MONTANA KEY MAP
COLUMBIA
BRITISH
ALBERTA
SASKATCHEWAN
N O
R T
H D
A K
O T
A
S O
U T
H D
A K
O T
A
WYOMING
ID
A
H O
UNITED STATES
CANADA
GLACIER
NATIONAL
PARK
YELLOWSTONE
NATIONAL
PARK
CHARLES M. RUSSELL
NATIONAL
WILDLIFE RANGE
Lake
Flathead
Elwell
Lake
M
Lake
Fort Peck
I SOS U IR
KALISPELL
MISSOULA
Anaconda
HELENA
BUTTE
BOZEMAN
Livingston
BILLINGS
City
Miles
Glendive
Point
Wolf Glasgow
HAVRE
Shelby
FALLS
GREAT
Lewistown
Dillon
E N
O T
S
WOLLEY
R E
VIR
90 15
2 2
MONTANA
REVIR
Project Location
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
SPECIFICATION:
PROJECT MANAGER
M. TRAFFALIS
PLANS FOR PROPOSED PROJECT
MONTANA
GLACIER COUNTY
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
COMMITMENT TO EXCELLENCE
FEDERAL LANDS HIGHWAY
C h e c k e d b y
D e s ig n e d b y
NATIONAL
PARK
SERVICE
Department of the Interior
N
SCALE IN MILES
1 0 1 2 3
C O
N T
IN
E N T A L
Sa int
L a k e
M a r y
S a in t
L a k e
Duck Lake
La ke S he rb ur ne
W ilb u r C reek
Swi ftc ur ren t
Creek
Lake
Bullhead
Lake
Redrock
Josephine
Lake
Lake
Moon Lake
Falling Lead
Lake
Grinnell
Lake
Swiftcurrent
Salamander
The
D
IV
ID
E
Lake
Natahki
Apikunt
C re e k
T H
E
Garden
W a ll
Glacier
Pigeon
C a ta r a c t
Cr ee k
Lake
Windmaker
Lake Iceburg
Saint Mary
Swiftc urre nt Cr ee k
R E S
E R
V A
T
IO
N
Lake Redrock
Lake
Kennedy lake
Pota
Lake
Swiftcurrent Ridge
Ke nn ed y
Glacier Many
B O
U N
D A
R Y
Babb
L o w e r
M a ry
Lake
Helen
Rising Sun
C a n y o n
C re e k
Lake
Cracker
Going To The Sun Road
NATIONAL GLACIER PARK
Landing Strip
GLACIER NATIONAL PARK
NATIONAL PARK SERVICE
U. S. DEPARTMENT OF THE INTERIOR
INDEX TO SHEETS
Projects, FP-14 of Roads and Bridges on Federal Highway
Standard Specifications for Construction roadway aggregate, placed riprap
Horizontal drains, embankment construction, NPS Drwg. No. 117/136055
NPS PMIS No. 54243
NPS PMIS NO. 54243
MT PRA GLAC 14(3)
SCHEDULE C - 1,540 CUYD REVETMENT AND 15,000 LNFT HORIZONTAL DRAIN
SCHEDULE B - 1,540 CUYD REVETMENT AND 20,000 LNFT HORIZONTAL DRAIN
SCHEDULE A - 2,720 CUYD REVETMENT AND 20,000 LNFT HORIZONTAL DRAIN
E. TEMPORARY TRAFFIC CONTROL
D. SEDIMENTATION AND EROSION CONTROL
C. GEOTECHNICAL IMPROVEMENT PLAN
B. SUMMARIES
A. GENERAL INFORMATION
APPROVED:
DATE
DATE
Glacier National Park
Superintendent, Western Federal Lands Highway Division
Chief of Engineering, M an y G la ci er
Road
ROAD SLIDE
REHABILITATE MANY GLACIER
A.1
STATE PROJECT
NUMBER
SHEET
MT
PRA GLAC 14(3)
M
M a r c h
I n t_ ft
D c m y fi le s p w p r o d u c ti o n d g la c a a .d g n
SIGN INSTALLATION, WOOD POSTS
SINGLE LANE CLOSURE (WITH SIGNALS)
ROLLED EROSION CONTROL PRODUCT ON SLOPES
MAINTENANCE ROAD DETAILS - ALL SCHEDULES
REVETMENT AND DRAIN DETAILS - ALL SCHEDULES
REVETMENT AND DRAIN LAYOUT - SCHEDULES B AND C
REVETMENT AND DRAIN LAYOUT - SCHEDULE A
EXISTING SITE LAYOUT - ALL SCHEDULES
TABULATION OF QUANTITIES - ALL SCHEDULES
SUMMARY OF QUANTITIES - SCHEDULE C
