Plans_Tiller_Trail.pdf
PDF 9 MB Posted
- Solicitation number
- DTFH70-15-B-00022
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_TillerTrail.pdf | ||
| A002.pdf | ||
| A001_Tiller_Trail.pdf | ||
| GR04-15__Tiller_Trail_OR_Douglas_1(1)FINAL_29May2015.pdf | ||
| ORDOUGLAS1(1)-EW.pdf | ||
| IFB_TillerTrail.pdf | ||
| ORDOUGLAS1(1)-CrossSections.pdf | ||
| Plan_Request_form_Tiller_Trail.pdf | ||
| PROJECT_DESCRIPTION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material A
M
M a r c h
U
S C c m y fi le s p w p r o d u c ti o n d D e t.
W .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2DOUGLAS 1(1)OR
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
VICINITY MAP
SCALE IN MILES
0.5 .5 1
Mountain
Threehorn
Mi tc he ll
Cr ee k
NF-1616
NF-1616
N F -1
E lk C r e e k
BEGIN PROJECT
END PROJECT
DOUGLAS CO.
JACKSON CO.
DOUGLAS CO.
JACKSON CO.
200+40
OR DOUGLAS 1(1)
MP 40.20-40.41
TILLER TRAIL HIGHWAY
212+20
OR DOUGLAS 1(1)
MP 40.20-40.41
TILLER TRAIL HIGHWAY
34 Miles to Medford, OR
35 Miles to Canyonville, OR
A.3
STATE PROJECT
NUMBER
OR
OR DOUGLAS 1(1)
P
J u ly
I n t_ ft
D m y fi le s p w p r o d u c ti o n d o r a a c .d g n
C h e c k e d b y
D e s ig n e d b y
Sheet and Description
Section C Section D Section E Section F Section G Section J Section K
Typical Section
Plan & Profile
Approach Roads
Erosion Control Drainage
Temporar y Traffic Control
Permanen t Traffic Control
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION CHANNEL LPSM ALL
A0140 15702-2000 SOIL EROSION CONTROL,
TURBIDITY MONITORING LPSM ALL
A0160 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 1,000 30 1,030
A0180 15801-0000 WATERING FOR DUST CONTROL MGAL 100 100
A0200 20101-0000 CLEARING AND GRUBBING ACRE 0.34 0.06 0.40
A0220 20301-2300 REMOVAL OF SIGN/MARKER EACH 1 1
A0240 20401-0000 ROADWAY EXCAVATION CUYD 1,023 77 1,100
A0260 20402-0000 SUBEXCAVATION CUYD 2,289 161 2,450
A0280 20410-0000 SELECT BORROW CUYD 2,378 122 2,500
A0300 20702-0100 GEOTEXTILE FILTER, CLASS 1,
TYPE A SQYD 1,882 118 2,000
A0320 20702-0300 GEOTEXTILE FILTER, CLASS 1,
TYPE C SQYD 3,813 187 4,000
A0340 20703-2000 GEOGRID, STABILIZATION SQYD 11,278 722 12,000
A0360 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 CUYD 17 3 20
A0380 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 1,013 58 29 1,100
A0400 30302-1000 DITCH RECONDITIONING LNFT 245 15 260
A0420 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 506 29 15 550
A0440 41201-0000 TACK COAT TON 1.4 0.1 1.5
A0460 60201-1100 42-INCH PIPE CULVERT LNFT 80 80
A0480 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 420 30 450
A0500 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 24
A0520 62201-1000 WHEEL LOADER, 4 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 24
A0540 62201-3200 HYDRAULIC EXCAVATOR, CRAWLER
MOUNTED, 1.5 CUBIC YARD
MINIMUM CAPACITY HOUR 24
-J an -2
8:
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
O
R D
O U
G
LA
S 1(
1) -F in al
Es tim at e.
xl sx
]S he et SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.1DOUGLAS 1(1)OR
Sheet and Description
Section C Section D Section E Section F Section G Section J Section K
Typical Section
Plan & Profile
Approach Roads
Erosion Control Drainage
Temporar y Traffic Control
Permanen t Traffic Control
ALLOWANCE Bid Schedule
A0560 62301-0000 GENERAL LABOR HOUR 40
A0580 62406-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH ACRE 0.34 0.06 0.40
A0600 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 0.34 0.06 0.40
A0620 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 0.34 0.06 0.40
A0640 62901-1300 ROLLED EROSION CONTROL
PRODUCT, TYPE 5.B SQYD 305 30 335
A0660 63302-0000 SIGN SYSTEM SQFT 26 26
A0680 63401-0100 PAVEMENT MARKINGS, TYPE A,
SOLID(YELLOW) LNFT 4,720 4,720
A0700 63401-0100 PAVEMENT MARKINGS, TYPE A,
SOLID(WHITE) LNFT 4,720 4,720
A0720 63502-1250 TEMPORARY TRAFFIC CONTROL,
TUBULAR MARKER, TYPE 42-INCH EACH 100 100
A0740 63502-1600 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE B EACH 2 2
A0760 63503-1000 TEMPORARY TRAFFIC CONTROL,
PLASTIC FENCE LNFT 285 15 300
A0780 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 123 37 160
A0800 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 560 560
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-J an -2
8:
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
O
R D
O U
G
LA
S 1(
1) -F in al
Es tim at e.
xl sx
]S he et
2) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.1DOUGLAS 1(1)OR
LC
Profile grade
3:1 3:1 elbairaV nworC %2 nworC %2
TILLER TRAIL HIGHWAY
FOOTNOTE:
NO SCALE
T y p
TYPICAL SECTIONS
QUANTITIES AND
TYPICAL SECTION
209+50 to 211+70
204+38 to 205+73
200+90 to 202+30
Traveled way Traveled way
Original ground Match ex.Match ex.
