About this file

17R00609 Attach J-1 - revised. (docx)

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

A) SCOPE OF WORK:

1) The contractor shall furnish all labor, supplies and equipment necessary to perform janitorial services for approximately 151,847 square feet of space at the Air Route Traffic Control Center (ARTCC) Complex, 512 Division Street, Farmington, Minnesota. The contractor shall provide a minimum of two (2) employees on site during the hours of 0700 to 1630 Monday through Friday, and 2030 to 0130 7 days per week to ensure timely completion of all work required to maintain the facility in accordance with the Work Schedule. The Contractor shall provide a supervisor fluent in speaking and understanding the English language on-duty during the administrative working hours of 0730 to 1600.

B) WORK PERFORMANCE:

1) See Appendix A for list of rooms, the estimated square footage, and the service frequency. See Appendix B for Definitions. Most services are performed during the hours indicated. Other services are performed at the times specified:

2) Government operations performed in the Control Room area directly affect the national security and involve the control and separation of air traffic. The importance of the operation cannot be overstressed.

a) There shall not be any interference by the contractor, his employees or his equipment.

b) It is of the utmost importance that the noise level to be kept to a minimum and special care be taken when cleaning the position consoles to prevent accidental movement of selector keys, etc.

C) GOVERNMENT FURNISHED PROPERTY

1) Government Furnished Equipment. The Contractor shall furnish all tools and equipment required for the performance of this contract. The Government will not provide tools or equipment to the Contractor.

2) Government Furnished Material. The Government will not provide any materials to the Contractor.

3) Availability of Utilities. The Government will furnish the following utility services at existing outlets, for use in those facilities provided by the Government and as may be required for the work to be performed under the contract: electricity, steam, natural gas, fresh water, sewage service, and refuse collection (from existing collection points). Information concerning the location of existing outlets may be obtained from the Contracting Officer. The Contractor shall provide and maintain, at his/her expense, the necessary service lines from existing Government outlets to the site of work. Utilities specified will be furnished at no cost to the Contractor

D) CLEANING REQUIREMENTS FOR FACILITIES CONTAINING ASBESTOS BUILDING MATERIALS

1) General Requirements

a) All Janitorial work shall be performed in compliance with 29CFR 1910.1101 - OSHA Asbestos Standard.

b) Contractor will be responsible for providing 2 hours of Asbestos Awareness Training to all employees at the time of initial assignment and annually thereafter. Training documentation shall be submitted to Contracting Officer for each employee working at the facility. Training must comply with 29 CFR 1910.1001U) (7)( iv).

c) An initial walkthrough with the contractor will be conducted to identify areas with asbestos containing materials. An asbestos survey report will be provided to the contractor representative prior to initial assignment. Any changes to the asbestos survey will be provided to the contractor representative.

d) Contractor shall comply with the OSHA Hazard Communication Standard, 29 CFR 1910.1200. Prior to bringing hazardous chemicals and substances to the facility, the contractor shall provide material safety data sheets (MSDS) to the Contracting Officer or Contracting Officer Representative. Contractor shall also keep an MSDS binder for his/her employees at a location accessible at all times.

e) All containers shall be labeled clearly with appropriate hazard warning noted and the name and address of the manufacturer. Product name found on label shall be the same as that found on the relevant MSDS for the product.

2) Work Procedures

a) HEPA (High Efficient Particulate Air) vacuuming shall be performed in the following locations: Rooms 1003, 1007, 1008, 1009, 1010, 1011, 1012A, 1012, 1016, 1017, 1018(hallway), 1019, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2011, (hallway). The central vacuum system must be used on the control floors. HEPA vacuums shall be emptied in a manner to minimize exposure to workplace. HEPA vacuum waste shall be placed in sealed bags, labeled, and disposed of according to all appropriate regulations. HEPA vacuums/attachments shall be sealed when not in use to prevent contamination of workplace.

b) Asbestos containing flooring materials shall be dry buffed only if there is sufficient finish so the pads cannot contact the floor materials. Stripping of finishes on floor tile shall be conducted using wetting agents and low abrasive pads at a speed lower than 300 rpm.

c) All areas requiring dusting shall be cleaned using wet cleaning methods (damp cloth or mop) to minimize dust unless unfeasible due to hazards.

d) All equipment used shall be decontaminated (wet wiped - cleaned) after use.

e) All waste generated through cleaning activities shall be disposed of according to all appropriate regulations.

3) Emergency Response

a) If suspect asbestos containing materials are identified as being damaged or disturbed, the contractor shall immediately report the problem to the Contracting Officer, Contracting Officer's Representative, Facility Asbestos Coordinator or ZMP Systems Operation Center. Clean up shall not be attempted unless directed by the Contracting Officer.

(i) Facility Asbestos Coordinator - Alex Gintner (651) 322-9312 ZMP

(ii) District Systems Operation Center /24 hour Watch Desk (651) 463-5623

E) TWICE PER DAY - AAS & CONTROL ROOM {ROOM 1052) ONLY

1) Empty all wastebaskets and containers between the hours of 1200 and 1300, Monday through Friday. Insert a clean plastic lining in wastebaskets and containers as needed. In case of leakage, wash or damp wipe receptacles to remove all residues and wipe dry. This service is in addition to the normal daily service required.

F) DAILY

1) Restrooms

a) Wet mop floors using a disinfectant solution. Clean all urinals, commodes and lavatories inside and out with disinfectant; remove stains, scale and odors. Clean all mirrors; wipe and polish all plumbing hardware. Spot clean walls and partitions. Fill soap dispensers, check and clean (as necessary) to assure proper operation. Advise the C.0.T.R. Of any dispensers found to be defective. Empty all waste containers and insert a clean plastic lining in the containers. In case of leakage, clean receptacles of all residues and wipe dry. Provide and maintain an adequate supply of quality hand towels and 2-ply toilet tissue in dispensers at all times.

