About this file

The initial IFB appeared to be corrupt assumingly due to size restrictions. This file contains only Section E - Special Contract Requirements. Appendices to follow in a separate document.

View the file

Other files

File Type Posted
GOGAA005.pdf PDF
GOGAA004.pdf PDF
GOGAA003.pdf PDF
GOGAA002.pdf PDF
Appendices.pdf PDF
FO IFB2.pdf PDF
A001.pdf PDF
FO IFB.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E-1

CA PRA GOGA 109(1)

Golden Gate National Recreation Area PMIS No. 88838

SPECIAL CONTRACT REQUIREMENTS

The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges, on Federal Highway Projects (FP-03) Metric Version , U.S.

Department of Transportation, Federal Highway Administration.

SI (METRIC)(1) TO U.S. CUSTOMARY CONVERSION FACTORS (approximate)

To the table on page iv, Delete the second line of the MASS and the second line of the ILLUMINATION portion of the table and substitute the following:

Symbol When You Know Multiply By To Find Symbol

MASS

kg kilograms 2.2046 pounds lb

ILLUMUNATION

cd/m2 candela/m2 0.2919 foot-Lamberts fl

Section 101. – TERMS, FORMAT, AND DEFINITIONS

101.04 Definitions.

Roadway Prism Delete the text and substitute the following:

The volume defined by the area between the original terrain cross-section and the final design cross-section multiplied by the horizontal distance between the centroids (geometric center) of the area.

Section 104. – CONTROL OF WORK

104.03 Specifications and Drawings. Add the following:

(c) As-built working drawings. Prepare and furnish as-built working drawings prior to final acceptance. The Government will provide one set of 280 x 430 millimeter contract drawings to be used exclusively for recording the as-built details of the project. Mark plans on title sheet “As-Built Plans”. Use red ink to record the information described below.

Note all additions or revisions to the location, character and dimensions of the prescribed work shown on the contract drawings. Location changes are to be shown in the same coordinate system used for the staking notes. Strikeout all details shown that are not applicable to the completed work.

Check and initial all plan sheets that were incorporated into the completed work without change.

E-2

Golden Gate National Recreation Area PMIS No. 88838

Retain the drawings at the project site and, as work progresses, continuously update them to reflect the as-built details. Submit a copy of the updated as-built drawings at least every 30 days to the CO for review for compliance with these specifications. Once the final as-built drawings have been approved, scan documents into pdf format. Provide CO with two compact discs containing as-built drawings.

As a minimum, show the following information on the as-built drawings:

(1) Title Sheet

(a) Name of contractor.

(b) Name of Project Engineer.

(c) Project completion date.

(d) Revisions to project length.

(e) Revisions to begin and end stations of project.

(f) Revisions to index to sheets.

(g) Strikeout any schedules or options not awarded.

(h) A note stating “All work was constructed as designed unless otherwise noted.”

(2) Typical section(s)

(a) Revisions in dimensions.

(b) Revisions in materials.

(c) Revisions in station ranges.

(d) Revisions to begin and end stations of project, and length of project.

(e) Revisions to station equations.

(f) Revisions to slope ratio and curve widening tables.

(g) Revisions to any notes.

(3) Summary of Quantities and Tabulation Sheets

(a) Revisions to all quantities, locations, notes/remarks, including totals.

(b) Strikeout unused pay items.

(c) Revisions to application rates.

(d) Revisions to location, type, end treatments, riprap, skew, on drainage summary.

(4) Control Sheets

(a) Show any control that was removed, destroyed, established, according to subsections 107.02, paragraph 2; 152.02, paragraph 2; and 152.03.

(b) Use a unique naming convention for newly established control points. Do not reuse CFL control point numbers.

(5) Plan and profile and layout sheets

(a) Revisions to the alignment; grades, elevations and stationing of intersection PIs;

station equations and superelevation.

(b) Major changes in the construction limits; particularly changes requiring additional design, additional right of way, or contract modifications. (Show information on plan and profile, layout sheets, and right of way plans if applicable.).

E-3

Golden Gate National Recreation Area PMIS No. 88838

(c) Changes in permanent rights of way caused by acquisition during construction.

(Show information on plan and profile, layout sheets, and right of way plans if applicable). In addition, annotate any construction completed according to agreements made with landowners during construction.

(d) Revisions in location, type and grade of road approaches.

(e) Revisions in locations of sub-excavation and roadway obliteration.

(f) Location, type and elevation of all constructed or relocated utilities, aerial and underground. Location, type and elevation of utilities not previously or inaccurately mapped, but encountered during construction, indicated as “approximate” or “as mapped”. (Show information on plan and profile and layout sheets and utilities plans if applicable).

(g) Location, size and type of underdrains.

(h) Location, number and type of horizontal, lateral, trench and blanket drains.

(i) Revisions to culvert diameter, length, type, stationing, skew, riprap and end treatments.

(j) Length of culvert extension, skew, and offset from centerline to the ends of extended culverts.

(k) Channel changes.

(l) Location of monuments and permanent references replaced according to subsection

107.02.

(m) Location, length and type of fencing.

(n) Location, length, stationing and type of walls.

