PROJECT_DESCRIPTION.pdf
PDF 30 KB Posted
- Solicitation number
- DTFH7017B00024
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_Upper_Hoh.pdf | ||
| Q&A_5-10-18.pdf | ||
| Q&A_5-7-18.pdf | ||
| Plan_Request_Form_Upper_Hoh.pdf | ||
| IFB_Upper_Hoh.pdf | ||
| Olym_10701-Planset.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA NPS OLYM 107(1), Upper Hoh River Emergency Repair, Olympic National Park, Jefferson County, Washington
The work consists of riprap, engineered log jam, earthwork, paving, striping, flow diversion and other small items of work.
Project length: 0.01 Miles
Tentative Fixed Completion Date: Fall 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: Less than $500,000
Location: 20 miles SE of Forks, WA.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
Base Schedule
DIVISION 150 – Project Requirements 152 Construction Survey & Staking Yes 153 Contractor Quality Control and Assurance Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) Yes 157 Soil Erosion & Sediment Control-Silt Fence Check Dams Turbidity Monitoring
290 LF
4 EA
LPSM
DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions Concrete Barrier 140 LF 204 Roadway Excavation Granular Backfill
3650 CUYD
29 CUYD
207 Geotextile 950SY
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 3130 CY
DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 320 T
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 140 T 412 Asphalt Tack Coat (asphalt surface treatment) 1 T
DIVISION 600 – Incidental Construction
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
Base Schedule
602 Culverts End Sections
70 LF
1 EA
634 Permanent Pavement Markings 2200 LF 635 Temporary Traffic Control LPSM 635 Temporary Traffic Control – Cone 50 647 Mitigation, Bank Stabilization (Engineered log jam) 10 EA 650 Construct and maintain Temporary Diversions (flow diversion) LPSM