(i) In addition to the above, waste containers in the restrooms in Area 2 shall be emptied at the start of the evening shift.

2) Ash Receptacles

a) Empty all outside and smoking shelter ash receptacles into metal containers. Wipe all receptacles clean.

3) Drinking Fountains

a) Clean and disinfect all exposed surfaces of drinking fountains with a disinfectant type cleaner.

4) Floors and Stairwells

a) Sweep all tiled, painted and concrete floors and stairs with a treated dust mop. Remove foreign objects and other adhesive material from floor surfaces.

b) Wet mop all tiled floor areas in the cafeteria on customer side of serving line and dining area

5) Waste Containers

a) Empty all wastebaskets and containers, except those in the kitchen area. Insert a clean plastic lining in wastebaskets and containers as needed. In case of leakage, clean receptacles by washing or damp wiping to remove all residues and wipe dry. All trash, garbage, packing, crating or other extraneous material shall be removed daily by the contractor and placed in dumpsters or proper recycling containers located outside the building. The area around the dumpsters shall be maintained in a clean, orderly condition.

6) Cafeteria/Dining Area

a) Clean and damp wipe tabletops and employee food prep areas in cafeteria dining room. Ensure tables and chairs are evenly distributed.

b) Spot clean the windows along cafeteria serving line.

7) Carpeted Floors

a) Vacuum and spot clean the Control Room (room 1052), ready room (room 1003), CCMS Room (Room B117). Dust tabletops and furniture in ready rooms.

b) Host Computer area is not occupied at this time, waiting for MOD Update.

c) Central vacuum system must be used for control rooms.

8) Tile

a) Damp mop all floors not specified for more frequent cleaning to remove oil, grease and other stubborn stains.

b) Spot wax high traffic areas to prevent floor finish from wearing through to the tile. Machine buff to a high gloss.

c) All baseboards are to be cleaned free of wax and buffer marks.

9) Window Sills and Wall Mounted Air Conditioning and Heating Units.

a) Window sills and wall mounted air conditioning and heating units in offices shall be dusted and wiped clean with a damp cloth.

G) TWICE WEEKLY

1) Carpeted Floors

a) Vacuum and spot clean all rooms in Area 1.

b) The remaining areas are to be policed and obvious pieces of debris removed.

2) Entrances, Loading Dock, Ramp Area, and Security Guard Building

a) Spot clean all inside and outside glass and metal surfaces of all entrances.

b) Sweep sidewalks, steps, landings, and loading dock

c) Police outside entrances and remove all debris

3) Smoking Shelters

a) Spot clean all inside glass and wood/metal surfaces

b) Sweep and empty inside waste containers

c) Police outside to remove all debris

H) WEEKLY

1) Floors and Stairwells

a) Painted/Concrete

(i) Damp mop to remove oil, grease, and other stubborn stains

b) Carpeted

(i) Vacuum and spot clean all carpeting not specified in the daily or twice weekly schedule

c) Tile

(i) Damp mod all floors not specified for more frequent cleaning, to remove oil, grease, and other stubborn stains.

(ii) Spot wax high traffic areas

(a) Machine buff to high gloss

(b) All baseboards are to be cleaned free of wax and buffer marks

2) Central Vacuum System

a) Empty dust containers each Saturday so that system will operate effectively.

3) Drinking Fountains

a) Damp wipe sides of all drinking fountains and clean adjacent wall areas.

4) Furniture and Equipment

a) Dust or wet wipe tops of all filing g cabinets, bookcases, and other furniture within reach while standing on the floor.

(i) Official papers and other items shall not be disturbed.

b) Wipe all conference room tables with a damp cloth and wipe dry, leaving them free of streaks.

5) Chalkboard and Chalk Trays:

a) Wash all whiteboards unless otherwise marked.

I) MONTHLY

1) Window Sills and Wall Mounted Air Conditioning and Heating Units

a) Units in offices shall be dusted and wiped clean with a damp cloth

2) Metal Handrails and Hardware

a) Clean all metal handrails and associated hardware in Control Room, Common Area, Host Room, and in all stairways.

3) Spot clean inside window surface of Gallery and Bridge (room 240A) to remove all fingerprints and smudges.

4) Clean/dust tops of refrigerators and vending machines throughout the building.

5) Clean all door surfaces with disinfecting cleaner. Clean both sides of safety windows.

6) Thoroughly clean the small exterior shack located on the northeast side. (Old guard shack)

7) Thoroughly clean the exterior phone boxes located at the loading dock and west side entrance door

J) QUARTERLY

1) Glass

a) Clean all glass in the Security Guard Building.

b) Clean glass in the entrance doors, glass partitions, safety windows in metal doors, and the interior surface of glass panels in the observation gallery/bridge.

2) General Cleaning, (high cleaning) To be performed after 2200

a) Vacuum or dust the tops, back’s, and cabinet pockets on the front of all control room consoles.

(i) Clean glass.

(ii) Dust all partition panels and desk units on control floor

3) Restrooms

a) Mechanically scrub the floors using a disinfectant solution.

4) Employee Lockers

a) Dust top of all lockers.

5) Carpeted Floors

a) Clean carpet in ready rooms, using methods currently approved by the carpet industry.

6) Air Supplies, Returns, Exhaust Fans, Control Room Vents, etc.

a) Clean all air supply diffusers, air return grills, exhaust fans, including louvered doors and screens, using a vacuum cleaner with appropriate attachments.

(i) Wash units (with a suitable cleaning solution that will not damage the finish) to remove all grease, grime and other foreign matter.

(ii) NOTE: The contractor is reminded that scaffolding will be required for cleaning the ceiling lights and air supply/return units in the control room and computer areas. Use of the agency hoist will be permitted, but must be coordinated with the C.O.R., and all OSHA requirements must be adhered to. Proof of OSHA approved training is required.

7) Thoroughly clean and polish stainless steel stall walls and doors in all restrooms.

