Complete plan set for WY PRA GRTE PRES 1(12) Grand Tetons National Park Pavement Preservation - DTFH68-11-B-00014 This is the same plan set that has been available on our website (www.cflhd.gov). Our website is temporarily not accessible so plans are also being made available on this websitel
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DTFH6811B00014.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLANS FOR PROPOSED
PROJECT MANAGER
SPECIFICATIONS:
"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS
AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-03,
U.S. CUSTOMARY UNITS"
NATIONAL
PARK
SERVICE
Department of the Interior
U.S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
U.S. CUSTOMARY DIMENSIONS:
Slopes are expressed as RISE:RUN
APPROVED:
DATE:
RECOMMENDED:
DATE:
TYPE OF CONSTRUCTION:
Restoration & Rehabilitation
PLANS PREPARED BY
FOR
D E P
A R T
M
E
NT
OF TRANSPO
R T
A T I O
N
U N
IT
E
D STATES OF
AME
R I C
A
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DENVER, COLORADO
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
A1 A2
Project location
PAVEMENT PRESERVATION
MONTANA
IDAHO
SOUTH DAKOTA
NEBRASKA
COLORADOUTAH
Casper
CHEYENNE
Sheridan
Jackson
Rock
Springs
Riverton
KEY MAP OF WYOMING
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
Gillette
Cody
Thermopolis
Worland
Rawlings
CALL BEFORE YOU DIG:
ONE CALL OF WYOMING
811 OR 1-800-849-2476
JACOBS ENGINEERING
LEAD DESIGNER
R. DUVAL
WY PRA/NPS GRTE PRES 1(12)
SUPERINTENDENT, GRAND TETON NATIONAL PARK
GRAND TETON NATIONAL PARK
BEGIN AND END PAVEMENT PRESERVATION
PROJECT GRTE PRES 1(12)
VARIOUS ROUTES ALONG STRING LAKE ROAD
OPTION Z
TETON COUNTY
Schedule A 13.98 miles
Option Z 0.53 miles
DIRECTOR OF ENGINEERING, CENTRAL FEDERAL LANDS HIGHWAY DIVISION
BEGIN AND END PAVEMENT PRESERVATION
PROJECT GRTE PRES 1(12)
VARIOUS ROUTES ALONG TETON PARK ROAD
SCHEDULE A
REG STATE PROJECT
TOTAL
SHEETS
SHEET
NO.
IMR WY
PRA GRTE PRES 1(12)
GRAND TETON N.P.
NPS PMIS NO.: 141367
A2 A2
NOTES:
Not To Scale
Construction Limits Construction Limits
Grade Varies Grade Varies
VariableSlope
Existing asphalt surface
Var ies
Varies
TYPICAL SECTION
MICRO-SURFACING
TYPICAL SECTION
GRAND TETON NATIONAL
PARK
See Summary Tabulation Sheets
For Roadway Width or Parking Lot Dimensions
1. Refer to Summary Tabulation Sheets for width and extent of asphalt surface treatment.
2. Protect existing project asphalt curbs, concrete curb & gutter, concrete barriers, concrete island, stone wall, manholes, and water valves during all surface treatment operations.
Micro-Surfacing, Type 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
REG STATE PROJECT
TOTAL
SHEETS
SHEET
NO.
IMR WY
PRA GRTE PRES 1(12)
PRA GRTE PRES 1(12)
PLAN BID
15101-0000 LPSM ALL ALL
15301-0000 LPSM ALL ALL
15401-0000 LPSM ALL ALL
15501-0000 LPSM ALL ALL
41002-2000 SQYD 285,562 299,800
41105-0000 TON 20 20
41412-1000 LB 45,473 47,700
42801-0150 SQYD 203 210
62201-0050 HOUR 20 20
62201-0450 HOUR 20 20
62301-0000 HOUR 40 40
63401-0000 LNFT 322,927 329,000
63405-0050 EACH 68 71
63501-1000 LPSM ALL ALL
63502-0700 EACH 100 100
63503-0700 LNFT 72,600 76,000
63504-1000 SQFT 217 230
63506-0500 HOUR 240 240
J:\_Transportation\WVXW3011_CFL_PavPres_GRTE\700CADD\PavePresTO011\Roadway\Sheets\B-Summ\GRTE B-sheets\[Altpriorities_GRTE_Proj_Summary_Shts_100%.xls]Sum Sch A NPS PMIS No. 141367
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
The following quantities are approximate unless noted as a contract quantity. Payment will be made for the actual quantities of work performed and accepted for materials furnished according to the contract. SUMMARY OF
QUANTITIES
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH
PAVEMENT MARKINGS Apply 2 coats at 107ft2/gal, according to 634.05
TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, FLAGGER
FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE 2
MICRO-SURFACING, TYPE 2
BLOTTER As directed by the CO
Measure according to 414.06
PAVEMENT MARKINGS, SYMBOLS
GENERAL LABOR
CRACK, CLEANING AND SEALING
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
WY B1
ITEM NO. ITEM DESCRIPTION
SUMMARY OF QUANTITIES - SCHEDULE A
IMR
UNIT
MOBILIZATION
REG. STATE
ESTIMATED QUANTITIES REMARKS AND/OR DETERMINATION OF ESTIMATED
QUANTITY
PROJECT
SHEET
NO.
