PROJECT_DESCRIPTION.pdf

PDF 14 KB Posted

Attached to
OR DOT 36(1), OR 36 Florence-Eugene Highway to Greenleaf Creek
Solicitation number
DTFH7017B00013
Issued by

View the file

Other files

File Type Posted
BidSum_Florence.pdf PDF
OR_36_PSE_2-15-2017_SSr1_Part2.pdf PDF
OR_36_PSE_2-15-2017_SSr1_Part1.pdf PDF
IFB_Florence-Eugene.pdf PDF
Plan_Request_form_Florence_Eugene.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OR DOT 36(1), OR 36 – Florence-Eugene Highway to Greenleaf Creek, Lane County, Oregon

The work consists of roadway surface preservation, signs, pavement markings, guardrail, and and other small items of work.

Project length: 21.4 miles

Tentative Fixed Completion Date: Fall 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $1 and $2 million.

Location: 35 miles west of Eugene Oregon

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

Base Schedule

DIVISION 150 – Project Requirements 152 Construction Survey & Staking No 153 Contractor Quality Control and Assurance Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll

200 LNFT

DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions (structures, demolition) Delineator Sign Terminal Section Guardrail (Rail Only)

500 EACH

140 EACH

6 EACH

150 LNFT

DIVISION 400 – Asphalt Pavements & Surface Treatments 407 Chip Seal Chip Seal Emulsified Asphalt Blotter

285,000 SQYD

510 TON

20 TON

414 Asphalt Pavement Crack Sealing and Filling Cracks, Cleaning and Sealing 6.5 MILE 418 Asphalt Concrete Pavement Patching Asphalt Concrete Pavement Patch 2650 SQYD

DIVISION 600 – Incidental Construction 617 Guardrail Terminal Section Replacement Post, Steel Replacement Blockout Replacement Guardrail W-Beam Rail Element, Type 2, Class A

10 EACH

5 EACH

5 EACH

150 LNFT

622 Rental Equipment Yes 623 General Labor Yes 624 Topsoil (landscaping & related items) No

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

Base Schedule

633 Permanent Traffic Control (traffic control devices) Sign System Sign, Aluminium Panel, Type 8 Sheeting Post, Wood, 4-inch x 4-inch Post, Wood, 6-inch x 6-inch Object Marker, Type 3 Delineator Rumble Strip Remove and Reset Sign

100 EACH

2 EACH

7 EACH

5 EACH

26 EACH

500 EACH

21.4 MILE

6 EACH

634 Permanent Pavement Markings (traffic pavement markings) Type B, Solid (Yellow) Type B, Solid (White) Type B, Broken (Yellow) Symbols Type B, Turn Arrow Type B, Railroad Symbol

400,000 LNFT

480,000 LNFT

38,000 LNFT

3 EACH

1 EACH

2 EACH

635 Temporary Traffic Control Cone Construction Sign Pavement Markings Pilot Car Traffic Control Supervisor Flagger

250 EACH

280 SQFT

50.0 MILE

250 HOUR

50 DAY

1000 FXHR

File details come from the government source that posted it. Updated .