Technical_Information_Form_1.docx
DOCX document 27 KB Posted
- Solicitation number
- DTFH70-13-R-00001
About this file
Technical Information Form 1 (Word)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A002_Yellowstone _Grand_Teton_ _Surrounding_Area_MATOC.pdf | ||
| A001_Yellowstone _Grand_Teton_MATOC.pdf | ||
| Technical_Information_Form_2.docx | DOCX document | |
| Past_Performance_Questionaire.docx | DOCX document | |
| RFP_Yellowstone_Grand_Teton_and_Surrounding_Area_MATOC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M-13
Technical Information Form 1 Technical Evaluation Factor 1 - Recent and Relevant Experience Project Information
A brief summary of a minimum of one and maximum of five contracts as a prime contractor meeting the following requirements:
(1) Completed after September 1, 2006 or the project is at least 50% complete as of the date of proposal submission; AND
(2) 50% of the work performed by the Prime; AND
(3) Road reconstruction, new construction, or rehabilitation project; AND
(4) $6 million minimum contract award amount In addition, each individual project must include a minimum of four of the following elements, and all six of the elements must be cumulatively represented.
(1) Multiple work shifts during a 24 hour period
(2) Performance under a maximum public traffic delay of 30 minutes
(3) Protection of environmental resources such as: wetlands, lakes, streams, or vegetation
(4) Protection or preservation of cultural resources such as: historic features or sites; archeological sites; or historic stone masonry such as found in Yellowstone and Grand Teton National Parks
(5) Performance under challenging conditions such as: accommodation of pedestrians and bicyclists through the work zone; limited supply of labor or operators in the project vicinity; or limited space for staging or operations within the project limits
(6) Paving – 8000 tons minimum Technical Experience Criteria Also include in the summary the following:
Unsatisfactory Performance – Submit comments regarding any known performance deemed not acceptable to the customer or not in accordance with the contract terms and conditions.
This form must be completed and submitted for EACH project.
Technical Information Form 1 (Page 2) Technical Evaluation Factor 1 - Recent and Relevant Experience Project Information
Project Name/Number: _________________________________________________ Project Contract Number: ___________________________________ Owner/Organization Name: _______________________________________________
| Address: | ______________________________ | |
| P.O. Box/Street | ||
| ___________________________________________________________ | ||
| City, State, Zip Code |
Owner/Organization Point of Contact: _______________________________________ Name Owner/Organization Phone Number: _______________________________________ Award Amount: $_________________ Completion Date: _______________ Road Description: ________________________________________________________ Brief Summary:
Source Selection Information See FAR 2.101 and 3.104 (Applicable when filled-in)
File details come from the government source that posted it. Updated .