WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009
W101-1
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
AND ABBREVIATIONS
PLAN SYMBOLS
NUMBER
SHEET
STATE
A.2
PROJECT
DAR 15(2)
MT
P
M
A u g u s t
U
S C
F h ig h w a y s F
H W
A
O M
A D
D e s ig n G e n e r a l I n fo r m a ti o n m t-d a b .d g n
U.S. CUSTOMARY DETAIL
DETAIL
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NOTE:
1.
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
PROPOSEDEXISTING
Trail
Lake, Pond or Reservoir; Marshland
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Building
Riprap
N
Transition
Toe of Fill
Top of Cut
Spring or Seep
LC
Concrete Barrier
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, BH
CP GPS
JH
TP
Material Source; Bore Hole; Test Pit
DI
Slope Stake Limits
Pipe Culvert with Drop Inlet
Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Box Culvert
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Right-of-Way Line with Monument
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Permanent Easement
Construction Easement
36 31
6 1
Section Corner (Found, Projected)
36 31
6 1
SEC.
SEC.
Property Line w/Found Property Corner
400Parcel Number
Large Creek or River
EL. 1234.56
N
E
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
RIP
Boulder; Well; Satellite Dish; Grave
- no symbol -wall face
G G
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
W W
Silt Fence
DI
Wattle
T T
Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Ø spiral central angle diameter curve central angle total central angle appr.
AH
ADT
abut.
brg.
br.
BP
BM
BK
approach ahead average daily traffic abutment bearing bridge balance point bench mark back ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
M.P.
M.L.
mile post main line
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Section Line4
Section Line16
Section Corner (Found, Projected)4
Section Corner (Found, Projected)16
Railroad
Intermittent Drainage or Small Creek
Signs (single, double post; portable)
NO SCALE
Control Point (Terrestrial and GPS); Jump Hub
A.3
STATE PROJECT
NUMBER
SHEET
A u g
P
M m t-d a c
B .d g n
U
S I n t2
D
B
W a c k e r h e c k e d b y
B ll s ig n e d b y
1 0.5 0 1 2
SCALE IN MILES
87 200
MONTANAMONTANA
BRAUN CREEK RD
SOUTH PEAK RD
SOUTH PEAK RD
U P P
E R H
I G
H W
O O
D C
R E
E K R
D
N S
P I O
N R
D
SOURDOUGH RD
S P
E N
C E
R R
D
GEYSER
B-01
L O
N E T
R E E C
R E E
K
HAY
CREEK
GEYSER CREEK
G E
Y S
E R C
R E E
K
O L
D
C R
O W C
O U
L E E
S H
A N
N O
N C
R E
E K
ARROW CREEK
BRAUN CREEK
D
IP
P
IN
G V
A T C
R E
E K
WILL
IAMS CREEK RD
M E
R I N
O B
E N
C H R
DMP 4.18
BASE ROAD B-01
MINUTEMAN MISSILE
MT DAR 15(2)
BEGIN PROJECT
MP 7.08
BASE ROAD B-01
MINUTEMAN MISSILE
MT DAR 15(2)
END PROJECT
B-01 ROAD
VICINITY MAP
MEDICINE MAN RD
B I G S
K Y R
K N
O L L
M A
R Y S
N
SKULL BUTTE RD
MEADOW BROOK RD
SURPRISE CREEK RD
MERINO RD
MONTANA
MONTANA
MONTANA
STARLIGHT RD
D R
Y W
O L F R
D
S U
R P R
IS
E C
R E E
K
S U
N C
R E E
K
D R Y W
O
LF
C
R E E K
HOLMES COULEE
RUNNING WOLF CREEK
W
IL
L O
W C
R E E
K
COYOTE CREEK
R U
N N
IN
G W
O
LF R
D
STANFORD
C-10
B-06
FOREST
NATIONAL
CLARK
LEWIS AND
BROKEN ARROW RD
S T
A G
E C
O A
C H R
D
A.4
STATE PROJECT
A u g
A
M m t-d a d
B .d g n
U
S I n t2
W a c k e c k e d b
B s ig n e d b y
1 0.5 0 1 2
SCALE IN MILES
C-08
S A
G E C
R E
E K T
R A I L
L E
H I G
H R
O A
D
.0 m iles
BEGIN PROJECT
MINUTEMAN MISSILE
BASE ROAD C-10
MP 1.07
MT DAR 15(2)
MP 6.73
BASE ROAD C-10
MINUTEMAN MISSILE
MT DAR 15(2)
END PROJECT
MP 0.00
BASE ROAD B-06
MINUTEMAN MISSILE
MT DAR 15(2)
BEGIN PROJECT
MP 2.77
BASE ROAD B-06
MINUTEMAN MISSILE
MT DAR 15(2)
END PROJECT
B-06, C-08, & C-10 ROADS
VICINITY MAP
MP 0.00
BASE ROAD C-08
MINUTEMAN MISSILE
MT DAR 15(2)
BEGIN PROJECT
MP 4.90
BASE ROAD C-08
MINUTEMAN MISSILE
MT DAR 15(2)
END PROJECT
C.1
STATE PROJECT
S e p
A
M m t-d c a .d g n
U
S I n t2
W a c k e c k e d b
B s ig n e d b y
1:3
Traveled way Traveled way
1:3
LC
Existing Slope
Existing Slope
5% Crown + 1/2% 5% Crown + 1/2%
22 3 3 li m it s
C o n s tr u c ti o n li m it s
C o n s tr u c ti o n
Original ground
1 1
FOOTNOTE:
9' min. - 12' max. 9' min. - 12' max.