SUMMARY OF QUANTITIES - SCHEDULE B
SUMMARY OF QUANTITIES - SCHEDULE A
SURVEY CONTROL
PLAN SYMBOLS AND ABBREVIATIONS
TITLE SHEET
E.2
E.1
D.1
C.6
C.5
C.4
C.3
C.2
C.1
B.3
B.2
B.1
A.3
A.2
A.1
113°25'10.74"W
48°50'46.70"N
Babb, MT 59411
3916 US-89
GNP Pit
113°34'14.54"W
48°49'26.71"N
Many Glacier Rd MP 7.1
Staging and Stockpiling Turnout
113°25'45.21"W
48°44'17.86"N
Hudson Bay Ranger District
Glacier National Park
PROJECT AREA
MT PRA GLAC 14(3)
Many Glacier Rd MP 6.2
48°49'37.05"N
113°33'6.69"W
6.2 Miles from Babb
Brent L Coe 03/28/17
03/28/17Jeff Mow
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material jt.
ID
joint inside diameter
NPS Drwg. No. 117/136055
NPS PMIS No. 54243
M a r c h
U
S C m y fi le s p w p r o d u c ti o n d g la c a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 PRA GLAC 14(3) MT
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
GPK FILE DATED September 2012
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
12112 1694548.055 993922.469 4832.680 48°49'43.380803"N 113°32'52.844583"W 4785.2551 0.99967075 5/8" IR w/FHWA Alum Cap 1.
12113 1694478.275 993432.112 4839.248 48°49'42.443099"N 113°33'00.109891"W 4791.8268 0.99967029 5/8" IR w/FHWA Alum Cap
12114 1694036.774 993131.975 4854.052 48°49'37.939068"N 113°33'04.248649"W 4806.637 0.99966888 5/8" IR w/FHWA Alum Cap
12115 1693933.913 992737.573 4855.117 48°49'36.724135"N 113°33'10.055916"W 4807.7058 0.99966864 5/8" IR w/FHWA Alum Cap
12116 1693961.239 992440.319 4868.939 48°49'36.841696"N 113°33'14.513775"W 4821.5272 0.999668 5/8" IR w/FHWA Alum Cap 2
12117 1694119.532 991748.915 4866.076 48°49'38.048540"N 113°33'24.955949"W 4818.6675 0.99966833 5/8" IR w/FHWA Alum Cap
PROJECT :Rehabilitate Many Glacier Road Slide DATE OF FIELD WORK : August-September 2012 DATE OF FINAL ADJUSTMENT : September 2012
PROJECT UNITS : International Foot COORDINATE SYSTEM : Montana SPCS NAD83 (2011)
EPOCH DATE : 2010.0000
VERTICAL DATUM : Elevations determined through differential Leveling holding initial elevation at 12601 NAV88 GEOID12b
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
Basis of Bearing is Grid North (Mt State Plane Coordinate System) c:
\m yf ile s\ pw
_p ro du ct io n\ d0 m an y_ gl ac ie r_ ro ad
_s lid e_ co nt ro ls he et _1
4( 3)
.x ls x] S he et
-M ar
-2
7:
W
FL
H D
S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
A.3
SHEET
NUMBER
PRA GLAC 14(3)MT
SURVEY CONTROL
Sheet and Description
Section C -
Geotechnical Improvements Allowance Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15101-0000 MOBILIZATION (HORIZONTAL
DRAINS) LPSM ALL
A0060 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0080 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0100 15401-0000 CONTRACTOR TESTING LPSM ALL
A0120 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0140 20103-0000 CLEARING AND GRUBBING SQYD 4,300 4,300 Contract Quantity
A0160 20420-0000 EMBANKMENT CONSTRUCTION CUYD 2,195 2,195 Contract Quantity