Varies 0' - 2'
Shoulder
Varies 0' - 2'
Shoulder
SAFETY EDGE DETAIL
Second lift of asphalt
First lift of asphalt to cover safety edge
Pull aggregate base
30°
Tack coat (between pavement lifts)
Detail (typ.)
See Safety Edge
Detail (typ.)
See Safety Edge
11' 11'
TILLER TRAIL HIGHWAY
211+70 TO 212+20
205+73 TO 209+50
202+30 TO 204+38
200+40 TO 200+90
LC
elbairaV
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
Existing base course
Mill pavement surface New asphalt
Tack coat
50'
212+20
200+40
Existing surface course 2
CONNECTION DETAIL
lifts. Tack between lifts placed in two equal
4" compacted depth pavement, type 1
Hot asphalt concrete
12" compacted depth
Roadway aggregate, method 2
Tack before placement
2" compacted depth.
pavement, type 1
Hot asphalt concrete [1]
[2]
[2
[2]
3:1 3:1 shldr.shldr.
2'
Traveled way
11'
Traveled way
11'
2'
[2]
[2]
[1] [1]
Vertical saw cut
C.1
STATE PROJECT
S e p te m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a c a .d
W it u c k i
M M Y
Y Y
Y
C h e c k e d b y
D e s ig n e d b y
Variable
S lo p e s ta k e
D
ROUNDING DETAIL
FILL SLOPE
C le a r in g l im it
5'-0' 5'-0"
0.25 D
Existing ground
10'-0'
C le a r in g l im it
0.25 D
Slope stake
Existing ground
5'-0" 5'-0"
B = 10'-0' distance proportionally.
height dimension and reduce the front slope rounding
For cut heights less than "B" reduce "B" to the cut
Construct slopes as shown in the Staking Report.
the plan and profile curve data.
Superelevate roadway on curves at the rate "e" as indicated on
[3]
[1]
ROUNDING DETAIL
CUT SLOPE
[3]
QUANTITIES
TABULATION OF PLAN
D.1
STATE PROJECT
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o f0 d a .d
C h e c k e d b y
D e s ig n e d b y
[1]
FOOTNOTE:
Stationing includes transitions. See Sheet I.2.
[1]
0 3
D
R= 250.00'
T= 46.36'
L= 91.67'
D
R= 600.00'
T= 20.67'
L= 41.31'
D
R= 250.00'
T= 27.60'
L= 54.98'
R= 250.00'
T= 31.92'
L= 63.50' D
R= 500.00'
T= 89.17'
L= 176.48'
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
500 CP
Line to be constructed
Slope stake limits
Slope stake limits
Profile grade
Existing ground
Existing ground
BEGIN PROJECT
END PROJECT
200+40.00
OR DOUGLAS 1(1)
D
Deep Patch Deep Patch Deep Patch
201+10 202+10 204+63 205+48 209+95 211+45
El=3199.63
E=20280.08
N=11029.19
212+20
OR DOUGLAS 1(1)
El=3258.95
E=19955.83
N=9916.13 Deep Patch
LEGEND:
Slope stake limits
Slope stake limits
Slope stake limits
Slope stake limits
Existing ROW
Existing ROW for Underdrain
Install outlet for Underdrain
Install Outlet
N
Remove sign culvert and headwall
Do not disturb existing for Underdrain
Install outlet for Underdrain
Install outlet
Place riprap at outlet
Install 42" CMP
Remove existing 36" CMP
210+93
See Sheet E.1 Construct approach road
1,070
CUYD
EXC.
CUYD
EMB.
3195 3230
3200 3235
3205 3240
3210 3245
3215 3250
3220 3255
3225 3260
3230 3265
3235 3270
D.2
STATE PROJECT
DOUGLAS 1(1)
S e p te m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a fb .d
C h e c k e d b y
D e s ig n e d b y
200+00 202+50 205+00 207+50 210+00 212+50 214+00
Sprint Locate: (800) 521-0579
Mike Conley, Field EngineerContact:
(541) 543-3771 (cell)
(541) 942-7410 (office)Phone:
Cottage Grove, OR 97424
78696 Bryson Sears RoadAddress:
FIBER OPTIC CABLE: Sprint Nextel
UTILITY CONTACT:
Profile grade
Profile grade
(No stockpiling)
Staging Area
Proposed ROW
Proposed ROW
P O
T
.0
P C
.7
P T
.0
P C
.9
P T
.6
P C
.6
P T
.5
P C
.6
P C
C
.1
P T
.6
U P
W A R N I N G B U R I E D
U T I L I T Y
,1
.0
,2
.2
,2
.2
100' VC
K = 43
SSD = 515'
,2
.6
,2
.2
,2
.8
100' VC
K = 71
SSD = 820'
,2
.4
,2
.0
,2
.2
100' VC
K = 21
SSD = 279'
,2
.5
,2
.0
NO SCALE APPROACH ROAD
QUANTITIES AND
APPROACH ROADSTATION REMARKS
APPROACH ROAD SUMMARY
(ft)
LENGTH
PAVED
(ft)
LENGTH
TOTAL
(ft)
R
(ft)
R
(ft)
W 1 2
E d g e o f s h o u ld e r
E n d p a v e m e n t
E d g e o f tr a v e le d w a y
L
Asphalt concrete pavement
Aggregate base
TYPICAL SECTION
W ditch Main line ditch Main line
1:6 min.1:6 min
206+47 Rt. 50 50 28 20 20
NOTE:
APPROACH ROAD
206+47
10% unless indicated on the plan.
