Final_Earthwork_MSE_Welded_Wire_Face_Walls_XS_803+40_to_804+60_Report.pdf

PDF 34 KB Posted

Attached to
OR BLM SAL 040727(1), Nestucca River Back Country Byway Phase 1
Solicitation number
DTFH7017B00026
Issued by

About this file

Final Earthwork MSE Welded Wire Face Walls XS 803+40 to 804+60_Report

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FHWA PROJECT

NESTUCCA RIVER BACK COUNTRY BYWAY

PHASE 1

OR BLM SAL 040727(1)

NESTUCCA RIVER ACCESS ROAD

EARTHWORK REPORT

MSE WALL 803+40 TO 804+60

BUREAU OF LAND MANAGEMENT NORTHWEST OREGON DISTRICT

TILLAMOOK AND YAMHILL COUNTIES

OREGON

File: c:\myfiles\pw_production\d0254046\Final Earthwork MSE 803+40-804+60_Report.log 7/27/2017, 4:11:51 PM beg sta = 803+40.00 R 1 end sta = 804+60.00 R 1

COMPUTING EARTHWORKS FOR BASELINE = BCB

COMPUTING EARTHWORKS FOR JOB = 701

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Page: 1

File: c:\myfiles\pw_production\d0254046\Final Earthwork MSE 803+40-804+60_Report.log 7/27/2017, 4:11:51 PM

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

803+40.00 RDWYEXC

Excavation 3.92 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 8.73 0 0 1.00 0 0

MSEWALLEXC

Excavation 104.86 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0

TOPSOIL

Excavation 10.02 0 0 0.00 0 Subsoil Exc 5.62 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.86 0 0 0.00 0 0

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.00 0 0 0.00 0 0

SELECTWALLBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 81.80 0 0 0.00 0 0

GRANULARBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 24.48 0 0 0.00 0 0

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Page: 2

File: c:\myfiles\pw_production\d0254046\Final Earthwork MSE 803+40-804+60_Report.log 7/27/2017, 4:11:51 PM

Fill 1.76 0 0 0.00 0 0

803+50.00 RDWYEXC

Excavation 2.03 1 1 1.00 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.59 3 3 1.00 -2 3

MSEWALLEXC

Excavation 260.08 68 68 1.00 68 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 66 0

TOPSOIL

Excavation 10.83 4 0 0.00 4 Subsoil Exc 4.47 2 0 0.00 2 Fill 0.00 0 0 0.00 66 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.16 3 0 0.00 66 3

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.42 5 0 0.00 66 5

SELECTWALLBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 172.22 47 0 0.00 66 47

GRANULARBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 93.88 22 0 0.00 66 22

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.87 0 0 0.00 66 0

803+60.00 RDWYEXC

Page: 3

File: c:\myfiles\pw_production\d0254046\Final Earthwork MSE 803+40-804+60_Report.log 7/27/2017, 4:11:51 PM

Excavation 0.00 0 0 1.00 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.53 3 3 1.00 63 6

MSEWALLEXC

Excavation 200.40 85 85 1.00 153 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 148 0

TOPSOIL

Excavation 6.66 3 0 0.00 7 Subsoil Exc 4.62 2 0 0.00 4 Fill 0.00 0 0 0.00 148 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.16 3 0 0.00 148 6

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.42 5 0 0.00 148 10

SELECTWALLBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 145.53 59 0 0.00 148 106

GRANULARBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 67.83 30 0 0.00 148 52

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.87 0 0 0.00 148 0

803+70.00 RDWYEXC

Excavation 1.40 0 0 1.00 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.04 3 3 1.00 145 9

Page: 4

File: c:\myfiles\pw_production\d0254046\Final Earthwork MSE 803+40-804+60_Report.log 7/27/2017, 4:11:51 PM

MSEWALLEXC

Excavation 158.68 67 67 1.00 220 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 212 0

TOPSOIL

Excavation 6.72 2 0 0.00 9 Subsoil Exc 4.73 2 0 0.00 6 Fill 0.00 0 0 0.00 212 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.16 3 0 0.00 212 9

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.42 5 0 0.00 212 15

SELECTWALLBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 105.28 46 0 0.00 212 152

GRANULARBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 59.95 24 0 0.00 212 76