A0180 20701-0300 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE C
(NONWOVEN) SQYD 250 15 265
A0200 20702-0300 GEOTEXTILE FILTER, CLASS 1,
TYPE C (NONWOVEN) SQYD 2,550 125 2,675
A0220 25101-0000 PLACED RIPRAP, METHOD A
(GOVERNMENT FURNISHED) CUYD 680 35 715
A0240 25101-0400 PLACED RIPRAP, METHOD A,
CLASS 4 CUYD 2,040 120 2,160
A0260 25125-0000 BOULDER EACH 4 4
A0280 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 280 15 295
A0300 61001-0000 HORIZONTAL DRAIN PIPE LNFT 20,000 20,000
A0320 61005-0000 HORIZONTAL DRAIN JETTING LPSM ALL ALL
A0340 61008-0000 HORIZONTAL DRAIN CASING AND
COLLAR EACH 80 80
A0360 61012-0000 CONSTRUCT AND REMOVE
TEMPORARY ACCESS AND DRILL
PADS LPSM ALL ALL
A0380 61101-0000 WATER SYSTEM (DRY STANDPIPE) LPSM ALL ALL
A0400 62901-0600 ROLLED EROSION CONTROL
PRODUCT, TYPE 2.B SQYD 550 25 575
A0420 63501-2000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC SIGNAL SYSTEM LPSM ALL ALL
A0440 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 30 5 35
A0460 63503-1000 TEMPORARY TRAFFIC CONTROL,
PLASTIC FENCE LNFT 235 20 255
A0480 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 75 75
A0500 63703-0000 RESIDENTIAL HOUSING EACH 2
-M ar -2
:4
A M c:
\m yf ile s\ pw
_p ro du ct io n\ dm s9
M
T
PR
A G
LA
C
4( 3)
E st im at e
S ch
A .x ls x]
Sh ee t SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.1PRA GLAC 14(3)MT
SHEET
NUMBER
NPS PMIS No. 54243 NPS Drwg No. 117/136055
Section C
Geotechnical Improvements Allowance Bid
Schedule
B0020 15101-0000 MOBILIZATION LPSM ALL
B0040 15101-0000 MOBILIZATION (HORIZONTAL
DRAINS) LPSM ALL
B0060 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
B0080 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
B0100 15401-0000 CONTRACTOR TESTING LPSM ALL
B0120 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
B0140 20103-0000 CLEARING AND GRUBBING SQYD 3,110 3,110 Contract Quantity
B0160 20420-0000 EMBANKMENT CONSTRUCTION CUYD 1,305 1,305 Contract Quantity
B0180 20701-0300 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE C
(NONWOVEN) SQYD 250 15 265
B0200 20702-0300 GEOTEXTILE FILTER, CLASS 1,
TYPE C (NONWOVEN) SQYD 1,500 75 1,575
B0220 25101-0000 PLACED RIPRAP, METHOD A
(GOVERNMENT FURNISHED) CUYD 680 35 715
B0240 25101-0400 PLACED RIPRAP, METHOD A,
CLASS 4 CUYD 860 45 905
B0260 25125-0000 BOULDER EACH 4 4
B0280 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 280 15 295
B0300 61001-0000 HORIZONTAL DRAIN PIPE LNFT 20,000 20,000
B0320 61005-0000 HORIZONTAL DRAIN JETTING LPSM ALL ALL
B0340 61008-0000 HORIZONTAL DRAIN CASING AND
COLLAR EACH 80 80
B0360 61012-0000 CONSTRUCT AND REMOVE
TEMPORARY ACCESS AND DRILL
PADS LPSM ALL ALL
B0380 61101-0000 WATER SYSTEM (DRY STANDPIPE) LPSM ALL ALL
B0400 62901-0600 ROLLED EROSION CONTROL
PRODUCT, TYPE 2.B SQYD 550 25 575
B0420 63501-2000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC SIGNAL SYSTEM LPSM ALL ALL
