OR PFH 16(7), Tiller Trail Highway, Umpqua National Forest, Jackson County, Oregon

The work consists of grading, base, drainage, MSE wall, guardrail, concrete curb and gutter, reinforced soil slope, asphalt paving and other small items of work.

Project length: 1 Mile

Tentative Fixed Completion Date: Exp. Fall 2014 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $3 million to $5 million

Location: 33 Miles N of Medford, Oregon

DESCRIPTION OF WORK in US CUSTOMARY UNITS

O ne

S ch ed ul e Sc h N am e

_A

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion Control, Soil Stabilization 4.5 ACRE 157 Soil Erosion Control, Mulching, Hydraulic Method 4.5 ACRE 157 Soil Erosion Control, Silt Fence 3980 LNFT 157 Soil Erosion Control, Sediment Wattle 5545 LNFT 157 Soil Erosion Control, Check Dam 116 EACH 157 Soil Erosion Control, Stabilized Construction Entrance 2 EACH 158 Watering for Dust Control 1000 MGAL

DIVISION 200 – Earthwork 201 Clearing & Grubbing 9.8 ACRE 203 Removal of Structures & Obstructions – Pipe Culvert 13 EACH 204 Roadway Excavation 33,000 CY 204 Subexcavation 1397 CY 204 Unclassified Borrow 2500 CY 204 Unclassified Borrow 2500 TON 204 Backfill, Select Granular, Foundation 1507 CY 205 Rock Blasting: Controlled Blast Hole (rock blasting) 8,597 LNFT 207 Earthwork Geotextiles (geotextiles) 6162 SQYD 208 Structure Excavation 231 SQFT 211 Roadway Obliteration 1255 SQYD

O ne

S ch ed ul e Sc h N am e

_A

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 218 CY 255 Mechanically Stabilized Earth Walls (retaining walls) 3005 SQFT 255 Select Granular Backfill 1027 CY

DIVISION 300 – Aggregate Courses 301 Untreated Aggregate Courses (crushed aggregate) 11,100 TON 310 Recycled Aggregate Course (asphalt pavement recycling) 23,100 SQYD

DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Hot Asphalt Concrete Pavement (asphalt concrete pavement) 4,200 TON 412 Asphalt Tack Coat (asphalt surface treatment) 9 TON

DIVISION 600 – Incidental Construction 601 Minor Concrete Structures (concrete – minor structures) 602 Culverts 852 LNFT 605 Underdrains 430 LNFT 609 Curb & Gutter (concrete – minor structures) (indicate which) 220 LNFT 617 Guardrail 3213 LNFT 622 Rental Equipment (yes/no) Yes 624 Topsoil – Furnishing & Placing 530 CY 624 Placing Conserved Topsoil 4.5 ACRE 625 Turf Establishment Pant Watering 11 MGAL 629 Rolled Erosion Control Products & Cellular Confinement Systems (turf establishment) 306 SQYD 633 Permanent Traffic Control Devices - Sign System 99 SQFT 633 Permanent Traffic Control Devices - Object Marker Type 3 23 EACH 633 Permanent Traffic Control Devices - Delineator 77 EACH 634 Permanent Pavement Markings (traffic pavement markings) 46,570 LNFT 635 Temporary Traffic Control – Concrete Barrier 700 LNFT 635 Temporary Traffic Control – Construction Sign 293 SQFT 635 Temporary Traffic Control – Flagger 1000 FXHR 635 Temporary Traffic Control – Pilot Car 200 HOUR 646 Roadside Development Flat Bottom Treatment Ditch 275 LNFT 646 Roadside Development, Biofiltration Swale 680 LNFT 646 Roadside Development Filter Strip 115 SQYD