PROJECT DESCRIPTION_Esmond.doc

DOC document 60 KB Posted

Attached to
RECOVERY - OR BLM ARRA 2009(2), Esmond, Hawley and Buck Creek Culverts
Solicitation number
DTFH70-10-B-00012
Issued by

View the file

Other files

File Type Posted
A002 OR BLM ARRA 2009(2).pdf PDF
A001_EHB.pdf PDF
Physical Data Request Form.pdf PDF
Book1_EHB.pdf PDF
Book2_EHB.pdf PDF
http //www.wfl.fhwa.dot.gov/contracting/construction/plans/esmond/ —
PlanRequestForm_EHB.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE

RECOVERY OR BLM ARRA 2009(2), Esmond, Hawley and Buck Creek Culverts, BLM Eugene District, Land and Douglas Counties, Oregon

The work consists of grading, aggregate surfacing, aggregate base, paving, drainage, major culverts and other small items of work.

Project length: .271 Miles Fixed Completion Date: October 15, 2011 Estimated Price Range: $500,000 to $1 million

Location: 14 Miles W of Cottage Grove, Oregon

DESCRIPTION OF WORK in US CUSTOMARY UNITS

DIVISION 150 – Project Requirements

151
Mobilization
X
YES

NO

152
Construction Survey & Staking
X
YES

NO

153
Contractor Quality Control and Assurance
X
YES

NO

154
Contractor Sampling & Testing
X
YES

NO

155
Schedules for Construction Contracts (construction schedules)
X
YES

NO

157
Soil Erosion Control, Turbidity Monitoring
1 lpsm
157
Soil Erosion Control, Temporary Diversion Channel
1 lpsm
157
Soil Erosion Control, Sediment Wattle
2,250.0 lnft

DIVISION 200 – Earthwork

201
Clearing & Grubbing
0.9 acre
203
Sawcutting pavement
350 lnft
204
Excavation & Embankment
650 cuyd
207
Earthwork Geotextiles (geotextiles)
2,500 sqyd

DIVISION 250 - Slope Reinforcement and Retaining Walls

251
Riprap
925 cuyd

DIVISION 300 – Aggregate Courses

308
Roadway Aggregate (crushed aggregate)
950 ton

DIVISION 400 – Asphalt Pavements & Surface Treatments

404
Minor Hot Asphalt Concrete (asphalt concrete pavement)
220 ton
412
Asphalt Tack Coat (asphalt surface treatment)
4 gal

DIVISION 600 – Incidental Construction

602
Culverts
610 lnft
603
Structural Plate Structures (culverts & drains)
76 lnft
624
Placing Conserved Topsoil
711 cuyd
625
Turf Establishment (indicate seeding or mulching separately)
0.9 acre
635
Temporary Traffic Control
1 lpsm
647
Mitigation, Rock Weir
9 each
647
Mitigation, Streambed Material
800 cuyd