(o) Location, length, stationing and end treatment of roadside design features, including, but not limited to, guardrail, guardwall, signs, fences, gates, etc.

(p) Revisions in location of pavement markings.

(q) Revisions to parking areas or turnouts location.

(r) Revisions in location, type and length of curbs, sidewalks, and accessible ramps.

(s) Revisions to any notes.

(t) Revisions to permanent erosion control measures.

(6) Standards, Details, and Specials Revisions to notes, dimensions, locations, and materials.

No direct payment will be made for preparing and furnishing as-built working drawings. A retention of 1/10th of 1% of payment due will be withheld from project pay estimates if the Contractor has not kept current the designated set of as-built plans. In addition, a retention of 1/10th of 1% of the contract amount paid to date will be withheld at the end of the project until the set of as-built plans has been submitted to and accepted by the Project Engineer. The final completed as-built working drawings must be submitted to and accepted by the Contracting Officer and placed on two compact discs in pdf format (in addition to the hard copy) before final acceptance will be granted on the project.

E-4

Section 105. - CONTROL OF MATERIAL

105.01 Source of Supply and Quality Requirements. Add the following:

Transport import material directly from the source to Golden Gate National Recreation Area without intermediary storage or staging. Materials must also be transported and stored such that they will not acquire invasive non-native plant seeds from adjacent vegetation.

Non-native invasive plants, or noxious weeds, are species of plants that do not naturally occur in a particular area and have the potential to spread from their point of introduction into surrounding areas.

Obtain clearance or eradicate non-native plants by;

(1) Provide certification by a county extension agent, agronomist, or other qualified invasive species expert that the source is free from exotic plants; or

(2) Notify the CO at least 2 weeks before beginning operations at the source or starting crushing to allow for investigation by the NPS for exotic plants. If exotics are found, the CO will determine if the upper portion of the source will need to be stripped or sprayed with an herbicide approved by the CO. If spraying is required, provide a licensed operator to spray according to applicable state regulations. Do not spray any herbicides until approved in writing by the CO. Spraying or stripping of material does not necessarily constitute approval.

(3) If exotic plant clearance is not obtained, heat all material to 300 degrees Fahrenheit to ensure sterilization of any exotic plants before delivery of uncertified material. Do not stockpile the heated material outside the park boundaries prior to delivery. These requirements are waived if the contractor uses a source that meets the requirements stated in items (1) and (2) above.

Submit samples of materials for quality verification testing for materials required to conform to Sections 703, 704, and 705.

Materials containing petroleum-based solvents such as cutback asphalts and traffic paints may be restricted from use by local laws or ordinances in certain geographic areas. Upon presenting proof of such restrictions, alternate materials considered acceptable to the CO may be substituted for the materials specified in the contract.

105.02 Material Sources

(b) Contractor-located sources. Add the following to the end of the first paragraph:

For Contractor-located, non-commercial sources, secure environmental clearances according to Subsection 107.10.

E-5

Golden Gate National Recreation Area PMIS No. 88838

105.04 Storing and Handling Material. Add the following after the third sentence of the second paragraph:

For Contractor-located, non-commercial staging, storing, and material handling areas, secure environmental clearances according to Subsection 107.10.

Add the following:

Equipment and material staging areas will be located in existing disturbed areas within construction limits or previously approved areas. The Contractor may use the following for staging equipment and/ or storage of materials:

Smith Road (Maintain a 30 m buffer or protect with silt fence the riparian area near Smith Road (Park will flag the boundaries of the riparian area). Install silt fence at the edge of the staging area to delineate and protect.)

Julian Road parking area Point Bonita parking area Bicentennial (“Lower Fisherman’s) parking area Lanes that are closed to traffic during construction.

Large parking area/ disturbed area off of Bunker Road west of the Baker-Barry tunnel Battery Alexander parking area (Half of this parking area must be open to visitor parking on holidays and weekends with temporary fencing (temporary traffic control, plastic fence) placed around any equipment or material stored here.)

Allow 14 days for approval prior to using any other areas for staging or storing materials and/ or equipment. An asphalt batch plant will not be permitted in the park.

Cover all material stockpiles with a tarp that are left inactive during the rainy season, between November 1 and March 31.

Section 106. - ACCEPTANCE OF WORK

106.01 Conformity with Contract Requirements. Delete the text and substitute the following:

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

E-6

Golden Gate National Recreation Area PMIS No. 88838

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method

(2) Number of samples

(3) Sample transport

(4) Test procedures

(5) Testing laboratories

(6) Reporting

(7) Estimated time and costs

(8) Validation process

E-7

Golden Gate National Recreation Area PMIS No. 88838

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory.

Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

Where sample/testing procedures make reference to AASHTO, ASTM, or other standards (designated as FLH T), the procedure as modified in the Materials Manual shall govern. Where the specifications make reference to AASHTO Test T11, “Procedure B - Washing Using a Wetting Agent” shall be the procedure followed.

Where the specifications make reference to AASHTO Test T310, “Direct Transmission Method of In-Place Nuclear Density and Moisture Content” shall be the procedure followed.