TOTAL
SHEETS
B8
41002-2000 41412-1000
FT FT SQYD LB
11 Teton Park Road 1365 3.38 10.80 39,178 30.9 134,510 20,776 11 Pullouts (6 Pullouts and 2 Aprons) 16,222 0 11 Teton Park Road 1365 10.80 12.26 7,709 30.5 26,124 4,088 105 South Jenny Lake Access Road 31295 0.00 0.59 3,115 30.0 10,384 1,652 209 Climbers Ranch Road 36045 0.00 0.28 1,478 18.0 2,957 784 209 Pullouts (2 Pullout) 667 0 225 Lupine Meadows Access Road 37766 0.00 0.23 1,214 24.5 3,306 644 225 Pullouts (1 Pullout, 1 Apron) 37766 333 500 Jenny Lake Loop Road (Two way portion only) 31647 0.00 1.50 7,920 31.0 27,280 4,200 500 Jenny Lake Loop Road (One way portion only) 31647 1.50 4.00 13,200 18.0 26,400 7,000 500 Pullouts (5 Pullouts) 31647 5,556 0
923 Taggart Lake Trailhead Parking Area 36745 4,185 832 924 Cottonwood Creek Picnic Area Parking 25915 1,343 267
926 Teton Glacier Parking 36767 2,835 564 929A-M South Jenny Lake Parking (off Rt 105 A-M) 4342 5,150 1,024
930 Jenny Lake Ranger Station and RV Overflow 6546 11,502 2,287
931 Cascade Canyon Parking Area ( Rt 11 @MP 9.4 left) 35893 2,775 552
934 Jenny Lake Overlook Parking (Rt 500@MP2.96) 11288 1,518 302
938 Mountain View Parking ( Rt 11@MP 11.13) 4294 2,517 500
Joint Sealant (lbs/gal) = 10.0
141367
Potential staging site with approval of CO
22,651
13,660
24,971
Water Source
BID ITEM NUMBER
MILE TO MILE
6,000
12,083 25,518
103,516
CRACK,
CLEANING AND
SEALINGFMSS No.
SUMMARY TABULATION
MICRO-
SURFACING,
TYPE 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
Remarks
REG.
B2
Project Starts at Gate
SHEET
NO.
FLEXIBLE
PAVEMENT,
FULL DEPTH
PATCH, TYPE 2
ROADWAY SUMMARY SHEET - SCHEDULE A
Route Name W
ID
T H
MILES
WY B8
STATE PROJECT
PRA GRTE PRES 1(12)
GRAND TETON N.P.
TOTAL
SHEETS
IMR
42801-0150
Potential staging site with approval of CO
SQYD
Treat Aprons, Protect Cobble Curbs
PARKING AREAS
37,665
R ou te N u m b er
LE
N
G T H
Protect Cobble Curbs
J:\_Transportation\WVXW3011_CFL_PavPres_GRTE\700CADD\PavePresTO011\Roadway\Sheets\B-Summ\GRTE B-sheets\[Altpriorities_GRTE_Proj_Summary_Shts_100%.xls]SchA_Road1 NPS PMIS No.
Treat Aprons, Protect Cobble Curbs
Rates and Weights Used for Estimating Purposes These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.
146,000
45,473
7/27/11 10:42 AM
Sheet B2 Subtotal 285,562
46,351
50,000
3,000
63401-0000 63401-0000 63503-0700
(TYPE B) (TYPE B)
YELLOW WHITE WHITE WHITE WHITE WHITE YELLOW WHITE
LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT EACH EACH EACH LNFT
11 Teton Park Road 78,356 78,356 450 78,356 78,806 16 39,178 11 Pullouts (6 Pullouts) 11 Teton Park Road 15,418 15,418 15,418 15,418 7,709
105 South Jenny Lake Access Road 6,230 7,788 72 6,230 7,860 4 3,115
Climbers Ranch Road
2,957 450 36 100 3,543 1,478
225 Lupine Meadows Access Road 450 36 486
Jenny Lake Loop Road (Two way portion only)
15,840 15,840 2,250 15,840 18,090 1 7,920
Jenny Lake Loop Road (One way portion only)
13,200 39,600 1,800 72 13,200 13,200 54,672 1 5 13,200
923 Taggart Lake Trailhead Parking Area 500 1,044 975 72 220 2,811 3 924 Cottonwood Creek Picnic Area Parking 252 72 110 434 2
926 Teton Glacier Parking 324 900 72 110 1,406 2
929A-M South Jenny Lake Parking 1,920 1,350 216 1,430 4,916 10 2
Jenny Lake Ranger Station & RV Overflow
2,700 515 440 3,655 7
931 Cascade Canyon Parking Area 468 72 110 650 2 934 Jenny Lake Overlook Parking 378 36 110 524 2
938 Mountain View Parking 504 110 614 2
(1)
(2)
(3)
(4)
(5)
(6)
(7) J:\_Transportation\WVXW3011_CFL_PavPres_GRTE\700CADD\PavePresTO011\Roadway\Sheets\B-Summ\GRTE B-sheets\[Altpriorities_GRTE_Proj_Summary_Shts_100%.xls]Striping1 141367
EACH
PARKING AREAS
Yellow edge line (Lt), Includes Bike Path Symbols
H/C ACCESS
IBLE SYMBOL
YELLOW
CENTERLINE (1)
For line widths other than 4 inches, the measured length of line is adjusted in the ratio of the required width to 4 inches
Centerline quantities are estimated assuming a double yellow centerline. Match existing pavement markings, or as directed by the CO.
R O
U T E N
U M
B E R
ROUTE NAME
Chevrons at bridge (hatched area quant)
CROSS-
WALK
STRIPING
63405-0050
HATCHED
AREAS
PAVEMENT
MARKINGS
PAVEMENT
MARKINGS
PAVEMENT
MARKINGS,
SYMBOLSARROWS
PAVEMENT MARKING SUMMARY - SCHEDULE A
REG.
IMR
BID ITEM NUMBER
PAVEMENT MARKINGS, TYPE B
TOTAL
SHEETS
WY B3 B8
GRAND TETON N.P.
(TYPE B)
STATE PROJECT
SHEET
NO.
SOLID EDGE
LINES and
MISC.
MARKINGS (2)
STOP BAR
WITH STOP
LETTERING
TEMPORARY
TRAFFIC
CONTROL,
PAVEMENT
MARKINGS
Remarks
FIO FIO
PRA GRTE PRES 1(12)
PARKING
STALL LINES
SCHEDULE A TOTAL 129,044 160,458 7,590 7569,140 15,940
Match existing pavement markings or as directed by the CO. Payment will be made for actual striped length on the project. Use Park H/C and arrow stencils.
Solid Edge Lines and Misc. Markings include edge (fog) lines, parallel parking lines, lane separation lines, and transverse stall lines for parking areas.
