WA PRA MORA 14(6) Nisqually to Paradise Road, Phase I, Mount Rainier National Park, Pierce and Lewis Counties, Washington.

The work consists of: Mill and overlay, Grading, Base, Paving, Roadway Stabilization, Utilities, Stone Masonry, Bridge Repair, Drainage and other smaller items. The bridge repair work includes the repair of two concrete bridges (Tahoma Creek Bridge and Kautz Creek Bridge). Work includes concrete repair, sealing concrete surface expansion joint repair, bridge deck joint repair, and painting of steel bridge railing. See “Description of Work” for additional details.

Two Bid Schedules - The work will be solicited under two alternate schedules, with different amounts of work in each schedule. One schedule will be awarded.

Schedule A consists of Nisqually to Paradise Road work (M.P. 0.00 to M.P.

6.55), Ricksecker Point Loop Road work, Paradise Valley Road work and underground utilities.

Schedule B consists of Nisqually to Paradise Road work (M.P. 0.00 to M.P.

6.55), MSE wall at Ricksecker Point Loop Road and underground utilities.

Project length: Schedule A - 9.789 miles Schedule B - 6.553 miles

Tentative Fixed Completion Date: Fall 2015 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $10 million to $15 million

Location: approximately 5.8 Miles East of Ashford, WA

DESCRIPTION OF WORK in US CUSTOMARY UNITS

Schedule A Schedule B

DIVISION 150 – Project Requirements

152 Construction Survey & Staking Yes Yes 153 Contractor Quality Control and Assurance Yes Yes 154 Contractor Sampling & Testing Yes Yes 155 Schedules for Construction Contracts (construction schedules) Yes Yes 157 Soil Erosion Control Devices Silt Fence 3,200 lnft

Sediment Log 4,500 lnft Silt Fence 3,200 lnft

Sediment Log 4,500 lnft 158 Watering for Dust Control 600 mgal 600 mgal

DIVISION 200 – Earthwork

203 Removal of Structures & Obstructions

Box Culvert 1 ea Headwall 1 ea

Pipe Culvert 4 ea Headwall Conduit 13 ea

Electrical Transclosure 6 ea asphalt curb 4,100 lnft concrete curb 330 lnft log curb 370 lnft concrete barrier 160 lnft asphalt pavement 22 sqyd asphalt sidewalk 254 sqyd temporary Maybe bridge lpsm bridge utility conduit lpsm

Box Culvert 1 ea Headwall 1 ea

Pipe Culvert 4 ea Headwall Conduit 13 ea

Electrical Transclosure 6 ea asphalt curb 4,100 lnft concrete curb 330 lnft log curb 370 lnft concrete barrier 160 lnft asphalt pavement 22 sqyd asphalt sidewalk 254 sqyd temporary Maybe bridge lpsm bridge utility conduit lpsm

204 Excavation & Embankment Subexcavation 7,998 cuyd Select borrow 2,376 cuyd

Subexcavation 7,928 cuyd Select borrow 2,334 cuyd

207 Earthwork Geotextiles Geotextile type III-A 15,157 sqyd Geotextile type III-B 1,398 sqyd Geotextile type IV-B 5,219 sqyd

Geogrid 7,238 sqyd

Geotextile type III-A 14,820 sqyd Geotextile type III-B 1,398 sqyd Geotextile type IV-B 5,219 sqyd

Geogrid 5,135 sqyd 211 Roadway Obliteration Obliteration method I 336 sqyd Obliteration method I 336 sqyd

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Riprap Class 4 4679cuyd Riprap Class 4 4679cuyd 255 Mechanically Stabilized Earth Walls (retaining walls) MSE Welded Wire Face 640 sqft MSE Welded Wire Face 640 sqft

DIVISION 300 – Aggregate Courses

303 Road Reconditioning Shoulder and Ditch Reconditioning 20,000 lnft

Aggregate Surfacing Reconditioning 700 lnft

Shoulder and Ditch Reconditioning 20,000 lnft

Aggregate Surfacing Reconditioning 700 lnft

305 Aggregate Topsoil Course Aggregate Topsoil Course 587 cuyd Aggregate Topsoil Course 421 cuyd 310 Recycled Aggregate Course (asphalt pavement recycling) 5” compacted depth 10,173 sqyd 5” compacted depth 8,070 sqyd

DIVISION 400 – Asphalt Pavements & Surface Treatments

401 Superpave Hot Asphalt Concrete Pavement

Superpave 12,352 ton Antistrip additive, type 3 - 124 ton

Superpave 7,940 ton Antistrip additive, type 3 - 79 ton

403 Hot Asphalt Concrete Pavement (asphalt concrete pavement) Hot asphalt 3,816 ton Hot asphalt 2,876 ton 404 Minor Hot Asphalt Concrete (asphalt concrete pavement) Minor hot asphalt 2,499 ton Minor hot asphalt 2,186 ton 412 Asphalt Tack Coat (asphalt surface treatment) Tack coat 133 ton Tack coat 103 ton 413 Asphalt Pavement Milling Milling 10” depth 4,880 sqyd