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.87 0 0 0.00 212 0

803+80.00 RDWYEXC

Excavation 1.78 1 1 1.00 2 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.06 3 3 1.00 210 12

MSEWALLEXC

Excavation 144.27 57 57 1.00 277 Subsoil Exc 0.00 0 0 1.00 0

Page: 5

File: c:\myfiles\pw_production\d0254046\Final Earthwork MSE 803+40-804+60_Report.log 7/27/2017, 4:11:51 PM

Fill 0.00 0 0 1.00 267 0

TOPSOIL

Excavation 6.39 2 0 0.00 11 Subsoil Exc 4.59 2 0 0.00 8 Fill 0.00 0 0 0.00 267 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.16 3 0 0.00 267 12

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.42 5 0 0.00 267 20

SELECTWALLBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 99.37 38 0 0.00 267 190

GRANULARBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 52.87 21 0 0.00 267 97

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.87 0 0 0.00 267 0

803+90.00 RDWYEXC

Excavation 2.01 1 1 1.00 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.43 3 3 1.00 265 15

MSEWALLEXC

Excavation 141.75 53 53 1.00 330 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 318 0

TOPSOIL

Excavation 6.40 2 0 0.00 13

Page: 6

File: c:\myfiles\pw_production\d0254046\Final Earthwork MSE 803+40-804+60_Report.log 7/27/2017, 4:11:51 PM

Subsoil Exc 4.49 2 0 0.00 10 Fill 0.00 0 0 0.00 318 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.16 3 0 0.00 318 15

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.42 5 0 0.00 318 25

SELECTWALLBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 93.26 36 0 0.00 318 226

GRANULARBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 47.85 19 0 0.00 318 116

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.87 0 0 0.00 318 0

804+00.00 RDWYEXC

Excavation 2.73 1 1 1.00 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.40 3 3 1.00 316 18

MSEWALLEXC

Excavation 153.93 55 55 1.00 385 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 371 0

TOPSOIL

Excavation 7.62 2 0 0.00 15 Subsoil Exc 4.36 2 0 0.00 12 Fill 0.00 0 0 0.00 371 0 Mass ordinate for TOPSOIL = 0

Page: 7

File: c:\myfiles\pw_production\d0254046\Final Earthwork MSE 803+40-804+60_Report.log 7/27/2017, 4:11:51 PM

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.86 3 0 0.00 371 18

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.00 5 0 0.00 371 30

SELECTWALLBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 101.71 36 0 0.00 371 262

GRANULARBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 57.03 19 0 0.00 371 135

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.76 0 0 0.00 371 0

804+10.00 RDWYEXC

Excavation 3.54 1 1 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.13 3 3 1.00 369 21

MSEWALLEXC

Excavation 156.27 58 58 1.00 443 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 427 0

TOPSOIL

Excavation 8.24 2 0 0.00 17 Subsoil Exc 4.32 2 0 0.00 14 Fill 0.00 0 0 0.00 427 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0

Page: 8

File: c:\myfiles\pw_production\d0254046\Final Earthwork MSE 803+40-804+60_Report.log 7/27/2017, 4:11:51 PM

Fill 7.86 3 0 0.00 427 21

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.60 6 0 0.00 427 36

SELECTWALLBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 109.66 39 0 0.00 427 301

GRANULARBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 63.41 22 0 0.00 427 157

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.21 1 0 0.00 427 1

804+20.00 RDWYEXC

Excavation 5.13 2 2 1.00 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.40 3 3 1.00 426 24

MSEWALLEXC

Excavation 133.24 53 53 1.00 496 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 479 0

TOPSOIL

Excavation 8.50 3 0 0.00 20 Subsoil Exc 4.16 2 0 0.00 16 Fill 0.00 0 0 0.00 479 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 3 0 0.00 479 24

LAYER2

Excavation 0.00 0 0 0.00 0

Page: 9

File: c:\myfiles\pw_production\d0254046\Final Earthwork MSE 803+40-804+60_Report.log 7/27/2017, 4:11:51 PM

Fill 16.34 6 0 0.00 479 42

SELECTWALLBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 104.07 40 0 0.00 479 341

GRANULARBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 55.26 22 0 0.00 479 179

