ZLA_CWB_MAJOR-MECH - Preliminary Commissioning Plan.pdf

PDF 26 MB Posted

Attached to
MAJOR MECHNICAL MODERNIZATION, ZLA, PALMDALE, CA
Solicitation number
DTFAWN-16-R-01814
Issued by

About this file

ZLA_CWB_MAJOR-MECH - Preliminary Commissioning Plan (pdf)

View the file

Other files

File Type Posted
ZLA Major Mech Responses to letter 02 dated 9-30-2016.pdf PDF
ZLA Major Mech Responses to letter 04 dated 10-4-2016.pdf PDF
SF-30 AMEND2.doc DOC document
WP-D-501-41474-CTR-E101.-12pdf.pdf PDF
DTFAWN-16-R-01814 VERSION 2 (BP - Rev 4.BP - Rev 4 (pdf —
ZLA_CWB_MAJOR-MECH - Specs 4.pdf PDF
WP-D-501-41474-CTR-E106.5pdf.pdf PDF
LAX-E-5896-S4.-9pdf.pdf PDF
LAX-E-5896-S5-10.pdf PDF
LAX-E-5896-S1-7.pdf PDF
WP-D-501-41474-CTR-E105.-13pdf.pdf PDF
LAX-E-5896-S6.-11pdf.pdf PDF
SF-30.AMEND-MMM PALMDALE.doc DOC document
customer satisfaction survey.docx DOCX document
ZLA Site Walk Sign in Sheet 9-13-2016.pdf PDF
LAX-E-5896-S2-8.pdf PDF
ZLA Major Mech Responses to letter 01 dated 9-30-2016.pdf PDF
ZLA Major Mech Responses to letter 03 dated 10-3-2016.pdf PDF
WP-D-501-41474-CTR-E110.5pdf.pdf PDF
1442-modernization at palmdale.pdf PDF
1442-modernization at palmdale.pdf PDF
ZLA_CWB_MAJOR-MECH - Drawings 1(Signed).Signed —
SF-30 AMEND3.doc DOC document
WAGE RATES.txt TXT text file
ZLA_CWB_MAJOR-MECH - HAZMAT Plan 2.pdf PDF
LAX-E-5896-S1-7.pdf PDF
WP-D-501-41474-CTR-E101.-12pdf.pdf PDF
LAX-E-5896-S4.-9pdf.pdf PDF
LAX-E-5896-S5-10.pdf PDF
ZLA Major Mech Responses to letter 01 dated 9-30-2016.pdf PDF
WP-D-501-41474-CTR-E110.5pdf.pdf PDF
LAX-E-5896-S2-8.pdf PDF
ZLA_CWB_MAJOR-MECH - Drawings 1(Signed).Signed —
WAGE RATES.txt TXT text file
WP-D-501-41474-CTR-E105.-13pdf.pdf PDF
WP-D-501-41474-CTR-E106.5pdf.pdf PDF
SF-30 AMEND2.doc DOC document
ZLA_CWB_MAJOR-MECH - Specs 4.pdf PDF
DTFAWN-16-R-01814 VERSION 2 (BP - Rev 4.BP - Rev 4 (pdf —
1442-modernization at palmdale.pdf PDF
ZLA Site Walk Sign in Sheet 9-13-2016.pdf PDF
ZLA Major Mech Responses to letter 04 dated 10-4-2016.pdf PDF
LAX-E-5896-S6.-11pdf.pdf PDF
ZLA_CWB_MAJOR-MECH - HAZMAT Plan 2.pdf PDF
ZLA Major Mech Responses to letter 02 dated 9-30-2016.pdf PDF
ZLA_CWB_MAJOR-MECH - Preliminary Commissioning Plan.pdf PDF
SF-30.AMEND-MMM PALMDALE.doc DOC document
customer satisfaction survey.docx DOCX document
ZLA Major Mech Responses to letter 03 dated 10-3-2016.pdf PDF
1442-modernization at palmdale.pdf PDF
Show 40 more

Latest 50 of 140 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Los Angeles ARTCC (ZLA)

Palmdale, California

Control Wing Basement Renovation and Chillers/Cooling Tower Replacement (Major Mechanical) Project

Final Design Submittal Preliminary Commissioning Plan

15 June, 2016

File details come from the government source that posted it. Updated .