A-E_Q A.pdf
PDF 10 KB Posted
- Attached to
- A-E FULL SERVICE DESIGN IDIQ Federal contract opportunity
- Solicitation number
- DTFH68-14-R-00001
About this file
Q A document
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A-E_Q A.pdf | ||
| A-E_Q A.pdf | ||
| A-E_Q A.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Architect-Engineer Full Service Design IDIQ
DTFH68-14-R-00001
November 5, 2013
Question 1: Are Part II’s included in the 80 page limit? Please note that including the Part II’s in the page count can be a disadvantage for those that have multiple subconsultants and/or office locations which will require more Part II’s to be included in the SF 330 submittal; thereby, reducing the pages that can be allocated to qualifications-based information (i.e., resumes and Item H).
Answer 1: Yes, Part II’s are included in the 80 page limit.
October 29, 2013
Question 1: I was reviewing the posting made for Solicitation #DTFH6814R00001 and it looked similar to one that was issued last year under Solicitation #DTFH6812R00009 and awarded to HDR Engineering and Aecom Technical Services. I was wanted to confirm that the two efforts were not for the same requirement and was wondering who the incumbent vendors are for the newly issued Solicitation (#DTFH6814R00001). Could you please provide the incumbent vendors and the corresponding contract numbers?
Answer 1: This is a separate solicitation. Incumbents are shown on our website at:
http://www.cflhd.gov/contracting/ae/contract-holders.cfm
File details come from the government source that posted it. Updated .