8) Thoroughly scrub floors to include corners and baseboards in all restrooms.

K) SEMI-ANNUALLY

1) Blinds

a) All blinds shall be dusted using a blind attachment for a vacuum cleaner. A damp cloth shall be used to remove accumulation of dirt and spots, not removable with the vacuum attachment.

2) Walls. Doors. Partitions, and Dividers and Elevator

a) Spot clean to remove finger marks and soil.

(i) This is to include all areas not identified under more frequent service requirements.

3) Wood paneled walls shall be dusted with a treated cloth.

4) All fabric wall covering and partitions shall be spot cleaned to remove stains and/or soil and vacuumed with appropriate vacuum m cleaner attachments.

a) NOTE: A manufacturer-approved cleaning solution shall be used.

5) Windows

a) Clean all windows inside and outside (including inside window sills, frames and casements) in the administrative office annex building, administrative wing, Engineering Services Building, smoking shelters, dock, cafeteria, and the outside surface of the observation gallery (time of cleaning to be coordinated with the C.O.R.).

b) Wash all glass in transoms, office wall panels and doors.

6) Tiled Floors

a) Strip all finish from tile floors in hallway in front of cafeteria, cafeteria serving line, hallway outside control room, AF Break Room, Dining Area, Power Service Building, and front lobby.

b) Apply floor finish and buff to a hard gloss y finish.

(i) NOTE: Only non-metallic pads may be used for scrubbing and buffing.

7) Fabric Upholstered Furniture and Drapes

a) Vacuum all drapes and the fabric upholstery on furniture.

b) Apply leather cleaner and conditioner to leather upholstered surfaces.

8) All Carpeted Areas

a) Clean the carpet in the control room (room l 052), locker room (room 1001), Administrative Wing Hallways, and cafeteria dining area (room 1033) using standard industrial dry-Chemical or wet shampoo method as appropriate for type of sub-floor to which the carpet is attached.

9) Metal Handrails and Door Hardware thorough cleaning of metal handrails.

10) Thoroughly clean ramp in Control Room

a) Use approved method to remove built up dirt and debris from ramp area.

L) ANNUALLY

1) Carpeted Floors

a) All carpeting (not specified for more frequent cleaning elsewhere in this statement of work) shall be cleaned, using methods currently approved by the carpet industry.

(i) The time of cleaning shall be coordinated with the C.0.R.

2) Tiled Floors

a) Strip all finish from tile floors in basement, PCS building, and other tile floors not specified for more frequent cleaning.

(i) Apply floor finish and buff to a hard glossy finish.

(ii) Asbestos containing flooring materials shall be dry buffed only if there is sufficient finish so the pads cannot contact the floor materials.

(iii) Stripping of finishes on floor tile shall be conducted using wetting agents and low abrasive pads at a speed lower than 300 rpm.

3) Walls

a) Thoroughly wash all painted walls not specified for more frequent cleaning.

4) Fabric Wall Covering and Partitions

a) All fabric wall covering and partitions shall be thoroughly cleaned to remove stains and/or soil and vacuumed with appropriate vacuum cleaner attachments.

(i) NOTE: A manufacturer-approved cleaning solution shall be used.

5) Restrooms

a) Wash walls, ceilings, doors and partitions using a disinfectant solution (including all installed showers).

6) Light Fixtures

a) Clean all light fixtures.

(i) Cleaning includes washing and polishing of globes, reflectors, diffusers, bulbs, tubes, glass and metal framework.

(a) Previous studies of this facility have identified asbestos in the ceilings in parts of the main center building. Extreme care should be taken not to disturb ceiling material when performing this work.

M) AS REQUIRED

1) Walk-in Floor mats

a) Walk-in floor mats will be used at all entrance doors during foul weather.

b) Furnishing of the mats will be the responsibility of the contractor and are subject to approval by the C.O.R. and Safety Officer.

2) Additional Floor Care

a) Vestibule, lobby, Security Guard Building, all corridors, locker room, stair steps and stairway landings shall receive additional wet mopping in inclement weather, as needed, when mud and dirt are tracked in from outside.

3) EMERGENCY SERVICES - ALL AREAS

a) Provide EMERGENCY cleaning services for incidental occurrences as required and requested. This service will be coordinated through C.O.R. prior to work being accomplished.

N) ORDER OF PRECEDENCE - WORK SPECIFICATION

1) If any discrepancies exist between this Section C, Schedule of Work and Appendix A, this written specification takes precedence.

O) WORK SCHEDULE AND CHECK OFF LISTS

1) Prior to performing work on this contract, the contractor shall submit a schedule indicating The dates on which he proposes to comply with the scheduled requirements.

a) All scheduling which pertains to the control room will be subject to continual approval and/or modification.

b) Work performed by the contractor in certain areas may be halted due to the workload brought on by excessive air traffic, adverse weather, etc.

(i) In the event work is halted the contractor will not be penalized because the normal work, which otherwise would have been accomplished during that interval, was not accomplished.

Section C: SCHEDULE OF WORK Minneapolis Air Route Traffic Control Center (ZMP) Farmington, Minnesota

Attachment J-1

April 2017

A) SCOPE OF WORK:

1) The Contractor shall furnish all labor, supplies and equipment necessary to perform janitorial services for approximately 6640 square feet of space at the Child Care Center at the Air Route Traffic Control Center. Minneapolis, Minnesota.

B) GENERAL

1) Cleaning is to be performed after the operating hours of the Child Care Center (Operating hours are 5:30 am to 11:00 pm, Sunday through Saturday) unless otherwise stated.

2) The Contracting Officer's Technical Representative (COTR) will notify the contractor if the Child Care Center operating hours differs from the hours that are specified. Any questions should be referred to the COTR.