Minor approach grade beyond landing is not to exceed beyond the right of way or construction easement line.
Secure written permission from landowner for work and from the main road.
traffic hazards, and afford entry and exit of traffic to
Construct approaches to fit local conditions, minimize
3.
2.
1.
R1
R2
1:3 1:3
E.1
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a e a .d
W it u c k i
M M Y
Y Y
Y
C h e c k e d b y
D e s ig n e d b y
SECTION A-A
A
A
6" compacted depth Roadway aggregate, method 2
3" compacted depth pavement, type 1 Hot asphalt concrete variesvaries
FOOTNOTE:
[1] Match existing roadway superelevation.
[1][1]
BEGIN PROJECT
N N
200+40
OR DOUGLAS 1(1)
El=3199.63
E=20280.08
N=11029.19
212+20
OR DOUGLAS 1(1)
El=3258.95
E=19955.83
N=9916.13
END PROJECT
NO SCALE
QUANTITIES AND PLANS
EROSION CONTROL
LEGEND:
Fiber roll
Plastic fence
F.1
STATE PROJECT
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a d b .d
W it u c k i
C h e c k e d b y
D e s ig n e d b y
Area of disturbance
STANDARD APPROVED FOR USE 6/2005
DRAFT: 3/2014
REVISED: 6/2007
157-5
DIVERSION CHANNELS
TEMPORARY
6" deep and secure with riprap or sandbags.
Bury plastic liner 6" deep
2'2'2' 2'
STATE PROJECT
NUMBER
SHEET
F.2
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
u g u s t
U m y fi le s p w p r o d u c ti o n d S td .1
.d g n
DOUGLAS 1(1) OR
NOTE:
NO SCALE
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
TEMPORARY CULVERT
DIVERSION CHANNEL
SECTION B-B
SECTION A-A
SECTION A-A SECTION B-B
SECTION B-B
PLAN
W
B
W
B
W
B B
W
T T
Ø when scheduled)
Silt fence (typ.
embankment
Roadway embankment
Roadway
Temporary culvert backfill
Subgrade
Bedding
Sandbags
Riprap lining Riprap lining backflow into natural channel
Use sandbags to prevent
Permanent natural channel
Earthwork limits with plastic liner or riprap
Temporary diversion channel when scheduled)
Silt fence (typ.
See Note 5
Permanent culvert
Roadway centerline temporary barrier
Use sandbags to construct
SandbagsPlastic liner
SSSS
SS SS
D
D D
D
SS
SS
SS SS
5.
4.
3.
2.
1.
FlowFlow
FlowFlow
Plastic liner when scheduled)
Silt fence (typ.
using one of the methods listed in Subsection 204.11(a).
temporary culvert. Compact temporary culvert backfill channel through the roadway embankment with
When specified replace the portion of the diversion liner. Bury the upstream edge of the liner a minimum of
Do not construct with longitudinal joints if using a plastic
Construct channel at a minimum grade of 0.5 percent.
width of the temporary diversion channel.
Use plastic liner or riprap along the entire length and diameter, riprap class, channel dimensions and quantities.
See Erosion Control Section for temporary culvert
A
A
BB
GeotextileGeotextile
Flow
Natural ground and secure with sandbags (typ.)
Drive stakes at each end and at 4' spacing
(ft)
(ft)
Excavate trench 2"
REVISED:
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 10/2014
FIBER ROLL
W157-21
3' min.
3' min. or m in
M in t o
1" x 1" Wood stake
3" to 5" u g u s t
U m y fi le s p w p r o d u c ti o n d o r d c .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
F.3DOUGLAS 1(1)OR
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
ELEVATION
Direction of runoff Fi ll slo pe
Flow
PLAN
Spacing Slope
STAKES REQUIRED
disturbed areas
Runoff from
1:1
1:2
1:3
1:4 or flatter as specified in plans
2.
1.
DRAINAGE DITCH INSTALLATION
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
Fiber roll length for each roll
Stakes required
FIBER ROLL SPACINGStep 2: Backfill soil against fiber rolls and install fiber rolls
Step 1: Excavate trench
FIBER ROLL STAKING DETAIL
conditions.
Use drainage ditch installation only in low flow permanent installations.
roll while staking. Live stakes may be used for until fiber roll is secure to slope. Do not crush
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
NOTE:
NO SCALE
Fiber roll larger than fiber roll
Existing ground (typ.)
Stagger joints (typ.)
Existing ground
Fiber roll along contours.