193,884 32
Apply 2 coats of paint for pavement markings according to subsection 634.05.
7/27/2011 10:42
25129,044 72,600
Restripe per CO Direction
Restripe to 9' per CO direction
Protect painted curbs.
Restripe per CO direction, Re-esablish croswalk pathway at RV overflow parking lot
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
NPS Package No.
SUMMARY TABULATION
Temporary pavement markings include only centerline stripes as measured along road centerline.
FIO = For Information Only
STOP
BARS(3)
63504-1000
SQFT Each SQFT
M635-1 G20-2 End Road Work 36 x 18 4.5 2 9
M635-1 W20-1 Road Work Ahead 48 x 48 16 2 32
M635-6, M635-7 W13-1P 25 MPH 24 x 24 2 6 12
M635-6, M635-7 W20-4 One Lane Road Ahead 48 x 48 16 2 32
M635-6 W20-7A Flagger Symbol 48 x 48 16 2 32
ITEM NO. SCH. A
63502-0700 100 63506-0500 240
7/27/11 10:42 AM NPS PMIS No. 141367J:\_Transportation\WVXW3011_CFL_PavPres_GRTE\700CADD\PavePresTO011\Roadway\Sheets\B-Summ\GRTE B-sheets\[Altpriorities_GRTE_Proj_Summary_Shts_10
Quantity
Additional signs as directed by CO
PROJECT
PRA GRTE PRES 1(12)
GRAND TETON N.P.
REG. STATE
CONSTRUCTION SIGN SUMMARY
NOTES
TEMPORARY TRAFFIC
CONTROL,
CONSTRUCTION
SIGN
Panel Size
Inches
Item Number
Sign MessageDrawing Reference MUTCD Reference Area
Unit
TOTAL
SHEETS
IMR WY B4 B8
TEMPORARY TRAFFIC CONTROL - SCHEDULE A
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
SUMMARY TABULATION
SCHEDULE A TOTAL
TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR
TRAFFIC CONTROL QUANTITIES
DESCRIPTION
TEMPORARY TRAFFIC CONTROL, CONE
UNIT
EACH
PLAN BID
15101-0000 LPSM ALL ALL
15301-0000 LPSM ALL ALL
15401-0000 LPSM ALL ALL
15501-0000 LPSM ALL ALL
41002-2000 SQYD 24,321 26,000
41105-0000 TON 5 5
41412-1000 LB 4,651 4,900
62201-0050 HOUR 10 10
62201-0450 HOUR 10 10
62301-0000 HOUR 20 20
63401-0000 LNFT 18,432 19,000
63405-0050 EACH 18 19
63501-1000 LPSM ALL ALL
63502-0700 EACH 50 50
63503-0700 LNFT 2,798 3,000
63504-1000 SQFT 113 120
63506-0500 HOUR 50 50
J:\_Transportation\WVXW3011_CFL_PavPres_GRTE\700CADD\PavePresTO011\Roadway\Sheets\B-Summ\GRTE B-sheets\[Altpriorities_GRTE_Proj_Summary_Shts_100%.xls]Sum OPT Z NPS PMIS No. 141367
TEMPORARY TRAFFIC CONTROL, FLAGGER
The following quantities are approximate unless noted as a contract quantity. Payment will be made for the actual quantities of work performed and accepted for materials furnished according to the contract. SUMMARY OF
QUANTITIES
U.S. DEPARTMENT OF TRANSPORTATION
BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH
GENERAL LABOR
PAVEMENT MARKINGS, SYMBOLS
Apply 2 coats at 107ft2/gal, according to 634.05
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
MICRO-SURFACING, TYPE 2
BLOTTER As directed by the CO
Measure according to 414.06
TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
PAVEMENT MARKINGS
CRACK, CLEANING AND SEALING
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
WY B5
ITEM NO. ITEM DESCRIPTION
SUMMARY OF QUANTITIES - OPTION Z
IMR
UNIT
MOBILIZATION
REG. STATE
ESTIMATED QUANTITIES REMARKS AND/OR DETERMINATION OF ESTIMATED
QUANTITY
PROJECT
SHEET
NO.
TOTAL
SHEETS
B8
41002-2000 41412-1000
FT FT SQYD LB
110 String Lake Road ( Rt 500@MP1.5) 4345 0.00 0.53 2798 27.00 8,395 1,484
933 Cathedral Group Parking (Rt 500 @MP .76) 35911 2,191 435.69
935A Leigh Lake Trailhead Parking A (Rt 110 @MP .33) 4344 4,639 922.51
935B Leigh Lake Trailhead Parking B (Rt 110 @MP .34) 4344 1,948 387.47
935C Leigh Lake Trailhead Parking C (Rt 110 @MP .38) 4344 605 120.40
936 String Lake Canoe Launch Parking (Rt 110@MP .21) 4346 3,933 782.11
937 String Lake Trailhead Parking (Rt 110@MP .04) 36742 2,609 518.81
Joint Sealant (lbs/gal) = 10.0
141367
35,396 23,480
PARKING AREAS
R ou te N u m b er
SQYD
FLEXIBLE
PAVEMENT,
FULL DEPTH
PATCH, TYPE 2
ROADWAY SUMMARY SHEET - OPTION Z
BID ITEM NUMBER
MICRO-
SURFACING,
TYPE 2
CRACK,
CLEANING AND
SEALING
MILE TO MILE
FMSS No.Route Name
Protect cobble median/curb
Remarks
TOTAL
SHEETS
Sheet B6 Subtotal
REG.
W
ID
T H
LE
N
G T H
MILES
SHEET
NO.
B8
STATE PROJECT
PRA GRTE PRES 1(12)
GRAND TETON N.P.
B6IMR
42801-0150
WY
19,718 41,750 17,536 5,449
24,321 4,651
J:\_Transportation\WVXW3011_CFL_PavPres_GRTE\700CADD\PavePresTO011\Roadway\Sheets\B-Summ\GRTE B-sheets\[Altpriorities_GRTE_Proj_Summary_Shts_100%.xls]OPT Z_Road1 NPS PMIS No.
