PROJECT DESCRIPTION_Realign.pdf

PDF 15 KB Posted

Attached to
AK PRA DENA 10(25), Realign Dog Kennels Access Road and Bus Turnaround
Solicitation number
DTFH70-10-B-00014
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AK PRA DENA 10(25), Realign Dog Kennels Access Road and Bus Turnaround, Denali National Park and Preserve, Denali Borough, Alaska

The work consists of grading, base, subexcavation, paving, drainage, electrical and other small items of work.

Project length: .3 Miles

Fixed Completion Date: June 22, 2011

Estimated Price Range: $1 million to $2 million

Location: 125 Miles SW of Fairbanks, Alaska

DESCRIPTION OF WORK in US CUSTOMARY UNITS

DIVISION 150 – Project Requirements 152 Construction Survey & Staking X YES NO 153 Contractor Quality Control and Assurance X YES NO 154 Contractor Sampling & Testing X YES NO 155 Schedules for Construction Contracts (construction schedules) X YES NO 157 Soil Erosion Control Devices (erosion control devices)

Silt fence Wattles

140 ft 1,800 ft

158 Watering for Dust Control 30,000 gal

DIVISION 200 – Earthwork 201 Clearing & Grubbing 1.5 acre 203 Removal of Structures & Obstructions (signs) Each 204 Excavation & Embankment

Roadway excavation Select borrow Subexcavation

12,000 cuyd 17,500 Ton 1,300 cuyd

207 Earthwork Geotextiles Geotextile Insulation board, polystyrene foam

10,400 sqyd 20,500 sqyd

211 Roadway Obliteration 3,000 sqyd

DIVISION 250 - Slope Reinforcement and Retaining Walls 251 Riprap, Class 2 1,100 cuyd

DIVISION 300 – Aggregate Courses 308 Minor Crushed Aggregate (crushed aggregate) 2,578 Ton

DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Hot Asphalt Concrete Pavement (asphalt concrete pavement) 714 Ton

DIVISION 600 – Incidental Construction 602 Culverts, 24” 416 lnft

609 Curb, recycled plastic

Wheelstop, recycled plastic 856 lnft 40 each

622 Rental Equipment X YES NO 624 Topsoil, Furnish and place

Topsoil, placing conserved 510 sqyd 1,600 sqyd

626 Plants, Trees, Shrubs, Vines & Groundcovers 150 each 633 Permanent Traffic Control Devices

Signs

48 sqft

634 Permanent Pavement Markings (traffic pavement markings) 10,400 lnft 636 Signal, Lighting, & Electrical Systems 1 LPSM 637 Facilities & Services, vehicle 2 each

File details come from the government source that posted it. Updated .