Install fiber rolls
Flow direction to end, without overlapping the ends
Abut adjacent fiber rolls tightly, end
Install fiber rolls snugly into trench.
soil to ground level
Backfilled and compacted
Slope
Stake and entrench fiber roll water from flowing around the fiber roll
Provide sufficient length to prevent sp ac in g ch ar t
S ee f ib er r ol l
Direction of runof f from distur bed area s
10.4 x 16 25101 -0300
60201 -1100
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
-I
N C
H P
IP
E
C U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :3
H
B
EV
EL
S
1V :3
H
REMARKS
See below for numbered notes
FEET CUYD CUYD LNFT Lt Rt
210+93 9 187 17 80 9 GS X X 1
PROJECT TOTAL 187 17 80
Allowable Pipe Material
FOOTNOTE: A Aluminum
1. Remove culverts as directed by the CO. AS Aluminized steel
C Concrete GS Galvanized steel P Plastic (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
G.1 c:
\m yf ile s\ pw
_p ro du ct io n\ d0 or
-2 ea .x ls x]
Sh ee t
-A ug
-2
8:
A
M A
S
W it uc ki 4/
D
C he ck er
D es ig ne d by
C he ck ed b y:
NUMBER
DOUGLAS 1(1)OR
METAL PIPE CULVERT
602-1
3" x 1" CORRUGATIONS
INCHES INCHES
INCHES MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
3" x 1" CORRUGATIONS 3" x 1" CORRUGATIONS5" x 1" CORRUGATIONS
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
METAL THICKNESS (INCH/GAGE)
METAL THICKNESS (INCH/GAGE)METAL THICKNESS (INCH/GAGE)
INCHES INCHES INCHES INCHES INCHES INCHESINCHES
0.060/160.075/140.105/120.135/100.060/160.075/140.105/120.135/100.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
3.5
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
3.5 analysis by the CO.
Fill heights exceeding 100 feet require special
INCHES
" CORRUGATIONS2
1" x 3
22" CORRUGATIONS2
1" x 3
" CORRUGATIONS2
1" x 3
22 " CORRUGATIONS2
1" x 3
STANDARD NO SCALE
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DOUGLAS 1(1)OR
STATE
G.2
PROJECT
o r e b .d g n
U
S C u s to m a r y
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
NOTE:
METAL ROUND PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
COVER
MINIMUM
DIAMETER
SIZE
PIPE
DIAMETER
SIZE
PIPE
COVER
MINIMUM
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
pavement.
the pavement for both flexible and rigid height from the top of the pipe to the top of for rigid pavements. Measure maximum fill pavements, and to the top of the pavement pipe culvert to the subgrade for flexible
Measure minimum cover from the top of the corrugation pipe.
Obtain approval before furnishing annular helical lockseam and welded seam pipe.
corrugations are more restrictive than those of heights for culvert pipe with annular lockseam and welded seam pipe only. Fill
The fill heights in the table are for helical
4.
3.
2.
1.
gradient.
amount of camber or increase the pipe culvert elevation of the inlet invert, reduce the parabolic curve as designed exceeds the curve. If the midpoint elevation on the pipe length. Develop camber on a parabolic inverts an ordinate amount equal to 1% of the from a chord through the inlet and outlet
When directed, camber pipe culverts upward
SPAN x RISE
SIZE
PIPE ARCH
SPAN x RISE
SIZE
PIPE ARCH
COUPLING BAND
METAL PIPE CULVERT
602-2
3 x 1
5 x 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 x 64 to 142 x 91
60 x 46 to 81 x 59
87 x 64 to 142 x 91
60 x 46 to 81 x 59
49 x 33 to 83 x 57
17 x 13 to 42 x 29
INCHES INCHES INCHES
MINIMUM BAND WIDTH (INCHES)
1 x 2
1 x 3
10.5
10.5
10.5
10.5
10.5
10.5
10.5
" for 21" round culvert (24" x 18" pipe arch) or more2
" for 18" round culvert (21" x 15" pipe arch) or less8 diameter of bolt:
0.052 inch for steel or 0.048 inch for aluminum. Fasten coupling bands with the following thicknesses thinner than the thickness of the pipe to be connected, and no thinner than as the connecting pipe. Provide coupling bands not more than 3 nominal sheet
Fabricate annular, helical and semi-corrugated type coupling bands from the same metal rerolled with 3" x 1" pipe corrugations.
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" x 3
2ends rerolled with 2 having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on pipe
Use annular corrugated bands with pipes having annular corrugations or with helical pipe steel, or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
less. Use a matching metal having a nominal thickness of not less than 0.040 inch for
Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or
" corrugations on rerolled pipe ends.2 1" x 3
2sizes apply to 2
The minimum band widths shown for 3" x 1" and 5" x 1" corrugated
42" diameter to 42" diameter, required above
Second angle connection optional
42" diameter to 42" diameter, required above
Second angle connection optional
STANDARD NO SCALE
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DOUGLAS 1(1)OR
STATE
G.3
PROJECT
o r e c .d g n
U
S C u s to m a r y
COUPLING BANDS FOR METAL PIPE CULVERT
Band Band
SLEEVE JOINT
Stab type joint
Smoother sleeve with center stop.
SMOOTH SLEEVE BAND FLAT BAND
W
SIDE VIEW
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
W W
SIDE VIEW SIDE VIEW
Band Angle
Oval Lug
Bar & Strap
Wedge and Strap
Wedge
Integral Flange
STANDARD BAND CONNECTIONS
Bolts
Angle
END VIEW
ANNULAR BAND
Bolts
Angle
END VIEW
HELICAL BAND
strap connector
Bolt, bar and
Pipe
Band
END VIEW
SEMI-CORRUGATED BAND
NOTE:
Band Bolts Band Bolts
W
4 5 underdrain 6 2.
1.
Section 26 may be used.
specifications for Highway Bridges, Division II performance criteria of AASHTO Standard devices that comply with the joint
Other types of coupling bands or fastening specified in the Special Contract Requirements.
