Signed_Plans_MT_BOR_2015.pdf
PDF 4 MB Posted
- Solicitation number
- DTFH7017B00011
About this file
Plans_Fresno
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Fresno.pdf | ||
| A001.pdf | ||
| IFB_Fresno.pdf | ||
| Plan_Request_form_Fresno.pdf | ||
| PROJECT_DESCRIPTION_MT_BOR_2015(1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section D Section E Section F
Plan & Profile Temporary Traffic Control
Permanent Traffic Control ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0060 15401-0000 CONTRACTOR TESTING LPSM ALL
A0080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0100 40601-0000 FOG SEAL TON 29 1 30
A0120 40702-0300 CHIP SEAL, TYPE 1C SQYD 33,525 1,475 35,000
A0140 40702-1200 CHIP SEAL, TYPE 2B SQYD 11,519 481 12,000
A0160 40711-0000 EMULSIFIED ASPHALT TON 111 4 115 Grade CRS-2P
A0180 40712-0000 BLOTTER TON 20 20 As directed by CO
A0200 41401-3000 CRACKS, CLEANING AND FILLING LNFT 100 100 As directed by CO
A0220 41402-2000 CRACKS, CLEANING AND SEALING MILE 3.1 3.1
A0240 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 SQYD 55 5 60
A0260 61108-4000 ADJUST VALVE BOX (WELLHEAD COVER) EACH 4 4
A0280 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM
CAPACITY HOUR 10
A0300 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM
RATED CAPACITY BUCKET, 18-INCH WIDTH HOUR 10
A0320 62301-0000 GENERAL LABOR HOUR 20
A0340 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID LNFT 71,860 3,140 75,000 Yellow and white
A0360 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN LNFT 17,792 208 18,000 Yellow
A0380 63405-0050 PAVEMENT MARKINGS, SYMBOLS Railroad crossing symbols per MUTCD
EACH 2 2 Figure 8B-7
A0400 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 220 220
A0420 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT
MARKINGS LNFT 14,782 218 15,000
A0440 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION
SIGN SQFT 200 200
A0460 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 30 30
A0480 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 250 250
-J an -2
8:
A M
J:
Tr an sp or ta tio n\ W
3X
5_
W
FL
_M T_
Fr es no \7
FH
W A \T
\E ng in ee r Es tim at es
Es tim at e-
.x ls x]
S he et
SUMMARY OF QUANTITIES
A M E N D
Line Item No. Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B.1BOR 2015(1)MT
SHEET
NUMBER
Slope
Variable
Construction Limits Construction Limits
Fog Seal
Existing asphalt surface
NOTE:
Var ies
Varies
CHIP SEAL
TYPICAL SECTION
Grade varies Grade varies
Slope
Variable
Construction Limits Construction Limits
Var ies
Varies
Grade varies Grade varies
DOUBLE CHIP SEAL
TYPICAL SECTION
TYPICAL SECTIONS
Existing asphalt surface
Fog Seal
Emulsified Asphalt
Grade CRS - 2P
C.1
Chip Seal, Type 1C
Emulsified Asphalt Grade CRS - 2P
2nd application
Surface treatment aggregate
Grading C
Emulsified Asphalt
Grade CRS - 2P
1st application
Surface treatment aggregate
Grading B
1. Refer to Surfacing Tabulation Sheet D.1 for width and extent of asphalt surface treatment.
2. Protect project asphalt curbs, concrete curb & gutter, concrete barriers, manholes, water valves, well head covers, drainage scuppers, and all other appurtenances during all surface treatment operations.
3. Measure existing roadway widths as per 152.05(m).
4. Patch surface and seal/fill cracks prior to chip seal.
See Sheet D.1 for routes.
5. Fog seal pavement edge to pavement edge for chip seal.
NO SCALE
For Roadway Width or Parking Lot Dimensions
See Summary Tabulation Sheets D.1 and F.1
For Roadway Width or Parking Lot Dimensions
See Summary Tabulation Sheets D.1 and F.1
STATE PROJECT
J a n
A
M A
M J
T r a n s p o r ta ti o n
W
X
W F L
M T F r e s n o F
H W
A T R o a d w a y C
A D
D S h e e ts m t-a c a .d g n
NUMBER
MT BOR 2015(1)
" to 1"4
NOTE:
NO SCALE
1" and greater
CRACK SEALING AND FILLING
CRACK SEALING AND FILLING
ASPHALT PAVEMENT
CRACK SEALING
CRACK FILLING
flush with the existing surface
Ensure all remaining overband isStrike off material to flush existing surface.
