Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
A- 10
63301-0000 SIGN SYSTEM
EACH $_______________ $___________________
63316-1000 REMOVE AND RESET SIGN
EACH $_______________ $___________________
63404-0200 PAVEMENT MARKINGS, TYPE B
GAL $_______________ $___________________
63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
EACH $_______________ $___________________
63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
SQFT $_______________ $___________________
63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
10.754
MILE $_______________ $___________________
63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
1,440
HOUR $_______________ $___________________
63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
HOUR $_______________ $___________________
63510-0100 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
WEEK $_______________ $___________________
64502-0000 LOCATE UTILITIES
EACH $_______________ $___________________
$_____________________TOTAL
Submitted by:
Name of Bidder
Project: CA PFH 137-1(4)
WENTWORTH SPRINGS ROAD
Bid Schedule A
REVISED 06-22-09
BID SCHEDULE A ALTERNATIVE BID
ITEM 15401-0000, CONTRACTOR TESTING,
USING A GOVERNMENT FURNISHED FIELD
LABORATORY $_________________
lorik Polygonal Line
15210-3000 15215-3000
STA. EACH
12+53 to 296+43 283.9
58+00 to 87+00 1
87+00 to 116+50 2
116+50 to 143+00 2
143+00 to 167+50 2
167+50 to 196+50 3 Includes Underdrain System
196+50 to 225+00 3
225+00 to 253+00 1
283.9 14Totals
CONSTRUCTION SURVEY AND STAKING
Item Number
Station to Station
Centerline, verification and staking Remarks
Survey and staking, drainage structure
Item Number Description Unit Quantity Remarks
63502-0700 Temporary traffic control, cone Each 400
63505-1000 Temporary traffic control, pavement markings Mile 10.754 Based on two applications
63506-0500 Temporary traffic control, flagger Hour 1,440
63506-0600 Temporary traffic control, pilot car Hour 480
63510-0100 Temporary traffic control, traffic and safety supervisor Week 12
TEMPORARY TRAFFIC CONTROL
30802-2000 40101-0600 40105-3000 40920-1000 41201-1000 41601-1000 41605-2500 41610-1000 41615-0000
LnFt LnFt LnFt LnFt SqYd Ton Ton Ton Ton Ton Ton Sta Ton Ton Ton 25+53 to 26+05 RT 52 22 65 80 310 Gravel Regrade 63 38+10 to 38+38 RT 28 45 124 70 631 Gravel Regrade 130
143+00 to 146+00 RT 488 Gravel Regrade 102 158+90 to 161+20 LT 230 12 25 15 341 Paved Pave 102 1 0.1 6.0 0.2 2.3 0.2 0.1 0.1 159+14 to 160+68 LT 154 16 25 55 351 Gravel Regrade 72
2,121 367 102 1 0.1 6.0 0.2 2.3 0.2 0.1 0.1
Note: Quantities are carried to the Surfacing Summary sheet.
PULLOUT SUMMARY
Totals
Approximate Station
Side
Match existing
Emulsified asphalt, grade
HFMS-2S
Area Quicklime
Fog Seal, grade CSS-1, CSS-1H, SS-1
OR SS-1H
Continuous cold recycled asphalt base course type A
Roadway Aggregate, Method 2
Superpave pavement, 1/2-inch nominal maximum size aggregate, 0.3 to <3 million
ESAL
Antistrip Additive, Type 3
Fog Seal, emulsified asphalt grade
CSS-1, CSS-1H,
SS-1, or SS-1H
Asphalt binder
PG 64-28
For Information
Only
Tack Coat grade CSS-1, CSS-1H, SS-
1, or SS-1H
Description of existing condition
Description of proposed work
Length Width T1 T2
Item Number
63504-1000
Sign Size
in. x in.
C9A (CA) Flagger (symbol) (with paddle) 2 36 x 36 18.0 C17 (CA) Road Work/Speed Limit 2 36 x 36 18.0
C31A (CA) No/Shoulder 4 30 x 30 25.0
G20-1 Road Work/Next 5 Miles 2 36 x 36 18.0
G20-2 End/Road Work 2 36 x 18 9.0
G20-4 Pilot Car/Follow Me 2 36 x 18 9.0
W3-4 Be/Prepared/To Stop 2 36 x 36 18.0
W8-3 Pavement Ends 2 36 x 36 18.0
W8-7 Loose/Gravel 4 30 x 30 25.0
W8-8 Rough/Road 4 30 x 30 25.0
W8-12 No/Center/Stripe 4 36 x 36 36.0
W13-1 30 MPH 2 24 x 30 10.0
W14-3 No/Passing/Zone (pennant) 4 36 x 48 x 48 24.0
W20-1 Road/Work/Ahead 4 36 x 36 36.0
W20-4 One Lane/Road/Ahead 4 36 x 36 36.0
W21-2 Fresh/Oil 4 30 x 30 25.0
Special Putting America to Work (incl. 18"x18" Symbol plaque) 2 66 X 18 21.0
Special Project Funded by ARRA 2 66 X 48 44.0
Special Construction Contact Information ** 2 84 X 60 70.0
Special Road Construction/Ahead/Expect Delays 2 84 X 36 42.0
527.0
** Wording to be provided by El Dorado County.
Total
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Sign Number
MUTCD
Description Quantity Area (sqft)
Item Number
Untitled
| Text1: |
| Text2: |
| 0: 1 |
| 1: 4 |
| Text3: |
| 0: A002 |
| 1: June 22, 2009 |
| 2: |
| 0: |
| 1: CA PFH 137-1(4) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: TIFFANY ATCHISON
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH68-09-B-00025 |
| 1: 5/29/2009 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 1* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 11 Above |
| Text13: |
INVITATION FOR BID
Remove Page A-10 and replace with revised Page A-10, dated June 22, 2009. Bid Item 63504-1000 Temporary Traffic Control, Construction Sign quantity changed.
PLAN SHEETS
Remove Sheets B-2 and B-6 and replace with new Sheets B-2 and B-6, dated June 22, 2009. Changed Bid Quantity on Bid Item 63504-1000 (Sheet B-2) and adjusted size of ‘Putting America to Work’ sign (Sheet B-6). Also added note to bottom of Sheet B-6 pertaining to Construction Contact Information sign.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it. Updated .