Watertight pipe joints are not required unless the dimension of the end corrugation in the pipe.
For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to
Use helical corrugated bands with pipes having helically corrugated ends.
PipePipe
BandBand heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest
SPAN x RISE
PIPE ARCH
BANDS
CORRUGATED
ANNULAR
BANDS
CORRUGATED
HELICALLY
BANDS
CORRUGATED
SEMI-
SIZE
CORRUGATION
DIAMETER
ROUND PIPE
18" ±
18"± 18" ± not exceeding 6" compacted depth.
Embankment material placed in layers
2'-0" ±
1'-0" ±
PIPE CULVERT BEDDING
METAL AND PLASTIC
602-3 minimum
1'-0"
(min.)
6"
(min.)
6" trench excavations
Reduce to 18" for *
24"
36" whichever is less
OR
Half diameter or span
> 54"
12" to 54"
6"
4"
48" and UP
UP to 48"
2H or 12' (max.)
2H or 12' (max.)
2H or 12' (max.)
2H or 12' (max.)
2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.)
2H or 12' (max.)1 or 36" (max.) for embankment installations excavation in trench
18" (min.)
12" (min.), 24" (max.)
"/foot of cover,2
6" in uncompacted depth.
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material
Or lean concrete backfill in accordance with Section 614.
Soil classification: A-1, A-2-4, A-2-5, or A-3
"2 1 Plastic Pipe: Maximum particle size: 1
Soil classification: A-1, A-2, or A-3
Metal Pipe: Maximum particle size = 3" exceeding 6" compacted depth meeting the following:
Compacted backfill material placed in layers not
STANDARD NO SCALE
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DOUGLAS 1(1)OR
STATE
G.4
PROJECT
o r e d .d g n
U
S C u s to m a r y
Roadway embankment
Roadway embankment
ABOVE NATURAL GROUND
Roadway embankment
Natural ground
ON NATURAL GROUND
Roadway embankment
Natural ground
NATURAL GROUND
ABOVE AND BELOW
Bedding material (uncompacted)
TRENCH EXCAVATION IN EMBANKMENT
BELOW NATURAL GROUND OR
Roadway excavation
ON UNSTABLE MATERIAL
Natural ground
Roadway embankment
ON UNYIELDING MATERIAL
Roadway embankment
Natural ground
H * H *
PIPE BEDDING
BEDDING DEPTH
PIPE SIZE (H) DEPTH
NOTE:
MULTIPLE PIPE INSTALLATION
MINIMUM SPACING
SPACING
or Span
Diameter
Toe plate
ELEVATION
or Span
Diameter
Toe plate
SECTION A-A
be adjusted to tie into impervious material.
granular material is used for backfill. Width may material at the pipe culvert inlet where
Construct piping plug of impermeable backfill
PIPING PLUG
H
A
A Width
(see table)
Minimum spacing dimension of all pipe arch culverts.
H equals the diameter of all round pipe culverts or the rise amount of camber or increase the pipe culvert gradient.
designed exceeds the elevation of the inlet invert, reduce the curve. If the midpoint elevation on the parabolic curve as to 1% of the pipe length. Develop camber on a parabolic through the inlet and outlet inverts an ordinate amount equal
When directed, camber pipe culverts upward from a chord
2.
1.
H H
Piping plug
H H
H H
Finished subgrade
Bedding
Natural ground
Finished subgrade
Bedding
Finished subgrade
Bedding treatment
Culvert end Bedding before trench excavation embankment height
Finished subgrade or
Original natural ground surface fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Finished subgrade depth table
See bedding section Metal end
Pipe culvert
Embankment slope
High water elevation
H H
H
H
H H
H
H
H H or SPAN
DIAMETER
Metal end section
Finished subgrade
2'
(min.)
NO SCALE
PLAN VIEW
END SECTION
CULVERT WITHOUT STANDARD
m in
S p a n
D ia o r
L m in
D m in
H
D it c h B o tt o m
W id th
D
D
D D
NOTE:
Original ground ground
Original
Flowline ditch slope existing
Match or flatter Sloped 1V:2H
4D
D
(inches)
SIZE
CULVERT
CLASS
RIPRAP
(feet) L
APRON
OF
LENGTH
(feet) H
APRON
OF
DEPTH
(CY)
QUANTITY
RIPRAP
ESTIMATED
(SY)
QUANTITY
GEOTEXTILE
ESTIMATED
CULVERT OUTLET DETAILS
PLACED RIPRAP AT
G.5
STATE PROJECT
o r e e .d g n
U
S I n t2
D
M M Y
Y Y h e c k e d b y
S
W it u c k i
D r a w n b y measured for payment.
Excavation and geotextile for placement of riprap will not be
Use for aprons serving culverts with slopes of less than 10%.
2.
1.