4. Force crack repair material into cracks to ensure adhesion to
3. Seal and fill cracks at locations designated by the CO.
other methods approved by the CO.
2. Remove existing sealant from cracks to be filled by routing or cracks.
Follow manufacturer's recommendations for sealing and filling
1. Prepare cracks for sealing and filling according to Section 414.
414.06(a) and 712.01(a)(1) crack sealant. See Subsections
Seal crack with hot applied
C.2 and 403.
existing surface. See Subsections 414.06(b)
Fill crack with asphalt concrete mix flush with
STATE PROJECT
J a n
A
M A
M J
T r a n s p o r ta ti o n
W
X
W F L
M T F r e s n o F
H W
A T R o a d w a y C
A D
D S h e e ts m t-a c c .d g n
NUMBER
]B.Letter2.US [c:\myfiles\pw_production\d0107577\Work_dd.cel
C.3
STATE PROJECT
NUMBER
SHEET
MT BOR 2015(1)
9:44 AM 12 May 2015 RJ Meadows, PE Jacobs Engineering 03/2017 02/2017 Revised by:Designed by:
1.
conditions encountered at time of construction.
Extent of patch to be determined by the CO based on
2.
3.
91% of the maximum specific gravity.
Compact minor hot asphalt concrete mix to a minimum of
4.
FULL DEPTH PATCH TYPE 2
Pay Limits to a depth of 4" base and subgrade material
Remove damaged pavement, V a r ie s pavement
Existing base course
Existing
Fog seal
NO SCALE
5.
Fog seal surface according to Subsection 406.06 item. See Section 418.
All items shown within the pay limits are included in the pay to Subsection 418.04(b)
Remove pavement according
4" Asphalt concrete, Type II
NOTE:
Tack coat of the patch.
to Subsection 412.04. Apply tack coat around the perimeter
Clean existing surface prior to applying tack coat according
PAVEMENT PATCH DETAILS
ASPHALT CONCRETE
NO SCALE
C.4
Sawcut Sawcut
WELLHEAD COVER
EXISTING BUREAU OF RECLAMATION
Do not disturb
Existing piezometer finished grade
" below
1" to
NOTE:
Double chip seal
Type II concrete
4" Asphalt
Crushed aggregate
DETAIL
WELLHEAD COVER
ring and cover
Remove existing pavement
Existing pavement existing
Remove
Do not disturb
" pvc well)
1(1
Existing piezometer and cover prior to ordering.
compatible with the new frame existing conditions are shown is schematic. Field verify
2. Existing well head cover detail the pay item 61108-4000.
ring and cover are included in and cover and install the new
1. All items shown to remove ring
WELLHEAD COVER
OF RECLAMATION
ADJUSTED BUREAU
Install new traffic rated frame and cover
STATE PROJECT
NUMBER
SHEET
MT BOR 2015(1)
R e v is e d b y R
J M e a d o w s
P E
40601-0000 40702-0300 40702-1200 40711-0000 41401-3000 41402-2000 41801-2000 61108-4000
FT FT
TON SQYD SQYD TON LNFT MILE SQYD EACH
001 Fresno Reservoir Rd 0.000 0.018 95 26 0.2 274 0.5 0.02 0 001 Fresno Reservoir Rd 0.018 0.020 10 30 0 001 Fresno Reservoir Rd 0.020 2.200 11,510 26 21.4 33,251 59.6 100 2.18 30 001 Fresno Reservoir Rd 2.200 2.380 950 30 2.0 3,167 14.0 0.18 5 4 002 Fresno Reservoir Rd 2.380 2.760 2,006 22 3.2 4,904 21.7 0.38 20
Fresno Dam Spillway Bridge
2.760 2.800 211 22 0.3 516 2.3 0.04 0
002 Boat Ramp Access Rd 0.000 0.250 1,320 20 1.9 2,933 13.0 0.25 0
145.2 = Hot Asphalt Concrete (lbs/cuft) 240.0 = Emulsified Asphalt (Gal./ton) 0.48 = Emulsified Asphalt (Gal./sqyd) (Type 2B 1st Application)
0.15 = Fog Seal (Gal./sqyd) 0.10 = Tack C= Emulsified Asphalt (Gal./ton) 0.58 = Emulsified Asphalt (Gal./sqyd) (Type 2B 2nd Application)
233.0 = Fog Seal (Gal./ton) 233.0 = Tack C= Tack Coat (Gal./sqyd) 0.43 = Emulsified Asphalt (Gal./sqyd) (Type 1C) c:\myfiles\pw_production\d0314629\[MT Fresno Proj_Sum_Shts.xlsm]Road 1
CRACKS,
CLEANING AND
FILLING
LE
N
G
TH
W
ID
TH ADJUST VALVE
BOX
(WELLHEAD
COVER)
Protect concrete curb, concrete barricade, wood curb, and wellhead covers.