B0440 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 30 5 35
B0460 63503-1000 TEMPORARY TRAFFIC CONTROL,
PLASTIC FENCE LNFT 235 20 255
B0480 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 75 75
B0500 63703-0000 RESIDENTIAL HOUSING EACH 2
-M ar -2
:3
A M c:
\m yf ile s\ pw
_p ro du ct io n\ dm s9
M
T
PR
A G
LA
C
4( 3)
E st im at e
S ch
B .x ls x]
Sh ee t SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.2PRA GLAC 14(3)MT
SHEET
NUMBER
Section C -
Geotechnical Improvements Allowance Bid
Schedule
C0020 15101-0000 MOBILIZATION LPSM ALL
C0040 15101-0000 MOBILIZATION (HORIZONTAL
DRAINS) LPSM ALL
C0060 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
C0080 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
C0100 15401-0000 CONTRACTOR TESTING LPSM ALL
C0120 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
C0140 20103-0000 CLEARING AND GRUBBING SQYD 3,110 3,110 Contract Quantity
C0160 20420-0000 EMBANKMENT CONSTRUCTION CUYD 1,305 1,305 Contract Quantity
C0180 20701-0300 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE C
(NONWOVEN) SQYD 250 15 265
C0200 20702-0300 GEOTEXTILE FILTER, CLASS 1,
TYPE C (NONWOVEN) SQYD 1,500 75 1,575
C0220 25101-0000 PLACED RIPRAP, METHOD A
(GOVERNMENT FURNISHED) CUYD 680 35 715
C0240 25101-0400 PLACED RIPRAP, METHOD A,
CLASS 4 CUYD 860 45 905
C0260 25125-0000 BOULDER EACH 4 4
C0280 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 280 15 295
C0300 61001-0000 HORIZONTAL DRAIN PIPE LNFT 15,000 15,000
C0320 61005-0000 HORIZONTAL DRAIN JETTING LPSM ALL ALL
C0340 61008-0000 HORIZONTAL DRAIN CASING AND
COLLAR EACH 60 60
C0360 61012-0000 CONSTRUCT AND REMOVE
TEMPORARY ACCESS AND DRILL
PADS LPSM ALL ALL
C0380 61101-0000 WATER SYSTEM (DRY STANDPIPE) LPSM ALL ALL
C0400 62901-0600 ROLLED EROSION CONTROL
PRODUCT, TYPE 2.B SQYD 550 25 575
C0420 63501-2000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC SIGNAL SYSTEM LPSM ALL ALL
C0440 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 30 5 35
C0460 63503-1000 TEMPORARY TRAFFIC CONTROL,
PLASTIC FENCE LNFT 235 20 255
C0480 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 75 75
C0500 63703-0000 RESIDENTIAL HOUSING EACH 2
SUMMARY OF QUANTITIES - Schedule C
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-M ar -2
:3
A M c:
\m yf ile s\ pw
_p ro du ct io n\ dm s9
M
T
PR
A G
LA
C
4( 3)
E st im at e
S ch
C .x ls x]
Sh ee t
STATE PROJECT
B.3PRA GLAC 14(3)MT
SHEET
NUMBER
NOTE:
TABULATION OF QUANTITIES
- ALL SCHEDULES
1. The horizontal drain work consists of the installation of primary and secondary drains. The approximate locations, orientations, inclinations, and lengths of the 40 primary drains are shown on
Sheets C.3-4. The number and cumulative length of secondary drains is dependent upon the awarded schedule. The CO will provide the locations, orientations, inclinations, and lengths of the secondary drains after the installation of the primary drains.
