductors, various AWG 19,114 LNFT 636 Luminaire, Type A and C 66 EACH 636 Utility Box, Pullbox 28 EACH 636 Utility Box, Junction Box 1 EACH 645 Locating Utilities LPSM 646 Fixture, Bench (government furnished) 1 EACH

DIVISION 200 – Earthwork
DIVISION 250 – Slope Reinforcement and Retaining Walls
DIVISION 300 – Aggregate and Base Courses
DIVISION 400 – Asphalt Pavements & Surface Treatments
DIVISION 500 – Rigid Pavement
DIVISION 550 – Bridge Construction