111.0
Material Application Rates and Weights Used for Estimating Purposes
33,525TOTAL
These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.
3/13/17 7:38 AM
TABULATION OF
SURFACING
QUANTITIES
3.05 429.0 11,519
SURFACING TABULATION SHEET
ROUTE NAME
MILES
ASPHALT
CONCRETE
PAVEMENT
PATCH, TYPE 2
FOG SEAL CHIP SEAL,
TYPE 1C
R O
U
TE
N U
M
BE
R
No work over railroad tracks
SHEET
NO.STATE PROJECT
D.1MT BOR 2015(1)
Remarks
BID ITEM NUMBER
MILE TO MILE CRACK, CLEANING
AND SEALING
SQFT
CHIP SEAL, TYPE
2B
Double chip
EMULSIFIED
ASPHALT
Single Chip, suspend at railroad tracks
Double chip. End at concrete boat ramp.
Single Chip, resume after railroad tracks
Double chip
Double chip
4000'2000'0
Scale in Feet
AREA 1
AREA 2
NOTE:
KEY MAP
FRESNO RESERVOIR ROAD
D.2
Fresno Reservoir Road
SH 2
Spillway Bridge
Fresno Dam
Milk River
Fresno Reservoir
Kremlin Bay
Access Road
Boat Ramp
MP 0.00
10+00
MT BOR 2015(1)
BEGIN PROJECT
To Havre
MP 2.81
158+42
MT BOR 2015(1)
END PROJECT
1. Stations shown are approximate. CO to field locate and mark work limits.
11+05
RESUME PROJECT
10+95
SUSPEND PROJECT
STATE PROJECT
J a n
A
M A
M J
T r a n s p o r ta ti o n
W
X
W F L
M T F r e s n o F
H W
A T R o a d w a y C
A D
D S h e e ts m t-a d b .d g n
NUMBER
AREA 1
FRESNO RESERVOIR ROAD
NOTE:
LEGEND:
No Work Unless Noted Otherwise
Double Chip Seal
Single Chip Seal
Fresno Reservoir Road
D.3
MP 0.00
10+00
MT BOR 2015(1)
BEGIN PROJECT
SH 2
(No Work)
Railroad Crossing
11+05
RESUME PROJECT
10+95
SUSPEND PROJECT
2000'1000'0
Scale in Feet
1. Begin work at start of county road
(at SH 2 right-of-way)
2. No work over railroad crossing.
STATE PROJECT
J a n
A
M A
M J
T r a n s p o r ta ti o n
W
X
W F L
M T F r e s n o F
H W
A T R o a d w a y C
A D
D S h e e ts m t-a d c .d g n
NUMBER
SHEET
MT BOR 2015(1)
NOTE:
LEGEND:
No Work Unless Noted Otherwise
AREA 2
FRESNO RESERVOIR ROAD
2000'1000'0
Scale in Feet
Double Chip Seal
Single Chip Seal
Fresno Reservoir Road
Access Road
Boat Ramp
D.4
MP 0.00
BEGIN PROJECT
MP 0.25
End Project
Spillway Bridge
Fresno Dam
MP 2.81
158+42
MT BOR 2015(1)
END PROJECT
MP 2.77
156+34
MP 2.20
126+00
Milk River
1. Protect wellheads located in the road crossing the dam. Remove and replace the covers. See
Sheet C.4.