2. See Sheet C.5 for riprap revetment and horizontal drain details.
3. See Sheet C.6 for maintenance road details.
NPS Drwg. No. 117/136055
NPS PMIS No. 54243
C.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d g la c q a .d g n
MT PRA GLAC 14(3)
P
M a r c h
C h e c k e d b y
D e s ig n e d b y
47904790
4815481
48204820
48304
48404840
48454845
48554855
04860
MG15-03
MG15-04
MG15-01
MG15-02
MG11-01
B-1
12115
12114
MG15-05
PBH
WW
4002040
Scale in feet
NPS Drwg. No. 117/136055
NPS PMIS No. 54243
LEGEND
NOTE:P1
P2
P3
P4
ALL SCHEDULES
EXISTING SITE LAYOUT -
El. 4785'
P5
P6El. 4795'
El. 4795'
C.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d g la c q b .d g n
WA PRA GLAC 14(3)
M a r c h
C h e c k e d b y
D e s ig n e d b y plastic fence
Temporary traffic control, P7 P8
P10
P9
P11
P12
P13 P14
P15
P16
Clearing limits, Schedule A
1. Do not disturb existing instrumentation or wiring. Verify locations before performing ground disturbing work. Wiring is buried 6" to 24" below original ground in 1-inch conduit.
2. Do not perform earthwork operations outside of the construction limits.
3. Beach material to a depth of 1' below original ground within the construction limits may be used for temporary fill but is otherwise considered unsuitable for permanent embankment construction. See Section 105.
4. Use a separation geotextile between the beach and all nonnative materials. Dispose of nonnative material used for drill pad embankment. See Section 105.
5. Planned Bore Hole (PBH) locations are additional borings that will be drilled before construction and may vary from the locations shown. The CO will mark the actual borehole locations in the field.
Water Connection Box
3/4 - Inch Waterline, Polythylene
Temporary Traffic Control, Plastic Fence
Sensitive Area (Do Not Disturb)
Planned Bore Hole (By Others)
Existing Instrumentation Wiring
Existing Instrumentation Station
Existing Bore Hole
Construction Limits
W
See Sheets E.1-2.
Temporary traffic control, traffic signal system
Water system (dry standpipe).
See Section 611.
CP
CP
4820 4820
304830
0 48
N
Revetment layout line
Line C
Proposed contours
Construction limits
Drain layout line
Line B
Drain layout line
Line A
30 6001530
Scale in feet
Maintenance road
LAYOUT - SCHEDULE A
REVETMENT AND DRAIN
NPS Drwg. No. 117/136055
NPS PMIS No. 54243
C.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d g la c q c .d g n
MT PRA GLAC 14(3)
M a r c h
C h e c k e d b y
D e s ig n e d b y
NOTE:
1. Existing instrumentation and sensitive area not shown for clarity. See Sheet C.2 for details.
2. Horizontal drain locations, bearings, elevations, inclinations, and lengths may be adjusted in the field by the CO.
3. Horizontal drain bearing is referenced to grid north.
4820 4820
304830
0 48
4810 4810
N
Construction limits
Proposed contours
Drain layout line
Line D
Revetment layout line
Line F
Drain layout line
Line E
Drain layout line
Line G
30 6001530
Scale in feet
Maintenance road
LAYOUT - SCHEDULES B AND C
REVETMENT AND DRAIN
NPS Drwg. No. 117/136055
NPS PMIS No. 54243
C.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d g la c q d .d g n
MT PRA GLAC 14(3)
M a r c h
C h e c k e d b y
D e s ig n e d b y
NOTE:
1. Existing instrumentation and sensitive area not shown for clarity. See Sheet C.2 for details.
2. Horizontal drain locations, bearings, elevations, inclinations, and lengths may be adjusted in the field by the CO.
3. Horizontal drain bearing is referenced to grid north.
NOTE:
