WA PRA MORA 14(6) Nisqually to Paradise Road, Phase I, Mount Rainier National Park, Pierce and Lewis Counties, Washington.
The work consists of: Mill and overlay, Grading, Base, Paving, Roadway Stabilization, Utilities, Stone Masonry, Bridge Repair, Drainage and other smaller items. The bridge repair work includes the repair of two concrete bridges (Tahoma Creek Bridge and Kautz Creek Bridge). Work includes concrete repair, sealing concrete surface expansion joint repair, bridge deck joint repair, and painting of steel bridge railing. See “Description of Work” for additional details.
Two Bid Schedules - The work will be solicited under two alternate schedules, with different amounts of work in each schedule. One schedule will be awarded.
Schedule A consists of Nisqually to Paradise Road work (M.P. 0.00 to M.P.
6.55), Ricksecker Point Loop Road work, Paradise Valley Road work and underground utilities.
Schedule B consists of Nisqually to Paradise Road work (M.P. 0.00 to M.P.
6.55), MSE wall at Ricksecker Point Loop Road and underground utilities.
Project length: Schedule A - 9.789 miles Schedule B - 6.553 miles
Tentative Fixed Completion Date: Fall 2015 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $10 million to $15 million
Location: approximately 5.8 Miles East of Ashford, WA
DESCRIPTION OF WORK in US CUSTOMARY UNITS
Schedule A Schedule B
DIVISION 150 – Project Requirements
152 Construction Survey & Staking Yes Yes 153 Contractor Quality Control and Assurance Yes Yes 154 Contractor Sampling & Testing Yes Yes 155 Schedules for Construction Contracts (construction schedules) Yes Yes 157 Soil Erosion Control Devices Silt Fence 3,200 lnft
Sediment Log 4,500 lnft Silt Fence 3,200 lnft
Sediment Log 4,500 lnft 158 Watering for Dust Control 600 mgal 600 mgal
DIVISION 200 – Earthwork
203 Removal of Structures & Obstructions
Box Culvert 1 ea Headwall 1 ea
Pipe Culvert 4 ea Headwall Conduit 13 ea
Electrical Transclosure 6 ea asphalt curb 4,100 lnft concrete curb 330 lnft log curb 370 lnft concrete barrier 160 lnft asphalt pavement 22 sqyd asphalt sidewalk 254 sqyd temporary Maybe bridge lpsm bridge utility conduit lpsm
Box Culvert 1 ea Headwall 1 ea
Pipe Culvert 4 ea Headwall Conduit 13 ea
Electrical Transclosure 6 ea asphalt curb 4,100 lnft concrete curb 330 lnft log curb 370 lnft concrete barrier 160 lnft asphalt pavement 22 sqyd asphalt sidewalk 254 sqyd temporary Maybe bridge lpsm bridge utility conduit lpsm
204 Excavation & Embankment Subexcavation 7,998 cuyd Select borrow 2,376 cuyd
Subexcavation 7,928 cuyd Select borrow 2,334 cuyd
207 Earthwork Geotextiles Geotextile type III-A 15,157 sqyd Geotextile type III-B 1,398 sqyd Geotextile type IV-B 5,219 sqyd
Geogrid 7,238 sqyd
Geotextile type III-A 14,820 sqyd Geotextile type III-B 1,398 sqyd Geotextile type IV-B 5,219 sqyd
Geogrid 5,135 sqyd 211 Roadway Obliteration Obliteration method I 336 sqyd Obliteration method I 336 sqyd
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Riprap Class 4 4679cuyd Riprap Class 4 4679cuyd 255 Mechanically Stabilized Earth Walls (retaining walls) MSE Welded Wire Face 640 sqft MSE Welded Wire Face 640 sqft
DIVISION 300 – Aggregate Courses
303 Road Reconditioning Shoulder and Ditch Reconditioning 20,000 lnft
Aggregate Surfacing Reconditioning 700 lnft
Shoulder and Ditch Reconditioning 20,000 lnft
Aggregate Surfacing Reconditioning 700 lnft
305 Aggregate Topsoil Course Aggregate Topsoil Course 587 cuyd Aggregate Topsoil Course 421 cuyd 310 Recycled Aggregate Course (asphalt pavement recycling) 5” compacted depth 10,173 sqyd 5” compacted depth 8,070 sqyd
DIVISION 400 – Asphalt Pavements & Surface Treatments
401 Superpave Hot Asphalt Concrete Pavement
Superpave 12,352 ton Antistrip additive, type 3 - 124 ton
Superpave 7,940 ton Antistrip additive, type 3 - 79 ton
403 Hot Asphalt Concrete Pavement (asphalt concrete pavement) Hot asphalt 3,816 ton Hot asphalt 2,876 ton 404 Minor Hot Asphalt Concrete (asphalt concrete pavement) Minor hot asphalt 2,499 ton Minor hot asphalt 2,186 ton 412 Asphalt Tack Coat (asphalt surface treatment) Tack coat 133 ton Tack coat 103 ton 413 Asphalt Pavement Milling Milling 10” depth 4,880 sqyd
Milling 1” to 3” depth 129,622 sqyd
Milling 2” depth 2,133 sqyd