STATE PROJECT
J a n
A
M A
M J
T r a n s p o r ta ti o n
W
X
W F L
M T F r e s n o F
H W
A T R o a d w a y C
A D
D S h e e ts m t-a d d .d g n
NUMBER
SHEET
MT BOR 2015(1)
63504-1000
SQFT Each SQFT 36 x 18 4.5 2 9.0 36 x 36 9 2 18.0 24 x 24 4 2 8.0 36 x 36 9 2 18.0 36 x 36 9 4 36.0 36 x 18 4.5 1 4.5 36 x 18 4.5 2 9.0 30 x 30 6.25 2 12.5
85.0
14,782
1. Quantities shown are J:\_Transportation\W3X71205_WFL_MT_Fresno\700FHWA\T0005\Roadway\CADD_Sheets\_Tabs\[MT Fresno Proj_Sum_Shts.xlsm]TTC
63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT
UNIT
TRAFFIC CONTROL QUANTITIES
TEMPORARY TRAFFIC CONTROL, CONE
As directed by CO
Inches
Sign Message
End Road Work Road Work Ahead
25 MPH
TEMPORARY TRAFFIC
CONTROL,
CONSTRUCTION
SIGN
Panel Size Area Quantity
Unit
Drawing Reference
635-1 635-1
635-6, 635-7
G20-2 W20-1 W13-1P
635-6, 635-7 635-6
One Lane Road Ahead Flagger Symbol
W20-4 W20-7 G20-4 Pilot Car Follow Me G24-B W8-7
Wait For Pilot Car Loose Gravel
DESCRIPTION
TOTAL
STATE
NOTES
TEMPORARY TRAFFIC CONTROL
SHEET
NO.PROJECT
Item Number
MUTCD Reference
MT E.1BOR 2015(1)
ITEM NO.
63502-0700
63506-0600 HOURTEMPORARY TRAFFIC CONTROL, PILOT CAR
1/19/17 8:02 AM
NOTES:
1. Quantities shown are estimated minimums. Provide actual quantities as needed for construction and as directed by the CO.
2. Temporary pavement markings include only centerline stipes as measured along the road centerline. TABULATION OF TEMPORARY
TRAFFIC CONTROL
QUANTITIES
CONSTRUCTION SIGN SUMMARY
200.0
Notes
EACH
63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR
DRAFT: 6/2014
REVISED:
635-1
TEMPORARY TRAFFIC CONTROL
ADVANCE SIGNING
NO SCALE
SIGNS IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
G20-2
G20-2
G20-2
See Note 11
G20-1
See Note 11
G20-1
M in o r R o a d
M a jo r R o a d
See Note 10
W20-1
See Note 10
W20-1
See Note 9
W16-8P
W20-1 over
See Note 9
W16-8P
W20-1 over
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
See Note 10
W20-1
See Note 10
W20-1
G20-2
NOTE:
the distance to the work area in feet or in miles. Install an additional W20-1
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify of the road on which the construction does occur (applies to major roads only).
construction work occurs, include a supplementary plaque indicating the name
If W20-1 is placed on a roadway other than that on which the actual post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use. Cover
Maintain two-way traffic during all non-work hours except as approved by the CO.
NCHRP-350 or MASH for crashworthiness.
Ensure all sign supports exposed to impact by traffic meet the requirements of indicate a maximum recommended speed through the construction area.
Install advisory speed plates under the W20 series warning signs as needed to construction conditions.
Additional or different message signs may be required to fit the actual messages as required.
locate the warning signs as determined by the CO for best results. Vary
Where advance warning signs, placed as shown, interfere with permanent signs, traffic control plan as necessary to accommodate actual operations.
to this project. The Contractor may add or delete information and details in this
Not all details shown on the temporary traffic control sheets may be applicable
Erect all project advance warning signs before starting construction work.
retroreflective sheeting types.