Reference to the Materials Manual means the Federal Lands Highway “Field Materials Manual, U.S. Department of Transportation, Federal Highway Administration,” Publication No. FHWA-FL- 91-002, dated January 2009, and all amendments and supplements thereto. Copies are available upon request by e-mail to CFLContracts@fhwa.dot.gov, by fax to 720-963-3360 or on our website at www.clfhd.gov/materials.

E-8

Golden Gate National Recreation Area PMIS No. 88838

106.03 Certification. Add the following after the second paragraph:

See Table 106-3 for schedule for full or partial acceptance by material certification. Submit certification and sample of material for testing as required.

106.05 Statistical Evaluation of Work and Determination of Pay Factor (Value of Work).

(b) Acceptance. Delete the last sentence of the second paragraph and substitute the following:

If a lot is concluded or terminated with fewer than three samples, the samples will be combined with those of an adjacent lot. In the event there is no adjacent lot, the material will be accepted according to Subsection 106.04.

Table 106-2 Pay Factor.

The Pay Factor 1.03, category I row: Delete the value 84 in the n=9 column and substitute the value 94.

The Pay Factor 0.75, category II row: Delete the value 35 in the n=3 column and substitute the value 25.

E-9

Golden Gate National Recreation Area

Table 106-3 Schedule For Full or Partial Acceptance by Materials Certification. Add Table 106-3 following Table 106-2.

Table 106-3 Schedule For Full or Partial Acceptance by Materials Certification

Frequency Section Description Material

Material Property Or Specification Certification Sample

306 Dust Palliative Magnesium Chloride, Emulsified Asphalt, Lignin Sulfonate, Calcium Chloride

As specified 1 per shipment First shipment

308 Minor Crushed Aggregate Crushed Aggregate Source, Quality and Gradation

1 per source 1 per source

404 and 417 Minor Hot Asphalt

Concrete, Minor Cold Asphalt Mix

Aggregate Asphalt Mix Source quality, Gradation, Stability, and Grade 1 per mix 1 per source

634 and 635 Permanent Pavement Markings, Temporary

Traffic Control

634.02 as applicable, 635 as applicable

As specified 1 per source -----

701 Hydraulic Cement Portland Cement, Blended

Hydraulic Cement and Masonry Cement

AASHTO M 85, M 240,

and ASTM C 91

1 per shipment 1 per 100 tons

702.01 Asphalt Material Asphalt Cement

AASHTO M 20, M 226,

MP 1 or as applicable 1 per shipment 1 per shipment

702.02 Asphalt Material Cut-back Asphalt

AASHTO M 81 or M 82 as applicable

1 per shipment 1 per shipment

702.03 Asphalt Material Emulsified Asphalt

AASHTO M 140 or M 208 as applicable

1 per shipment 1 per shipment

702.05 Asphalt Material

Asphalt Materials used for Damproofing and Waterproofing Concrete Surfaces

As specified for each type of asphalt material

1 per shipment -----

702.06 Recycling Agent As specified As applicable 1 per shipment 1 per shipment

702.08 Antistrip As specified As applicable 1 per shipment -----

706 Concrete and Plastic Pipe As specified As applicable 1 per shipment -----

707 Metal Pipe Metal Pipe as specified As applicable 1 per shipment -----

708 Paint As specified As applicable 1 per batch\lot 1 sample for quantities >100L

E-10

Golden Gate National Recreation Area PMIS No. 88838

Frequency Section Description Material

Material Property Or Specification Certification Sample

Reinforcing Steel and Wire Rope

As specified As applicable 1 per shipment

For 709.01 & 709.03 submit 3 1-meter bars of each size and grade of bar furnished.

709.02 submit 1 2-meter length for each size furnished

710 Fence and Guardrail As specified As applicable 1 per shipment -----

Concrete Curing

Material and Admixtures As specified As applicable

1 per material source per material type

712 Joint Material (all) As specified As applicable 1 per shipment -----

Roadside Improvement

Materials (all) As specified As applicable 1 per shipment -----

Geotextile and

Geocomposite Drain As specified As applicable 1 per shipment 1 per project per type

715 Piling As specified As applicable 1 per shipment -----

Material for Timber

Structures Timber and Hardware As applicable 1 per shipment -----

717 Structural Metal As specified As applicable 1 per shipment

717.01(e) minimum 6 per shipment for each size used.

717.10 1 per project

Traffic Signing and

Marking (all) As specified As applicable 1 per shipment -----

Structural Wall and

Stabilized Materials (all) As specified As applicable

1 per shipment per material type

Electrical and Illumination

Material (all) As specified As applicable

1 per shipment per material type

722 Anchor Material As specified As applicable 1 per shipment per material type

725 Miscellaneous materials As specified As applicable 1 per shipment per material type

E-11

MIS No. 88838

Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

107.01 Laws to be Observed. Add the following:

Section 401 and 404 of the Clean Water Act.

Comply with the terms and conditions of the 404 permit and with the terms and conditions, if any, specified in the 401certification by the Regional Water Quality Control Board. Comply with the terms and conditions of any permits that are issued for the performance of work within the jurisdictional waters of the U.S. Permits are included in the Appendix.

Encroachment Permits. Project Manager will provide.