Roadway reconditioning
TYPICAL SECTION
4" compacted depth imported surface course aggregate, Calcium chloride aggregate stabilization, (4" AGGREGATE SURFACING)
TYPICAL SECTION
3. 38.5 TON/approach for public or missile approach
2. 9.0 TON/approach for farm field approach
1. 12.0 TON/approach for private approach
Estimates based on the following:
Estimated quantity represents material for road approaches.
of surface course aggregate and 94% purity.
Calcium chloride estimates based on 1.7% by dry weight
Estimated quantities based on 1.97 TON/CUYD.
Taper at a rate of 25:1 between widths. See Sheet C.2.
Adjust to match existing road width as approved by CO.
Remove 3 feet of foreslope vegetation and slope to drain.
superelevation. Do not exceed 8% superelevation.
Superelevate roadway on curves to match the existing roadway
4 5 4 6
C.2
A u g
P
M m t-d c b .d g n
U
S I n t2
W a c k e c k e d b
B s ig n e d b y
TYPICAL DETAILS
CONNECTION WITH NONPAVED ROADWAYS
AT THE BEGINNING AND END OF
TYPICAL TREATMENT OF GRAVEL SECTIONS
PROFILE
PROFILE
d e p th s u r fa c in g
B e g in E n d f u
25:1 Taper
25:1 Taper
TYPICAL TAPER
PLAN
LC
FOOTNOTE:
NO SCALE
e x is ti n g w id th
V a r ia b le e x is ti n g w id th
V a r ia b le grade line
Existing road
Profile grade grade line
Existing road
50' min.
50' min.
structures and existing roadways as approved by the CO.
Adjust transition length to provide a smooth transition to surfacing.
Do not measure excavation and disposal of gravel profile grade from existing grade to the depth shown.
intersecting roadway or from the structure. Taper
Excavate existing gravel surfacing from the edge of imported surface course aggregate
Calcium chloride aggregate stabilization, imported surface course aggregate
Calcium chloride aggregate stabilization, surfacing section
Match mainline surfacing section
Match mainline
Profile grade
PAVED INTERSECTIONS
TYPICAL TREATMENT AT EXISTING
roadway
Existing paved
See Sections 622 and 623 for more details. Hours shown are for the entire project, regardless of mileage completed.
ESTIMATED ROADWAY QUANTITIES - For Information Only
Section 623
John Kaczmarek
B-01
B-06, C-08, C-10 Kevin StoneSprint Nextel
P.O. Box 429, Fairfield, MT 59436
B-01, B-06, C-08, C-10
USAF - Malmstrom Cable Affairs
338 US HWY 87 E., Billings, MT 59101
6932 Goddard Dr., Bldg. 165, Rm. 153, Malmstrom AFB, MT 59402
Calenn Heppner
Brendan Flower
Mike Best
Phone #Contact
UTILITY CONTACT INFORMATION
(406) 431-0859
Justin Cleveland
Phillips 66 Pipeline LLC
B-06 1620 Airport Rd, Lewistown, MT 59457
NorthWestern Energy 1437 Helena Ave. Suite 6, Helena, MT 59601
Backhoe loader, 6 cuft minimum rated capacity, 24" width
(HOUR)
General labor
(HOUR)
FOOTNOTE:
Road Number
Doug Lutke
(406) 394-2838
Address
Triangle Communications
Jay Kinsey
Company
B-06, C-08, C-10
B-06, C-08, C-10 130 N Main St., Butte, MT 59701
15 15 10
Motor grader, 12 foot minimum blade
(HOUR)
B-01, B-06, C-08, C-10
(406) 467-42053 Rivers Communications
(406) 538-1301
(406) 255-5738
(406) 491-5862
(406) 231-2139
Dump truck, 12 cubic yard minimum capacity
(HOUR)
(406) 731-2459
Section 622
B-06, C-08, C-10 Front Range Pipeline, LLC (CHS Inc.) 543 W. Dry Creek Rd., Buffalo, MT 59418 Montana Department of Transportation
P.O. Box 1140, Havre, MT 59501
STATE PROJECT
DAR 15(2) D.1MT
F:
\h ig hw ay s\
FH
W
A\
_O
M A D
_1 5(
2) \D es ig n\ Li ne G ra ph s\ [m t- 3-
S ep
-2
9:
A
M N
B
EL
L 8/
B
W A C K
ER
8/
D es ig ne d by
C he ck ed b y:
NUMBER
ESTIMATION OF PLAN
QUANTITIES
m t-d la
B .d g n
I n t_ ft
D
D.2
STATE PROJECT
A u g
A
W a c k
B
C h e c k e d b y
D e s ig n e d b y
LINE GRAPH
B-01 ROAD
M P .0
M P .0
M P .0
M P .0
M P .0
M P .0
M P .0
M P .0
M P .0
NO SCALE
B e g in P r o je c t
M P .1
B e g in A g g r e g a te S u r fa c in g
P u b li c A p p r
R T
M P .7 tr u c tu r e
R e c o n d it io n D r a in a g e
M P .2
P r iv a te A p p r
R T
M P .4 le a n C u lv e r t i n P la c e
M P .6
P r iv a te A p p r
L T
M P .0
P u b li c A p p r
R T
M P .0 n d P r o je c t
M P .0
E n d A g g r e g a te S u r fa c in g
R e p la c e
P ip e C u lv e r t
M P .2
F a r m F ie ld A p p r
L T
M P .2
F a r m F ie ld A p p r
L T
M P .2
M is s il e A le r t
F a c il it y B
M is s il e A le r t
F a c il it y A p p r
T
.0 a r m F ie ld A p p r
L T
M P .9
I n s ta ll N e w
P ip e C u lv e r t
M P .0
NOTE:
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for roadway widths and application quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved by CO.