These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
SUMMARY TABULATION
Rates and Weights Used for Estimating Purposes
No Pay 63401-0000 63401-0000 63503-0700
(TYPE B) (TYPE B)
YELLOW WHITE WHITE WHITE WHITE WHITE YELLOW WHITE
LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT EACH EACH EACH LNFT
110 String Lake Road 5,596 5,596 5,596 5,596 2,798
933 Cathedral Group Parking 594 110 704 2
935A Leigh Lake Trailhead Parking A 964 900 220 2,084
935B Leigh Lake Trailhead Parking B 576 900 1,476
935C Leigh Lake Trailhead Parking C 342 900 1,242 5
936 String Lake Canoe Launch Parking 200 666 36 110 1,012 2
937 String Lake Trailhead Parking 540 72 110 722 2
(1)
(2)
(3)
(4)
(5)
(6)
(7) J:\_Transportation\WVXW3011_CFL_PavPres_GRTE\700CADD\PavePresTO011\Roadway\Sheets\B-Summ\GRTE B-sheets\[Altpriorities_GRTE_Proj_Summary_Shts_100%.xls]OPT Z Striping1 141367
H/C ACCESS
IBLE SYMBOL
STOP BAR
WITH STOP
LETTERING
(TYPE B)
R O
U T E N
U M
B E R
For line widths other than 4 inches, the measured length of line is adjusted in the ratio of the required width to 4 inches
Centerline quantities are estimated assuming a double yellow centerline. Match existing pavement markings, or as directed by the CO.
CROSS-
WALK
STRIPING
HATCHED
AREAS
STOP
BARS(3)
63405-0050
PAVEMENT
MARKINGS
PAVEMENT
MARKINGSPARKING
STALL LINES
BID ITEM NUMBER
PAVEMENT MARKINGS, TYPE B
FIO FIO
Remarks
TEMPORARY
TRAFFIC
CONTROL,
PAVEMENT
MARKINGS
PAVEMENT
MARKINGS,
SYMBOLS
SHEET
NO.
PAVEMENT MARKING SUMMARY - OPTION Z
REG.
IMR
TOTAL
SHEETS
WY
PRA GRTE PRES 1(12)
B7 B8
GRAND TETON N.P.
STATE PROJECT
YELLOW
CENTERLINE (1)
SOLID EDGE
LINES and
MISC.
MARKINGS (2)
ROUTE NAME
OPTION Z TOTAL 5,596 5,796 12,836 11550 5,596
Match existing pavement markings or as directed by the CO. Payment will be made for actual striped length on the project. Use Park H/C and arrow stencils.
Apply 2 coats of paint for pavement markings according to subsection 634.05.
7/27/2011 10:42
2,7003,682 108
NPS Package No.
SUMMARY TABULATION
2,79818
Solid Edge Lines and Misc. Markings include edge (fog) lines, parallel parking lines, lane separation lines, and transverse stall lines for parking areas.
Temporary pavement markings include only centerline stripes as measured along road centerline.
FIO = For Information Only
ARROWS
PARKING AREAS
EACH
Restripe per CO direction
Includes 7 RV Symbols
U.S. DEPARTMENT OF TRANSPORTATION
63504-1000
SQFT Each SQFT
M635-1 G20-2 End Road Work 36 x 18 4.5 2 9.0
M635-1 W20-1 Road Work Ahead 48 x 48 16 2 32.0
M635-6, M635-7 W13-1P 25 MPH 24 x 24 4 2 8.0
M635-6, M635-7 W20-4 One Lane Road Ahead 48 x 48 16 2 32.0
M635-6 W20-7A Flagger Symbol 48 x 48 16 2 32.0
ITEM NO. OPT. Z
63502-0700 50 63506-0500 50
7/27/11 10:42 AM NPS PMIS No. 141367J:\_Transportation\WVXW3011_CFL_PavPres_GRTE\700CADD\PavePresTO011\Roadway\Sheets\B-Summ\GRTE B-sheets\[Altpriorities_GRTE_Proj_S
Quantity
PROJECT
PRA GRTE PRES 1(12)
GRAND TETON N.P.
REG. STATE
CONSTRUCTION SIGN SUMMARY
NOTES
TEMPORARY TRAFFIC
CONTROL,
CONSTRUCTION
SIGN
Panel Size
Inches
Item Number
Sign MessageDrawing Reference MUTCD Reference Area
Unit
TOTAL
SHEETS
IMR WY B8 B8
TEMPORARY TRAFFIC CONTROL - OPTION Z
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
SUMMARY TABULATION
OPTION Z TOTAL
TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR
TRAFFIC CONTROL QUANTITIES
DESCRIPTION
TEMPORARY TRAFFIC CONTROL, CONE
UNIT
EACH
C1 C3
Miles
Park Owned Routes
6 3 6
GRAND TETON
NATIONAL PARK
ROUTE LOCATION MAP
KEY MAP
1. Maps taken directly from RIP data book
2. Highlighted routes are included in schedule of work.
Red strike thru routes are NOT included in schedule of work
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
REG STATE PROJECT
TOTAL
SHEETS
SHEET
NO.
IMR WY
PRA GRTE PRES 1(12)
C2 C3
2 1 2
Unique colors used to differentiate routes
GRAND TETON
NATIONAL PARK
ROUTE LOCATION MAP
AREA 3
End Rte 0011 mile post 12.26
Potential staging sitePotential staging site
Water source
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
REG STATE PROJECT
TOTAL
SHEETS
SHEET
NO.
IMR WY
PRA GRTE PRES 1(12)
GRAND TETON N.P.
NPS PMIS NO.: 141367
R te
R te
Z
Z
R te
R te
R te
3 R te
R te
R te
R te
R te
R te
R te
Z
Z
R te
R te
R te
R te
1. Maps taken directly from RIP data book
2. Yellow and purple highlighted routes are included in schedule of work.
Red strike thru routes are NOT included in schedule of work
3. Schedule A includes all yellow highlighted routes.
4. Option Z includes all purple highlighted routes.
C3 C3
2 1 2
Unique colors used to differentiate routes
GRAND TETON
NATIONAL PARK
ROUTE LOCATION MAP
AREA 5
Begin Rte 0011 mile post 3.38
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
REG STATE PROJECT
TOTAL
SHEETS
SHEET
NO.