National Pollutant Discharge Elimination System (NPDES)

Obtain a separate NPDES permit associated with industrial activity for any mobile asphalt, aggregate, and concrete plants that provide material for the project.

Implement the requirements of the NPDES for erosion control due to storm water runoff during construction as specified under the NPDES Construction Stormwater General Permit No. 99-08- DWQ for California. CFLHD has submitted an NOI for the project, but has not prepared the

SWPPP.

(a) General. Designate the erosion control/water quality supervisor according to Subsection 157.03 who will be responsible for implementing the Storm Water Pollution Prevention Plan (SWPPP).

Ensure familiarity with SWPPP procedures and practices and ensure that emergency procedures and the SWPPP are updated as needed and available for inspection.

(b) Preparation of SWPPP. At least three weeks prior to beginning construction provide a draft SWPPP for the project, which includes the following information and forms:

(1) Site Description

(2) Expected sequencing of operations and construction schedule

(3) Weather monitoring procedure

(4) Descriptions and details of erosion and sediment controls, including dust control

(5) Erosion Control Details and Quantities provided in the Plans

(6) Controls for other potential onsite storm water pollutants

(7) Hazardous Spill Plan (see (e) below)

(8) Applicable specifications and Special Contract Requirements

(9) Maintenance and inspection procedures and forms

(10) Description of potential non-storm water discharges at the site

(11) Copy of Notice of Intent (NOI) form submitted by CFLHD

(12) Blank Notice of Termination (NOT) form

(13) Contractor and Subcontractor Certification forms

(14) Other record keeping forms and procedures

(15) “Good housekeeping” practices and requirements

E-12

Golden Gate National Recreation Area MIS No. 88838

Modify the erosion and sediment control details, layout sheets, and quantities included in the plans if necessary to address project site conditions and proposed construction operations and include them in the SWPPP.

To comply with the General Permit, jointly review the draft SWPPP with the CO and agree to any needed revisions. Jointly approve and sign the revised SWPPP. The approved SWPPP will describe and ensure the implementation of practices, which will be used to reduce the pollutants in storm water discharges to assure compliance with the terms and conditions of the General Permit.

When the SWPPP is approved and signed by the CO and Contractor, it will be the document in force on the project. Implement the SWPPP as required throughout the construction period.

Place the SWPPP and all updates in a three-ring binder so that completed inspection forms and other records may be inserted. Maintain a current copy of the SWPPP, including a copy of the permit, NOI, Waste Discharge Identification (WDID), and all associated records and forms at the job site throughout the duration of the project. Make the SWPPP available for public inspection and for the inspection and use of the CO.

Maintain all related erosion control elements in proper working order throughout construction.

Ensure erosion control measures are in place prior to construction activities and in good repair by October 15 each year. Do not perform clearing and grubbing or earthwork until the SWPPP has been implemented.

Prior to construction, the Contractor and all subcontractors must sign certifications (included in the SWPPP) that they understand the requirements of the General Permit. Ensure that all subcontractors comply with the requirements of the General Permit.

At the completion of the project, provide the CO with the SWPPP, including inspection forms and all data used in developing and modifying the SWPPP. The Contractor is also required to retain a copy for a period of at least three years from the date the site is finally stabilized.

(c) Notice of Intent (NOI). Post the NOI at the construction site bulletin board throughout the duration of the project.

(d) Erosion Controls. Implement soil erosion controls according to the SWPPP and Section 157.

(e) Controls for Other Pollutants. Implement controls to eliminate the discharge of pollutants (other than erodible soil) into storm water, such as pollutants from materials stored onsite. Include the implementation of spill prevention and material management controls and practices to prevent the release of pollutants into storm water. Include these controls and practices and storage procedures for chemicals, construction materials and other pollution prevention measures in the Hazardous Spill Plan Section of the SWPPP.

E-13

Golden Gate National Recreation Area MIS No. 88838

In addition, contact the appropriate federal, state, and local authorities to determine the quantity of discharge that initiates reporting of petroleum products and hazardous material spills to those authorities. List the quantities in the SWPPP for all petroleum products and hazardous material used on the project.

Submit a Spill Prevention, Control, and Countermeasure (SPCC) plan for oil and oil products on sites that meet the requirements of 40 CFR Part 112 (Refer to EPA checklist at the following web address:

http://www.epa.gov/emergencies/docs/oil/spcc/guidance/G_Bulk_Storage_Checklist.pdf

Submit and follow the Hazardous Spill Plan in the SWPPP when a SPCC plan is not required.

Develop a plan describing what actions will be taken in case of a spill and incorporate preventative measures to be implemented (such as the placement of refueling facilities, storage and handling of hazardous materials, etc).

Submission of either plan must be made at least 2 days before beginning work.

(f) “Good Housekeeping” Practices and Requirements. Specify the Contractor’s “good housekeeping” practices and requirements, including vehicle wash-down areas, onsite and offsite tracking control, protection of equipment storage and maintenance areas, and sweeping of highways and roadways related to hauling activities in the SWPPP.

Take precautions to prevent pollution of streams, lakes, and reservoirs with fuels, oil, bitumens, calcium chloride, magnesium chloride, Portland cement, fresh Portland cement concrete, raw sewage, muddy water, chemicals or other harmful materials. Do not discharge these materials into channels leading to any stream, lake or reservoir.