Refer to the Section 635 of the Special Contract Requirements for allowable
State standards may be used as an alternative if approved by the CO.
that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, verify whole mile.
each end of the project. Show the distance on the G20-1 sign to the nearest
Expressway / Freeway
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
C
B
A as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
A
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
(optional)
W13-1P
(optional)
W13-1P xx
MPH
xx
MPH
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
E.2
STANDARD
U.S. CUSTOMARY STANDARD
STATE PROJECT
STANDARD APPROVED FOR USE 06/2005
J a n
A
M A
M J
T r a n s p o r ta ti o n
W
X
W F L
M T F r e s n o F
H W
A T R o a d w a y C
A D
D S h e e ts m t-a e b .d g n
NUMBER
PAVEMENT MARKINGS
TEMPORARY
DRAFT: 9/2011
REVISED:
635-2
NO SCALE
10' centers.
Curves < 500' Radius Tangents or Curves ≥ 500' Radius
Single solid line: pavement markers spaced on 10' centers.
less, Standard 635-3 may be used as an alternate for the full 14 day
Standard 635-3 may be used as an alternate. For ADT of 1000 or
2' broken line: two pavement markers spaced 2' apart
4" Broken yellow
4" Broken yellow
4" Solid double
4" Solid double
4" Broken yellow and
Traffic flow Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow Traffic flow
Traffic flow
Double solid line: two pavement markers, side by side, spaced on temporary marking period.
allowed by the gap shown based on curvature.
For ADT of greater than 1000 and periods of 3 days or less, patterns:
To substitute raised pavement markers for lines, use the following contract to determine no passing zones for each direction of travel.
Use permanent pavement marking layout as designated in the
3.
2.
1.
DETAIL A DETAIL B
NOTE:
Two-way traffic
Passing zone both directions
DETAIL B1
Two-way traffic
Passing zone both directions
DETAIL A1
Two-way traffic
No passing zone one direction
DETAIL A2
Two-way traffic
No Passing zone one direction
DETAIL B2
Two-way traffic
No passing zone both directions
DETAIL A3
Two-way traffic
No Passing zone both directions
DETAIL B3
yellow centerline
Shoulder
Shoulder and solid yellow centerline
Shoulder yellow centerline
Shoulder yellow centerline solid yellow centerline
Shoulder
Shoulder
2' 18'
2' 18'
40'
20'
20'
40'
2' 38'
2' 38'
4" Broken yellow centerline
E.3
STANDARD
U.S. CUSTOMARY STANDARD
STATE PROJECT
STANDARD APPROVED FOR USE 06/2005
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
J a n
A
M A
M J
T r a n s p o r ta ti o n
W
X
W F L
M T F r e s n o F
H W
A T R o a d w a y C
A D
D S h e e ts m t-a e c .d g n
NUMBER
FOR UNMARKED PAVEMENTS
DELINEATION AND SIGNING
DRAFT: 8/2013
REVISED:
635-3
NO SCALE
temporary traffic control zones greater than 3 miles long.
Repeat W8-12 after each major intersection and every 2 miles for
Repeat R4-1 at 1 mile intervals.
On curves with radius less than 500', reduce cycle length to 20'.
with paint or tape, use Standard 635-2.
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
DO
NOT
PASS
DO
NOT
PASS
DO
NOT
PASS
PASS
WITH
CARE
PASS
WITH
CARE
PASS
WITH
CARE
Traffic flow
Traffic flow
W8-12
Traffic flow
Traffic flow
Traffic flow
Traffic flow
W8-12
W8-12
W8-12
W8-12
W8-12 each direction of travel.
Use permanent markings plan to determine no passing zones for
(optional)
W14-3
(optional)
W14-3
(optional)
W14-3
TABLE A
Markings Are Required
Maximum Duration Before
ADT
See Note 2
See Note 2
See Note 2
3 Days
14 Days
> 1000
≤ 1000
R4-1
R4-1
R4-1
See Note 6
R4-2
See Note 6
R4-2
See Note 6
R4-2
6.
5.
4.
3.
2.
