PROJECT_DESCRIPTION.pdf
PDF 14 KB Posted
- Solicitation number
- DTFH7017B00013
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Florence.pdf | ||
| OR_36_PSE_2-15-2017_SSr1_Part2.pdf | ||
| OR_36_PSE_2-15-2017_SSr1_Part1.pdf | ||
| IFB_Florence-Eugene.pdf | ||
| Plan_Request_form_Florence_Eugene.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR DOT 36(1), OR 36 – Florence-Eugene Highway to Greenleaf Creek, Lane County, Oregon
The work consists of roadway surface preservation, signs, pavement markings, guardrail, and and other small items of work.
Project length: 21.4 miles
Tentative Fixed Completion Date: Fall 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $1 and $2 million.
Location: 35 miles west of Eugene Oregon
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
Base Schedule
DIVISION 150 – Project Requirements 152 Construction Survey & Staking No 153 Contractor Quality Control and Assurance Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll
200 LNFT
DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions (structures, demolition) Delineator Sign Terminal Section Guardrail (Rail Only)
500 EACH
140 EACH
6 EACH
150 LNFT
DIVISION 400 – Asphalt Pavements & Surface Treatments 407 Chip Seal Chip Seal Emulsified Asphalt Blotter
285,000 SQYD
510 TON
20 TON
414 Asphalt Pavement Crack Sealing and Filling Cracks, Cleaning and Sealing 6.5 MILE 418 Asphalt Concrete Pavement Patching Asphalt Concrete Pavement Patch 2650 SQYD
DIVISION 600 – Incidental Construction 617 Guardrail Terminal Section Replacement Post, Steel Replacement Blockout Replacement Guardrail W-Beam Rail Element, Type 2, Class A
10 EACH
5 EACH
5 EACH
150 LNFT
622 Rental Equipment Yes 623 General Labor Yes 624 Topsoil (landscaping & related items) No
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
Base Schedule
633 Permanent Traffic Control (traffic control devices) Sign System Sign, Aluminium Panel, Type 8 Sheeting Post, Wood, 4-inch x 4-inch Post, Wood, 6-inch x 6-inch Object Marker, Type 3 Delineator Rumble Strip Remove and Reset Sign
100 EACH
2 EACH
7 EACH
5 EACH
26 EACH
500 EACH
21.4 MILE
6 EACH
634 Permanent Pavement Markings (traffic pavement markings) Type B, Solid (Yellow) Type B, Solid (White) Type B, Broken (Yellow) Symbols Type B, Turn Arrow Type B, Railroad Symbol
400,000 LNFT
480,000 LNFT
38,000 LNFT
3 EACH
1 EACH
2 EACH
635 Temporary Traffic Control Cone Construction Sign Pavement Markings Pilot Car Traffic Control Supervisor Flagger
250 EACH
280 SQFT
50.0 MILE
250 HOUR
50 DAY
1000 FXHR
File details come from the government source that posted it. Updated .