16.5
2.5
2.5
1.5
1.5
1.5
41.5
32.5
16.9
12.3
5.4
3.4
1.8
AND ESTIMATED QUANTITIES
PROTECTIVE APRON DIMENSIONS
PROTECTIVE APRON AT CULVERT OUTLET
A
A
BB
SECTION A-A SECTION B-B
Separation stabilization geotextile, class 1, type c geotextile, class 1, type c Separation stablilization
1.5
I.1
STATE PROJECT
o f0 ib .d g n
U
S I n t2
W it u c k i e c k e d b
M o r e h o u e s ig n e d b y
DEEP PATCH DETAILS
Do not over-excavate
.7
1.5 g e o g r id l a y e r s
V e r ti c a l s p a c in g
.5
NO SCALE
1.5
LCLC
LC
pavement structure details See typical sections for g e o g r id l a y e r s
V e r ti c a l s p a c in g
Select borrow
Stabilization geogrid cross slope to drain
Excavation
Stabilization geogrid
Stabilization geogrid class 1, type C Geotextile non-woven, class 1, type A
Geotextile non-woven, class 1, type C non-woven, Geotextile class 1, type C non-woven, Geotextile
.5 class 1, type C non-woven, Geotextile
1.5
Do not over-excavate
LC
Stabilization geogrid class 1, type C Geotextile non-woven, Geotextile non-woven, class 1, type C
1.5 layers to field conditions
Adjust embankment g e o g r id l a y e r s
V e r ti c a l s p a c in g
See Sheet I.3 Outlet drain pipe
See Sheet I.3 Outlet drain pipe
See Sheet I.3 Outlet drain pipe
See Sheet I.3 Outlet drain pipe control product, type 5B
Rolled erosion control product, type 5B
Rolled erosion product, type 5B
Rolled erosion control product, type 5B
Rolled erosion control class 1, type C
Geotextile non-woven, See Sheet I.3 Underdrain System b e tw e e n g e o g r id l a y e r s
V e r ti c a l s p a c in g
See Sheet I.3 Underdrain SystemSee Sheet I.3
Underdrain System
See Sheet I.3 Underdrain System connect to previous underdrain
Install underdrain system and beyond toe of slope control product 2 feet
Extend rolled erosion beyond toe of slope control product 2 feet Extend rolled erosion beyond toe of slope control product 2 feet
Extend rolled erosion beyond toe of slope control product 2 feet Extend rolled erosion
FOOTNOTE:
pavement structure details
See typical sections for
.nim %2
SITE 1
DEEP PATCH
201+10 to 202+10
209+95 to 210+40 pavement structure details
See typical sections for
210+40 to 211+45
SITE 3B
DEEP PATCH
SITE 2
DEEP PATCH
204+63 to 205+48
See Sheet I.2 for Detail A See Sheet I.2 for Detail B
See Sheet I.2 for Detail A
.nim %2
Select borrow
Select borrow
SITE 3
DEEP PATCH
pavement structure details
See typical sections for
.nim %2
See Sheet I.2 for Detail A
Select borrow
[1]
[2]
[1][2]
[2]
[2]
[2]
[1]
[1]
Outslope to drain.
Daylight outlet drain pipe through fill in embankment sections.
Do not exceed 9-inch vertical spacing between geogrid layers.
DEEP PATCH DETAILS
STATE PROJECT
W it u c k i e c k e d b
M o r e h o u s ig n e d b y
I.2
4' Geogrid embedment
18"
2" (typ.)
erosion control product
18" - Embedment, rolled
4' Min. embedment
9"
NO SCALE
9" (typ.)
18"
4' Geogrid embedment
2" (typ.)
Geotextile non-woven, class 1, type A
Geotextile non-woven, class 1, type A
Geotextile non-woven, class 1, type A
Geotextile non-woven, class 1, type C
Geotextile non-woven, class 1, type A
Geotextile non-woven, class 1, type C
Geotextile non-woven, class 1, type A
1V:5H
Geotextile non-woven, class 1, type C
Taper
Top of subgrade
Do not exceed 9-inch vertical spacing between geogrid layers.
TRANSITION DETAIL
DEEP PATCH
B E
G I N E
N D D
E E P P
A T
C H
Geotextile non-woven, class 1, type A
[1]
[1]
[1]
2 - feet over each geogrid layer non-woven, class 1, type C
Lap back geotextile, 2' (typ.) 2' (typ.)
DETAIL A
product, type 5B
Rolled erosion control
Stabilization geogrid
DETAIL B
Stabilization geogrid
Select borrow
Select borrow
LEFT AND RIGHT-SIDE FACING
Stabilization geogrid
FOOTNOTE:
beyond toe of slope control product 2 feet
Extend rolled erosion
FOOTNOTE:
Distance to be determined in field, or as directed by CO.[1]
[1]
[1]
TRAFFIC CONTROL QUANTITIES
TABULATION OF TEMPORARY
J.1
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a n a .d g n
S
W it u c k i
M M Y
Y Y
Y
C h e c k e d b y
D e s ig n e d b
SIGNS IN FEET
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2010
REVISED:
635-1
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
STANDARD
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE
J.2
PROJECT
DOUGLAS 1(1)OR
p r il
U m y fi le s p w p r o d u c ti o n d o r a n b .d g n xx
ROAD WORK
NEXT MILES
ROAD
WORK
xx FT
ROAD
WORK
xx FT xx
ROAD WORK
NEXT MILES
ROAD
WORK
xx FT
ROAD
WORK
xx FT
G20-2
G20-2
G20-2
See Note 11
G20-1
See Note 11
G20-1
M in o r R o a d
M a jo r R o a d
See Note 10
W20-1
See Note 10
W20-1
See Note 9
W16-8P
W20-1 over
See Note 9
W16-8P
W20-1 over
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
NOTE:
NO SCALE
A
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
ROAD WORK
END
WORK
AHEAD
ROAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
AHEAD
ROAD
WORK
AHEAD
ROAD
ROAD NAME
ROAD NAME
See Note 10
W20-1
See Note 10
W20-1
G20-2
B as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
Expressway / Freeway retroreflective sheeting types.