1.
longer periods/higher ADT or for application of temporary markings positioning guides and signing are provided per this detail. For
For periods noted in Table A, pavement may be unmarked if vehicle installed at the upstream end of the zone.
a no-passing zone only if a "DO NOT PASS" (R4-1) sign has been
Use the "PASS WITH CARE" (R4-2) sign at the downstream end of
NOTE:
Two-way traffic
Passing zone both directions
DETAIL A
Two-way traffic
No Passing zone one direction
DETAIL B
Two-way traffic
No Passing zone both directions
DETAIL C
vehicle positioning guides
Bi-directional yellow vehicle positioning guides
Bi-directional yellow vehicle positioning guides
Bi-directional yellow
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
Passing AllowedNo Passing ZonePassing Allowed
NO
PASSING
ZONE
NO
PASSING
ZONE
NO
PASSING
ZONE
329.1'
329.1'
329.1'
329.1'
329.1'
329.1' cycle length
26.3' cycle length
26.3' cycle length
26.3'
E.4
STANDARD
U.S. CUSTOMARY STANDARD
STATE PROJECT
STANDARD APPROVED FOR USE 06/2005
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
J a n
A
M A
M J
T r a n s p o r ta ti o n
W
X
W F L
M T F r e s n o F
H W
A T R o a d w a y C
A D
D S h e e ts m t-a e d .d g n
NUMBER
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
(WITH FLAGGERS)
DRAFT: 8/2013
REVISED:
635-6
NO SCALE
MPH
SPACING IN FEET
FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
50' - 100' (optional)50' - 100'
Traffic flow
Traffic flow
See Note 4
W20-1 W20-7W20-4
See Note 4
G20-2
Spacing Table)
(See Length and
(optional)
WORK SPACE (optional)(optional)
(optional)
W13-1P
(optional)
W16-2P
7.
6.
5.
4.
3.
2.
1.
the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the contractor on the pilot car.
a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
LENGTH
BUFFER SPACE
NOTE:
Expressway / Freeway
Channelizing devices
Flagger location
Flagger location
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table) TERMINATION AREA
Device spacing
BUFFER SPACE
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
xxx
FEET
ROAD WORK
END
See Note 6
10' min.
E.5
STANDARD
U.S. CUSTOMARY STANDARD
STATE PROJECT
STANDARD APPROVED FOR USE 06/2005
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
J a n
A
M A
M J
T r a n s p o r ta ti o n
W
X
W F L
M T F r e s n o F
H W
A T R o a d w a y C
A D
D S h e e ts m t-a e e .d g n
NUMBER
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
(WITH YIELD SIGN)
DRAFT: 6/2014
REVISED:
635-7
50' - 100' 50' - 100' (optional)
50 MPH.
MPH
SPACING IN FEET
FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
YIELD
TO
ONCOMING
TRAFFIC
Traffic flow
Traffic flow
W20-4
W1-4
See Note 3
W20-1 W20-4 W3-2
R1-2
See Note 3
G20-2
See Note 3
G20-2
See Note 3
W20-1
Spacing Table)
(See Length and
WORK SPACE
(optional)
W13-1P
R1-2aP
(optional)
W13-1P
See Note 5
(optional)
W16-2P
7.
6.
5.
4.
3.
2.
1.
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
(optional) (optional) in the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored
Requirements, Section 156.
For project specific minimum width, refer to Special Contract
Use the "YIELD AHEAD" (W3-2) sign when approach speeds exceed of the MUTCD.
If the surface is paved, install yield lines that comply with Section 3B.16
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field approaching traffic through and beyond the work site.
that must yield, and if drivers from both directions are able to see
Use this layout only if sufficient gaps in oncoming traffic exist for traffic
LENGTH
BUFFER SPACE
NOTE:
Expressway / Freeway
See Note 4
(optional)
YIELD LINE
Channelizing devices light (optional)
Type B warning light (optional)
Type B warning
BA
BUFFER SPACE TAPER AREA A
(See Length and Spacing Table) VARIABLE TERMINATION AREA
Device spacing
BUFFER SPACETAPER AREAABC
ADVANCE WARNING AREA (See Sign Spacing Table) xx
MPH
xx
MPH
xxx
FEET
15'
See Note 6
10' min.
E.6
STANDARD
U.S. CUSTOMARY STANDARD
STATE PROJECT
STANDARD APPROVED FOR USE 06/2005
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
J a n
A
M A
M J
T r a n s p o r ta ti o n
W
X
W F L
M T F r e s n o F
H W
A T R o a d w a y C
A D
D S h e e ts m t-a e f.
d g n
NUMBER
DRAFT: 9/2014
REVISED:
635-14
TEMPORARY TRAFFIC CONTROL
WOOD POSTS
SIGN INSTALLATION
Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)
1.5
1.5
1.5
(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
" dia. bolts 4 1Attach sign panels with a minimum of 2 -
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, NOTE:
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
Post
See table for hole size parallel to sign face.
