Exhibit_J.1_-_COST_PRICE_PROPOSAL_WORKSHEET.xls

XLS spreadsheet 35 KB Posted

Attached to
Laboratory Support Services for the Geotechnical Research Program
Solicitation number
DTFH6117R00014
Issued by

About this file

Exhibit J.1 Cost/Price Proposal Worksheet

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule 1

BaseOption Period 1Option Period 2Option Period 3Option Period 4
Direct LaborDirect LaborDirect LaborDirect LaborDirect Labor
Labor CategoryRate/HrRate/HrRate/HrRate/HrRate/Hr
Program Manager/Research Engineer/Specialist Level 2 (RE/S-2)
Research Engineer/Technician
Research Engineer Modeler
Geotechnical Technician Level 3
Computer Specialist Level 2
Construction Technician (CT)
Office Support Personnel (SP)
General Laborer (L)
Direct Labor Fringe @
Total Direct Labor and Fringe
Direct Labor Overhead @
Total Direct Labor through Overhead
Total G&A Base
G&A @
Total Cost
Profit/Fee @
ODC/Travel$185,000.00$185,000.00$185,000.00$185,000.00$185,000.00
Total Amount
The Contractor shall modify the Cost/Price Proposal Template as needed to provided the required information.
The direct labor rates are based on the actual rates as of (insert date) and escalated by (insert percentage) percent each year.
The supporting data and rate calculations are located in file _____________________________and is available immediately upon request.
The Indirect Rates (fringe, Labor Overhead, Material Overhead and G&A) are based on our current Forward Pricing Rate Agreement (FPRA).
The FPRA is attached to the proposal.
ODCs shall be reimbursed at cost.

&CDirect Labor and Indirect Costs &L&"Times New Roman,Regular"&A

File details come from the government source that posted it. Updated .