T A B U L A T I O N O F B I D S Schedule A Total of Bid Items: 629,000.00$ -28.7% 448,595.00$ Project No: KS FLAP CR 1200(1)

Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

15101-0000 Line A0020 ALL LPSM 56,295.00$ 56,295.00$ 50,000.00$

15210-1000 Line A0040 7.500 STA 100.00$ 750.00$ 2,625.00$

15215-5000 Line A0060 9 EACH 500.00$ 4,500.00$ 3,150.00$

15216-2000 Line A0080 14.000 STA 800.00$ 11,200.00$ 4,900.00$

15301-0000 Line A0100 ALL LPSM 17,000.00$ 17,000.00$ 16,000.00$

15401-0000 Line A0120 ALL LPSM 17,000.00$ 17,000.00$ 10,000.00$

15501-0000 Line A0140 ALL LPSM 3,000.00$ 3,000.00$ 1,500.00$

15705-0100 Line A0160 350 LNFT 4.00$ 1,400.00$ 2,800.00$

15706-0200 Line A0180 8 EACH 100.00$ 800.00$ 3,200.00$

20102-0000 Line A0200 ALL LPSM 5,000.00$ 5,000.00$ 1,500.00$

20301-2400 Line A0220 4 EACH 220.00$ 880.00$ 400.00$

20302-1200 Line A0240 90 LNFT 12.00$ 1,080.00$ 1,980.00$

20303-2900 Line A0260 820 SQYD 18.00$ 14,760.00$ 24,600.00$

Engineer's Estimate

30.00$

22.00$

100.00$

1,500.00$

400.00$

8.00$

1,500.00$

10,000.00$

16,000.00$

350.00$

Marberry Concrete

350.00$

50,000.00$

MOBILIZATION

CENTERLINE, STAKING

SURVEY AND STAKING, BOX CULVERT

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SILT FENCE

SOIL EROSION CONTROL, CHECK DAM

CLEARING AND GRUBBING

REMOVAL OF SIGN

REMOVAL OF GUARDRAIL

CONTRACTOR QUALITY CONTROL

CONTRACTOR TESTING

REMOVAL OF PAVEMENT, CONCRETE, 6-INCH DEPTH

SURVEY AND STAKING, GRADE FINISHING STAKES

350.00$

4/28/2016 Page 1 of 9

Project No: KS FLAP CR 1200(1)

Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Engineer's Estimate Marberry Concrete

20420-0000 Line A0280 1,050 CUYD 30.00$ 31,500.00$ 21,000.00$

25101-3000 Line A0300 120 CUYD 170.00$ 20,400.00$ 5,880.00$

30110-0000 Line A0320 750 TON 40.00$ 30,000.00$ 28,500.00$

60220-3000 Line A0340 293 LNFT 1,200.00$ 351,600.00$ 190,450.00$

61701-1200 Line A0360 60 LNFT 80.00$ 4,800.00$ 1,800.00$

61701-4500 Line A0380 330 LNFT 65.00$ 21,450.00$ 40,260.00$

61701-4500 Line A0400 150 LNFT 30.00$ 4,500.00$ 5,250.00$

61702-0800 Line A0420 1 EACH 2,500.00$ 2,500.00$ 3,000.00$

61702-1500 Line A0440 4 EACH 2,500.00$ 10,000.00$ 12,000.00$

62301-0000 Line A0460 40 HOUR 70.00$ 2,800.00$ 1,600.00$

62511-2000 Line A0480 2,100 SQYD 2.50$ 5,250.00$ 8,400.00$

62516-2000 Line A0500 2,100 SQYD 2.35$ 4,935.00$ 4,200.00$

62901-1100 Line A0520 60 SQYD 10.00$ 600.00$ 600.00$ 10.00$

2.00$

4.00$

40.00$

3,000.00$

3,000.00$

35.00$

122.00$

30.00$

650.00$

38.00$

49.00$

20.00$

AGGREGATE SURFACE COURSE

10 FEET SPAN, 5 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT

GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS

MULCHING, HYDRAULIC METHOD

ROLLED EROSION CONTROL PRODUCT, TYPE 4

GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS

GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS

TERMINAL SECTION TYPE TANGENT

TERMINAL SECTION, TYPE MGS TANGENT

GENERAL LABOR

SEEDING, HYDRAULIC METHOD

EMBANKMENT CONSTRUCTION

PLACED RIPRAP, CLASS 3

4/28/2016 Page 2 of 9

Project No: KS FLAP CR 1200(1)

Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Engineer's Estimate Marberry Concrete

63301-0000 Line A0540 2 EACH 250.00$ 500.00$ 500.00$

63501-0000 Line A0560 ALL LPSM 2,500.00$ 2,500.00$ 1,000.00$

63504-1000 Line A0580 50 SQFT 40.00$ 2,000.00$ 1,500.00$ 30.00$

1,000.00$

250.00$

SIGN SYSTEM

TEMPORARY TRAFFIC CONTROL

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

4/28/2016 Page 3 of 9

Schedule A Total of Bid Items:

