E-17
CA BLM 19006(1)
PANOCHE ACCESS ROAD & TRAILHEAD
If the invoice meets the requirements of Subsection 109.08(d), but has quantities or unit prices exceeding the corresponding quantities and unit prices shown on the Government's receiving report, the Government's data for that item of work will be used. The Contractor's invoice, as revised by the Government's receiving report, will be forwarded for processing within 7 days of the Government's receipt of the invoice. The Contractor will be notified of the reasons for any changes to the invoice.
(f) Partial payments. Add the following after the first paragraph:
Partial payments for stockpiled manufactured material (aggregates) will be based on Contractor process control test results. If test results show the material to be out-of-specification, or in “reject” where statistical evaluation procedures are used, no payment for stockpiled materials will be made.
Section 152. - CONSTRUCTION SURVEY AND STAKING
Construction Requirements
152.02 General. Delete the first paragraph and substitute the following:
For 19006(1) Panoche Access Road Project and 5403(1) Mendo Lake Road Project, no government survey will be provided. Grade stakes are not required for aggregate surface course.
Add the following to the fourth paragraph:
For 19006(1) Panoche Access Road Project and 5403(1) Mendo Lake Road Project, protect all land survey monuments, property corners, USGS bench marks and USGS control points. Move and reference those which fall within the construction limits according to Subsection 107.02, Protection and Restoration of Property and Landscape. Coordinate the new locations with CO.
For 19041(1) Ft. Ord Roadways Project Option V, the Government will furnish to the Contractor one copy of each of the following information:
• 3D coordinates and offset distance from centerline for subgrade and surface course finishing stakes at 50-foot intervals and miscellaneous intermediate stations for the low water crossing.
• Slope stake books containing centerline grade and slope staking information at 50-foot station intervals and miscellaneous intermediate stations for the low water crossing.
• Computer listings containing: horizontal alignment, vertical alignment, earthwork quantities, and staking details showing superelevation template data and slope information.
Amendment A003 May 4, 2010
E-18
PANOCHE ACCESS ROAD & TRAILHEAD
For 19041(1) Ft. Ord Roadways Project Option V, the Government will provide files for downloading 3D data. Following is the information that will be provided electronically:
• 3D coordinates of control points.
• 3D coordinates of grade finishing stakes.
• 3D coordinates of slope stakes
Delete the second sentence of the second paragraph and substitute the following:
For 19041(1) Ft. Ord Roadways Project Option V, reestablish missing control points, and stakes before slope staking begins.
Add the following:
Furnish a practicable schedule of staking activities with the construction schedule submitted according to Section 155. Include the dates and sequence of staking requirements.
152.03 Survey and Staking Requirements.
(f) Grade finishing stakes. (applies to 19041(1) Ft. Ord Roadways Project Option V) Delete the third paragraph and substitute the following:
The maximum longitudinal spacing between stakes is 25 feet when the centerline curve radius is less than or equal to 250 feet. When the centerline curve radius is greater than 250 feet, the maximum longitudinal spacing between stakes is 50 feet. The maximum transverse spacing between stakes is 25 feet. Reset grade finishing stakes as many times as necessary to construct the subgrade and each aggregate course. Use brushes or guard stakes at each stake.
(g) Culverts. (applies for all except 19041(1) Ft. Ord Roadways Project Options V, W and X) Delete the first paragraph and substitute the following:
Verify, in the field, the approximate location of each individual culvert with the CO prior to surveying, designing, and staking culverts. Use the “Guide for Designing and Staking Culvert in the Field”, dated January 9, 1996, issued by the U.S. Department of Transportation, Central Federal Lands Highway Division, Lakewood, CO, as a guide to the work in this section.
Perform the following:
(4) Add the following:
(a) For single skewed culverts, also submit a plotted field design cross-section, normal to roadway centerline, at each end section. Plot the offset and elevation of natural
E-20
PANOCHE ACCESS ROAD & TRAILHEAD
information. Label each stake with the following information corresponding to each respective lane:
(1) Station
(2) Offset from road centerline or other location as directed by the CO
(3) Offset from the proposed edge of pavement
(4) Existing road cross-slope. If cross-slope is to be changed, provide proposed change
Allow the CO to comment on any required changes to the stationing and/or readjust or establish additional centerline points. Minor adjustments in grade and/or alignment may need to be made during construction to produce a smooth, uniform project. The final alignment need not be a geometrically computed centerline and may be field adjusted up to 1 foot at the direction of the CO to provide a smooth flowing, best-fit alignment.
Provide a list to the CO of any stations or locations where the proposed pavement edge is within 2 feet of a break in the topography of the shoulder. The CO will determine if corrective action is required.
Provide stations to the nearest 3 feet, offsets to the nearest 2 inches, and cross-slopes to the nearest 0.2 percent.
Record the above information books and provide one hard copy to the CO.
Measurement
152.05 Delete the fourth paragraph and substitute the following:
Do not measure miscellaneous survey and staking.
Included in item 15201-0000 Construction Survey and Staking of 19041(1) Ft. Ord Roadways Project are all items necessary to perform survey for the proposed construction. This includes points, cross sections, slope stakes and references, clearing and grubbing limits, centerline reestablishment, grade finishing stakes, bridges, retaining walls and structures, borrow and waste sites, permanent monuments and markers and any other miscellaneous survey and staking.