IMR WY
PRA GRTE PRES 1(12)
GRAND TETON N.P.
NPS PMIS NO.: 141367
R te
R te
R te 0011
1. Maps taken directly from RIP data book
2. Yellow highlighted routes are included in schedule of work.
Red strike thru routes are NOT included in schedule of work
3. Schedule A includes all yellow highlighted routes.
Not To Scale 414-A
K1 K2
1" or greater
CRACK SEALING DETAILS
Screed to 18" to 14" below existing surface elevation.
Fill crack with asphalt mix flush with existing surface.
4 " to 1"
ASPHALT PAVEMENT
CRACK SEALING DETAILS
Seal crack with hot-poured elastic sealant.
1. Clean existing surface prior to sealing cracks and seal according to Subsection 414.04.
2. Force crack repair materials into cracks to assure adhesion to existing surface.
3. See Subsection 414 for the type of sealant to be used. Follow manufacturer’s recommendations for sealing cracks.
4. All items shown within the pay limits are included in pay item 41412-1000
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SPECIAL
U.S. CUSTOMARY SPECIAL
REG STATE PROJECT
TOTAL
SHEETS
SHEET
NO.
IMR WY
PRA GRTE PRES 1(12)
Not To Scale 428-B
K2 K2
FULL DEPTH PATCH TYPE 2 DETAIL
Existing base course
V a r ie s
Pay Limits as directed by CO
4" Minor hot asphalt concrete
Existing pavement
Remove damaged pavement, base, and subgrade material to a depth of 4"
Tack coat according to
Section 412 around the perimeter of patch
Remove pavement according to Subsection 428.07
1. Extent of patch to be determined by the CO based on conditions encountered at time of construction.
2. Clean existing surface prior to applying tack coat according to
Subsection 412.04.
3. Compact minor hot asphalt concrete mix to a minimum of 90% of the maximum specific gravity.
4. Fog seal surface according to Subsection
409.11 if patch area is not to be surface treated within 7 days.
5. All items shown within the pay limits are included in pay item 42801-0150.
FLEXIBLE PAVEMENT
FULL DEPTH PATCH
TYPE 2 DETAIL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
TOTAL
SHEETS
SHEET
NO.
IMR WY
PRA GRTE PRES 1(12)
14"12"14"
12"30"30"
33"
27"
R
12"30"30"
33"
R
R
27"
8"
72"
V
M
P H
V
M
P H
V
M
P H
V
M
P H
4" Typical
81"
4" Minimum
84"
72"
T y p
96"
T y p
4" Minimum
117"
4" Typical
45"
M in im u m
24" Minimum
3" Minimum
"21
6" R
9" R
3"R
3"R
3"R
T1
SQFT
White border when specified in the Striping Plans
ACCESSIBILITY PARKING SPACE MARKING
"AHEAD" WORD MARKING "SCHOOL" WORD MARKING
"ONLY" WORD MARKING
"YIELD" WORD MARKING"STOP" WORD MARKING
TURN LANE-USE ARROW
TYPE
PAVEMENT MARKING AREAS
THROUGH
LANE-USE ARROW
TURN AND THROUGH
LANE-USE ARROW
YIELD AHEAD
TRIANGLE SYMBOL
Through Lane-Use Arrow
Turn Lane-Use Arrow
Turn and Through Lane-Use Arrow
Yield Ahead Arrow (V<70 km/h)
Yield Ahead Arrow (V=70 km/h)
Accessibility Marking (symbol only)
Accessibility Marking w/ border (White)
Accessibility Marking w/ border (Blue)
AHEAD Word Marking
ONLY Word Marking
SCHOOL Word Marking
STOP Word Marking
YIELD Word Marking
Blue background when border specified in the Striping Plans
634-1
1. Place pavement word and symbol markings in accordance with the ’’Manual on Uniform Traffic
Control Devices’’ (MUTCD), current edition.
2. All letters, numerals and symbols shall conform with the "Standard Highway Signs", current edition.
3. The Accessibility Parking Space marking only includes the accessibility symbol unless a border is indicated in the Striping Plans.
T11
PAVEMENT MARKINGS
SYMBOLS AND WORDS
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY OFFICE
STANDARD
U.S. CUSTOMARY STANDARD
TOTAL
SHEETS
SHEET
NO.
STANDARD APPROVED FOR USE 06/2005
REVISED:
IMR WY
4" Typical
T2
NOTE:
SQFTTYPE
PAVEMENT MARKING AREAS
Through Lane-Use Arrow
Turn Lane-Use Arrow
I 1
2"
STOP BAR INCLUDING
"STOP" WORD MARKING
"NO PARKING"
WORD MARKING
Accessibility Marking With Border
NO PARKING Word Marking
Stop Bar Including STOP Word Marking
4.
1. All striping shall be in accordance with the Manual on Uniform Traffic Control
Devices (MUTCD) latest edition.
2. All letters, numerals, and symbols shall conform with the "Standard Highway Signs", current edition.
3. Match existing pavement marking configurations, symbols and words, or as directed by the CO.
4. Extend stop bar across the width of the lane.
A 12’ lane width was assumed for estimating purposes only.
PAVEMENT MARKINGS
SYMBOLS AND WORDS
C634-A
6.75’
13.5" 6" 45"
T11
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
TOTAL
SHEETS
SHEET
NO.
IMR WY
PRA GRTE PRES 1(12)
T3
634-B
1. All striping shall be in accordance with the Manual on Uniform Traffic Control
Devices (MUTCD) latest edition.
2. All letters, numerals, and symbols shall conform with the "Standard Highway Signs", latest edition.
3. Dimensions shown are for informational purposes only. Match existing pavement marking configurations, symbols and words, or as directed by the CO.