1. Gravel existing approaches and turnouts to match existing widths m t-d lb
B .d g n
I n t_ ft
D
D.3
STATE PROJECT
A u g
W a c k
B
C h e c k e d b y
D e s ig n e d b y
LINE GRAPH
B-06 ROAD
M P .0
M P .0
M P .0
NO SCALE
B e g in P r o je c t
M P .0
B e g in A g g r e g a te S u r fa c in g
P r iv a te A p p r
L T
M P .1
R e p la c e
P ip e C u lv e r t
M P .4
P r iv a te A p p r
R T
M P .6 r m F ie ld A p p r
L T
M P .7
F a r m F ie ld A p p r
R T
M P .8 iv a te A p p r
R T
M P .9 r m F ie ld A p p r
L T
M P .9
P r iv a te A p p r
L T
M P .1
F a r m F ie ld A p p r
L T
M P .1
P r iv a te A p p r
R T
M P .1 r m F ie ld A p p r
L T
M P .2
P r iv a te A p p r
R T
M P iv a te A p p r
R T
M P p la c e
P ip e C u lv e r t
M P .5
F a r m F ie ld A p p r
R T
M P a n C u lv e r t i n P la c e
M P .8
S tr u c tu r e
R e c o n d it io n D r a in a g e
M P .9
C le a n C u lv e r t i n P la c e
M P .0
P r iv a te A p p r
R T
M P iv a te A p p r
R T
M P .2 r m F ie ld A p p r
L T
M P .2
P r iv a te A p p r
R T
M P .3 r m F ie ld A p p r
R T
M P .5 r m F ie ld A p p r
L T
M P .5
F a r m F ie ld A p p r
R T
M P r m F ie ld A p p r
R T
M P d P r o je c t
M P .7
E n d A g g r e g a te S u r fa c in g
P r iv a te A p p r
L T
M P .6
F a r m F ie ld A p p r
R T
M P iv a te A p p r
R T
M P a n C u lv e r t in P la c e
M P .7
C le a n C u lv e r t in P la c e
M P .5
M is s il e L a u n c h F a c il it y B
M is s il e L a u n c h F a c il it y A p p r
L T
M P .7
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for roadway widths and application quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved by CO.
NOTE:
m t-d lc
C .d g n
I n t_ ft
D
D.4
STATE PROJECT
A u g
W a c k
B
C h e c k e d b y
D e s ig n e d b y
LINE GRAPH
C-08 ROAD
M P .0
M P .0
M P .0
M P .0
M P .0
NO SCALE
F a r m F ie ld A p p r
L T
M P .6
S tr u c tu r e
R e c o n d it io n D r a in a g e
M P .0
C le a n C u lv e r t i n P la c e
M P .6
F a r m F ie ld A p p r
L T
M P .0
C le a n C u lv e r t i n P la c e
M P .4
B e g in P r o je c t
M P .0
B e g in A g g r e g a te S u r fa c in g
E n d P r o je c t
M P .9
E n d A g g r e g a te S u r fa c in g
R e p la c e
P ip e C u lv e r t
M P .4
C le a n C u lv e r t in P la c e
M P .0
F a r m F ie ld A p p r
R T
M P u c tu r e
R e c o n d it io n D r a in a g e
M P .7
F a r m F ie ld A p p r
L T
M P .6
F a r m F ie ld A p p r
L T
M P .0
P r iv a te A p p r
L T
M P .5
C le a n C u lv e r t i n P la c e
M P .0
F a r m F ie ld A p p r
L T
M P .1
F a r m F ie ld A p p r
L T
M P .4
F a r m F ie ld A p p r
L T
M P .5
C le a n C u lv e r t i n P la c e
M P .7
P u b li c A p p r
R T
M P
NOTE:
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for roadway widths and application quantities.
2. All culverts are existing unless otherwise noted.
m t-d ld
C .d g n
I n t_ ft
D
D.5
STATE PROJECT
A u g
W a c k
B
C h e c k e d b y
D e s ig n e d b y
LINE GRAPH
C-10 ROAD
M P .0
M P .0
M P .0
M P .0
M P .0
M P .0
M P .0
NO SCALE
B e g in P r o je c t
M P .0
B e g in A g g r e g a te S u r fa c in g
P u b li c A p p r
R T
M P u c tu r e
R e c o n d it io n D r a in a g e
M P .5
F a r m F ie ld A p p r
L T
M P .9
P r iv a te A p p r
R T
M P r m F ie ld A p p r
R T
M P r m F ie ld A p p r
L T
M P .4
P r iv a te A p p r
R T
M P r m F ie ld A p p r
L T
M P .7
F a r m F ie ld A p p r
R T
M P r m F ie ld A p p r
L T
M P .0
F a r m F ie ld A p p r
R T
M P iv a te A p p r
R T
M P b li c A p p r
L T
M P .9
R e p la c e
P ip e C u lv e r t
M P .9
P u b li c A p p r
R T
M P b li c A p p r
R T
M P r m F ie ld A p p r
R T
M P .3 r m F ie ld A p p r
L T
M P .8
P r iv a te A p p r
R T
M P r m F ie ld A p p r
L T
M P .6
P r iv a te A p p r
R T
M P d P r o je c t
M P .7
E n d A g g r e g a te S u r fa c in g a n C u lv e r t in P la c e
M P .8 fo r
C u lv e r t in P la c e
C o n s tr u c t
R ip r a p H e a d w a ll L
T
M P .7 fo r
C u lv e r t in P la c e
L T R
T
C o n s tr u c t
R ip r a p H e a d w a ll s
S tr u c tu r e
R e c o n d it io n D r a in a g e
M P .5 fo r
C u lv e r t in P la c e
C o n s tr u c t
R ip r a p H e a d w a ll R
T
M P .5
M is s il e L a u n c h F a c il it y C
M is s il e L a u n c h F a c il it y A p p r
L T
M P .7
M P .0
NOTE:
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for roadway widths and application quantities.