152.05 Add the following:
For 19041(1) Ft. Ord Roadways Project, reestablishing missing Government-set terrain cross-section reference hubs, control points, and stakes will be measured under Special labor, Hired survey services when it is paid by the hour. No payment will be made for re-establishing missing hubs, control points, or stakes after construction operations have begun.
E-36
PANOCHE ACCESS ROAD & TRAILHEAD
For creek base flows, sediment-laden water from initial pumping startup may first be directed to a vegetated area not susceptible to erosion. When the pump is discharging clear water, the flows may be discharged directly to the creek.
Excavation work areas shall be kept free from water during excavation, backfilling, low water crossing construction, and riprap placement. Dewatering, sufficient to provide a completely dry work area, shall be maintained during all construction operations. The Contractor shall be responsible for repair and replacement of damaged areas resulting from water flows or the dewatering operations.
At the acceptable completion of work, the Contractor shall remove all dewatering operations and diversion features and restore disturbed areas to natural conditions.
Measurement
208.13 153.06 Add the following:
Dewatering and creek flow diversion will be measured by the lump sum.
Payment
208.14 153.07 Add the following: Payment will be full compensation for the labor, equipment, and materials for the work prescribed in this Section.
The Dewatering lump sum will be paid based on the following payment distributions:
(1) 50 percent of the lump sum will be paid after the Contractor has implemented dewatering operations as described above.
(2) 50 percent of the lump sum will be paid for upon accepted completion of the work.
Section 212. – LINEAR GRADING (For 19006(1) Panoche Access Road Project Only)
Payment
212.07 Delete this subsection and add the following:
Linear Grading will not be measured or paid for separately but will be subsidiary to the cost of Surface Aggregate Course 30110-0000.
Section 251. – RIPRAP
251.07 Acceptance. Delete the second sentence and substitute the following:
Riprap will be evaluated under Subsections 106.02 and 106.04.
E-37
PANOCHE ACCESS ROAD & TRAILHEAD
Verify that riprap delivered to the placement site meets the applicable class size specified in Table 705-1 through sampling as specified in Table 251-1 and testing the size characteristic as follows:
The intermediate dimension of the largest accessible rock will be measured and must be greater than the upper limit of the D85 size range specified in Table 705-1 for the applicable riprap class. The intermediate dimension is defined as the shortest, straight-line distance from one side of the rock to the other on the maximum projection plane (plane of rock with the largest projected surface area).
Verify that production riprap meets the applicable class gradation specified in Table 705-1 through sampling and testing the gradation characteristic as specified in Table 251-1.
Provide the contracting officer a minimum 7-day advance notice of the sampling and testing schedule and location.
E-66
PANOCHE ACCESS ROAD & TRAILHEAD
(5) Alkali-silica reaction with cementitious materials <0.04% at 24 months ASTM C 1293 performed on approved mix design mass percent combinations.
703.05 Subbase, Base, and Surface Course Aggregate
(c) Surface Course Aggregate. Delete the text including Table 703-3 and substitute the following:
Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming to the following:
(1) Los Angeles abrasion, AASHTO T 96 50% max.
(2) Fractured faces, one or more, ASTM D 5821 50% min.
(3) Free from organic matter and lumps or balls of clay
(4) Liquid limit, AASHTO T 87 and T 89 35 max.
(5) Dust ratio: 2/3 max.
(6) Gradation and plasticity index, AASHTO T 87 and T 90 Table 703-3
Do not use material that breaks up when alternately frozen and thawed or wetted and dried.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.
Fine aggregate, material passing the No. 4 sieve, will consist of natural or crushed sand and fine mineral particles.
Do not furnish material that contains asbestos fibers.
Table 703-3 Target Value Ranges for
Surface Course Gradation and Plasticity Index
Sieve Size Percent by Mass Passing
Designated Sieve (AASHTO T 27 and T 11)
¾ inch 100 (1)
No. 4 41-71 (7) No. 40 12-28 (5)
No. 200 9-16 (4) Plasticity Index (PI) 8 (4)
(1) Statistical procedures do not apply.
( ) Allowable deviations (+/-) from the target values
% passing #200 % passing #40
| Untitled |
| wages.pdf |
| washingon d-b |
| kane d-b |
| Text1: |
| Text2: |
| 0: 1 |
| 1: 7 |
| Text3: |
| 0: A003 |
| 1: May 4, 2010 |
| 2: |
| 0: |
| 1: CA BLM 19006(1) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: RYAN OLSON
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH68-10-B-00018 |
| 1: April 8, 2010 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 1* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 11 Above |
| Text13: INVITATION FOR BID |
Remove Pages E-17, E-18 and E-20 and Replace with E-17, E-18 and E-20. Added text to project description and modified Measurement Subsection.
Remove Pages E-36 and E-37 and Replace with Pages E-36 and E-37. Revised Measurement and Payment heading numbers.
Remove Page E-66 and Replace with Page E-66. Added Subsection 703.05 heading.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it. Updated .