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.89 1 0 0.00 479 2

804+30.00 RDWYEXC

Excavation 5.73 2 2 1.00 9 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.18 2 2 1.00 479 26

MSEWALLEXC

Excavation 133.17 49 49 1.00 545 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 528 0

TOPSOIL

Excavation 8.65 3 0 0.00 23 Subsoil Exc 3.83 1 0 0.00 17 Fill 0.00 0 0 0.00 528 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 3 0 0.00 528 27

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.08 6 0 0.00 528 48

SELECTWALLBACKFILL

Page: 10

File: c:\myfiles\pw_production\d0254046\Final Earthwork MSE 803+40-804+60_Report.log 7/27/2017, 4:11:51 PM

Subsoil Exc 0.00 0 0 0.00 0 Fill 97.78 37 0 0.00 528 378

GRANULARBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 50.37 20 0 0.00 528 199

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.69 1 0 0.00 528 3

804+40.00 RDWYEXC

Excavation 4.21 2 2 1.00 11 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.25 2 2 1.00 528 28

MSEWALLEXC

Excavation 139.84 51 51 1.00 596 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 579 0

TOPSOIL

Excavation 7.87 3 0 0.00 26 Subsoil Exc 4.10 1 0 0.00 18 Fill 0.00 0 0 0.00 579 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 3 0 0.00 579 30

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.28 6 0 0.00 579 54

SELECTWALLBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 91.77 35 0 0.00 579 413

Page: 11

File: c:\myfiles\pw_production\d0254046\Final Earthwork MSE 803+40-804+60_Report.log 7/27/2017, 4:11:51 PM

GRANULARBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 47.50 18 0 0.00 579 217

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.10 1 0 0.00 579 4

804+50.00 RDWYEXC

Excavation 5.92 2 2 1.00 13 Subsoil Exc 0.00 0 0 1.00 0 Fill 6.81 2 2 1.00 579 30

MSEWALLEXC

Excavation 89.94 43 43 1.00 639 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 622 0

TOPSOIL

Excavation 6.55 3 0 0.00 29 Subsoil Exc 4.12 2 0 0.00 20 Fill 0.00 0 0 0.00 622 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 3 0 0.00 622 33

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.47 6 0 0.00 622 60

SELECTWALLBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 56.39 27 0 0.00 622 440

GRANULARBACKFILL

Excavation 0.00 0 0 0.00 0

Page: 12

File: c:\myfiles\pw_production\d0254046\Final Earthwork MSE 803+40-804+60_Report.log 7/27/2017, 4:11:51 PM

Fill 28.98 14 0 0.00 622 231

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.50 1 0 0.00 622 5

804+60.00 RDWYEXC

Excavation 5.93 2 2 1.00 15 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.25 3 3 1.00 621 33

MSEWALLEXC

Excavation 62.96 28 28 1.00 667 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 649 0

TOPSOIL

Excavation 5.45 2 0 0.00 31 Subsoil Exc 4.39 2 0 0.00 22 Fill 0.00 0 0 0.00 649 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.53 3 0 0.00 649 36

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.67 5 0 0.00 649 65

SELECTWALLBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 39.67 18 0 0.00 649 458

GRANULARBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.16 8 0 0.00 649 239

SHOULDERBACKFILL

Page: 13

File: c:\myfiles\pw_production\d0254046\Final Earthwork MSE 803+40-804+60_Report.log 7/27/2017, 4:11:51 PM

Fill 0.90 0 0 0.00 649 5

Page: 14

File: c:\myfiles\pw_production\d0254046\Final Earthwork MSE 803+40-804+60_Report.log 7/27/2017, 4:11:51 PM

G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 15 15 1.00 Subsoil Exc 0 0 1.00 Fill 33 33 1.00

MSEWALLEXC

Excavation 667 667 1.00 Subsoil Exc 0 0 1.00 Fill 0 0 1.00

TOPSOIL

Excavation 31 0 0.00 Subsoil Exc 22 0 0.00 Fill 0 0 0.00

LAYER1

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 36 0 0.00

LAYER2

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 65 0 0.00

SELECTWALLBACKFILL

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 458 0 0.00

GRANULARBACKFILL

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 239 0 0.00

SHOULDERBACKFILL

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 5 0 0.00