Milling 10” depth 2,777 sqyd Milling 1” to 3” depth
98,224 sqyd Milling 2” depth 2,133 sqyd
DIVISION 550 – Bridge Construction
552 Structural Concrete (concrete – major structures)
Repair concrete lpsm Seal concrete surface 424 sqyd
Expansion joint repair lpsm
Repair concrete lpsm Seal concrete surface 424 sqyd
Expansion joint repair lpsm
559 Waterproofing (concrete – major structures) Membrane waterproofing type 2 - 22 sqyd Membrane waterproofing type 2 - 22 sqyd 563 Painting (structures, painting) Painting steel structure lpsm Painting steel structure lpsm
DIVISION 600 – Incidental Construction 601 Minor Concrete Structures Concrete Headwall 1 ea Concrete Headwall 1 ea 602 Culverts & Drains 18” pipe culvert 180 lnft
24” pipe culvert 830 lnft 36” pipe culvert 32 lnft
132” pipe culvert 72 lnft 6’x4’ concrete box culvert 62 lnft
18” pipe culvert 180 lnft 24” pipe culvert 830 lnft 36” pipe culvert 32 lnft
132” pipe culvert 72 lnft 6’x4’ concrete box culvert 62 lnft
605 Underdrains, Sheet Drains & Pavement Edge Drains Standard underdrain system 3,509 lnft Standard underdrain system 3,509 lnft 607 Cleaning, Reconditioning, and Repairing Existing Drain Structures
Cleaning culvert in place 70 ea Cleaning stone masonry headwall
51 ea
Cleaning culvert in place 70 ea Cleaning stone masonry headwall
51 ea 609 Curb & Gutter (concrete – minor structures)
Stone curb type1 24”-depth 630 lnft Log curb 300 lnft
Stone curb type1 24”-depth 630 lnft Log curb 300 lnft
611 Water systems 6” waterline galvanized steel - 3 lnft 6” waterline galvanized steel - 3 lnft 615 Sidewalks, Drive Pads & Paved Medians (concrete – minor structures)
Sidewalk, concrete 112 sqyd Sidewalk, decomposed granite 295 sqyd
Drive pad, concrete 57 sqyd
Sidewalk, concrete 112 sqyd Sidewalk, decomposed granite 295 sqyd Drive pad, concrete 57 sqyd
617 Guardrail Gov’t furnished guardrail - 270 lnft Gov’t furnished guardrail - 270 lnft 620 Stone Masonry Stone masonry headwall for 24” culvert 3 ea Stone masonry headwall for 36” culvert 1 ea Remove and reset stone masonry headwall 15 ea Clean stone masonry surfaces
100 sqyd
Stone masonry headwall for 24” culvert 3 ea
Stone masonry headwall for 36” culvert 1 ea
Remove and reset stone masonry headwall 15 ea
Clean stone masonry surfaces 100 sqyd
622 Rental Equipment Yes Yes 625 Turf Establishment Sidewalk, decomposed granite 295 sqyd
Sidewalk, decomposed granite 295 sqyd 633 Permanent Traffic Control Devices Sign system 540 sqft
Snowpole holder 30 ea Sign system 540 sqft
Snowpole holder 30 ea 634 Permanent Pavement Markings (traffic pavement markings)
Striping 343,686 lnft Accessibility symbol 2 ea
Striping 343,686 lnft Accessibility symbol 2 ea
635 Temporary Traffic Control Barricade type 3 4 ea Tubular marker, 42” 500 ea
Drum 100 ea Warning Light 46 ea
Concrete barrier 1,000 lnft Plastic Fence 5,000 lnft
Construction sign 593 sqft Pavement markings 6.5 mile
Portable message sign 420 day
Barricade type 3 4 ea Tubular marker, 42” 500 ea
Drum 100 ea Warning Light 46 ea
Concrete barrier 1,000 lnft Plastic Fence 5,000 lnft
Construction sign 593 sqft Pavement markings 6.5 mile
Portable message sign 420 day 635 Temporary Traffic Control – Traffic Safety Supervisor 320 day 320 day 635 Temporary Traffic Control – Flagger 15,000 hr 15,000 hr 635 Temporary Traffic Control – Pilot Car 1,600 hr 1,600 hr 636 Signal, Lighting, & Electrical Systems
Traffic detector system wire loop lpsm
Electrical connection to existing transclosure 7 ea
Electrical loadbreak vault 8 ea Electrical splice vault 10 ea
Gov’t Furnished conduit - 65,400 lnft 2” PVC conduit 130,700 lnft
2” rigid galvanized steel conduit 175 lnft
Wire electrical conductors 71,400 lnft Utility trench concrete filled - 300 lnft
Utility trench 32,700 lnft Manhole electrical 23 ea
Telephone vault 4 ea
Traffic detector system wire loop lpsm
Electrical connection to existing transclosure 7 ea
Electrical loadbreak vault 8 ea Electrical splice vault 10 ea
Gov’t Furnished conduit - 65,400 lnft 2” PVC conduit 130,700 lnft
2” rigid galvanized steel conduit 175 lnft
Wire electrical conductors 71,400 lnft Utility trench concrete filled - 300 lnft
Utility trench 32,700 lnft Manhole electrical 23 ea
Telephone vault 4 ea