Milling 1” to 3” depth 129,622 sqyd

Milling 2” depth 2,133 sqyd

Milling 10” depth 2,777 sqyd Milling 1” to 3” depth

98,224 sqyd Milling 2” depth 2,133 sqyd

DIVISION 550 – Bridge Construction

552 Structural Concrete (concrete – major structures)

Repair concrete lpsm Seal concrete surface 424 sqyd

Expansion joint repair lpsm

Repair concrete lpsm Seal concrete surface 424 sqyd

Expansion joint repair lpsm

559 Waterproofing (concrete – major structures) Membrane waterproofing type 2 - 22 sqyd Membrane waterproofing type 2 - 22 sqyd 563 Painting (structures, painting) Painting steel structure lpsm Painting steel structure lpsm

DIVISION 600 – Incidental Construction 601 Minor Concrete Structures Concrete Headwall 1 ea Concrete Headwall 1 ea 602 Culverts & Drains 18” pipe culvert 180 lnft

24” pipe culvert 830 lnft 36” pipe culvert 32 lnft

132” pipe culvert 72 lnft 6’x4’ concrete box culvert 62 lnft

18” pipe culvert 180 lnft 24” pipe culvert 830 lnft 36” pipe culvert 32 lnft

132” pipe culvert 72 lnft 6’x4’ concrete box culvert 62 lnft

605 Underdrains, Sheet Drains & Pavement Edge Drains Standard underdrain system 3,509 lnft Standard underdrain system 3,509 lnft 607 Cleaning, Reconditioning, and Repairing Existing Drain Structures

Cleaning culvert in place 70 ea Cleaning stone masonry headwall

51 ea

Cleaning culvert in place 70 ea Cleaning stone masonry headwall

51 ea 609 Curb & Gutter (concrete – minor structures)

Stone curb type1 24”-depth 630 lnft Log curb 300 lnft

Stone curb type1 24”-depth 630 lnft Log curb 300 lnft

611 Water systems 6” waterline galvanized steel - 3 lnft 6” waterline galvanized steel - 3 lnft 615 Sidewalks, Drive Pads & Paved Medians (concrete – minor structures)

Sidewalk, concrete 112 sqyd Sidewalk, decomposed granite 295 sqyd

Drive pad, concrete 57 sqyd

Sidewalk, concrete 112 sqyd Sidewalk, decomposed granite 295 sqyd Drive pad, concrete 57 sqyd

617 Guardrail Gov’t furnished guardrail - 270 lnft Gov’t furnished guardrail - 270 lnft 620 Stone Masonry Stone masonry headwall for 24” culvert 3 ea Stone masonry headwall for 36” culvert 1 ea Remove and reset stone masonry headwall 15 ea Clean stone masonry surfaces

100 sqyd

Stone masonry headwall for 24” culvert 3 ea

Stone masonry headwall for 36” culvert 1 ea

Remove and reset stone masonry headwall 15 ea

Clean stone masonry surfaces 100 sqyd

622 Rental Equipment Yes Yes 625 Turf Establishment Sidewalk, decomposed granite 295 sqyd

Sidewalk, decomposed granite 295 sqyd 633 Permanent Traffic Control Devices Sign system 540 sqft

Snowpole holder 30 ea Sign system 540 sqft

Snowpole holder 30 ea 634 Permanent Pavement Markings (traffic pavement markings)

Striping 343,686 lnft Accessibility symbol 2 ea

Striping 343,686 lnft Accessibility symbol 2 ea

635 Temporary Traffic Control Barricade type 3 4 ea Tubular marker, 42” 500 ea

Drum 100 ea Warning Light 46 ea

Concrete barrier 1,000 lnft Plastic Fence 5,000 lnft

Construction sign 593 sqft Pavement markings 6.5 mile

Portable message sign 420 day

Barricade type 3 4 ea Tubular marker, 42” 500 ea

Drum 100 ea Warning Light 46 ea

Concrete barrier 1,000 lnft Plastic Fence 5,000 lnft

Construction sign 593 sqft Pavement markings 6.5 mile

Portable message sign 420 day 635 Temporary Traffic Control – Traffic Safety Supervisor 320 day 320 day 635 Temporary Traffic Control – Flagger 15,000 hr 15,000 hr 635 Temporary Traffic Control – Pilot Car 1,600 hr 1,600 hr 636 Signal, Lighting, & Electrical Systems

Traffic detector system wire loop lpsm

Electrical connection to existing transclosure 7 ea

Electrical loadbreak vault 8 ea Electrical splice vault 10 ea

Gov’t Furnished conduit - 65,400 lnft 2” PVC conduit 130,700 lnft

2” rigid galvanized steel conduit 175 lnft

Wire electrical conductors 71,400 lnft Utility trench concrete filled - 300 lnft

Utility trench 32,700 lnft Manhole electrical 23 ea

Telephone vault 4 ea

Traffic detector system wire loop lpsm

Electrical connection to existing transclosure 7 ea

Electrical loadbreak vault 8 ea Electrical splice vault 10 ea

Gov’t Furnished conduit - 65,400 lnft 2” PVC conduit 130,700 lnft

2” rigid galvanized steel conduit 175 lnft

Wire electrical conductors 71,400 lnft Utility trench concrete filled - 300 lnft

Utility trench 32,700 lnft Manhole electrical 23 ea

Telephone vault 4 ea