2. All culverts are existing unless otherwise noted.
E.1
A u g
P
M m t-d d a .d g n
U
S S u r
W a c k e c k e d b
B s ig n e d b y
EROSION CONTROL PLAN
NO SCALE
SEDIMENT WATTLE PLACEMENT
TYPICAL
NOTE:
FOOTNOTE:
D it c h
D it c h D it c h
D it c h
Flowing Drainage
F lo w in g D ra in a g e
Install sediment wattles
Install sediment wattles
Culvert are to be determined in the field as approved by the CO.
approximate and are for estimating purposes only. Final locations
1. The location of soil erosion control devices shown are flowing water.
Place sediment wattles adjacent to ditches with standing or with standing or flowing water.
extend across any ditches intersecting the culverts or flowing water. See Sheet E.3 for details. Ensure wattles
Place sediment wattles around culverts with standing
2'2'2'2'
A
B B
Flow
SECTION A-A SECTION B-B
SECTION A-A
SECTION B-B
Flow
Flow
Flow embankment
Roadway
NOTE:
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
Flow
Geotextile, type IV-E
Sandbags
SECTION B-B
PLAN
DIVERSION CHANNEL
Plastic linerSandbagsPlastic liner temporary barrier
Use sandbags to construct
Permanent culvert
Roadway centerline
Permanent natural channel
Earthwork limits
Subgrade
Temporary culvert backfill
Natural ground
Geotextile, type IV-E with plastic liner or riprap
Temporary diversion channel
Ø
1:1 1:
6"
1:1 1:
6"
1:1 1:
1:1
1:
whichever is greater.
Ø = 2' or diameter of temporary culvert, DIVERSION CHANNELS
TEMPORARY
see Section A-A backflow into natural channel, Use sandbags to prevent
Riprap, class 1 Riprap, class 1
Silt fence (typ.)
sandbags.
6" deep and secure with riprap or upstream edge of the liner a minimum of joints if using a plastic liner. Bury the
Do not construct channel with longitudinal methods listed in Subsection 204.11(a).
Compact temporary culvert backfill using with temporary culvert as approved by CO.
channel through the roadway embankment
Replace the portion of the diversion
Sandbag (typ.)
Subsection 157.09.
be used. Conform to the requirements of
Single or multiple temporary culverts may embankment
Roadway
Ø
Bedding (typ.)
TEMPORARY CULVERT(S)
See note 6
Temporary culvert(s) see note 5
Diversion channel, and secure with sandbags (typ.)
Bury plastic liner 6" deep
E.2
STATE PROJECT
A u g
P
M m t-d d b .d g n
U
S C u s to m a r
W a c k e c k e d b
B s ig n e d b y
2Ø
4Ø4Ø
2Ø
4Ø
2Ø
4Ø
2Ø when scheduled)
Silt fence (typ.
NO SCALE
when scheduled)
Silt fence (typ.
ØØ
Ø Ø
(typ.)
Sandbag
0.5 percent.
Construct channel at a minimum grade of diversion channel.
length and width of the temporary
Use plastic liner or riprap along the entire
6.
5.
4.
3.
2.
1.
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 9/2007
REVISED:
Drive stakes at each end and at 4' spacing
(ft)
(ft)
3' min.
3' min. or t o m in
M in
SEDIMENT WATTLE
W157-20
3" to 5" Excavate trench 2"
1" x 1" Wood stake
NUMBER
SHEET
STATE
E.3
PROJECT
S e p te m b e r
U h ig h w a y s F
H W
A
O M
A D
D e s ig n E r o s io n C o n tr o l\ m t-d d c .d g n
U.S. CUSTOMARY DETAIL
DETAIL
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NOTE:
NO SCALE
Flow direction to end, without overlapping the ends
Abut adjacent wattles tightly, end
Install wattles snugly into trench.
water from flowing around the wattle
Provide sufficient length to prevent soil to ground level
Backfilled and compacted
Fl ow conditions.
Use drainage ditch installation only in low flow permanent installations.
wattle while staking. Live stakes may be used for until wattle is secure to slope. Do not crush
T o e o f fi ll s lo p e
Existing ground
Slope
Sediment wattle
Stagger joints (typ.)
Sediment wattle
Existing ground (typ.)
Step 2: Backfill soil against wattles
ELEVATION
PLAN
ELEVATION
Direction of runoff Fi ll slo pe
Flow for each wattle
Stakes requiredWattle length
PLAN
Spacing Slope
WATTLE SPACING
STAKES REQUIRED
and install wattles
Step 1: Excavate trench disturbed areas
Runoff from
1:1
1:2
1:3
1:4 or flatter as specified in plans
Direction of runof f from distur bed area s
2.
1.
along contours.
