The work consists of base, paving, drainage and other small items of work.

Project length: 2.76 Miles

Tentative Fixed Completion Date: Summer, 2015 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $1 million to $2 million

Location: 13 Miles North of Madras, Oregon

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-03

DIVISION 150 – Project Requirements 152 Construction Survey & Staking Yes 153 Contractor Quality Control and Assurance

Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts Yes 157 Soil Erosion Control Devices Silt Fence Sediment Wattle Check Dam

4,200 LNFT

5,900 LNFT

135 EACH

158 Watering for Dust Control 800 MGAL DIVISION 200 – Earthwork 201 Clearing & Grubbing 1.0 ACRE 203 Removal of Structures & Obstructions Removal of Pipe Culvert Removal of Cattle Guard

4 EACH

1 EACH

204 Waste 2,000 CUYD DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Ditch 600 LNFT DIVISION 300 – Aggregate Courses 303 Road Reconditioning 140 STA 308 Minor Crushed Aggregate 6900 CUYD DIVISION 400 – Asphalt Pavements & Surface Treatments 404 Minor Hot Asphalt Concrete 1,650 TON DIVISION 600 – Incidental Construction 602 Culverts & Drains

18-INCH

24-INCH

467 LNFT

76 LNFT

619 Cattle Guard 1 EACH 622 Rental Equipment Yes 625 Turf Establishment Seeding, Hydraulic Method

1.0 ACRE

634 Permanent Pavement Markings Solid marking 13,700 LNFT 635 Temporary Traffic Control – Flagger 1,000 FIXED HR