C) CLEANING SUPPLIES FURNISHED BY CONTRACTOR

1) The Contractor shall furnish all mechanical and electrical equipment, appliances (such as brooms, mops, ladders, pails, trash cart), and other power cleaning equipment necessary for satisfactory performance of contract specifications.

a) All electrical equipment shall be three (3) wires grounded with yellow extension cords.

2) The Contractor shall also furnish all toilet paper, paper towels, and soap for dispensers, floor wax,

a) EPA registered detergents and EPA registered Quat (disinfectant) to mop floors with and all miscellaneous supplies not listed.

3) Floor mats shall be furnished by the Contractor for all entrances.

a) Mats shall be industrial rental supply or equal.

D.TWICE PER DAY

Cleaning Requirements
Quality Requirements

1) NURSERIES, CLASSROOMS AND PLAY AREAS (Includes all areas not specifically identified elsewhere in the contract)

Police and free the facility of all paper, trash, and other discarded materials. Empty trash receptacles and dispose of feces filled and soiled diapers in plastic bags. One of the disposals shall occur around midday
SOLID WASTE COLLECTION: All solid wastes generated in the building except solid wastes generated in kitchen/eating area, shall be collected and removed to storage areas designated for trash by the Contracting Officer's Representative.

NOTE: Feces filled and soiled diapers shall be sealed in plastic bags or disposed of in covered collection cans lined with disposable bags by the Child Care Center operator. Custodial contractor shall remove the sealed bags to the trash collection point or dumpster

2) TOILET AREAS/RESTROOMS

Empty waste receptacles and service dispensers, police rooms and clean washbasins, once around midday
See Quality Requirements in 1. For waste disposal.

Wash basins shall be clean and bright, no dust, spots, stains, green mold, rust, encrustation or excess moisture.

3) KITCHEN/EATING AREA

Remove trash from waste receptacles, once after the midday meal time.
See Quality Requirements in 1 (kitchen is “except” in 1)

E. DAILY

Cleaning Requirements
Quality Requirements

1) NURSERIES, CLASSROOMS AND PLAY AREAS (Includes all areas not specifically identified elsewhere in the contract)

Clean drinking fountains and door and observation glass
Glass shall be clean and free of dust, dirt, streaks, watermarks, and grime
Vacuum entire rug area, sweep and wet mop or scrub floors, and clean all toilet room surfaces utilizing a cleaner disinfectant
Thoroughly vacuum pedestrian traffic areas, and under and around furniture. Carpets shall be clean and free from dust balls, dirt, and other debris
Wash inside and out or steam clean cans used for collection of feces filled and soiled diaper and food remnants. Wash, damp wipe or provide plastic liners for waste baskets
Waste baskets shall be free of dirt dust, streaks and spots

Clean horizontal surfaces, including tables, counters, and desk tops. Clean all appliances.

NOTE: Official papers shall not be disturbed in the office area. However, desk type items shall be lifted for dusting.

All surfaces and furniture shall be dusted with a treated cloth to insure a dust free environment. Appliance surface areas shall be cleaned with appropriate cleaners. Surface areas shall be grease and dirt free. Appliances shall shine, no smears or streaks shall be on surfaces

Clean sinks and mirrors. Replenish toilet supplies and provide paper towels for all dispensers
Wash basins shall be clean and bright no dust, spots, stains, green mold, rust encrustation or excess moisture
Clean vertical surfaces of cabinets
Smudges, marks, or spots shall be removed without causing unsightly discolorations
Vacuum entry matting
Thoroughly vacuum to remove all dirt and other debris
Spot clean carpeting to remove spills
Daily spot cleaning shall insure removal of any stains, dirt, grease, etc. Spots cleaned shall blend in with overall carpet appearance. No evidence of fuzzing cause d by harsh rubbing or brushing

Deodorizers may be required to alleviate odors.

Diaper changing board shall be washed with mild detergent and disinfectant
Detergent shall remove all soil from the changing board. A cleaner disinfectant shall be used daily to insure the surface is germ free and odor free. Surface shall be clear of smudges, soil, and streaks

2) TOILET AREAS/RESTROOMS

Disinfect floor by sweeping and wet moping or scrubbing
The floors shall be clean and free of dirt, dust, water streaks, string, gum, grease, tar, etc., and present an overall appearance of cleanliness. All surfaces shall be dry and corners shall be clean
Clean all fixtures, including metal chrome surfaces, toilets, urinals, shelving, washbasins. shower stalls, mirrors, waste receptacles, dispensers, and wall surfaces, using a cleaner disinfectant
Porcelain fixtures and metal surfaces (washbasins, urinals, toilets, shower stalls, etc.) shall be clean and bright; surfaces shall be free of dust, spots, stains, rust, green fold, encrustation, or excess moisture
Empty waste receptacles, and service/supply paper towels, toilet paper, and soap dispensers. Empty, clean and disinfect sanitary receptacles; replace soiled bags. Collect soiled bags in separate containers for disposal.
All supplies shall be provided and dispensers shall be filled. Waste receptacles shall be emptied, cleaned, disinfected, and new bags inserted
Spot-clean other surfaces and dust horizontal surfaces.
SPOT CLEANING: Smudges, marks or spots shall be removed without causing unsightly discolorations.