4. Yellow edge line may be used as directed by the CO.
PAVEMENT MARKINGS
PARKING AREAS
18’
8’ 5’
20’
5’
8’
9’
20’
18’
9’
4" solid single white edge line 4" solid single white edge line
Existing curb Existing curb
HANDICAP ACCESSIBLE
DIAGONAL PARKING
WITH HATCHED AISLE
HANDICAP ACCESSIBLE
HEAD-ON PARKING
WITH HATCHED AISLE
18"
18"
HEAD-ON PARKING
STRIPING
DIAGONAL PARKING
STRIPING
22’ - 26’ 20’ min.
8’
Detail A
PARALLEL PARKING
STRIPING DETAIL A
Edge of pavement
NO PARKING
HATCH
4" solid single white edge line
4" solid single white edge line
18"
4" solid white edge line. See note 4.
Varies
V a r ie s
12"
28"
4"
Existing curb Existing curb
T11
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
TOTAL
SHEETS
SHEET
NO.
T4
634-C
PAVEMENT MARKINGS
MISCELLANEOUS ROADWAY
STRIPING
NOTE:
1. All striping shall be in accordance with the Manual on Uniform Traffic Control
Devices (MUTCD) latest edition.
2. All letters, numerals, and symbols shall conform with the "Standard
Highway Signs", latest edition.
3. Match existing pavement marking configurations, symbols and words, or as directed by the CO.
4. Extend crosswalk across the full width of the roadway.
Edge of pavement
10 ft (Typ.
10 ft (Typ.
10 ft (Typ.)
ONE-WAY TRAFFIC -- LANE SHIFT
ONE-WAY TWO-LANE TRAFFIC -- LANES SEPARATE
TWO-WAY TWO-LANE TRAFFIC -- LANES SEPARATE
CROSSWALK STRIPING
4. Edge of pavement
4" solid white line
4" solid white line
4" solid yellow line
4" double solid yellow line
Direction of travel
Direction of travel
Direction of travel
Direction of travel
Direction of travel
T11
24" solid white longitudinal lines, center on centerlane and edge strip and center travel lane line between adjacent lines ty p
Match width to approaches
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
TOTAL
SHEETS
SHEET
NO.
IMR WY
PRA GRTE PRES 1(12)
T5
DETAIL C
No passing zone both directions
Two-way traffic
Staked centerline
4 4
4" white edge line
Shoulder
4" broken yellow center line s
10’ 30’
40’ shoulder (s) guardrail offset Travel way (L) curve widening (w)
Edgeline striping
(normal edge of shoulder)
Travel way (L) w/2
Striped centerline and top lift pavement joint
Edgeline striping
(normal edge of shoulder)
Paved ditch shoulder (s) guardrail offset shoulder (s) curve widening (w/2)
Travel way (L) curve widening (w/2)
Travel way (L)
Striped centerline and top lift pavement jointEdgeline striping
(normal edge of shoulder) Edgeline striping
(normal edge of shoulder)
Paved ditch shoulder (s)
Staked Centerline
4" white edge line Shoulder
4" solid double yellow center line
Shoulder 40’
30’10’
4" white edge line
No Passing Zone
No Passing Zone
4" broken and solid yellow center line
Length of curve widening s L
L s
L w
L w s
L w w
Staked design centerline
4" white edge line
Shoulder
4" solid double yellow center line s
L L s
L w w
L w s
L w s
L w s
L w s
L w
(Staked)
L L s
(Staked) s
Staked design centerline
L w
L w 2s
L w s
4" white edge line
Length of curve widening
Shoulder s L
L s
4" solid double yellow center line
DETAIL A
Passing zone both directions
Two-way traffic No passing zone single lane direction
Two-way traffic
DETAIL B
CURVE WIDENING ON SIMPLE CURVES (INSIDE)
CURVE WIDENING ON SPIRAL CURVES
STRIPING DETAIL
ON SPIRAL CURVES
To be used on curves where curve widening is applied. See note 2
CURVE STRIPING DETAIL ON SIMPLE CURVES
To be used on curves where curve widening is applied. See note 2
" 4
No passing zone both directions
Two-way traffic
1. See Summary Tabulation for tables showing station ranges and quantities for pavement markings.
2. Paint centerline striping on curves with curve widening to achieve equal lane widths within the traveled way. Shoulder widths remain constant throughout the curve widening.
3. Centerline offset striping is only applicable to curve widening on simple curves.
4. 4" or as required by the state.
5. Match all existing striping on project.
CENTERLINE STRIPING
AND TOP LIFT
PAVEMENT JOINT
03/2008
DETAIL
C634-50
07/2004
U.S. CUSTOMARY DETAIL
T11
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DETAIL
U.S. CUSTOMARY DETAIL
DETAIL APPROVED FOR USE
REG STATE PROJECT
TOTAL
SHEETS
SHEET
NO.
IMR WY
PRA GRTE PRES 1(12)
ROAD WORK
END
WORK
AHEAD
ROAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
AHEAD
ROAD
WORK
AHEAD
ROAD
ROAD NAME
ROAD NAME
Not To Scale 635-1
T6
TEMPORARY TRAFFIC CONTROL
ADVANCE SIGNING
T11
REVISED:
DRAFT: 9/2010
Urban and Rural 30 MPH and less
Urban and Rural 35 MPH to 50 MPH
Rural greater than 50 MPH sign when approach speeds exceed 50 MPH. When used place the two W20-1 signs "B" feet apart according to the Sign Spacing Table.
For work zones that are 2 miles or more in length, install G20-1 signs at xx
ROAD WORK
NEXT MILES
ROAD
WORK
xx FT
ROAD
WORK
xx FT xx
ROAD WORK
NEXT MILES
ROAD
WORK
xx FT
ROAD
WORK
xx FT
G20-1
See Note 11
G20-1
See Note 11
W20-1
See Note 10
W20-1
See Note 10
W20-1 over
W16-8P
See Note 9
W20-1 over
W16-8P
See Note 9
W20-1
Ro ad N am e
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
W20-1
See Note 10
W20-1
See Note 10 each end of the project. Show the distance on the G20-1 sign to the nearest whole mile.
