AK NPS KEFJ 10(4), Herman Leirer Road (Exit Glacier Road) Flood Mitigation, Kenai Fjords National Park, Kenai Peninsula Borough, Alaska
The work consists of Roadway excavation, embankment construction, riprap, grading, concrete barrier removal, aggregate base, paving and other small items of work.
Project length: .77 Miles
Tentative Fixed Completion Date: Fall 2016 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $3 million to $4 million
Location: 7 Miles NW of Seward, Alaska
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
O ne
S ch ed ul e Sc h N am e
A
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (temporary diversion)) All 157 Soil Erosion & Sediment Control (Fiber roll) 11,000 LF 157 Soil Erosion & Sediment Control (Silt fence) 975 LF 157 Soil Erosion & Sediment Control (Check dam) 12 EA 158 Watering for Dust Control 50 MGAL DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions (Removal of pipe culvert) 5 EA 203 Removal of Structures & Obstructions (Removal of guardrail, concrete) 2200 LF 203 Removal of Structures & Obstructions (Removal of pavement) 13,300 SQYD 204 Excavation & Embankment (roadway excavation) 1260 CUYD 204 Excavation & Embankment (select borrow) 29,800 CUYD 205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No 207 Earthwork Geosynthetics (info only) 6,560 SQYD 208 Structure Excavation (info only) 147 CUYD DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap, Class 4 500 CUYD 251 Riprap, Class 5 4,890 CUYD DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 5,800 TON
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
O ne
S ch ed ul e Sc h N am e
A
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 2,580 TON DIVISION 600 – Incidental Construction 602 Culverts & Drains (6’x5’ precast box culvert with wingwalls) 220 LF 617 Guardrail, remove and reset 165 LF 621 Monuments & Markers (construction survey & staking) (yes/no) No 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 625 Turf Establishment (seeding) 5,800 SQYD 629 Rolled Erosion Control Products & Cellular Confinement Systems (turf establishment and erosion control) 5,300 SQYD 633 Permanent Traffic Control (Object marker type 3) 8 EA 633 Permanent Traffic Control (Remove and reset Park entrance sign) 1 EA 633 Permanent Traffic Control (Remove and reset sign) 5 EA 633 Permanent Traffic Control (Pavement markings, white) 15,932 LF 634 Permanent Pavement Markings (Pavement markings, yellow) 16,400 LF 635 Temporary Traffic Control – Traffic control supervisor ALL 635 Temporary Traffic Control – Barricade type 3 4 EA 635 Temporary Traffic Control – Tubular Marker, type 28 inch 120 EA 635 Temporary Traffic Control – Construction sign 115 SQFT 635 Temporary Traffic Control – Flagger 1,400 HR