THOROUGH DUSTING: Surfaces shall be free of streaks. Corners, crevices, moldings and ledges shall be free of all dust. No spots or smudges caused by dusting tools shall remain on dusted surfaces

3) KITCHEN/EATING AREA

Damp mop floor to remove all grease, grime and dirt
The floors shall be cleaned and free of dirt, water streaks, mop marks, and present an overall appearance of cleanliness. All surfaces shall be dry and the corners clean

F. Weekly

Cleaning Requirements
Quality Requirements

1) NURSERIES, CLASSROOMS AND PLAY AREAS (Includes all areas not specifically identified elsewhere in the contract)

Dust vertical surfaces and under surface of furniture (knee wells, chair rungs, table legs, etc.)
There shall be no dust streaks. Comers, crevices, moldings and ledges shall be free of all dust. There shall be no oils, spots or smudges on dusted surfaces caused by dusting tools
Damp mop and spray buff all hard and resilient floors.
Floors shall be thoroughly cleaned and free of streaks. Walls, baseboards and other surfaces shall be free of splashing and markings from the equipment

2) TOILET AREAS/RESTROOMS & KITCHEN AREA

Damp mop and spray buff all hard and resilient floors.
Floors shall be thoroughly cleaned and free of streaks. Walls, baseboards and other surfaces shall be free of splashing and markings from the equipment

G. Monthly

Cleaning Requirements
Quality Requirements
Damp wipe both sides of all glass partitions and any other glass , and spot clean other surfaces within approximately 70" of the floor
Glass shall be clean and free of dust, di1i, streaks, watermarks, and grime. Mirrors shall be clean and free of dirt, dust, streaks, and spots
Dust all book shelves, toy shelves, and cubbies
All surfaces shall be dusted to insure a dust free environment
Thoroughly clean all carpets using shampoo and/or steam extraction method. (NOTE: This shall be scheduled in advance through the COR to allow for thorough drying)
All stains, dirt, oil, spots, etc. shall be removed. Cleaning shall be scheduled in advance. If required a deodorizer shall be utilized to remove odors. Furniture shall be moved to allow cleaning of the entire area. Harsh scrubbing shall not result in fuzzing of the carpet areas

H. Every Two Months

Cleaning Requirements
Quality Requirements

TOILET AREAS/RESTROOMS

Damp wipe the entire surface area of all stall partitions, doors, window frames, sills, and waste receptacles utilizing a multi-purpose (disinfectant-deodorizer) cleaner
All dirt, dust, water stains, spots, streaks, smudges , etc. shall be removed from the surfaces

I. Quarterly

Cleaning Requirements
Quality Requirements

NURSERIES, CLASSROOMS AND PLAY AREAS (Includes all areas not specifically identified elsewhere in the contract)

Clean by dusting or vacuuming surfaces and objects approximately 70" or more from the floor. This includes but is not limited to the wall and ceiling area adjacent to ventilating and air conditioning outlets , transoms, clocks, molding around ceilings, tops of partitions , overhead pipes, wall fans, pictures, plaques, wall or ceiling light diffusers, file cabinets, bookcases, lockers, walls, etc.
All surfaces shall be clean and free of dust, dirt, smudges, etc.
Dust or vacuum all blinds
Thoroughly dust, wash, or vacuum all blinds per manufacturers recommendations

J. Semi-Annual

Cleaning Requirements
Quality Requirements
Wash all interior and exterior windows
Windows shall be free of all dirt, smears, grime, finger marks, and streaks
Strip and apply floor finish to all resilient floors
All old finish or wax shall have been removed. There shall be no evidence of gum, rust, burns, or scuff marks. Water solutions shall not be used on wood flooring

K. Annual

Cleaning Requirements
Quality Requirements
Wash all walls with a germicidal solution. Walls are painted with latex paint
Walls shall be free of streaks or spots. There shall be no signs of overlapping. There shall be no smudge spots where cleaning of the upper and lower halves of the wall overlap. Walls shall be unifom1ly clean. Woodwork on doors, windows, moldings, etc., shall be cleaned

Section C: SCHEDULE OF WORK Child Care Facility Minneapolis Air Route Traffic Control Center (ZMP) Farmington, Minnesota

FIRST FLOOR ADMINISTRATIVE

Room No.
Space Assignment
Area
Floor
Sq. Ft.
Frequency
1001
Hallway
1
Carpet
448
D5
1001A
Resource Management
1
Carpet
308
D5
1001B
Operations Manager
1
Carpet
144
D5
1001C
Operations Manager
1
Carpet
144
D5
1001D
Operations Manager
1
Carpet
176
D5
1001E
Air Handler Room
1
Tile
80
D5
1001F
Vestibule
1
Tile
352
AC
1002
Hall Way
1
Tile
752
D7X
1002A
Ready Room
2
Carpet
242
D7
1002B
NATCA Office
1
Carpet
170
D5
1002C
Ready Room
1
Carpet
43
D5
1002D
NATCA Office
1
Carpet
125
D5
1002E
NATCA Area Manager
1
Carpet
83
D5
1002F
Area Manager
1
Carpet
78
D5
1003
Ready Room
2
Carpet
252
D7
1004
Ready Room Hall
2
Carpet
180
D7
1005
Lobby Vestibule
1
Tile
102
D5
1006
Lobby
1
Tile
738
D5
1007B/C
Mail Room
1
Carpet
150
D5
1007D/I
Office Cubicles
1
Carpet
314
D5
1008
AT Asst. Manager
1
Carpet
188
D5
1009
AT Sec. Office
1
Carpet
187
D5
1010
AT Manager Office
1
Carpet
251
D5
1011
Facility Manager Office
1
Carpet
193
D5
1012A
Operational Support
1
Carpet
128
D5
1012
Conference Room / Wisconsin
1
Carpet
128
D5
1013
Air Traffic Manager
1
Carpet
128
D5
1014
Program Support Manager
1
Carpet
128
D5
1016
Operational Support
1
Carpet
589
D5
1017
Operational Support Manager
1
Carpet
192
D5
1018
Hallway
1
Carpet
400
D5
1019A
Program Support
1
Carpet
213
D5
1020
Ladies Lounge
1
Carpet
135
D5
1021
Ladies Restroom
1
Tile
57
D5
1022
Men's Restroom
2
Tile
121
D7
1023
Break Room
2
Tile
35
1Wkly
1024
Men's Toilet
2
Tile
786
D7
1025
Toilet Vestibule
2
Tile
32
D7
1026
Corridor
2
Tile
640
D7
1027
Janitor's Closet
2
Tile
17
1Wkly
1028
Ladies Lounge
2
Tile
252
D7
1029
Supply Room
4
Carpet/Tile
290
D5A
1030
Ladies Toilet
2
Tile
134
D7
1031
Logistics & Supply
1
Carpet
279
D5
1032
Cafeteria N/S hall
2
Tile
783
D7
1033
Cafeteria Dining Area
2
Tile
1985
D7
1046
Cafeteria Serving Line
2
Tile
515
D7
1047
Hall Vestibule
2
Tile
48
D7
1048
Cafeteria E/W Hall
2
Tile
355
D7
1049
Loading Dock
4
Concrete
210
D5A
1050
Entrance
2
Tile
400
D7
1051
Control Room-M1
2
Carpet
6656
AC
1052
Control Room - DSR
2
Carpet
9472
AC