If signing on a roadway under a jurisdiction other than the client agency, verify that an encroachment permit has been obtained.
State standards may be used as an alternative if approved by the CO.
Refer to the Section 635 of the Special Contract Requirements for allowable retroreflective sheeting types.
Erect all project advance warning signs before starting construction work.
Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.
Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs as determined by the CO for best results. Vary messages as required.
Additional or different message signs may be required to fit the actual construction conditions.
Install advisory speed plates under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.
Ensure all sign supports exposed to impact by traffic meet the requirements of
NCHRP-350 or MASH for crashworthiness.
Maintain two-way traffic during all non-work hours except as approved by the CO.
Do not store traffic control devices along the roadway when not in use. Cover post-mounted signs when not applicable.
If W20-1 is placed on a roadway other than that on which the actual construction work occurs, include a supplementary plaque indicating the name of the road on which the construction does occur (applies to major roads only).
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify the distance to the work area in feet or in miles. Install an additional W20-1
A
A
A
ADVANCE
W
ARNI
NG
AREA
(S ee S ig n
Sp ac in g
Ta bl e)
C
B
A
ADVANCE
W
ARNI
NG
AREA
(S ee S ig n
Sp ac in g
Ta bl e)
A
W or k zo ne A re a of In flu en ce as d et er m in ed b y th e
CO
B
C
Pr oj ec t L im its
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
TOTAL
SHEETS
SHEET
NO.
Not To Scale 635-2
T11
TEMPORARY
PAVEMENT MARKINGS
T7
Curves < 500’ Radius Tangents or Curves = 500’ Radius
4" Broken yellow
4" Solid double
4" Solid double
4" Broken yellow and
Traffic flow Traffic flow
DETAIL A2
No passing zone one direction
Two-way traffic
Traffic flow
Traffic flow
DETAIL B2
No Passing zone one direction
Two-way traffic
DETAIL B1
Passing zone both directions
Two-way traffic
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
DETAIL A3
No passing zone both directions
Two-way traffic
Traffic flow
Traffic flow
DETAIL B3
No Passing zone both directions
Two-way traffic
DETAIL A1
Passing zone both directions
Two-way traffic
DETAIL A DETAIL B
4" Broken yellow centerline
Shoulder
Shoulder and solid yellow centerline
Shoulder yellow centerline
Shoulder yellow centerline solid yellow centerline
Shoulder
Shoulder
40’
38’2’
40’
38’2’
20’
18’ 2’
20’
18’ 2’
10’ centers.
Single solid line: pavement markers spaced on 10’ centers.
Standard 635-3 may be used as an alternate. For ADT of 1000 or less, Standard 635-3 may be used as an alternate for the full 14 day
2’ broken line: two pavement markers spaced 2’ apart
NOTE:
Double solid line: two pavement markers, side by side, spaced on temporary marking period.
allowed by the gap shown based on curvature.
For ADT of greater than 1000 and periods of 3 days or less, Use permanent pavement marking layout as designated in the contract to determine no passing zones for each direction of travel.
To substitute raised pavement markers for lines, use the following patterns:
1.
2.
3.
4" Broken yellow yellow centerline
REVISED:
DRAFT: 9/2010
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
TOTAL
SHEETS
SHEET
NO.
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
PASSING
ZONE
NO
PASSING
ZONE
NO
PASSING
ZONE
DO
NOT
PASS
DO
NOT
PASS
DO
NOT
PASS
PASS
WITH
CARE
PASS
WITH
CARE
PASS
WITH
CARE
Not To Scale 635-3
DELINEATION AND SIGNING
FOR UNMARKED PAVEMENTS
T11
REVISED:
DRAFT: 9/2010
Repeat R4-1 at 1 mile intervals.
Repeat W8-12 after each major intersection and every 2 miles for temporary traffic control zones greater than 3 miles long.
with paint or tape, use Standard 635-2.
On curves with radius less than 500’, reduce cycle length to 20’.
NOTE:
Traffic flow
Traffic flow
W8-12
Traffic flow
Traffic flow
Traffic flow
Traffic flow
W8-12
W8-12
W8-12
W8-12
W8-12
Use permanent markings plan to determine no passing zones for each direction of travel.
W14-3
(optional)
W14-3
(optional)
W14-3
(optional)
TABLE A
Maximum Duration Before
Markings Are Required
ADT
See Note 2
See Note 2
See Note 2
14 Days
3 Days
= 1000
> 1000
R4-1
R4-1
R4-1R4-2
See Note 6
R4-2
See Note 6
R4-2
See Note 6
1.
2.
3.
4.
5.
6.
DETAIL C
No Passing zone both directions
Two-way traffic
DETAIL B
No Passing zone one direction
Two-way traffic
DETAIL A
Passing zone both directions
Two-way traffic
For periods noted in Table A, pavement may be unmarked if vehicle positioning guides and signing are provided per this detail. For longer periods/higher ADT or for application of temporary markings
Use the "PASS WITH CARE" (R4-2) sign at the downstream end of a no-passing zone only if a "DO NOT PASS" (R4-1) sign has been installed at the upstream end of the zone.
Bi-directional yellow vehicle positioning guides
Bi-directional yellow vehicle positioning guides
Bi-directional yellow vehicle positioning guides
40’ cycle length
40’ cycle length
40’ cycle length
500’
500’
500’
500’
500’
500’
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
Passing Allowed No Passing Zone Passing Allowed
T8
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
TOTAL
SHEETS
SHEET
NO.
Not To Scale 635-6
TEMPORARY TRAFFIC CONTROL
SINGLE LANE CLOSURE LAYOUT
(WITH FLAGGERS)
T11
REVISED:
DRAFT: 9/2010
MPH
SPACING IN FEET
FEET
Urban and Rural 30 MPH and less
Urban and Rural 35 MPH to 50 MPH
Rural greater than 50 MPH
SIGNS IN FEET
50’ - 100’ (optional)50’ - 100’
ROAD
WORK
AHEAD AHEAD
ONE LANE
ROAD
ROAD WORK
END
Traffic flow
Traffic flow
W20-1
See Note 4
W20-7aW20-4
G20-2
See Note 4
(See Length and
Spacing Table)
(optional)
WORK SPACE (optional)(optional)
W13-1P
(optional)
W16-2P
(optional)
1.
