A-E_Q A.pdf

PDF 10 KB Posted

Attached to
A-E FULL SERVICE DESIGN IDIQ Federal contract opportunity
Solicitation number
DTFH68-14-R-00001
Issued by
Department of Transportation Federal Highway Administration

About this file

Q A document

View the file

Other files for this federal contract opportunity

Other files attached to A-E FULL SERVICE DESIGN IDIQ, newest first.
File Type Posted
A-E_Q A.pdf PDF
A-E_Q A.pdf PDF
A-E_Q A.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Architect-Engineer Full Service Design IDIQ

DTFH68-14-R-00001

November 5, 2013

Question 1: Are Part II’s included in the 80 page limit? Please note that including the Part II’s in the page count can be a disadvantage for those that have multiple subconsultants and/or office locations which will require more Part II’s to be included in the SF 330 submittal; thereby, reducing the pages that can be allocated to qualifications-based information (i.e., resumes and Item H).

Answer 1: Yes, Part II’s are included in the 80 page limit.

October 29, 2013

Question 1: I was reviewing the posting made for Solicitation #DTFH6814R00001 and it looked similar to one that was issued last year under Solicitation #DTFH6812R00009 and awarded to HDR Engineering and Aecom Technical Services. I was wanted to confirm that the two efforts were not for the same requirement and was wondering who the incumbent vendors are for the newly issued Solicitation (#DTFH6814R00001). Could you please provide the incumbent vendors and the corresponding contract numbers?

Answer 1: This is a separate solicitation. Incumbents are shown on our website at:

http://www.cflhd.gov/contracting/ae/contract-holders.cfm

File details come from the government source that posted it. Updated .