T A B U L A T I O N O F B I D S Schedule A Total of Bid Items: 629,000.00$ -28.7% 448,595.00$ Project No: KS FLAP CR 1200(1)
Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
15101-0000 Line A0020 ALL LPSM 56,295.00$ 56,295.00$ 50,000.00$
15210-1000 Line A0040 7.500 STA 100.00$ 750.00$ 2,625.00$
15215-5000 Line A0060 9 EACH 500.00$ 4,500.00$ 3,150.00$
15216-2000 Line A0080 14.000 STA 800.00$ 11,200.00$ 4,900.00$
15301-0000 Line A0100 ALL LPSM 17,000.00$ 17,000.00$ 16,000.00$
15401-0000 Line A0120 ALL LPSM 17,000.00$ 17,000.00$ 10,000.00$
15501-0000 Line A0140 ALL LPSM 3,000.00$ 3,000.00$ 1,500.00$
15705-0100 Line A0160 350 LNFT 4.00$ 1,400.00$ 2,800.00$
15706-0200 Line A0180 8 EACH 100.00$ 800.00$ 3,200.00$
20102-0000 Line A0200 ALL LPSM 5,000.00$ 5,000.00$ 1,500.00$
20301-2400 Line A0220 4 EACH 220.00$ 880.00$ 400.00$
20302-1200 Line A0240 90 LNFT 12.00$ 1,080.00$ 1,980.00$
20303-2900 Line A0260 820 SQYD 18.00$ 14,760.00$ 24,600.00$
Engineer's Estimate
30.00$
22.00$
100.00$
1,500.00$
400.00$
8.00$
1,500.00$
10,000.00$
16,000.00$
350.00$
Marberry Concrete
350.00$
50,000.00$
MOBILIZATION
CENTERLINE, STAKING
SURVEY AND STAKING, BOX CULVERT
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, CHECK DAM
CLEARING AND GRUBBING
REMOVAL OF SIGN
REMOVAL OF GUARDRAIL
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
REMOVAL OF PAVEMENT, CONCRETE, 6-INCH DEPTH
SURVEY AND STAKING, GRADE FINISHING STAKES
350.00$
4/28/2016 Page 1 of 9
Project No: KS FLAP CR 1200(1)
Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Marberry Concrete
20420-0000 Line A0280 1,050 CUYD 30.00$ 31,500.00$ 21,000.00$
25101-3000 Line A0300 120 CUYD 170.00$ 20,400.00$ 5,880.00$
30110-0000 Line A0320 750 TON 40.00$ 30,000.00$ 28,500.00$
60220-3000 Line A0340 293 LNFT 1,200.00$ 351,600.00$ 190,450.00$
61701-1200 Line A0360 60 LNFT 80.00$ 4,800.00$ 1,800.00$
61701-4500 Line A0380 330 LNFT 65.00$ 21,450.00$ 40,260.00$
61701-4500 Line A0400 150 LNFT 30.00$ 4,500.00$ 5,250.00$
61702-0800 Line A0420 1 EACH 2,500.00$ 2,500.00$ 3,000.00$
61702-1500 Line A0440 4 EACH 2,500.00$ 10,000.00$ 12,000.00$
62301-0000 Line A0460 40 HOUR 70.00$ 2,800.00$ 1,600.00$
62511-2000 Line A0480 2,100 SQYD 2.50$ 5,250.00$ 8,400.00$
62516-2000 Line A0500 2,100 SQYD 2.35$ 4,935.00$ 4,200.00$
62901-1100 Line A0520 60 SQYD 10.00$ 600.00$ 600.00$ 10.00$
2.00$
4.00$
40.00$
3,000.00$
3,000.00$
35.00$
122.00$
30.00$
650.00$
38.00$
49.00$
20.00$
AGGREGATE SURFACE COURSE
10 FEET SPAN, 5 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS
MULCHING, HYDRAULIC METHOD
ROLLED EROSION CONTROL PRODUCT, TYPE 4
GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS
GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS
TERMINAL SECTION TYPE TANGENT
TERMINAL SECTION, TYPE MGS TANGENT
GENERAL LABOR
SEEDING, HYDRAULIC METHOD
EMBANKMENT CONSTRUCTION
PLACED RIPRAP, CLASS 3
4/28/2016 Page 2 of 9
Project No: KS FLAP CR 1200(1)
Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Marberry Concrete
63301-0000 Line A0540 2 EACH 250.00$ 500.00$ 500.00$
63501-0000 Line A0560 ALL LPSM 2,500.00$ 2,500.00$ 1,000.00$
63504-1000 Line A0580 50 SQFT 40.00$ 2,000.00$ 1,500.00$ 30.00$
1,000.00$
250.00$
SIGN SYSTEM
TEMPORARY TRAFFIC CONTROL
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