Install wattles
PROPERLY STAKED AND ENTRENCHED WATTLE
WATTLE STAKING DETAIL
DRAINAGE DITCH INSTALLATION
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
sp ac in g ch ar t
S ee w at tl e
Stake and entrench wattle larger than wattle
10.4 x 16
DIAMETER or SPAN x RISE (inch)
B-01
4.28 GS
5.22 5.65
7.06 GS
B-06
0.42 GS
1.55 GS
1.84 1.98 2.04 2.51 2.75
C-08 0.01
0.41 GS
1.76 3.09 3.49 3.64 4.06 4.71
C-10 1.53
2.73 2 3.85
3.99 GS
6.51 1,2
6.54 1
PROJECT TOTAL
NOTE: FOOTNOTES: Allowable pipe culvert material
1. Steel pipe, aluminized steel pipe, and aluminum pipe culvert minimum 1. Riprap headwall at inlet. See Sheet F.2. A Aluminum wall thickness is the thickness required by the Std. 602-1 fill height table. 2. Riprap headwall at outlet. See Sheet F.2. AS Aluminized steel
2. In cut sections, construct cut slope inlets as shown on Std. 602-6. C Concrete
GS Galvanized steel P Plastic ( ) Any appropriate material X/__ Any appropriate material except ___
11 6
Reconditioning drainage structure
(EACH)
Footnotes
MILE POST
EST MAX
COVER
(ft)
STR EXC
(CUYD)
Section 607
Allowable Pipe
Material
Cleaning culvert in place
(EACH)
Section 602
Pipe culvert
(LNFT)
Section 251
Placed riprap, class 4
(CUYD)
Riprap Headwall
ESTIMATION OF DRAINAGE QUANTITIES - For Information Only Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
F.1
F:
\h ig hw ay s\
FH
W
A\
_O
M A D
_1 5(
2) \D es ig n\ D ra in ag e\
[m t-
-A ug -2
9:
A M
N
B el l 8/
B
W ac ke r
8/
D es ig ne d by
C he ck ed b y:
NUMBER
DAR 15(2)MT
RIPRAP HEADWALL DETAILS
riprap headwall
Placed riprap, class 4, RIPRAP HEADWALL QUANTITIES (FOR INFORMATION ONLY)
V a r ia b le
(ft)
Width (W)
W W
SKEW ANGLE DIAGRAM
c e n te r li n e
R o a d w a y
Cu lv er t ce nt er lin e
BOP
EOP
SECTION A-A
riprap headwall
Placed riprap, class 4, NOTE:
FOOTNOTE:
1 Slope to match roadway embankment.
2 2' standard, 1' if headwall extends into subgrade.
NO SCALE
Mile Post
V a r ia b le
F.2
STATE PROJECT
A u g
A
M m t-d e a .d g n
U
S S u r
W a c k e c k e d b
B s ig n e d b y
DETAILS
RIPRAP HEADWALL
ELEVATION - SINGLE PIPE
Pipe invert
D or S
D o r R
1.
C-10 Road
C-10 Road
6.54 RT 18
2 7.1
6.6
C-10 Road
6.51 2 13.2
2.73 LT 36
Pipe culvert
Skew angle
See Sheet F.1 for estimated quantities.
type IV-B, nonwoven
Earthwork geotextile, (sqyd)
Earthwork geotextile, type IV-B, nonwoven
(in) diameter or 2' minimum.
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
602-1
METAL PIPE CULVERT
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS3" x 1" CORRUGATIONS" CORRUGATIONS2 1" x 3
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
0.060/160.075/140.105/120.135/100.060/160.075/140.105/120.135/100.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
3.5
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
3.5
INCHESINCHES INCHESINCHES
INCHESINCHESINCHESINCHESINCHESINCHESINCHESINCHES
Fill heights exceeding 100 feet require
STATE PROJECT
NUMBER
SHEET
F.3
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
A u g u s t
U h ig h w a y s F
H W
A
O M
A D
D e s ig n D r a in a g e m t-d e b .d g n
DAR 15(2) MT
4.
3.
2.
1.
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
SPAN x RISE
SIZE
PIPE ARCH
SIZE
PIPE ARCH
SPAN x RISE DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
COVER
MINIMUM
DIAMETER
SIZE
PIPE
SIZE
PIPE
DIAMETER COVER
MINIMUM
ALUMINUMSTEEL
NOTE:
NO SCALE
of camber or increase the pipe culvert gradient.
elevation of the inlet invert, reduce the amount parabolic curve as designed exceeds the curve. If the midpoint elevation on the pipe length. Develop camber on a parabolic inverts an ordinate amount equal to 1% of the from a chord through the inlet and outlet
When directed, camber pipe culverts upward pavement for both flexible and rigid pavement.
from the top of the pipe to the top of the rigid pavements. Measure maximum fill height pavements, and to the top of the pavement for pipe culvert to the subgrade for flexible
Measure minimum cover from the top of the corrugation pipe.
Obtain approval before furnishing annular of helical lockseam and welded seam pipe.
corrugations are more restrictive than those
Fill heights for culvert pipe with annular lockseam and welded seam pipe only.
The fill heights in the table are for helical special analysis by the CO.
602-2
COUPLING BAND
METAL PIPE CULVERT
MINIMUM BAND WIDTH (INCHES)
1 x 2
1 x 3
3 x 1
5 x 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 x 64 to 142 x 91
60 x 46 to 81 x 59
87 x 64 to 142 x 91
60 x 46 to 81 x 59
49 x 33 to 83 x 57
17 x 13 to 42 x 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
" for 18" round culvert (21" x 15" pipe arch) or less8
" for 21" round culvert (24" x 18" pipe arch) or more2 having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on pipe rerolled with 3" x 1" pipe corrugations.
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" x 3
2ends rerolled with 2
The minimum band widths shown for 3" x 1" and 5" x 1" corrugated sizes apply to
" corrugations on rerolled pipe ends.2 1" x 3 steel, or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
less. Use a matching metal having a nominal thickness of not less than 0.040 inch for
Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or
42" diameter to 42" diameter, required above
42" diameter to 42" diameter, required above steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for
STATE PROJECT
NUMBER
SHEET
F.4
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
A u g u s t
U h ig h w a y s F
H W
A
O M
A D
D e s ig n D r a in a g e m t-d e c .d g n
DAR 15(2) MT
2.
1.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Stab type joint
Smoother sleeve with center stop.
DIAMETER
ROUND PIPE
SPAN x RISE
PIPE ARCH
BANDS
CORRUGATED
ANNULAR
BANDS
CORRUGATED
HELICALLY
BANDS
CORRUGATED
SEMI-
SIZE
CORRUGATION
underdrain
COUPLING BANDS FOR METAL PIPE CULVERT
NOTE:
NO SCALE
W
W W W
Band Band
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
Band Bolts Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge be used.