2.
3.
4.
5.
6.
7.
Signs are shown for one direction of travel only. Place devices similar to those depicted for the opposite direction of travel.
Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at a conspicuous location on the rear of vehicle. Prominently display the name of the contractor on the pilot car.
If closure is completely within the project limits, eliminate the "ROAD
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
For night time flagging operation, provide floodlighting at flagger stations.
For project specific minimum width, refer to the Special Contract
Requirements, Section 156.
Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
LENGTH AND SPACING TABLE
APPROACH
SPEED* TAPER
AREA
BUFFER
SPACE
WORK
SPACE
CHANNELIZING DEVICE
* Approach speed based on the regulatory posted speed, not the advisory speed.
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
Expressway / Freeway
NOTE:
MPH
XX xxx
FEET
BUFFER SPACE
LENGTH
Flagger location Channelizing devices
Flagger location
10’ min.
See Note 6
BUFFER SPACE
ADVANCE WARNING AREA (See Sign Spacing Table) (See Length and Spacing Table) TERMINATION AREA
C B A TAPER AREA BUFFER SPACE VARIABLE BUFFER SPACE TAPER AREA A
Device spacing
T9
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
TOTAL
SHEETS
SHEET
NO.
WORK
AHEAD
ROAD
AHEAD
ONE LANE
ROAD
ROAD WORK
END
ROAD WORK
END
WORK
AHEAD
ROAD
AHEAD
ONE LANE
ROAD
MPH
XX
MPH
XX
Not To Scale 635-7
TEMPORARY TRAFFIC CONTROL
SINGLE LANE CLOSURE LAYOUT
(WITH YIELD SIGN)
T10 T11
REVISED:
DRAFT: 9/2010
50’ - 100’ 50’ - 100’ (optional)
50 MPH.
MPH
SPACING IN FEET
FEET
Urban and Rural 30 MPH and less
Urban and Rural 35 MPH to 50 MPH
Rural greater than 50 MPH
SIGNS IN FEET
YIELD
TO
ONCOMING
TRAFFIC
Traffic flow
Traffic flow
W20-4
W1-4
W20-1
See Note 3
W20-4 W3-2
R1-2
G20-2
See Note 3
G20-2
See Note 3
W20-1
See Note 3
(See Length and
Spacing Table)
WORK SPACE
W13-1P
(optional)
R1-2aW13-1P
(optional)
W16-2P
(optional)
See Note 5
1.
2.
3.
4.
5.
6.
7.
xxx
FEET
NOTE:LENGTH AND SPACING TABLE
APPROACH
SPEED* TAPER
AREA
BUFFER
SPACE
WORK
SPACE
CHANNELIZING DEVICE
* Approach speed based on the regulatory posted speed, not the advisory speed.
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
Expressway / Freeway
(optional) (optional)
For project specific minimum width, refer to Special Contract
Requirements, Section 156.
Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
Use this layout only if sufficient gaps in oncoming traffic exist for traffic that must yield, and if drivers from both directions are able to see approaching traffic through and beyond the work site.
Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.
If closure is completely within the project limits, eliminate the "ROAD
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If the surface is paved, install yield lines that comply with Section 3B.16 of the MUTCD.
Use the "YIELD AHEAD" (W3-2) sign when approach speeds exceed
BUFFER SPACE
LENGTH
YIELD LINE
(optional)
See Note 4 Channelizing devices
Type B warning light (optional)
Type B warning light (optional)
15’
10’ min.
See Note 6
C B A
ADVANCE WARNING AREA (See Sign Spacing Table)
A B
TERMINATION AREAVARIABLE(See Length and Spacing Table)
TAPER AREA BUFFER SPACE ATAPER AREABUFFER SPACE
Device spacing
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
TOTAL
SHEETS
SHEET
NO.
Not To Scale 635-14
" 4
" 3
F a c e o f
C u r b
E d g e o f s h o u ld e r
NOTE:
1.
2.
3.
4.
Use Type III or higher type sheeting on all signs and channelizing devices. Warning lights are not normally needed on devices with Type III or higher type sheeting, but may be beneficial to attract the drivers attention in fog or other special conditions. When used, apply the appropriate type of warning light (Type A, B, C, or D) per the MUTCD Chapter 6F.
Ensure all sign supports exposed to impact by traffic meet the requirements of NCHRP-350 for crash worthiness.
Do not store traffic control devices along the roadway when not in use. Cover post-mounted signs when not applicable.
State standards may be used as an alternative if approved by the CO.
Local Tangent
200’
Shorter dimension for non-square post
1 12" dia. for 4" x 6" post and 2" dia. for 6" x 6" post
Embed 14 of the total length of the sign post in the ground
POST DETAIL SIGN INSTALLATION ANGLE
Mount signs with area 9 sqft and under on a single 4" x 4" wood post. Use double wood posts for signs wider than 36" or signs with an area over 9 sqft. Steel may be used in lieu of wood posts (see note #2).
NOTE:
SIGN PLACEMENT
URBAN AREAS
(or pedestrian or parking areas)
RURAL AREAS
Breakaway holes required for all wooden sign posts larger than
4" x 4". See Post Detail m in m in f o r a d v is o r y p la te
6’ to 12’2’ min.
m in f o r a d v is o r y p la te m in
TEMPORARY TRAFFIC CONTROL
SIGN INSTALLATION
T11 T11
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
TOTAL
SHEETS
SHEET
NO.
| A01.pdf |
| A02 |
| B01 |
| B02 |
| B03 |
| B04 |
| B05 |
| B06 |
| B07 |
| B08 |
| C01 |
| C02 |
| C03 |
| K01 |
| K02 |
| T01 |
| T02 |
| T03 |
| T04 |
| T05 |
| T06 |
| T07 |
| T08 |
| T09 |
| T10 |
| T11 |
File details come from the government source that posted it. Updated .