Total Square Footage

30680

Second Floor Administrative

Room No.
Space Assignment
Area
Floor
Sq. Ft.
Frequency
2001
Operational support
1
Carpet
264
D5
2002
Operational Support
1
Carpet
280
D5
2003
Operation Manager
1
Carpet
403
D5
2004
Operational Support
1
Carpet
237
D5
2005
Conference Room
1
Carpet
325
D5
2006
Conference Room
1
Carpe t
174
D5
2007
Facility Manager
1
Carpet
253
D5
2008
Cartography
1
Carpet
256
D5
2009
Engineer's Office
1
Carpet
271
D5
2010
Office
1
Carpet
128
D5
2011A
Administrative Officer
1
Carpet
128
D5
2011B/C
Administrative Assistant
1
Carpet
128
D5
2011D/G
Office Cubicles
1
Carpet
350
D5
2011H
Copier Room
1
Carpet
116
D5
2011I
Closet
1
Carpet
25
D5
2013
Me n's Restroom
1
Tile
108
D5
2014
Ladies Restroom
1
Tile
88
D5
2015
Break Room
1
Tile
46
D5
20 16
Stairway Platform 2ND Floor
1
Carpet
124
D5
2018
Hallway/West
1
Carpet
96
D5
2020
Conference Room / Nebraska
1
Carpet
230
D5
2022
PIV Work Room
1
Carpet
143
D5
2023
Foyer
1
Carpet
190
D5
2024
Temp Office
1
Carpet
149
D5
2025S
So. Conference Room (#2)
1
Carpet
957
D5
2025N
No. Conference Room (#1)
1
Carpet
957
D5
2026N/S
HRC Office
4
Tile
118
D5A
2027
Store Room
4
Tile
98
D5A
2028
Corridor South
1
Carpet
45
D5
2029
Corridor North
1
Carpet
45
D5
2032
AOS-370
1
Carpet
378
D5

Total Square Footage

Basement Administrative

Room No.
Space Assignment
Area
Floor
Sq. Ft.
Frequency
B-101
Telco
5
Concrete
672
2Wkly
B-101A
Com. Office
1
Carpet
330
D7X
B-101B
Office Space
1
Carpet
275
D7X
B-101C
Office Space
1
Carpet
90
D7X
B-101D
Break Room
3
Tile
559
D7
B-101E
Surveillance
4
Tile
407
D7
B-101F
IFU Sup. Office
1
Carpet
90
D7X
B-1010
Corridor
4
Tile
202
D7
B-1010A
Com. Tech Support
4
Carpet
150
D7
B-102
Central Maintenance Shop
4
Concrete
2785
2Wkly
B-103
Logistics Storage
4
Concrete
665
2Wkly
B-103C
Vestibule
4
Tile
35
2Wkly
B-105
Men's Restroom
2
Tile
176
D7
B-106
Ladies Restroom
2
Tile
176
D7
B-107
Elevator Equip. Room
4
Tile
127
2Wkly
B-108
Corridor
1
Tile
1170
D5
B-109
Corridor
1
Tile
612
D5
B-110
Janitor Office
4
Tile
215
2Wkly
B-111
Electrical Room
4
Concrete
338
2Wkly
B-112
Maintenance Shop
1
Tile/Concrete
634
D7
B-112A
Workshop/Storage
6
Tile
144
2Wkly
B-113
Maintenance Shop
1
Tile ·
640
D7X
B-113A
ENV Sup. Office
3
Tile
274
D5A
B-113B
Office
3
Carpet
273
D7X
B-l 13C
Conference Room
1
Carpet
542
D7X
B-1130
Environmental Storage
6
Tile
234
2Wkly
B-114
Machine Room
4
Concrete
980
2Wkly
B-115
Chiller Room
4
Concrete
3000
2Wkly
B-116
Boiler Room
4
Concrete
1721
2Wkly
B-117
CCMS Room
4
Carpet
300
D7
B-118
Vestibule
4
Tile
449
D7
B-119
Mechanical Room
3
Tile
704
D7
B-120
Electronic Equipment Room
3
Carpet
9960
D7
B-132
Janitor Closet
2
Tile
18
1Wkly
B-134
Host Computer Room
3
Carpet
4517
D7
B-134C
COS Office
1
Carpet
167
D7X
B-1340
Data Sup. Office
1
Carpet
196
D7X
D-8A
Closet
1
Tile
32
1Wkly

Total Square Footage

33709

Auto Wing Basement

Room No.
Space Assignment
Area
Floor
Sq. Ft.
Frequency
B10A
CDC Computer Floor
1
Carpet
6939
D5
B10A
FSDPS Area
1
Carpet
336
D5
B12A1
Vestibule
1
Carpet
50
D5