Refer to the Section 635 of the Special Contract Requirements for allowable
State standards may be used as an alternative if approved by the CO.
that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, verify whole mile.
each end of the project. Show the distance on the G20-1 sign to the nearest the distance to the work area in feet or in miles. Install an additional W20-1
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify of the road on which the construction does occur (applies to major roads only).
construction work occurs, include a supplementary plaque indicating the name
If W20-1 is placed on a roadway other than that on which the actual post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use. Cover
Maintain two-way traffic during all non-work hours except as approved by the CO.
NCHRP-350 or MASH for crashworthiness.
Ensure all sign supports exposed to impact by traffic meet the requirements of indicate a maximum recommended speed through the construction area.
Install advisory speed plates under the W20 series warning signs as needed to construction conditions.
Additional or different message signs may be required to fit the actual messages as required.
locate the warning signs as determined by the CO for best results. Vary
Where advance warning signs, placed as shown, interfere with permanent signs, traffic control plan as necessary to accommodate actual operations.
to this project. The Contractor may add or delete information and details in this
Not all details shown on the temporary traffic control sheets may be applicable
Erect all project advance warning signs before starting construction work.
(WITH FLAGGERS)
ROAD CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
MPH FEET
635-5
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2010
REVISED:
STANDARD
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE
J.3
PROJECT
DOUGLAS 1(1)OR
J u ly
U m y fi le s p w p r o d u c ti o n d o r a n c .d g n
Traffic flow
Traffic flow the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the Contractor on the pilot car.
at a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the "PILOT CAR FOLLOW ME" (G20-4) sign conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
Spacing Table)
(See Length and
LENGTH AND SPACING TABLE
SPEED*
APPROACH
6.
5.
4.
3.
2.
1.
ADVANCE WARNING AREA (See Sign Spacing Table)
Spacing Table)
(See Length and WORK SPACE
ROAD WORK
END
See Note 4
G20-2
See Note 4
W20-1 W3-4
(optional)
W16-2P
W20-7a
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
A
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
Expressway / Freeway posted speed, not the advisory speed.
Approach speed based on the regulatory *
NOTE:
NO SCALE
Flagger location
Flagger location
TERMINATION AREAVARIABLEBUFFER SPACEABC
xxx
FEET
BUFFER SPACE
(optional)
LENGTH
BUFFER SPACE
(WITH FLAGGERS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
635-6
MPH
SPACING IN FEET
FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
50' - 100' (optional)50' - 100'
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2010
REVISED:
See Note 6
10' min.
STANDARD
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE
J.4
PROJECT
DOUGLAS 1(1)OR
p r il
U m y fi le s p w p r o d u c ti o n d o r a n d .d g n
ROAD
WORK
AHEAD AHEAD
ONE LANE
ROAD
ROAD WORK
END
Traffic flow
Traffic flow
See Note 4
W20-1 W20-7aW20-4
See Note 4
G20-2
Spacing Table)
(See Length and
(optional)
WORK SPACE (optional)(optional)
(optional)
W13-1P
(optional)
W16-2P
7.
6.
5.
4.
3.
2.
1.
the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the contractor on the pilot car.
a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
Expressway / Freeway
NOTE:
NO SCALE
BUFFER SPACE
Flagger location Channelizing devices
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table) TERMINATION AREA
Flagger location
MPH
XX xxx
FEET
LENGTH
BUFFER SPACE
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
Device spacing
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
obstructed, use 7' minimum mounting height for main sign
Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)
1.5
1.5
1.5
(SQFT)
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2011
REVISED:
635-14
TEMPORARY TRAFFIC CONTROL
WOOD POSTS
SIGN INSTALLATION
200' m in m in
6' - 12'
" dia. bolts per 4 1Attach sign panels with a minimum of 2 -minimum lateral offset of 1' behind the face of the curb lateral offset of 2' may be used. In urban areas, a
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48" p r il
U m y fi le s p w p r o d u c ti o n d o r a n e .d g n
STATE PROJECT
NUMBER
SHEET
J.5OR DOUGLAS 1(1)
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
NO SCALE
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
Post
See table for hole size parallel to sign face.
Field drill holes through post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
D
See post detail (typ.)
Break-away holes.
S e e N o te
S e e N o te
In rural areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
field conditions.
H1 and H2 = Overall post length. Select post lengths to fit post.
7.
6.
5.
4.
3.
2.
1.
by the CO.
State standards may be used as an alternative if approved
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
Long side of post
D
90°
93°
In pedestrian locations, or in areas where the view is may be used.
NOTE:
TRAFFIC CONTROL QUANTITIES
TABULATION OF PERMANENT
K.1
STATE PROJECT
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a n a .d
W it u c k i
M M Y
Y Y
Y
C h e c k e d b y
D e s ig n e d b y applications according to Section 634.