Locate machinery servicing and refueling areas away from streambeds and washes to reduce the possibility and minimize the impacts of accidental spills or discharges.

Remove non-waste materials, such as used cans, oils, machine and equipment parts, paint, hazardous materials, plastic and rubber parts, discarded metals, and building materials from the construction site and dispose of at an approved landfill.

Where the Contractor’s working area encroaches on a running or intermittent stream, construct and maintain adequate barriers to prevent the discharge of any contaminants into the stream.

Do not operate mechanical equipment in running streams unless approved in writing by the CO.

Fording of running streams with construction equipment will not be permitted. Obtain approval from the CO to use temporary bridges or other structures whenever crossings are necessary.

Immediately clear streams, lakes and reservoirs of all work items, debris or other obstructions inadvertently placed thereby or resulting from construction operations.

E-14

Golden Gate National Recreation Area MIS No. 88838

(g) Inspections and Revisions to the SWPPP. Conduct inspections before and within 24 hours after storm events and once each 24-hour period during extended storm events. Conduct a minimum of one site inspection per month for areas that receive less than 510 millimeters (20 inches) of annual rainfall. Inspection frequency can be reduced to one per month if: 1) the site is temporarily stabilized, 2) runoff is unlikely due to winter conditions (site is covered with snow, ice, or the ground is frozen, or 3) during seasonal arid and semi-arid periods (areas with an average rainfall of 510 millimeters (20 inches) or less). Conduct a minimum of one site inspection every seven calendar days where the mean annual rainfall equals 510 millimeters (20 inches) or more. The area of inspection includes, but is not limited to, disturbed areas that have not been finally stabilized, areas used for storage of materials, locations where vehicles enter or exit the site, and all of the erosion and sediment controls that are included in the SWPPP. Monitor rainfall with a rain gauge accurate to the nearest 13 millimeters (0.5 inches) of rain.

Document the inspections on forms provided in the SWPPP. Be consistent with the State Water Quality Control Board inspection forms, and sign according to the requirements of the SWPPP and the General Permit. Retain inspection forms onsite in the SWPPP notebook throughout the construction period.

Revisions to the SWPPP may be necessary during construction to make improvements or to respond to unforeseen conditions noted during construction or site inspections. For that purpose, specify in the SWPPP the mechanism whereby revisions may be proposed by the Contractor or the CO and incorporated into the plan, including review and approval of minor changes. Jointly approve and sign each revision to the SWPPP before implementation. Implement approved modifications within 7 calendar days following the date of the inspection when deficiencies or necessary corrections were first noted.

107.02 Protection and Restoration of Property and Landscape. Add the following:

Protect historic batteries, bunkers, tunnels, and related features, and existing concrete curbs, gutters, and sidewalks, from damage including asphalt and emulsion overspray. If needed use protective covers to protect the adjacent features.

At historic curb, gutters and paved waterways to be preserved, saw cut the seam between the concrete and the pavement prior to the pavement removal.

Notify the CO if historic curb, gutter, or other historic features are damaged. Repair damage at no cost to the Government.

Place temporary fencing (temporary traffic control, plastic fence) around wetland area on McCullough Road near station 3+900 prior to beginning work in this area. Park will flag wetland boundaries prior to construction.

Notify the Park Archeologist, Leo Barker at (415) 561-2836, two weeks prior to ground disturbing activities in Archeologically Sensitive Areas, which include, East Road outside of the paved roadway and the wetland mitigation site on Bunker Rd (near the Rodeo Lagoon).

E-15

Golden Gate National Recreation Area MIS No. 88838 Delete the sixth paragraph and substitute the following:

The Contractor will contact Underground Service Alert (USA)(1-800-642-2444) seven (7) calendar days prior to start of each section and will be responsible for maintaining a valid USA location tag through renewal during the construction. The Contractor will schedule a utility field meeting prior to any excavation. This will be so stated in the USA notification. The Contractor will be responsible to coordinate the utility field meeting at which time he will explain the limits and impacts to USA member utilities.

The sanitary sewer and water lines within Marin Headlands are owned by NPS. The sanitary sewer and water lines on East Road in Fort Baker are owned by NPS from 1+035 to approximately 2+375. Gas lines on East Road in Fort Baker are owned by NPS from 1+035 to approximately 1+080. These utilities will not be marked out by USA. It is the Contractor's responsibility to field locate and mark all utilities within the project work area a minimum of 3 days prior to ground disturbance. Notify the CO upon completion of field location and marking for review and approval. No trenching shall be performed prior to CO approval. Utility plans will be made available to the Contractor upon request.

Add the following:

The locations of the utilities shown in the plans have been certified to a Quality Level B, with spot locations certified to a Quality Level A according to the CLFHD Utility Data Quality Certification requirements: http://www.cflhd.gov/design/survey-map-row/_documents/UtilityProcess.pdf

Summary of Status of Utilities:

UTILITY

TYPE STATUS Contact Name Contact Number Contact Info

FO 4

John Smoot (fld) James Robinett

(415) 999-5596

(925) 977-2415

AT&T

Rosemary Hamill 2741 N. Main St.