Project No: KS FLAP CR 1200(1)

Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"

Item No. Quantity Unit

15101-0000 Line A0020 ALL LPSM

15210-1000 Line A0040 7.500 STA

15215-5000 Line A0060 9 EACH

15216-2000 Line A0080 14.000 STA

15301-0000 Line A0100 ALL LPSM

15401-0000 Line A0120 ALL LPSM

15501-0000 Line A0140 ALL LPSM

15705-0100 Line A0160 350 LNFT

15706-0200 Line A0180 8 EACH

20102-0000 Line A0200 ALL LPSM

20301-2400 Line A0220 4 EACH

20302-1200 Line A0240 90 LNFT

20303-2900 Line A0260 820 SQYD

MOBILIZATION

CENTERLINE, STAKING

SURVEY AND STAKING, BOX CULVERT

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SILT FENCE

SOIL EROSION CONTROL, CHECK DAM

CLEARING AND GRUBBING

REMOVAL OF SIGN

REMOVAL OF GUARDRAIL

CONTRACTOR QUALITY CONTROL

CONTRACTOR TESTING

REMOVAL OF PAVEMENT, CONCRETE, 6-INCH DE

SURVEY AND STAKING, GRADE FINISHING STAK

24.0% 779,775.00$ 15.8% 728,500.00$

Unit Price Amount Unit Price Amount

140,000.00$ 37,000.00$

2,250.00$ 2,400.00$

2,700.00$ 3,150.00$

2,800.00$ 2,380.00$

8,000.00$ 51,000.00$

6,000.00$ 31,000.00$

4,000.00$ 7,800.00$

350.00$ 546.00$

2,000.00$ 3,112.00$

5,000.00$ 4,800.00$

1,000.00$ 364.00$

4,500.00$ 1,980.00$

41,000.00$ 5,740.00$ 50.00$ 7.00$

50.00$ 22.00$

250.00$ 91.00$

5,000.00$ 4,800.00$

250.00$ 389.00$

1.00$ 1.56$

4,000.00$ 7,800.00$

6,000.00$ 31,000.00$

8,000.00$ 51,000.00$

300.00$ 320.00$

300.00$ 350.00$

LaForge and Budd Construction Co. Aspen Construction

140,000.00$ 37,000.00$

200.00$ 170.00$

4/28/2016 Page 4 of 9

Project No: KS FLAP CR 1200(1)

Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"

Item No. Quantity Unit

20420-0000 Line A0280 1,050 CUYD

25101-3000 Line A0300 120 CUYD

30110-0000 Line A0320 750 TON

60220-3000 Line A0340 293 LNFT

61701-1200 Line A0360 60 LNFT

61701-4500 Line A0380 330 LNFT

61701-4500 Line A0400 150 LNFT

61702-0800 Line A0420 1 EACH

61702-1500 Line A0440 4 EACH

62301-0000 Line A0460 40 HOUR

62511-2000 Line A0480 2,100 SQYD

62516-2000 Line A0500 2,100 SQYD

62901-1100 Line A0520 60 SQYD

AGGREGATE SURFACE COURSE

10 FEET SPAN, 5 FEET RISE PRECAST REINFORC

GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEE

MULCHING, HYDRAULIC METHOD

ROLLED EROSION CONTROL PRODUCT, TYPE 4

GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STE

GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STE

TERMINAL SECTION TYPE TANGENT

TERMINAL SECTION, TYPE MGS TANGENT

GENERAL LABOR

SEEDING, HYDRAULIC METHOD

EMBANKMENT CONSTRUCTION

PLACED RIPRAP, CLASS 3

24.0% 779,775.00$ 15.8% 728,500.00$

Unit Price Amount Unit Price Amount

LaForge and Budd Construction Co. Aspen Construction

31,500.00$ 17,661.00$

12,000.00$ 12,360.00$

37,500.00$ 21,150.00$

414,595.00$ 423,678.00$

1,800.00$ 2,610.00$

33,000.00$ 52,470.00$

4,500.00$ 6,750.00$

3,500.00$ 4,200.00$

12,800.00$ 17,428.00$

1,600.00$ 3,300.00$

420.00$ 651.00$

630.00$ 987.00$

330.00$ 510.00$ 5.50$ 8.50$

0.30$ 0.47$

0.20$ 0.31$

40.00$ 82.50$

3,200.00$ 4,357.00$

3,500.00$ 4,200.00$

30.00$ 45.00$

100.00$ 159.00$

30.00$ 43.50$

1,415.00$ 1,446.00$

50.00$ 28.20$

100.00$ 103.00$

30.00$ 16.82$

4/28/2016 Page 5 of 9

Project No: KS FLAP CR 1200(1)

Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"

Item No. Quantity Unit

63301-0000 Line A0540 2 EACH

63501-0000 Line A0560 ALL LPSM

63504-1000 Line A0580 50 SQFT

SIGN SYSTEM

TEMPORARY TRAFFIC CONTROL

TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO

24.0% 779,775.00$ 15.8% 728,500.00$

Unit Price Amount Unit Price Amount

LaForge and Budd Construction Co. Aspen Construction

1,000.00$ 3,112.00$

2,500.00$ 6,111.00$

2,500.00$ 4,250.00$ 50.00$ 85.00$

2,500.00$ 6,111.00$

500.00$ 1,556.00$

4/28/2016 Page 6 of 9

Project No: KS FLAP CR 1200(1)

Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"

Item No. Quantity Unit

15101-0000 Line A0020 ALL LPSM

15210-1000 Line A0040 7.500 STA

15215-5000 Line A0060 9 EACH

15216-2000 Line A0080 14.000 STA

15301-0000 Line A0100 ALL LPSM

15401-0000 Line A0120 ALL LPSM

15501-0000 Line A0140 ALL LPSM

15705-0100 Line A0160 350 LNFT

15706-0200 Line A0180 8 EACH

20102-0000 Line A0200 ALL LPSM

20301-2400 Line A0220 4 EACH

20302-1200 Line A0240 90 LNFT

20303-2900 Line A0260 820 SQYD

MOBILIZATION

CENTERLINE, STAKING

SURVEY AND STAKING, BOX CULVERT

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SILT FENCE

SOIL EROSION CONTROL, CHECK DAM

CLEARING AND GRUBBING

REMOVAL OF SIGN

REMOVAL OF GUARDRAIL

CONTRACTOR QUALITY CONTROL

CONTRACTOR TESTING

REMOVAL OF PAVEMENT, CONCRETE, 6-INCH DE

SURVEY AND STAKING, GRADE FINISHING STAK

41.9% 892,480.00$

Unit Price Amount

100,000.00$

3,750.00$

4,500.00$

7,000.00$

25,000.00$

10,000.00$

5,000.00$

3,500.00$

4,000.00$

10,000.00$

400.00$

2,700.00$

44,280.00$ 54.00$

30.00$

100.00$

10,000.00$

500.00$

10.00$

5,000.00$

10,000.00$

25,000.00$

500.00$

500.00$

Kovilic Construction Company, Inc.

100,000.00$

500.00$

4/28/2016 Page 7 of 9

Project No: KS FLAP CR 1200(1)

Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"

Item No. Quantity Unit

20420-0000 Line A0280 1,050 CUYD

25101-3000 Line A0300 120 CUYD

30110-0000 Line A0320 750 TON

60220-3000 Line A0340 293 LNFT

61701-1200 Line A0360 60 LNFT

61701-4500 Line A0380 330 LNFT

61701-4500 Line A0400 150 LNFT

61702-0800 Line A0420 1 EACH

61702-1500 Line A0440 4 EACH

62301-0000 Line A0460 40 HOUR

62511-2000 Line A0480 2,100 SQYD

62516-2000 Line A0500 2,100 SQYD

62901-1100 Line A0520 60 SQYD

AGGREGATE SURFACE COURSE

10 FEET SPAN, 5 FEET RISE PRECAST REINFORC

GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEE

MULCHING, HYDRAULIC METHOD

ROLLED EROSION CONTROL PRODUCT, TYPE 4

GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STE

GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STE

TERMINAL SECTION TYPE TANGENT

TERMINAL SECTION, TYPE MGS TANGENT

GENERAL LABOR

SEEDING, HYDRAULIC METHOD

EMBANKMENT CONSTRUCTION

PLACED RIPRAP, CLASS 3

41.9% 892,480.00$

Unit Price Amount

Kovilic Construction Company, Inc.

52,500.00$

9,000.00$

22,500.00$

439,500.00$

3,000.00$

47,850.00$

7,500.00$

3,750.00$

16,000.00$

3,000.00$

5,250.00$

6,300.00$

600.00$ 10.00$

3.00$

2.50$

75.00$

4,000.00$

3,750.00$

50.00$

145.00$

50.00$

1,500.00$

30.00$

75.00$

50.00$

4/28/2016 Page 8 of 9

Project No: KS FLAP CR 1200(1)

Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"

Item No. Quantity Unit

63301-0000 Line A0540 2 EACH

63501-0000 Line A0560 ALL LPSM

63504-1000 Line A0580 50 SQFT

SIGN SYSTEM

TEMPORARY TRAFFIC CONTROL

TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO

41.9% 892,480.00$

Unit Price Amount

Kovilic Construction Company, Inc.

600.00$

50,000.00$

5,000.00$ 100.00$

50,000.00$

300.00$

4/28/2016 Page 9 of 9