Highway Bridges, Division II Section 26 may criteria of AASHTO Standard specifications for devices that comply with the joint performance
Other types of coupling bands or fastening specified in the Special Contract Requirements.
Watertight pipe joints are not required unless
3 4 5 of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
Use annular corrugated bands with pipes having annular corrugations or with helical pipe dimension of the end corrugation in the pipe.
For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the
Use helical corrugated bands with pipes having helically corrugated ends.
as the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
Fabricate annular, helical and semi-corrugated type coupling bands from the same metal
Second angle connection optional Second angle connection optional
DRAFT: 10/2014
REVISED: 4/1994 6/2005
602-3
PIPE CULVERT BEDDING
METAL AND PLASTIC
or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth. Or lean concrete
> 54"
12" to 54"
6"
4"
48" and UP
UP to 48" 24"
2'-0" ±
1'-0" ±
2H or 12' (max.)2H or 12' (max.)
18" ±
18" ±18"±
18" (min.)
minimum
1'-0"
"2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.)1
2H or 12' (max.)
(min.)
6"
2H or 12' (max.)
(min.)
6"
2H or 12' (max.) 2H or 12' (max.)
6" in uncompacted depth.
12" (min.), 24" (max.)
"/foot of cover,2
* Reduce to 18" for span or 36", STATE PROJECT
NUMBER
SHEET
F.5
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
A u g u s t
U h ig h w a y s F
H W
A
O M
A D
D e s ig n D r a in a g e m t-d e d .d g n
DAR 15(2) MT
See Section 704 for bedding and backfill requirements.
dimension of all pipe arch culverts.
H equals the diameter of all round pipe culverts or the rise amount of camber or increase the pipe culvert gradient.
designed exceeds the elevation of the inlet invert, reduce the curve. If the midpoint elevation on the parabolic curve as to 1% of the pipe length. Develop camber on a parabolic through the inlet and outlet inverts an ordinate amount equal
When directed, camber pipe culverts upward from a chord
3.
2.
1.
be adjusted to tie into impervious material.
granular material is used for backfill. Width may material at the pipe culvert inlet where
Construct piping plug of impermeable backfill
MULTIPLE PIPE INSTALLATION
PIPING PLUG
TRENCH EXCAVATION IN EMBANKMENT
BELOW NATURAL GROUND OR
ON UNSTABLE MATERIAL
NATURAL GROUND
ABOVE AND BELOW
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
LEGEND:
Bedding material (uncompacted)
Impermeable backfill material.
BEDDING DEPTH
MINIMUM SPACING
SPACING
or SPAN
DIAMETER
PIPE SIZE (H) DEPTH
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
NOTE:
NO SCALE
H H or Span
Diameter or Span
Diameter
H
Width
(see table)
Minimum spacing
H H
H H
H H
H H
H
H
H H
H
Finished subgrade Finished subgrade
Natural ground section
Metal end
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Metal end section
Roadway embankment
Finished subgrade compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
whichever is less fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding depth table
See bedding excavation in trench
Half diameter or
HH
30"
24"
18"
7'
6'
5'
602-6
TREATMENT IN CUT SLOPES
PIPE CULVERT INLET
1'
1'
(min.)
4' d ip a t c e n te r
(Min.)
4'
STATE PROJECT
NUMBER
SHEET
F.6
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
A u g u s t
U h ig h w a y s F
H W
A
O M
A D
D e s ig n D r a in a g e m t-d e e .d g n
DAR 15(2) MT
dimension of all pipe arch culverts.
D equals the diameter of all round pipe or the rise 1.
TYPE II
TYPE I
SECTION B-B
SECTION A-A
PLAN PLAN
N o r m a l d it c h l in e
S u b g r a d e s h o u ld e r
Pipe culvert
E n d o f p ip e
FLOW
B e r m
Flat b ottom di tch a t culv ert in let
FLOW
Tape r at 1
0:1 r atio
Taper a t 10:1 ratio
B e r m
FLOW
2D or
FLOW
Taper at 10
:1 rat io
2D or
N o r m a l d it c h l in e subgrade elevation
Maximum 2D or
S u b g r a d e s h o u ld e r o r e n d s e c ti o n
E n d o f p ip e b e v e l
PIPE SIZE (D) WIDENING
DITCH WIDENING
NOTE:
NO SCALE
Flat b ottom ditc h at c ulvert inlet
A
A
B
B section
End
Original ground cut slope
Normal in mountainous terrain flat terrain. Taper at 5:1
Taper at 10:1 in rolling or ditch line
Normal
5:1 in mountainous terrain.
or flat terrain. Taper at
Taper at 10:1 in rolling
Normal ditch line ditch line
Normal
Pipe culvert
Original ground cut slope
Normal
D
D
(See table)
Ditch widening
D in lieu of 45° pipe elbow
30° pipe elbows may be required
At skewed pipe locations, 22.5° or
Standard 45° pipe elbow.
slope
1:3 max
Subgrade shoulder Normal ditch line
Cut Slope slope
1:3 max
Subgrade shoulder
Cut Slope
Pavement surface
Subgrade
Berm
Pavement surface
Subgrade
End section
Berm maximum slope
1:1.5
D maximum slope
1:1.5 pipe as staked
Slope at ditch at end section
Flow line of pipe as staked
Slope at
G20-1 ROAD WORK NEXT XX MILES 36 x 18 G20-2 END ROAD WORK 36 x 18
M4-10R DETOUR ARROW RIGHT 48 x 18 M4-10L DETOUR ARROW LEFT 48 x 18 R11-2 ROAD CLOSED 48 x 30 W1-6 ONE-DIRECTION LARGE ARROW 48 x 24 W3-4 BE PREPARED TO STOP 36 x 36 W8-6 TRUCK CROSSING 36 x 36
W13-1P 25 MPH 24 x 24 W20-1 ROAD WORK AHEAD 36 x 36 W20-1 ROAD WORK 500 FT 36 x 36 W20-3 ROAD CLOSED 500 FT 36 x 36 W20-3 ROAD CLOSED 1000 FT 36 x 36 W20-4 ONE LANE ROAD AHEAD 36 x 36 W20-7a FLAGGER (SYMBOL) 36 x 36 W24-1 DOUBLE REVERSE CURVE 36 x 36
1. Install all signs according to Standard 635-14 and Part 6 of the M.U.T.C.D., current edition.
All devices are estimates and are shown for information only.