Walnut Creek, CA 94597

T 1 Bob Edgar (field) Anita Gabrielson

(707) 575-2089

(707) 575-2077

AT&T Engineering 2125 Occidental Road Santa Rosa, CA 95401

G

(PG&E)

3 & 4 Albert Caballero (415) 257-3174

PG&E Pacific Gas and Electric Co 1220 Anderson Drive San Rafael, CA 94901 AEC4@PGE.com

G

(NPS)

John Ryan (cell)

(415) 561-4955

(415) 725-8610

Golden Gate National Recreation Area Building 201, Fort Mason San Francisco, CA 94123

P

(NPS)

2 & 4 John Ryan (cell)

(415) 561-4955

(415) 725-8610

Golden Gate National Recreation Area Building 201, Fort Mason San Francisco, CA 94123

E-16

W

(MMWD)

2 & 4 Bob Pieri (field) Jon Lahaye

(415) 945-1589

Marin Municipal Water District 220 Nellen Avenue Corte Madera, CA 94925

W

(NPS)

John Ryan (cell)

(415) 561-4955

(415) 725-8610

Golden Gate National Recreation Area Building 201, Fort Mason San Francisco, CA 94123

SS 3 & 4

John Ryan (cell)

(415) 561-4955

(415) 725-8610

Golden Gate National Recreation Area Building 201, Fort Mason San Francisco, CA 94123

P

(GGBD)

4 Paul Wong (415) 923-2322 Golden Gate Bridge District Box 9000, Presidio Station San Francisco, CA 94129

FO Fiberoptic P Power T Telephone W Water

UTILITY

TYPE

KEY G Gas SS Sanitary Sewer

Status 1: The utilities are in conflict with the project and REQUIRE relocation by OTHERS

DURING construction.

Status 2: The utilities are in conflict with the project and REQUIRE relocation by the Contractor DURING construction.

Status 3: The utilities are in conflict with the project and REQUIRE relocation BEFORE construction.

Status 4: The utilities are located within the project rights of way but require NO relocation.

Status 1 Utilities:

Utility Type Location Station

Offset (m)

Utility Conflict or Exception to Minimum Clearance

T East Road

1+457 6.0 RT Culvert conflicts with local phone line.

T East Road

1+563 4.7 RT

Culvert has 175 mm clearance over local phone line.

T East Road

1+611 5.2 RT

Culvert has 200 mm clearance over local phone line.

T East Road

1+758 5.6 RT Culvert conflicts with local phone line.

T East Road

2+286 1.6 RT

Culvert has 250 mm clearance over phone line.

E-17

Golden Gate National Recreation Area MIS No. 88838

Status 2 Utilities:

Utility Type Location Station

Offset

(m) Utility Conflict

P

(NPS)

East Road

1+087 3.2 LT

Move empty 25 mm grey PVC line below proposed culvert.

W

(MMWD)

East Road

2+376 2+377 2+407

LT

Reset 2 water valve covers and 1 water meter cover.

P

(NPS)

Danes Drive

1+013 LT

Turn lane widening conflicts with powerline to flashing beacon.

Status 3 Utilities:

Utility Type Location Station

Offset (m)

Utility Conflict or Exception to Minimum Clearance

G

(NPS)

East Road

1+074 4.3 RT Culvert has 50 mm clearance over gas line

G

(PG&E)

East Road

1+085 2.6 LT

Culvert has 100 mm clearance over gas line (above transoceanic fiberoptic encasement)

SS-FM

East Road

1+456 2.0 RT

Culvert has unknown clearance over sanitary sewer - force main line

SS-FM

East Road

1+758 2.8 RT

Culvert has 125 mm clearance over sanitary sewer - force main line

G

(PG&E)

East Road

2+155 3.5 RT Drop inlet within 125 mm of gas line

G

(PG&E)

East Road

2+286 3.9 RT

Drop inlet has 200 mm clearance over gas line

Status 4 Utilities (Requiring Utility Owner Monitoring During Construction):

Utility Type Location Station

Offset

(m) Exception to Minimum Clearance

W

(NPS)

East Road 1+076 2.4 RT Culvert has 225 mm clearance over water line

FO East Road 1+085 2.6 LT Culvert has 10" clearance over transoceanic fiberoptic line (below gas line)

E-18

G

(PG&E)

East Road 1+455 2.8 LT Culvert has unknown clearance over gas line (above transoceanic fiberoptic encasement)

FO East Road 1+455 2.8 LT Culvert has unknown clearance over transoceanic fiberoptic encasement (below gas line)

FO East Road 1+611 7.5 RT Culvert conflicts with concrete backfill above gas line and transoceanic fiberoptic line

G

(PG&E)

East Road 1+611 7.5 RT Culvert conflicts with concrete backfill above gas line and transoceanic fiberoptic line

FO East Road 1+759 3.6 LT Culvert conflicts with concrete backfill above transoceanic fiberoptic line

G

(PG&E)

East Road 1+758 4.5 RT Culvert has 175 mm clearance over gas line

W

(MMWD)

East Road 2+286 3.0 RT Culvert has 275 mm clearance over water line

P

(GGBD)

Commuter Lot (off Lower Conzelman)

Monitor culvert installation below power line at south end of Commuter Lot

P

(NPS)

Field Road 2+080 RT Railroad ties mark a possibly active 4kV power line at proposed cut slope

SS Field Road 2+500 Sanitary sewer line exists below proposed 5" grade lowering

W

(NPS)

Field and Bunker Intersection

2+720 Water line is near proposed grade lowering

107.03 Bulletin Board. Add the following:

(g) “Beck” poster, according to FAR Clause 52.222-39 Notification of Employee Rights Concerning Payment of Union Dues or Fees.