Field drill holes through post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
D
See post detail (typ.)
Break-away holes.
S e e N o te
S e e N o te
7.
6.
5.
4.
3.
2.
1.
by the CO.
State standards may be used as an alternative if approved
See Note 4
E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
Long side of post
D
90°
93°
In areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
per post.
In pedestrian locations, or in areas with obstructed views, the curb may be used.
200' m in m in
6' - 12'
E.7
STANDARD
U.S. CUSTOMARY STANDARD
STATE PROJECT
STANDARD APPROVED FOR USE 06/2005
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
J a n
A
M A
M J
T r a n s p o r ta ti o n
W
X
W F L
M T F r e s n o F
H W
A T R o a d w a y C
A D
D S h e e ts m t-a e g .d g n
NUMBER
63401-0300(4)(5) 63401-0300(4)(5) 63401-0400(4)(5) 63405-0050(4)(5)
YELLOW WHITE WHITE YELLOW WHITE YELLOW (TYPE B)
LNFT LNFT LNFT LENGTH EACH LNFT LNFT LNFT LNFT EACH
Fresno Reservoir Rd (MP 0.00 to MP 0.023)
120 110 110 13 1 78 440 440 1 1
Fresno Reservoir Rd (MP 0.023 to MP 0.089)
350 350 350 700 1,400 700 1 1
Fresno Reservoir Rd (MP 0..089 to MP 1.39)
6,858 6,858 6,858 0 27,432 13,716 0
Fresno Reservoir Rd (MP 1.39 to MP 1.61)
1,157 1,157 1,157 0 4,628 4,628 0
Fresno Reservoir Rd (MP 1.61 to MP 1.93)
1,688 1,688 1,688 0 6,752 3,376 0
Fresno Reservoir Rd (MP 1.93 to MP 2.26)
1,751 1,751 1,751 7,004 7,004
Fresno Reservoir Rd (MP 2.26 to MP 2.80)
2,858 2,858 0 0 11,432 0 0
Boat Ramp Access Rd 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
J:\_Transportation\W3X71205_WFL_MT_Fresno\700FHWA\T0005\Roadway\CADD_Sheets\_Tabs\[MT Fresno Proj_Sum_Shts.xlsm]Striping 1
MT
(1) Match existing pavement markings, or as directed by the CO.
(2) Solid Edge Lines & Misc. Markings include edge (fog) lines.
(3) For line widths other than 4 inches, the measured length of line is adjusted in the ratio of the required width to 4 inches.
(4) Match existing pavement markings or as directed by the CO. Payment will be made for actual striped length on the project.
(5) Apply 2 coats of paint for pavement markings according to Subsection 634.05.
(6) FIO = For Information Only.
1157 ft solid double yellow around corner w/white edge
24,204
1688 ft broken yellow striping w/white edge
2 2TOTAL 14,782 14,772 11,914 017,792
F.1
STATE PROJECT SHEET
NO.
BOR 2015(1)
1/19/17 8:02 AM
PAVEMENT MARKING SUMMARY
BID ITEM NUMBER FIO(6)
Route Length YE
LL
O
W
EN
TE
R
LI
N E an d
M
IS
C
M
AR
K
IN
G S (
1) Stop Bars
ST
O
P
BA
R S(3
STOP BARS
WHITE
R
AI
LR
AD
R O
SS
IN
G
FIO(6)
PAVEMENT
MARKINGS, TYPE B,
SOLID Remarks
Solid single yellow striping to end (existing).
Replace with double yellow stripe
PAVEMENT
MARKINGS,
SYMBOLS
No pavement markings
Railroad crossing symbol per MUTCD Figure 8B-7.