Install signs 500 feet on either side of the material source entrance road.
Temporary traffic control, drum
Description Sign size (in x in)
NOTE:
TEMPORARY
TRAFFIC CONTROL PLAN
FOOTNOTE:
MUTCD
Number
ESTIMATED TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGNS
ESTIMATED TEMPORARY TRAFFIC CONTROL,
CHANNELIZING DEVICES
Description
Temporary traffic control, barricade type 3 Temporary traffic control, cone, type 36-inch
DAR 15(2) G.1MT
F:
\h ig hw ay s\
FH
W
A\
_O
M A D
_1 5(
2) \D es ig n\ Te m po ra ry
T ra ff ic
C on tr ol m t-
-A ug
-2
:0
N
B el l 8/
B
W ac ke r
8/
D es ig ne d by
C he ck ed b y:
m t-d n a .d g n
I n t_ ft
D
G.2
STATE PROJECT
A u g
W a c k
B
C h e c k e d b y
D e s ig n e d b y
8 ft
TYPE 3 BARRICADE
T r a ff ic f lo w
T r a ff ic f lo w f t f t
500 FT
ROAD
CLOSED
W20-3
1000 FT
ROAD
CLOSED
W20-3
NOTE:
R11-2
DETOUR
ROAD
CLOSED
M4-10
DETOUR
ROAD
CLOSED
center barricade
Mount signs over and border.
White background w/ black legendR11-2 and border.
Orange background w/ black legendM4-10 and border.
Orange background w/ black legendW20-3
5. Sign colors are as follows:
4. Mount signs on wood posts. See Standard 635-14.
signing.
3. Conform with the current M.U.T.C.D. edition on all approved by CO.
and ensure adequate space for turnaround as
2. Adjust location and spacing to meet field conditions opposite direction of travel.
Place devices similar to those depicted for the
1. Signs are shown for one direction of travel only.
DETAIL
CONTROL ROAD CLOSURE
TEMPORARY TRAFFIC
NO SCALE
see detail this sheet
Type 3 barricade, SIGNS IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
635-1
TEMPORARY TRAFFIC CONTROL
ADVANCE SIGNING
STATE PROJECT
NUMBER
SHEET
G.3
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
A u g u s t
U h ig h w a y s F
H W
A
O M
A D
D e s ig n T e m p o r a r y T r a ff ic C o n tr o l\ m t-d n b .d g n
DAR 15(2) MT
G20-2
G20-2
G20-2
See Note 11
G20-1
See Note 11
G20-1
M in o r R o a d
M a jo r R o a d
See Note 10
W20-1
See Note 10
W20-1
See Note 9
W16-8P
W20-1 over
See Note 9
W16-8P
W20-1 over
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
See Note 10
W20-1
See Note 10
W20-1
G20-2
NOTE:
NO SCALE
the distance to the work area in feet or in miles. Install an additional W20-1
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify of the road on which the construction does occur (applies to major roads only).
construction work occurs, include a supplementary plaque indicating the name
If W20-1 is placed on a roadway other than that on which the actual post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use. Cover
Maintain two-way traffic during all non-work hours except as approved by the CO.
NCHRP-350 or MASH for crashworthiness.
Ensure all sign supports exposed to impact by traffic meet the requirements of indicate a maximum recommended speed through the construction area.
Install advisory speed plates under the W20 series warning signs as needed to construction conditions.
Additional or different message signs may be required to fit the actual messages as required.
locate the warning signs as determined by the CO for best results. Vary
Where advance warning signs, placed as shown, interfere with permanent signs, traffic control plan as necessary to accommodate actual operations.
to this project. The Contractor may add or delete information and details in this
Not all details shown on the temporary traffic control sheets may be applicable
Erect all project advance warning signs before starting construction work.
retroreflective sheeting types.
Refer to the Section 635 of the Special Contract Requirements for allowable
State standards may be used as an alternative if approved by the CO.
that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, verify whole mile.
each end of the project. Show the distance on the G20-1 sign to the nearest
Expressway / Freeway
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
(optional)
W13-1P
(optional)
W13-1P xx
MPH
xx
MPH
If the tangent distance along the temporary diversion is more than 600', SPACING IN FEET
FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
TEMPORARY TRAFFIC CONTROL
FOR DIVERSION
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
635-4
STATE PROJECT
NUMBER
SHEET
G.4
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
A u g u s t
U h ig h w a y s F
H W
A
O M
A D
D e s ig n T e m p o r a r y T r a ff ic C o n tr o l\ m t-d n c .d g n
DAR 15(2) MT
W1-6 Rt. or Lt.
Traffic flow
Traffic flow conflicting pavement markings.
no passing zone, add signing and/or marking as appropriate. Remove
If the area approaching diversion is not already signed and marked as a those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
See Note 4
W20-1
See Note 4
W20-1
See Note 4
G20-2
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
W13-1P
6.
5.
4.
3.
2.
1.