E-19

Golden Gate National Recreation Area MIS No. 88838

107.05 Responsibility for Damage Claims. Delete the first paragraph and insert the following:

Indemnify and hold harmless the Government, the California Department of Transportation, and the Golden Gate Bridge, Highway, and Transportation District, their directors, officers, employees, agents, and consultants from suits; actions; or claims brought for injuries or damage received or sustained by any person, persons, or property resulting from the construction operations or arising out of the negligent performance of the contract.

107.08 Sanitation, Health, and Safety. Add the following:

There will be considerable contact with poison oak during construction. Implement appropriate protection measures when working in or around poison oak.

107.10 Environmental Protection. Delete the text and substitute the following:

(a) Spills of Petroleum Products or Hazardous Materials. Properly clean up, mitigate, and remedy, if necessary, all spills of petroleum products, hazardous materials, or other chemical or biological products released from construction, fleet, or other support vehicles, or stationary sources. Respond in accordance with federal, state, and local regulations.

Immediately report to the CO any spill of petroleum products or a hazardous material. Report the spill to the appropriate federal, state, and local authorities, if the spill is a reportable quantity.

(b) Water pollution. Do not operate mechanized equipment or discharge or otherwise place any material within the wetted perimeter of any waters of the U.S. within the scope of the Clean Water Act (33 USC § 1251 et seq.). This includes wetlands unless authorized by a permit issued by the U.S. Army Corps of Engineers according to 33 USC § 1344, and, if required, by any State agency having jurisdiction over the discharge of material into the waters of the U.S. In the event of an unauthorized discharge:

(1) Immediately prevent further contamination;

(2) Immediately notify appropriate authorities; and

(3) Mitigate damages as required.

Comply with the terms and conditions of any permits that are issued for the performance of work within the wetted perimeter of the waters of the U.S.

Separate work areas, including material sources, by the use of a dike or other suitable barrier that prevents sediment, petroleum products, chemicals, or other liquid or solid material from entering the waters of the U.S. Use care in constructing and removing the barriers to avoid any discharge of material into, or the siltation of, the water. Remove and properly dispose of the sediment or other material collected by the barrier.

E-20

Golden Gate National Recreation Area MIS No. 88838

(c) Vehicles and equipment. All vehicles and equipment entering the project area must be clean of noxious weeds and free from oil leaks and will be inspected prior to entering the project. Wash all construction equipment to thoroughly remove all dirt, plant, and other foreign material. Particular attention must be shown to the under carriage and any surface where soil containing exotic seeds may exist. These efforts are critical to prevent the introduction and establishment of non-native plant species into the project area. Make arrangements for the CO to attend each inspection on each piece of equipment before entering the project. The Contractor will maintain records of all inspections. Equipment found operating on the project that has not been inspected, or has oil leaks will be shut down and subject to citation.

In general, when gasoline, diesel fuel, antifreeze, hydraulic fluid or any other chemical contained within the vehicle is released to the pavement or ground, proper corrective, clean-up, and safety actions specified in the SWPPP must be immediately implemented. All vehicles with load rating of 2 tons or greater should carry, at minimum, enough absorbent materials to effectively immobilize the total volume of fluids contained within the vehicle.

Repair oil leaks immediately on discovery. Do not use equipment that is leaking. Have oil pans and absorbent material in place prior to beginning repair work. Have the “on scene” capability of catching and absorbing leaks or spillages of petroleum products including antifreeze from breakdowns or repair actions with approved absorbent materials. Keep a supply of acceptable absorbent materials at the job site in the event of spills, as defined in the SWPPP. Sand or soil are not approved absorbent materials.

Use oil pans and absorbent materials to prevent leaks, spills and draining petroleum fluids from falling onto bare ground and paved surfaces during servicing of equipment. Dig up soils contaminated with such fluids, place in appropriate safety containers, and dispose of according to state and/or federal regulations.

(d) Environmental Clearances.

(1) Contractor-Selected, Non-Commercial Areas. Contractor-selected, non-commercial areas include, but are not limited to, material sources, disposal sites, waste areas, haul roads, and staging areas. (A commercial source is a current operating concern, which has in the recent past provided same-type materials or services). These requirements do not apply for areas identified by the FHWA as having previously received clearance.