4/28/2016 Page 3 of 9
Schedule A Total of Bid Items:
Project No: KS FLAP CR 1200(1)
Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15210-1000 Line A0040 7.500 STA
15215-5000 Line A0060 9 EACH
15216-2000 Line A0080 14.000 STA
15301-0000 Line A0100 ALL LPSM
15401-0000 Line A0120 ALL LPSM
15501-0000 Line A0140 ALL LPSM
15705-0100 Line A0160 350 LNFT
15706-0200 Line A0180 8 EACH
20102-0000 Line A0200 ALL LPSM
20301-2400 Line A0220 4 EACH
20302-1200 Line A0240 90 LNFT
20303-2900 Line A0260 820 SQYD
MOBILIZATION
CENTERLINE, STAKING
SURVEY AND STAKING, BOX CULVERT
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, CHECK DAM
CLEARING AND GRUBBING
REMOVAL OF SIGN
REMOVAL OF GUARDRAIL
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
REMOVAL OF PAVEMENT, CONCRETE, 6-INCH DE
SURVEY AND STAKING, GRADE FINISHING STAK
24.0% 779,775.00$ 15.8% 728,500.00$
Unit Price Amount Unit Price Amount
140,000.00$ 37,000.00$
2,250.00$ 2,400.00$
2,700.00$ 3,150.00$
2,800.00$ 2,380.00$
8,000.00$ 51,000.00$
6,000.00$ 31,000.00$
4,000.00$ 7,800.00$
350.00$ 546.00$
2,000.00$ 3,112.00$
5,000.00$ 4,800.00$
1,000.00$ 364.00$
4,500.00$ 1,980.00$
41,000.00$ 5,740.00$ 50.00$ 7.00$
50.00$ 22.00$
250.00$ 91.00$
5,000.00$ 4,800.00$
250.00$ 389.00$
1.00$ 1.56$
4,000.00$ 7,800.00$
6,000.00$ 31,000.00$
8,000.00$ 51,000.00$
300.00$ 320.00$
300.00$ 350.00$
LaForge and Budd Construction Co. Aspen Construction
140,000.00$ 37,000.00$
200.00$ 170.00$
4/28/2016 Page 4 of 9
Project No: KS FLAP CR 1200(1)
Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"
Item No. Quantity Unit
20420-0000 Line A0280 1,050 CUYD
25101-3000 Line A0300 120 CUYD
30110-0000 Line A0320 750 TON
60220-3000 Line A0340 293 LNFT
61701-1200 Line A0360 60 LNFT
61701-4500 Line A0380 330 LNFT
61701-4500 Line A0400 150 LNFT
61702-0800 Line A0420 1 EACH
61702-1500 Line A0440 4 EACH
62301-0000 Line A0460 40 HOUR
62511-2000 Line A0480 2,100 SQYD
62516-2000 Line A0500 2,100 SQYD
62901-1100 Line A0520 60 SQYD
AGGREGATE SURFACE COURSE
10 FEET SPAN, 5 FEET RISE PRECAST REINFORC
GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEE
MULCHING, HYDRAULIC METHOD
ROLLED EROSION CONTROL PRODUCT, TYPE 4
GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STE
GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STE
TERMINAL SECTION TYPE TANGENT
TERMINAL SECTION, TYPE MGS TANGENT
GENERAL LABOR
SEEDING, HYDRAULIC METHOD
EMBANKMENT CONSTRUCTION
PLACED RIPRAP, CLASS 3
24.0% 779,775.00$ 15.8% 728,500.00$
Unit Price Amount Unit Price Amount
LaForge and Budd Construction Co. Aspen Construction
31,500.00$ 17,661.00$
12,000.00$ 12,360.00$
37,500.00$ 21,150.00$
414,595.00$ 423,678.00$
1,800.00$ 2,610.00$
33,000.00$ 52,470.00$
4,500.00$ 6,750.00$
3,500.00$ 4,200.00$
12,800.00$ 17,428.00$
1,600.00$ 3,300.00$
420.00$ 651.00$
630.00$ 987.00$
330.00$ 510.00$ 5.50$ 8.50$
0.30$ 0.47$
0.20$ 0.31$
40.00$ 82.50$
3,200.00$ 4,357.00$
3,500.00$ 4,200.00$
30.00$ 45.00$
100.00$ 159.00$
30.00$ 43.50$
1,415.00$ 1,446.00$
50.00$ 28.20$
100.00$ 103.00$
30.00$ 16.82$
4/28/2016 Page 5 of 9
Project No: KS FLAP CR 1200(1)
Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"
Item No. Quantity Unit
63301-0000 Line A0540 2 EACH
63501-0000 Line A0560 ALL LPSM