D12A2

B12A2

IT Support
1
Carpet
120
D5
B12A3
Computer Specialist
1
Carpet
170
D5
B12A4A
Storage
1
Carpet
90
D5
B12A5
IT Support
1
Carpet
250
D5
B12A6
Hallway/Ramp
1
Carpet
160
D5
B12A7
Fire Cabinet
4
Concrete
608
AC
B12A8
Air Handler/Storage
4
Concrete
25
AC
B12A9
Air Handler/Storage
4
Concrete
225
AC
B13A
Critical Electric Vault
4
Tile
1035
2Wkly
B14A
Entrance Area
4
Concrete
247
2Wkly
B15A
Communication Support
1
Carpet
96
D5
B16A
Special Projects
1
Carpet
96
D5
B17A
Operation Support
1
Carpet
96
D5
B18A
PASS/Union Office
1
Carpet
96
D5
Bl9A
Special Project Office
1
Carpet
96
D5
B20A
Men's Restroom
2
Tile
35
D5A
B21A
FTI
1
Carpet
176
D5
B22A
Hallway
1
Tile
80
D7
B136
Pump room
6
Concrete
85
2Wkly
B138
Stair/Ramp/Landing
1
Carpet
32
D5
B137
Ladies Restroom
2
Tile
39
D7

Total Square Footage

11992

Auto Wing First Floor(CCC)

Room No.
Space Assignment
Area
Floor
Sq. Ft.
Frequency
110A
Tech Ops Automation - Data
4
Carpet
3484
D7
110C
Automation Manager
1
Carpet
192
D5
110D
Dysim
2
Carpet
1984
D5
11OE
Dysim Lab Manager
1
Carpet
1344

D5

110F
Tech Ops Maintenance
1
Carpet
360

D5

110G
Vestibule
1
Carpet
192
D5
110J
Hallway
1
Tile
30
D5
111A
Air Handling Equipment Room
4
Concrete
404
AC
112A
NAS Specialist Office
1
Carpet
270
D5
116A
Storage
4
Tile
34
AC
117A
Janitors Closet
4
Tile
36
AC
118A
Men's Restroom
3
Tile
39
D7
119A
Corridor
1
Tile
210
5
120
Power Vault
4
Tile
1127
AC
135A
Ladies Room
2
Tile
36
D7

Total Square Footage

Auto Wing 2nd Floor

Room No.
Space Assignment
Area
Floor
Sq. Ft.
Frequency
A211
Instructor Offices
1
Carpet
208
D5
A212
CBI Room
1
Carpet
521
D5
A213
Conference Room
1
Carpet
332
D5
A214
MPLS District Manager
1
Carpet
175
D5
A215A/B
Trainee Department
1
Carpet
161
D5
A215C
Management Support
1
Carpet
87
D5
A215D/F
Cubicle Offices
1
Carpet
309
D5
A216
Open Office Space
4
Carpet
583
D5A
A216A/F
Cubicle Offices
4
Carpet
578
D5A
A217
Q/C Manager
1
Carpet
158
D5
A218
Open Office
1
Carpet
659
D5
A218A/K
Cubicle Offices
1
Carpet
943
D5
A219
Operation Support Manager
1
Carpet
171
D5
A220
Program Support
1
Carpet
155
D5
A221
Program Support
1
Carpet
155
D5
A222
Elec. Closet
1
Vinyl
121
AC.
A223
Contract Support
1
Carpet
170
AC
A224
Men's Restroom
4
Ceramic
230
D7
A225
Women's Restroom
4
Ceramic
254
D7
A226
Janitor Closet
4
Tile
86
AC
A227
Office
1
Carpet
11
D5
A228
Radar Lab
1
Carpet
312
D5
A229
Office
1
Carpet
166
D5
A229A
Office
1
Carpet
151
D5
A229B
Office
1
Carpet
159
D5
A230
Class Room
1
Carpet
612
D5
A231
Class Room
1
Carpet
612
D5
A232A/B
Class Room
1
Carpet
675
D5
A210
Corridor
1
Carpet
649
D5
A210A
Corridor
1
Carpet
255
D5
A210B
Corridor
1
Carpet
198
D5
A210 C
Corridor
1
Carpet
210
D5
A210D
Corridor
1
Carpet
111
D5
A210E
Corridor
1
Carpet
113
D5
240A
Observation Bridge
1
Carpet/Rubber Tile
1350
D5

Total Square Footage

11736

M1 Area

Room No.
Space Assignment
Area
Floor
Sq. Ft.
Frequency
1051
Raised Floor Area TMU/SMIC
1
Carpet
2916
D5
1051A
Administrative Area
1
Carpet
3327
D5

Total Square Footage

AAS Administrative Support Building

Room No.
Space Assignment
Area
Floor
Sq. Ft.
Frequency
101
Office
1
Carpet
224
D5
102
Office
1
Carpet
99
D5
103
F&E
1
Carpet
99
D5
104
F&E
1
Carpet
99
D5
105
F&E
1
Carpet
99
D5
106
Corridor
1
Carpet
156
D5
107
Wellness Center
1
Tile
591
D5
108
F&E Shop
1
Carpet
99
D5
109
F&E Storage
1
Carpet
90
D5
110
Closet
1
Carpet
14
AC
111
Closet
1
Carpet
14
AC
112A
Conference Room
1
Carpet
143
D5
112B
Conference Room
1
Carpet
121
D5
113
Office
1
Carpet
131
D5
114
Corridor
1
Carpet
90
D5
115
Janitor Closet
1
Concrete
16
D5
116
Unisex Restroom
1
Tile
82
D5
117
Unisex Restroom
1
Tile
82
D5
118
Closet
1
Carpet
85
D5
Walkway
1
Concrete
501
AC

Total Square Footage

Other Buildings, Stairways and Areas

Room No.
Space Assignment
Area
Floor
Sq. Ft.
Frequency
Old Guard House
3
Tile
120
AC
Power Service Building
4
Concrete/Tile
26170
D5A
Guard House
3
Tile
144
D7
Elevator
4
Tile
50
D5A
Stairway No. 1
1
Tile
385
D5
Stairway No. 2
1
Tile
1120
D5
Stairway No. 3
1
Tile
385
D5
Stairway No. 4
1
Tile
200
D5
Stairway No. 5
1
Tile
80
D5
Stairway No. 6
1
Tile
175
D5
Stairway A
1
Tile
540
D5
Stairway B
1
Tile
400
D5
Stairway C
1
Tile
60
D5
Stairway D
4
Concrete
200
2Wkly
Utility Chase 1
4
Concrete
75
AC
Utility Chase 2
4
Concrete
50
AC
Smoking Shelters
7
Concrete