Prior to construction activities in Contractor-selected, non-commercial areas, provide the following to the CO and the FHWA Environmental Section (12300 West Dakota Avenue, Lakewood, CO 80228/Fax 720-963-3610):

(a) A report with documentation, according to the Secretary of the Interior’s Standards and Guidelines for Archeology and Historic Preservation, to determine if prehistoric or historic buildings, structures, sites, objects, or districts listed or eligible for listing in the National Register of Historic Places (NRHP) are present and if they will be affected by the proposed

E-21

Golden Gate National Recreation Area MIS No. 88838 activity. Include information identifying the location, total land area, and type of activity proposed. The FHWA will review this documentation. The FHWA will coordinate with the State Historic Preservation Officer (SHPO) and other parties, which will require the following time frames:

(1) Coordination on a “no effect” determination may require 30 days or longer.

(2) Coordination on eligibility and affects may require 45 days or longer.

(3) Coordination on mitigation of adverse effects may require 60 days or longer.

(b) Written documentation that such activities will not affect any “Waters of the U.S.” as defined by the U.S. Army Corps of Engineers. Provide documentation by an individual capable of performing wetland delineations according to the 1987 Corps of Engineers’ manual. Documentation of effects to wetlands or other Waters of the U.S. will be submitted to the CO and to the FHWA Environmental section. If wetlands are affected, coordination with the Corps of Engineers may require 45 days or longer.

(c) Written documentation that such activities will not affect any species protected under the Endangered Species Act (ESA). Provide documentation prepared by a biological specialist.

The written documentation will include a “no effect,” a “may affect-is not likely to adversely affect,” or a “may affect-is likely to adversely affect,” determination according to Section 7 of the Endangered Species Act. Submit the documentation to the CO and the FHWA Environmental Section. If the determination is “may affect-is not likely to adversely affect” or “may affect-is likely to adversely affect,” the FHWA will coordinate with the U.S.

Fish and Wildlife Service (FWS), which will require the following time frames:

(1) “May affect-is not likely to adversely affect” may require 45 days or longer.

(2) “May affect-is likely to adversely affect” may require 150 days or longer.

Contract time will not be increased due to the submittal and approval process for the above three items.

(e) Air Pollution. The following basic control measures for construction emissions of PM10 (Bay Area Air Quality Management District 1999) will be implemented at all construction sites:

All active construction areas will be watered to control dust.

All trucks hauling soil, sand, and other loose materials will be covered, or all trucks will be required to maintain at least 0.6 meters of freeboard.

All paved access roads, parking areas, and staging areas at construction sites will be swept (where required and necessary).

Streets will be swept as required (with water sweepers) if visible soil material is carried onto adjacent public streets at no cost to the government.

E-22

Golden Gate National Recreation Area MIS No. 88838

(f) Noise. The following basic control measures to control noise will be implemented at all construction sites:

Equipment and trucks used for construction will utilize noise control techniques, including original mufflers, intake silencers, ducts, engine enclosures and acoustically attenuating shields or shrouds.

All equipment and construction vehicles must meet federal standards for the year they were built and must be properly maintained and equipped with exhaust mufflers that meet state standards.

Construction equipment shall not idle for long periods of time.

Impact tools used for construction will be hydraulically or electrically powered wherever possible to avoid noise associated with compressed air or exhaust from pneumatically powered tools.

When a pneumatically powered tool must be used, an exhaust muffler on the compressed air exhaust will be used.

External jackets on the tools will be used where feasible.

Section 108. - PROSECUTION AND PROGRESS

108.01 Commencement, Prosecution, and Completion of the Work: Add the following:

Complete all work for Schedules A, B, and C by September 16, 2011.

Prior to beginning work, the Contractor must attend a project orientation conducted by Golden Gate National Recreation Area to learn about the sensitivity of the Park, Park regulations, and best management practices while working in the Park.

There is a potential for the presence of Unexploded Ordinance (UXO) within Golden Gate National Recreation Area from former Army bases and routine training. In the event the Contractor uncovers UXO the Contractor shall cease work in the affected area, remove personnel from the affected area, and notify the CO immediately. The Contractor may resume work only upon authorization by the

CO.

Limit operations as follows:

(1) Substantially complete Conzelman Road between Field Road and McCullough Road, including the roundabout; McCullough Road; East Road; and Danes Drive in 2010. To allow for the completion of the majority of the work to repair the erosion finger in 2010, the excavation of slopes on Conzelman Road between Alexander Avenue and McCullough Road, Field Road, and the wetland mitigation sites on Bunker Road are allowed in 2010 provided that the excavations are accomplished without removing or causing substantial damage to the existing pavement. Due to the need to provide some access to visitors no other work is allowed in 2010 in these locations.

E-23

(2) Winter shutdown will be enforced after substantial completion of work in 2010 until

January 10, 2011. No construction activities will be allowed during this time period.

(3) Substantially complete Conzelman Road between Alexander Avenue and McCullough

Road; Conzelman Road “East”; Dillingham Lot; Mendell Road, and Field Road in 2011.

Conzelman Road from Battery Spencer to McCullough Rd may not be closed until Conzelman Road “East” and the Dillingham “Commuter” lot are substantially complete.

(4) Rathbone Road, which is the connector road between Conzelman Road and Field Road may be completed in 2010 or 2011.

(5) See subsection 156 for allowed road closures.

(6) No major ground disturbing activities, including pavement removal, are permitted between November 1 and March 31, except MSE wall…