63504-1000 Line A0580 50 SQFT
SIGN SYSTEM
TEMPORARY TRAFFIC CONTROL
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
24.0% 779,775.00$ 15.8% 728,500.00$
Unit Price Amount Unit Price Amount
LaForge and Budd Construction Co. Aspen Construction
1,000.00$ 3,112.00$
2,500.00$ 6,111.00$
2,500.00$ 4,250.00$ 50.00$ 85.00$
2,500.00$ 6,111.00$
500.00$ 1,556.00$
4/28/2016 Page 6 of 9
Project No: KS FLAP CR 1200(1)
Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15210-1000 Line A0040 7.500 STA
15215-5000 Line A0060 9 EACH
15216-2000 Line A0080 14.000 STA
15301-0000 Line A0100 ALL LPSM
15401-0000 Line A0120 ALL LPSM
15501-0000 Line A0140 ALL LPSM
15705-0100 Line A0160 350 LNFT
15706-0200 Line A0180 8 EACH
20102-0000 Line A0200 ALL LPSM
20301-2400 Line A0220 4 EACH
20302-1200 Line A0240 90 LNFT
20303-2900 Line A0260 820 SQYD
MOBILIZATION
CENTERLINE, STAKING
SURVEY AND STAKING, BOX CULVERT
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, CHECK DAM
CLEARING AND GRUBBING
REMOVAL OF SIGN
REMOVAL OF GUARDRAIL
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
REMOVAL OF PAVEMENT, CONCRETE, 6-INCH DE
SURVEY AND STAKING, GRADE FINISHING STAK
41.9% 892,480.00$
Unit Price Amount
100,000.00$
3,750.00$
4,500.00$
7,000.00$
25,000.00$
10,000.00$
5,000.00$
3,500.00$
4,000.00$
10,000.00$
400.00$
2,700.00$
44,280.00$ 54.00$
30.00$
100.00$
10,000.00$
500.00$
10.00$
5,000.00$
10,000.00$
25,000.00$
500.00$
500.00$
Kovilic Construction Company, Inc.
100,000.00$
500.00$
4/28/2016 Page 7 of 9
Project No: KS FLAP CR 1200(1)
Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"
Item No. Quantity Unit
20420-0000 Line A0280 1,050 CUYD
25101-3000 Line A0300 120 CUYD
30110-0000 Line A0320 750 TON
60220-3000 Line A0340 293 LNFT
61701-1200 Line A0360 60 LNFT
61701-4500 Line A0380 330 LNFT
61701-4500 Line A0400 150 LNFT
61702-0800 Line A0420 1 EACH
61702-1500 Line A0440 4 EACH
62301-0000 Line A0460 40 HOUR
62511-2000 Line A0480 2,100 SQYD
62516-2000 Line A0500 2,100 SQYD
62901-1100 Line A0520 60 SQYD
AGGREGATE SURFACE COURSE
10 FEET SPAN, 5 FEET RISE PRECAST REINFORC
GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEE
MULCHING, HYDRAULIC METHOD
ROLLED EROSION CONTROL PRODUCT, TYPE 4
GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STE
GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STE
TERMINAL SECTION TYPE TANGENT
TERMINAL SECTION, TYPE MGS TANGENT
GENERAL LABOR
SEEDING, HYDRAULIC METHOD
EMBANKMENT CONSTRUCTION
PLACED RIPRAP, CLASS 3
41.9% 892,480.00$
Unit Price Amount
Kovilic Construction Company, Inc.
52,500.00$
9,000.00$
22,500.00$
439,500.00$
3,000.00$
47,850.00$
7,500.00$
3,750.00$
16,000.00$
3,000.00$
5,250.00$
6,300.00$
600.00$ 10.00$
3.00$
2.50$
75.00$
4,000.00$
3,750.00$
50.00$
145.00$
50.00$
1,500.00$
30.00$
75.00$
50.00$
4/28/2016 Page 8 of 9
Project No: KS FLAP CR 1200(1)
Project Name: Pleasanton East Lake Bridge CQ = "Contract Quantity"
Item No. Quantity Unit
63301-0000 Line A0540 2 EACH
63501-0000 Line A0560 ALL LPSM
63504-1000 Line A0580 50 SQFT
SIGN SYSTEM
TEMPORARY TRAFFIC CONTROL
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
41.9% 892,480.00$
Unit Price Amount
Kovilic Construction Company, Inc.
600.00$
50,000.00$
5,000.00$ 100.00$
50,000.00$
300.00$
4/28/2016 Page 9 of 9