D5

Total Square Footage

30154

ENGINEERING SERVICES (ES) BUILDING

Room No.
Space Assignment
Area
Floor
Sq. Ft.
Frequency
109
Storage
11
Tile
900
AC
101
Entrance
1
Tile
480
3Wkly
105
Open Office w/Kitchen
1
Carpet
1320
3Wkly
106
Restroom
1
Tile
20
3Wkly
104
Conference Room
1
Carpet
240
3Wkly
103
Office
1
Carpet
192
3Wkly

Total Square Footage

CHILD CARE CENTER

Room No.
Space Assignment
Floor
Sq. Ft
Frequency
Infant Room
Tile
644
D7CCF
Toilet
Tile
156
D7CCF
Toddler Room
Tile
1094
D7CCF
Toilet
Tile
81
D7CCF
Corridor
Tile
110
D7CCF
Laundry
Tile
63
D7CCF
Kitchen
Tile
198
D7CCF
Dining Area
Tile
304
D7CCF
Preschool Room
Tile
1732
D7CCF
Girl's Restroom
Tile
81
D7CCF
Boy's Restroom
Tile
81
D7CCF
Corridor
Tile
110
D7CCF
Office
Carpet
56
D7CCF
Conference Room
Carpet
150
D7CCF
Director's Office
Carpet
100
D7CCF
Women 's Restroom
Tile
30
D7CCF
Men's Restroom
Tile
30
D7CCF
Reception Area
Tile
66
D7CCF
Misc. Areas
Tile
1555
AC

Total Square Footage

ATTACHMENT A

DEFINITIONS

As used throughout this contract, the following terms shall have the meaning set forth below. Additional definitions are in the "DEFINITIONS" clause.

1. Where "as shown", "as indicated", "as detailed", or words of similar import are used, it shall be understood that reference is made to this specification and the drawings accompanying this specification unless stated otherwise.

2. Where "as directed", "as required", "as permitted", "approval", "acceptance", or words of similar import are used, it shall be understood that direction, requirement, permission, approval, or acceptance of the Contracting Officer is intended unless stated otherwise.

3. Clean. "Clean" shall be defined as free of dirt, dust, spots, streaks, stains, smudges, litter, debris, and other residue.

4. Contracting Officer. The Contracting Officer is a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.

5. Contract Officer Representative (COR). The Government employee designated by the Contracting Officer to be responsible for monitoring of Contractor performance.

6. Contractor. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall ensure that his/her subcontractors comply with the provisions of this contract.

7. Contractor Representative. A foreman or superintendent assigned in accordance with the "CONTRACTOR EMPLOYEES" clause.

8. Disinfect. Cleaning in order to destroy any harmful microorganisms by application of an approved chemical agent.

9. Facility. An establishment, structure, or assembly of units of equipment designated for a specific function.

10. Frequency of Service.

a. AC - As Coordinated. Service will be coordinated between the Contracting Officer’s Representative and the Contractor.

b. Annual. Services performed once during each 12 month period of the contract at intervals of 345 to 385 days.

c. Semi-Annual. Services performed twice during each 12 month period of the contract at intervals of 160 to 200 calendar days.

d. Quarterly. Services performed 4 times during each 12 month period of the contract at intervals of 80 to 100 calendar days.

e. Monthly. Services performed 12 times during each 12 month period of the contract at intervals of 28 to 31 calendar days.

f. Semi-Monthly. Services performed 24 times during each 12 month period of the contract at intervals of 14 to 16 calendar days.

g. 1Wkly - Weekly. Services performed 52 times during each 12 month period of the contract at intervals of six to eight calendar days.

h. 2Wkly -Twice weekly. Services performed twice a week, such as Monday and Thursday or Tuesday and Friday. Between 0700-0130.

i. 3Wkly - Three times weekly. Services performed three times a week, such as Monday, Wednesday and Friday.

j. Daily D5. Services performed once each calendar day, Monday through Friday, between 0700-1630, excluding holidays unless otherwise noted.

k. Daily D5A. Services performed once each calendar day, Monday through Friday, between 0700-0130, excluding holidays unless otherwise noted.

l. Daily D7X. Services performed once each calendar day, seven days per week, excluding National holidays. Monday through Friday between 0700-1630, Saturday and Sunday between 2030-0130.

m. Daily D7. Services performed once each calendar day, seven days per week, including weekends and National holidays, between 2030-0130.

n. Daily D7CCF. Daily at Child Care Facility. Services performed once each calendar day, seven days per week, including weekends and National holidays, between 0530-2300.

11. Holidays New Year’s Day Martin Luther King's Birthday Presidents Day Memorial Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day

12. Quality Assurance (QA). A method used by the Government to provide some measure of control over the quality of purchased goods and services received.

13. Quality Control (QC). A method used by the Contractor to control the quality of goods and services produced.

14. Response Time. Response time is defined as the time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site, with appropriate tools, equipment, and materials, ready to perform the work required. Response times are designated in the appropriate technical clauses.

15. Space. A space is an area to receive custodial services which may or may not be considered a room by common definition. Examples of spaces are definable sections of hallways, stairwells, lobbies, offices, entrances, and elevators.

16. Spot clean- Wet clean identified spot with appropriate chemical cleaning agent.

17. Spot vacuum- Vacuum localized area affected by a dry spill.

18. Waste and Recycling Containers. Waste containers are defined as trash receptacles, waste baskets, trash cans, wastepaper baskets, ash trays, or any container holding trash, paper, or other recyclables and refuse of any type.

File details come from the government source that posted it. Updated .