See Note 3
W24-1 not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
LENGTH
BUFFER SPACE
NOTE:
NO SCALE
Expressway / Freeway for all diversion curves radius for the signed speed
Use at least the minimum
Mounted on
Type 3 barricades
Show markings as no passing unless otherwise directed by the CO)
Channelizing devices (drums, as directed by the CO devices along diversion
Delineators or channelizing
ABC
ADVANCE WARNING AREA (See Sign Spacing Table)
TAPER AREA BUFFER SPACE
See Length and Spacing Table
TAPER AREABUFFER SPACE
A
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx xx
MPH
ROAD WORK
END
the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Place channelizing devices outside temporary roadway.
"ROAD WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If the diversion is completely within the project limits, eliminate the diversion has sharp curves with recommended speeds of 30 mph or less.
original alignment. Use "Reverse Turn" signs (W1-3) instead when the
Curve" sign (W1-4) in advance of the second reverse curve back to the
Reverse Curve" sign (W24-1). Install a second, appropriate "Reverse use an appropriate "Reverse Curve" sign (W1-4) instead of the "Double
MPH FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
TEMPORARY TRAFFIC CONTROL
(WITH FLAGGERS)
ROAD CLOSURE LAYOUT
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
635-5
STATE PROJECT
NUMBER
SHEET
G.5
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
A u g u s t
U h ig h w a y s F
H W
A
O M
A D
D e s ig n T e m p o r a r y T r a ff ic C o n tr o l\ m t-d n d .d g n
DAR 15(2) MT
Traffic flow
Traffic flow the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the Contractor on the pilot car.
at a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the "PILOT CAR FOLLOW ME" (G20-4) sign conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
Spacing Table)
(See Length and
LENGTH AND SPACING TABLE
SPEED*
APPROACH
6.
5.
4.
3.
2.
1.
Spacing Table)
(See Length and WORK SPACE
See Note 4
G20-2
See Note 4
W20-1 W3-4
(optional)
W16-2P
W20-7
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C posted speed, not the advisory speed.
Approach speed based on the regulatory *
BUFFER SPACE
LENGTH
BUFFER SPACE
NOTE:
NO SCALE
Expressway / Freeway
Flagger location
Flagger location
ADVANCE WARNING AREA (See Sign Spacing Table)
TERMINATION AREAVARIABLEBUFFER SPACEABC
(optional)
A
WORK
ROAD
AHEAD
BE
PREPARED
TO STOP
ROAD WORK
END
xxx
FEET
SPACING IN FEET
FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
50' - 100' (optional)50' - 100'
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
(WITH FLAGGERS)
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
635-6
See Note 6
10' min.
STATE PROJECT
NUMBER
SHEET
G.6
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
A u g u s t
U h ig h w a y s F
H W
A
O M
A D
D e s ig n T e m p o r a r y T r a ff ic C o n tr o l\ m t-d n e .d g n
DAR 15(2) MT
Traffic flow
Traffic flow
See Note 4
W20-1 W20-7W20-4
See Note 4
G20-2
Spacing Table)
(See Length and
(optional)
WORK SPACE (optional)(optional)
(optional)
W13-1P
(optional)
W16-2P
7.
6.
5.
4.
3.
2.
1.
the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the contractor on the pilot car.
a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
LENGTH
BUFFER SPACE
NOTE:
NO SCALE
Expressway / Freeway
Channelizing devices
Flagger location
Flagger location
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table) TERMINATION AREA
Device spacing
BUFFER SPACE
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
xxx
FEET
ROAD WORK
END
Diamond = 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)
1.5
1.5
1.5
(SQFT)
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2014
REVISED:
635-14
TEMPORARY TRAFFIC CONTROL
WOOD POSTS
SIGN INSTALLATION
200' m in m in
6' - 12'
Other Shapes = 48"
Diamond = 36"
Other Shapes = 12'
Diamond = 48"
" dia. bolts 4 1Attach sign panels with a minimum of 2 -
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, STATE PROJECT
NUMBER
SHEET
G.7
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
A u g u s t
U h ig h w a y s F
H W
A
O M
A D
D e s ig n T e m p o r a r y T r a ff ic C o n tr o l\ m t-d n f.
d g n
DAR 15(2) MT
NOTE:
NO SCALE
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
Post
See table for hole size parallel to sign face.
Field drill holes through post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
D
See post detail (typ.)
Break-away holes.
S e e N o te
S e e N o te
7.
6.
5.
4.
3.
2.
1.
by the CO.
State standards may be used as an alternative if approved
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
Long side of post
D
90°
93°
In areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
per post.
In pedestrian locations, or in areas with obstructed views, the curb may be used.
| mt-d1502aa-US_Int2D-000 |
| mt-d1502ab-USC-000 |
| mt-d1502ac_B-1-US_Int2D-000 |
| mt-d1502ad_B-6-US_Int2D-000 |
| mt-d1502ca-US_Int2D-000 |
| mt-d1502cb-US_Int2D-000 |
| mt-d1502_Section_D_Quantities |
| mt-d1502la_B-01-Int_ft2D-000 |
| mt-d1502lb_B-06-Int_ft2D-000 |
| mt-d1502lc_C-08-Int_ft2D-000 |
| mt-d1502ld_C-10-Int_ft2D-000 |
| mt-d1502da-US_Sur2D-000 |
| mt-d1502db-US Customary-000 |
| mt-d1502dc-USC-000 |
| mt-d1502_SectionF_Quantities |
| mt-d1502ea-US_Sur2D-000 |
| mt-d1502eb-USC-000 |
| mt-d1502ec-USC-000 |
| mt-d1502ed-USC-000 |
| mt-d1502ee-USC-000 |
| mt-d1502_Section_H_Quantities |
| mt-d1502na-Int_ft2D-000 |
| mt-d1502nb-USC-000 |
| mt-d1502nc-USC-000 |
| mt-d1502nd-USC-000 |
| mt-d1502ne-USC-000 |
| mt-d1502nf-USC-000 |
File details come from the government source that posted it. Updated .