1. Permanent pavement marking quantities shown reflect two
BEGIN PROJECT
MARKING PLAN
SIGNING AND PAVEMENT
N N
200+40
OR DOUGLAS 1(1)
El=3199.63
E=20280.08
N=11029.19
212+20
OR DOUGLAS 1(1)
El=3258.95
E=19955.83
N=9916.13
END PROJECT
W 1-4R
W 1-4R
LEGEND:
MPH
MPH
NO SCALE
W 13-1P
W 13-1P
K.2
STATE PROJECT
J u ly
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a n b .d
W it u c k i
C h e c k e d b y
D e s ig n e d b y
Sign system
WOOD POSTS
INSTALLATION
PERMANENT SIGN
NOTE:
NO SCALE
E d g e o f tr a v e le d w a y of traveled way
Elevation at edge
LC E
d g e o f s h o u ld e r
Rural Districts
Location
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r of traveled way
Elevation at edge
E d g e o f s h o u ld e r of traveled way
Elevation at edge
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r of traveled way
Elevation at edge
E d g e o f tr a v e le d w a y exceeds the limit for the largest post, use steel post installation.
Values shown are the maximum permitted. If the product of XYZ
5.
4.
3.
2.
1.
a secondary sign mounted below another sign.
Residence Districts
Business or
See table for hole size post, parallel to sign face.
Field drill holes through
SINGLE POST SIGNS TWO POST SIGNS
POST DETAIL
THREE POST SIGNS FOUR POST SIGNS
MINIMUM DISTANCE TO SIGN
SIGNS WITHOUT ANGLES
TYPICAL MOUNTING FOR
WOOD POST SELECTION TABLE
SIZE
POST NUMBER OF POSTS
1 2 3 4 D diameter and hole depth
Notch from curb
Offset (W)
Lateral
Height (V)
Mounting
Backfill material
Backfill material
Same post size
Long side of post
Bottom of sign
(See Post Selection table)
Notch depth (where required) post
Finish ground line single post installations of post. Omit notch for
Saw cut notch full width W
V
.5
Y
Z ty p
D
H
W
.5
Y
Z ty p
D
V Y
H
H
0.2X 0.2X0.6X
Same post size
Backfill material
V Y
W ty p
D
.5
Y Z
0.125X0.25X0.25X0.25X0.125X
H
H
H
H
0.15X0.35X0.35X0.15X ty p
Z
.5
Y
W
V Y
H
H
H
Same post size
Backfill material of a rectangle enclosing all the signs.
- Multiple sign installations: X and Y are the dimensions overall dimensions of the signs.
- Single sign, or back to back signs: X and Y are the
For the purpose of post selection X and Y are as follows:
the longest post.
Z is the height from ground line to mid-height of sign at soil conditions. See Wood Post Selection Table below.
D is the minimum post embedment depth for average lengths to fit field conditions.
indicate overall post length. Select post 4 thru H1H outside the clear zone.
or if the post is vulnerable to being struck when placed all around (typ.)
3" minimum maximum
X=5 ft to 12 ft (max.)
X=4 ft (min.)
all around (typ.)
3" minimum than 6" x 8" when located within the clear zone
Traffic barrier protection is required for all posts larger
" lock nut16
" oversized washer16
" bolt16
" outside dia.)4 1(1 oversized washer
" nonmetallic16
" bolt thru the post8
8 x 12
8 x 10
6 x 10
6 x 8
6 x 6
4 x 6
4 x 4
6'-0"
5'-0"
5'-0"
4'-0"
4'-0"
4'-0"
3'-0"
"4
"4
"2
Product of X-Y-Z in CUFT
2 ft
6 ft 7 ft
7 ft
V may be reduced by 1 foot in rural districts for
22 ft (max.)
X=14 ft (min.) to all around (typ.)
3" minimum all around (typ.)
3" minimum
18 ft (max.)
X=10 ft (min.) to
K.3
STATE PROJECT
A p r il
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a n c .d
C h e c k e d b y
D e s ig n e d b y
200'
Local tangent
SIGN INSTALLATION ANGLE
90°
93°
10'30'10'30'10'
2' to 6'
REVISED: 10/2012
W634-2
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 10/2007
PAVEMENT MARKINGS
LINEAR
2' m a x m in
4" dotted white line
4" solid white edge
4" solid double
4" dotted white
Locate 12" wide stop line to
4" solid white edge line
4" broken yellow centerline
A p r il
U m y fi le s p w p r o d u c ti o n d o r a n d .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
K.4DOUGLAS 1(1)OR
NOTE:
NO SCALE
s s w
Transition
Curve widening
Transition
S h o u ld e r s
T ra v e l
L
T ra v e l
L
S h o u ld e r s s L
L when specified in plans o u ld e r
L a n e
T r a v e l
L a n e
T r a v l o u ld e r required by the maintaining agency.
pavement markings when specified on the plans or when
Typical pavement marking widths are shown. Use wider for curve widening transition locations.
throughout the curve widening area. See staking details the roadway. Maintain a constant shoulder width "s" curve widening "w" to achieve equal lane widths within
Paint centerline pavement markings on curves with curb interface when curb is present.
Place edge line pavement markings at asphalt/concrete required by the maintaining agency when specified in the plans or when
Increase spacing between parallel lines
3.
2.
1.
markings when specified
Approach road pavement
TYPICAL PAVEMENT MARKING APPLICATIONS
CENTERLINE MODIFICATION FOR CURVES WITH WIDENING APPLIED ON INSIDE
CENTERLINE DETAIL
See Note 2 for treatment of curves when widening "w" is split equally on both sides of centerline
L w break specified in plans extension when edge line line when specified in plans yellow centerline line extension
Turnout
Edge of pavement allow sufficient sight distance
Major approach road
Minor approach
Centerline as required
Edge line when specified in plans and location of top lift pavement joint
Offset centerline for pavement markings
Design
Edge line when specified in plans w w w
CL