AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 82
2. AMENDMENT/MODIFICATION NO.
000002
3. EFFECTIVE DATE
12/29/2016
4. REQUISITION/PURCHASE REQ.NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE AAQ310-AFN 7. ADMINISTERED BY (If other than Item 6) CODE
AAQ-310 AT FACILITIES & ATC TECH TR
Orville Wright Bldg. (FOB10A), Room 406 FAA National Headquarters 800 Independence Ave., SW Washington DC 20591
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (x) 9A. AMENDMENT OF SOLICITATION NO.
DTFAWA-17-R-00015
x 9B. DATED (SEE ITEM 11)
12/13/2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
x The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, x is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide changes to Sections B,C,J,L and respond to offeror's questions. Refer to Summary of Changes and the revised Sections.
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Wanda J. Mundy
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. CONTRACT AUTHORITY 16C. DATE SIGNED
12/29/16
(Signature of person authorized to sign)
(Signature of Contracting Officer)
CHANGES ARE AS FOLLOWS:
• Section A - Added signed Amendment 0000001 and respond to offeror's questions (refer to NSOP Questions and Answers_ CSA Amendment 000002).
• Section B – Estimated level of effort for this requirement was added to Section B.1 General.
• Section C – Removed 30 days after contract award management and transition plan submission requirement from Section C.17.1 and Section C.17.2.
• Section J.0- Updated to show that J.4 has been added.
• Section J.4 -Added; CSA Collective Bargaining Agreement Rates.
• Section J.6 –Estimated level of effort for this requirement was added to General section at the top of the page.
• Section L – Revised Section L.4(b) Proposal Presentation, Format and Content, Section L.5.2 Volume 1
Part B-Pricing and Section L.6(d) Volume 2 - Management, Technical and Past Performance.
Refer to highlighted areas in RED for changes to sections B, C, J and L.
(End of Summary of Changes)
| 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS |
| 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. |
| The purpose of this amendment is to provide changes to Sections B,C,J,L and respond to offeror's questions. Refer to Summary of Changes and the revised Sections. |
| Section A - Added signed Amendment 0000001 and respond to offeror's questions (refer to NSOP Questions and Answers_ CSA Amendment 000002). |