Suspend work over railroad tracks. Solid double yellow stripe w/white edge. Railroad symbol on NB lane
1751 ft of solid double yelllow w/white edge
350 ft of solid yellow on west side and broken yellow on east side w/white edges. Railroad crossing symbol on SB lane
6,858 ft of broken yellow striping w/white edge
TABULATION OF
PERMANENT PAVEMENT
MARKINGS
47,656
R O
U
TE
N U
M
BE
R
EACH
ST
O
P
BA
R W
IT
H
ST
P
LE
TT
ER
IN
G
13 1 78
ROUTE NAME
PAVEMENT
MARKINGS, TYPE B,
SOLID
PAVEMENT
MARKINGS, TYPE B,
BROKEN
SO
LI
D E
D G
E
LI
N
ES
(2
REVISED: 10/2012
W634-2
DETAIL APPROVED FOR USE 10/2007
PAVEMENT MARKINGS
LINEAR
NO SCALE
DETAIL
U.S. CUSTOMARY DETAIL
4" dotted white line
4" solid white edge
4" solid double
4" dotted white
Locate 12" wide stop line to
4" solid white edge line
NOTE:
Place edge line pavement markings at asphalt/concrete curb interface when curb is present.
Paint centerline pavement markings on curves with curve widening "w" to achieve equal lane widths within the roadway. Maintain a constant shoulder width "s" throughout the curve widening area. See staking details for curve widening transition locations.
Typical pavement marking widths are shown. Use wider pavement markings when specified on the plans or when required by the maintaining agency.
1.
2.
3.
TYPICAL PAVEMENT MARKING APPLICATIONS
CENTERLINE MODIFICATION FOR CURVES WITH WIDENING APPLIED ON INSIDE
CENTERLINE DETAIL
See Note 2 for treatment of curves when widening "w" is split equally on both sides of centerline
CL
CL
L a n e
L a n e
10' 30' 10' 30' 10'
2' to 6'
2' m in m a x
4" broken yellow centerline s s w
Transition
Curve widening
Transition s S h o u ld e r
L T ra v e l
L T ra v e l s S h o u ld e r s L
L s when specified in plans
S h o u ld e r
T a v e l
L a n e
T r a v e l
L a n e
S h o u ld e required by the maintaining agency when specified in the plans or when
Increase spacing between parallel lines markings when specified
Approach road pavement
L w break specified in plans extension when edge line line when specified in plans yellow centerline line extension
Turnout
Edge of pavement allow sufficient sight distance
Major approach road
Minor approach
Centerline as required
Edge line when specified in plans and location of top lift pavement joint
Offset centerline for pavement markings
Design
Edge line when specified in plans w L
L
F.2
STATE PROJECT
J a n
A
M A
M J
T r a n s p o r ta ti o n
W
X
W F L
M T F r e s n o F
H W
A T R o a d w a y C
A D
D S h e e ts m t-a fb .d g n
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SYMBOLS AND WORDS
PAVEMENT MARKINGS
4" Typical
6.75'
1'
(W
HI
TE
M
ARKI
NGS)
9.5'
10'
CHEVRON SYMBOL
SPEED BUMP
of Lane Center
20.5" 6" 27"
"2
WORD MARKING
"BUS ONLY"
NOTE:
SQFTTYPE
PAVEMENT MARKING AREAS
F.3
[1]STOP LINE
"STOP" WORD MARKING
STOP LINE INCLUDING
CROSSING SYMBOL
RAILROAD GRADE
50'
15'
20'
15'
8'
6'
2'
16"
Full width of travel lane of Lane Center
NO SCALE
MUTCD, or as directed by CO.
Match existing pavement marking location, [2] purposes only.
A 12' lane width was assumed for estimating
Extend stop line across the width of the lane.[1]
FOOTNOTE:
symbols and words, or as directed by the CO.
3. Match existing pavement marking configurations, current edition.
conform with the "Standard Highway Signs",
2. Provide letters, numerals, and symbols that
Devices (MUTCD) latest edition.
the Manual on Uniform Traffic Control
1. Provide striping in accordance with
[2]
Chevron Symbol
Stop Line Including STOP Word Marking
Railroad Grade Crossing Symbol
BUS ONLY Word Marking
STATE PROJECT
J a n
A
M A
M J
T r a n s p o r ta ti o n
W
X
W F L
M T F r e s n o F
H W
A T R o a d w a y C
A D
D S h e e ts m t-a fc .d g n
NUMBER
File details come from the government source that posted it. Updated .