1. See cross-section sheets for variable revetment dimensions.
NO SCALE
REVETMENT AND DRAIN
DETAILS - ALL SCHEDULES
NPS Drwg. No. 117/136055
NPS PMIS No. 54243
C.5
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d g la c q e .d g n
MT PRA GLAC 14(3)
M a r c h
C h e c k e d b y
D e s ig n e d b y
TYPICAL HORIZONTAL DRAIN PROFILE
HORIZONTAL DRAIN DETAIL
25'
Unslotted pipe Slotted pipe
1'2'
1:1.75
OG
1:1
Match existing slope
6'
Slope varies
Varies class 1, type C (nonwoven)
Geotextile filter, 4" min. dia., 20' length
Permanent steel casing, Horizontal drain pipe
RIPRAP REVETMENT DETAIL
Horizontal drain
Riprap revetment
OG
Embankment construction
Length varies
Inclination angle varies
Horizontal drain pipe
Varies
El. 4810 ft
Revetment layout line
Watertight compression seal and collar elevation
Horizontal drain layout line spillway elev. 4801.915 ft
Lake Sherburne
Lake Sherburne spillway elev. 4801.915 ft riprap 3' min. and cover
Wrap geotextile back into
3' min. thickness placed riprap, method A (government furnished), Placed riprap, method A, class 4 or
,8
.1
,8
.8
-3.2500%
-24.7000%
20' VC
,8
.1
-24.7000%
-5.0000%
20' VC 4
,8
.5
P O
T
.0
P C
.0
PRC
.5
P T .7
P O T .7
D
R= 50.00'
T= 36.84'
L= 63.51' D
R= 45.00'
T= 53.28'
L= 78.25'
.6
.1
.3
15015
Scale in feet
307.5
N
SUPERELEVATION DIAGRAM
PLAN
PROFILE
.0
.0
.3
2.
6%
3%
2%
1%
0%
-1%
-2%
-3%
-4%
4%
CUYD
EXC.
CUYD
EMB.
15+5015+0014+5014+00
ER RT: 3.6%
14+78.50
ER RT: 3.6%
14+00.00
ER LT: -3.6%
14+00.00
ER LT: -3.6%
14+78.50
ER LT: 2.0%
15+11.00
ER RT: -2.0%
15+11.00
ER LT: 2.0%
15+60.00
ER RT: -2.0%
15+60.00
ER RT: 3.1%
15+91.75
ER LT: -3.1%
15+91.75
P24
P22
P21
P19
P18
P17
P20
P23
Line H
Maintenance RoadProposed contours
1:2
1:2
NO SCALE
C le a r in g l im it
C le a r in g l im it
Varies
LC
10'
Traveled way
Embankment construction
14+00.00 to 15+91.75
TYPICAL SECTION
ER LT
ER RT
ROUNDING DETAIL
CUT SLOPE
ROUNDING DETAIL
FILL SLOPE
C le a r in g l im it
10'-0'
5'-0" 5'-0"
D
S lo p e s ta k e
S lo p e s ta k e
C le a r in g l im it
0.25 D
5'-0' 5'-0"
0.25 D
Center line (Axis of rotation)
Boulder
10" compacted depth
Roadway aggregate, method 1, Roadway excavation
OG
Profile grade
Profile grade
E R L
T
E R R
T
- ALL SCHEDULES
MAINTENANCE ROAD
NPS Drwg. No. 117/136055
NPS PMIS No. 54243
See Sheet D.1.
Rolled erosion control product, type 2.B
Separation-stabilization geotextile, class 1, type C (nonwoven)
Construction limits
Temporary traffic control, plastic fence
Sensitive Area (Do Not Disturb)
C.6
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d g la c q f.
d g n
MT PRA GLAC 14(3)
M a r c h
C h e c k e d b y
D e s ig n e d b y
(57 TON)
10" compacted depth
Roadway aggregate, method 1, (98 TON)
10" compacted depth
Roadway aggregate, method 1, 3' (min.)
3/4-inch waterline, polyethylene, 6-inch min. cover W
W
NOTE:
See Sheet C.2 for details.
1. Existing instrumentation not shown for clarity.
NO SCALE
edge overlap see N ote 1
S tap le sp acin g
NPS Drwg. No. 117/136055
NPS PMIS No. 54243
4" (min.)
' (m ax.) c-c
12" (max.) c-c
12" (max.) c-c
12" (max.) c-c
3'
6" (max.) c-c
Pr ev ai lin g w in d
D.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d g la c d a .d g n
MT PRA GLAC 14(3)
M a r c h
C h e c k e d b y
D e s ig n e d b y
PRODUCT ON SLOPES
ROLLED EROSION CONTROL
Overlap in the direction of the prevailing wind.
recommendations.
