About this file

Amendment A002 does not extend the bid opening date. This amendment will show on FBO's site as Amendment 3 but it is only the second amendment issued by FHWA.

View the file

Other files

File Type Posted
grandcan003.pdf PDF
http //www.cflhd.gov/procurement/construction/amendments/grandcan001.pdf PDF
grandcan001.pdf PDF
IFB.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A-3 REVISED 08/06/2009

Block 9: FOR GENERAL INFORMATION: Call 720-963-3355 or 720-963-3353 from the hours of 7 a.m. to 4 p.m. (Mountain Time) or e-mail us at CFLContracts@fhwa.dot.gov.

FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@fhwa.dot.gov or by fax to 720-963-3360.

FOR PHYSICAL DATA: The following data is available electronically at www.cflhd.gov/procurement/construction/advertised-projects.cfm :

• NONE Road Inventory Report, GRCA 8210

Block 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15 Performance and

Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-03.

Block 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee (Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the FP-03.

Block 19: ACKNOWLEDGEMENT OF AMENDMENTS: FAILURE TO ACKNOWLEDGE

AMENDMENTS BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE

SOLICITATION MAY RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to www.fbo.gov and/or http://www.cflhd.gov/procurement/construction/advertised-projects.cfm.

Block 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the FP-03.

ESTIMATED PRICE: The price range of the project work is between $1,750,000.00 and $3,000,000.00

Project: GRCA-PRES-1(09)

GRAND CANYON NATIONAL PARK PAVEMENT PRESERVATION

A- 5

Bid Schedule

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

15101-0000 MOBILIZATION

ALL Lump Sum $___________________

15401-0000 CONTRACTOR TESTING

ALL Lump Sum $___________________

15501-0000 CONSTRUCTION SCHEDULE

ALL Lump Sum $___________________

40910-0300 SURFACE TREATMENT, DESIGNATION 1C

430,000

SQYD $_______________ $___________________

40920-1000 FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR

SS-1H

TON $_______________ $___________________

40940-1300 EMULSIFIED ASPHALT, GRADE CRS-2P

TON $_______________ $___________________

41002-3000 MICRO-SURFACING, TYPE 3

70,000

SQYD $_______________ $___________________

41105-0000 BLOTTER

TON $_______________ $___________________

41411-1000 CRACK, CLEANING AND SEALING

40.0

MILE $_______________ $___________________

42801-0100 FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE 1

SQYD $_______________ $___________________

Project: GRCA-PRES-1(09)

GRAND CANYON NATIONAL PARK PAVEMENT PRESERVATION

Bid Schedule A

REVISED 08/06/2009

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

A- 6

42801-0150 FLEXIBLE PAVEMENT, FULL DEPTH PATCH, TYPE 2

SQYD $_______________ $___________________

62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY

HOUR $_______________ $___________________

62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY

BUCKET, 18-INCH WIDTH

HOUR $_______________ $___________________

62301-0000 GENERAL LABOR

HOUR $_______________ $___________________

63404-0200 PAVEMENT MARKINGS, TYPE B

2,600

GAL $_______________ $___________________

63405-0050 PAVEMENT MARKINGS, SYMBOLS

EACH $_______________ $___________________

63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR

ALL Lump Sum $___________________

63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

EACH $_______________ $___________________

63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C

EACH $_______________ $___________________

63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

SQFT $_______________ $___________________

63505-1500 TEMPORARY TRAFFIC CONTROL, VEHICLE POSITIONING GUIDES

45.0

MILE $_______________ $___________________

63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

HOUR $_______________ $___________________

Project: GRCA-PRES-1(09)

GRAND CANYON NATIONAL PARK PAVEMENT PRESERVATION

Bid Schedule A

REVISED 08/06/2009

LORIK

Polygonal Line

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

A- 7

63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

HOUR $_______________ $___________________

$_____________________TOTAL

Submitted by:

Name of Bidder

Project: GRCA-PRES-1(09)

GRAND CANYON NATIONAL PARK PAVEMENT PRESERVATION

Bid Schedule A

REVISED 08/06/2009

Untitled
404 NWP 23 Authorization SPK-2006-00687.pdf
404 NWP 23 Authorization SPK-2006-00687
404 Nationwide Permit 23
Text1:
Text2:
0: 1
1: 5
Text3:
0: A002
1: August 6, 2009
2:
0:
1: AZ NPS GRCA-PRES-1(09)
Text4:
0:
0: FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENU, SUITE 360

LAKEWOOD, COLORADO 80228

ATTENTION: LORI KLIETHERMES

1:

1:
0:
Text6:
0: DTFH68-09-B-00031
1: July 24, 2009
2:
3:
Check Box7:
0: Yes
2: Yes
1:
0:
0: Off
1: Off
2: Off
Check Box9:
1: Off
2: Off
0:
0: Off
1: Off
Text10: 1*
Text11:
0:
1:
Text12: * See Item 11 Above
Text13: INVITATION FOR BID

Remove and Replace Page A-3; Additional Information Available on CFLHD's website.

Remove and Replace Bid Schedule A, Pages A-5 through A-7; Correction made to Quantity on Bid Item 63404-0200 Pavement Markings Type B - changed from 1,350 GAL to 2,600 GAL.

NOTE: FBO site will show this as Amendment 3 although it is the second amendment issued by FHWA; Amendment A002.

*FAILURE TO ACKNOWLEDGE THIS AMENDMENT BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)

Text14:
0:
1:
Text15:
1:
0:
1:
0:
0:
1:
Text16:
0:
1:
Text17:
Text5:
0: 6905001
1:
Check Box1:
0: Yes
1: Off