Install staples according to the manufacturer's
2.
1.
Staple (typ.)
Blanket edge
Blanket ends
Slope stake
NOTE:
edge overlap
6" (min.)
staples at top of slope.
Use a double row of staples at tow of slope.
Use a double row of
NO SCALE
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
STOP
HERE ON
RED
ROAD WORK
END
ROAD WORK
END STOP
HERE ON
RED
LENGTH
BUFFER SPACE
Expressway / Freeway xx
MPH
ONE LANE
ROAD
AHEAD
WORK
ROAD
AHEAD
(optional) light warning
Type B
See Note 5
STOP LINE
Channelizing devices
See Note 5
STOP LINE
See Note 2
Temporary traffic signal to provide access to work space downstream taper if necessary
Reduce or eliminate drums in
See Note 2
Temporary traffic signal
NPS Drwg. No. 117/136055
NPS PMIS No. 54243
635-9
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2016
REVISED:
MPH FEET
SPACING IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
it has two signal faces that are at least 8 feet apart and meets the other
50' - 100' 50' - 100' (optional)
(WITH SIGNALS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
See Note 7
10' min.
40' - 180'
40' - 180'
STATE PROJECT
NUMBER
SHEET
E.1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
PRA GLAC 14(3) MT
U S
C c m y fi le s p w p r o d u c ti o n d g la c n a .d g n
M a r c h
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
(optional)
W1-4
(optional) (optional)
WORK SPACE
Traffic flow
Traffic flow
W3-3
R10-6
See Note 6
G20-2
See Note 6
G20-2
Spacing Table)
(See Length and
8.
7.
6.
5.
4.
3.
2.
1.
See Note 6
W20-1 W20-4
(optional)
W13-1P
R10-6
NOTE:
A single signal installation is acceptable, on the right-hand side of the road, if depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to those
ADVANCE WARNING AREA (See Sign Spacing Table)
ABC
(See Length and Spacing Table) VARIABLE TERMINATION AREA
BUFFER SPACETAPER AREA BUFFER SPACE TAPER AREA A
Device spacingSee Note 5 the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Section 156.
For project specific minimum width, refer to Special Contract Requirements, AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD WORK pavement markings.
Removeable pavement markings may be used for stop lines and no-passing advance of the stop line that comply with MUTCD Section 3B.02.
markers between the work space and the stop line. Add no-passing lines in
Section 3B.16. Remove existing conflicting pavement markings and raised
For paved roadway surfaces, install stop lines complying with MUTCD must be determined by a qualified engineer.
conditions as approved by the CO. If signals are moved, revised signal timing
Final location and spacing of signs and devices may be changed to fit field automatically, ensure red signal indications are flashed to both approaches.
engineer. When the signal is changed to the flashing mode either manually or provisions of the MUTCD, Part 4. Signal timing shall be established by a qualified
Install and operate temporary traffic control signals in accordance with the requirements of Part 4 of the MUTCD.
WIDTH
"X"
AREA
NUMBER
OF POSTS
POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
NO SCALE
Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
D
See post detail (typ.)
Break-away holes.
Long side of post
D
90°
93°
NPS PMIS No. 54243
NPS Drwg. No. 117/136055
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2014
REVISED:
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)
1.5
1.5
1.5
(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
200' m in m in
6' - 12'
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
" dia. bolts 4 1Attach sign panels with a minimum of 2 -
STATE PROJECT
NUMBER
SHEET
E.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
PRA GLAC 14(3) MT
U S
C c m y fi le s p w p r o d u c ti o n d g la c n b .d g n
M a r c h
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
3.
4.
5.
6.
7. State standards may be used as an alternative if approved by the CO.
per post.
H1 and H2 = Overall post length.
Select post lengths to fit field conditions.
D = Post embedment depth for average soil conditions.
In areas where lateral distance is limited, a minimum the curb may be used.
In pedestrian locations, or in areas with obstructed views, NOTE:
See table for hole size parallel to sign face.
Field drill holes through post