Amdt 002 Con't Page for DTFASA-17-R-00450 (pdf)

View the file

Other files

File Type Posted
SF30_Amdt 001.pdf PDF
LVK 25R - LOC - BLDG LAYOUT.pdf PDF
SF-33.pdf PDF
DTFASA-17-R-00450.pdf PDF
SF30_Amdt 002.pdf PDF
LVK 25R LOC and GS bldgs - SPECS.pdf PDF
SF30_Amdt 003.pdf PDF
LVK 25R - GS - BLDG LAYOUT.pdf PDF
LVK 25R - LOC - BLDG LAYOUT.pdf PDF
SF30_Amdt 002.pdf PDF
LVK 25R - GS - BLDG LAYOUT.pdf PDF
LVK 25R LOC and GS bldgs - SPECS.pdf PDF
SF30_Amdt 001.pdf PDF
Amdt 002 Con't Page for DTFASA-17-R-00450.pdf PDF
DTFASA-17-R-00450.pdf PDF
DTFASA-17-R-00450.pdf PDF
LVK 25R LOC and GS bldgs - SPECS.pdf PDF
LVK 25R - GS - BLDG LAYOUT.pdf PDF
LVK 25R - LOC - BLDG LAYOUT.pdf PDF
LVK 25R LOC and GS bldgs - SPECS.pdf PDF
LVK 25R - LOC - BLDG LAYOUT.pdf PDF
LVK 25R - GS - BLDG LAYOUT.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Continuation Page for Amendment 002 to the Design, Fabricate, Deliver and Off Load of two (2) 12’Wide x 16‘Long x 9’ High steel/metal building in support of 25R Glideslope (GS) and 25R Localizer (LOC) at the Livermore Airport- (LVK) in Livermore, CA, Solicitation DTFASA-17-R-00450.

PART 3 EXECUTION, 3.5 WARRANTIES / GUARANTEES

Reads As:

The shelter manufacturer shall provide a warranty for five (2) years on the shelter against defects in materials, leaks (including but not limited to door gasket leaks and factory wall penetrations), workmanship, corrosion, and design deficiencies, and shall make repairs and replacements at no cost to the FAA. Repairs made shall resemble a like new condition. The shelter manufacturer shall have the capability to make all repairs at the delivery site.

This warranty shall also cover all components of the shelter for a minimum of two years including but not limited to: doors, door seals, door mechanisms, hoods, vents, and all electrical and/or mechanical components.

The air conditioning system is warranted for a minimum of two years on parts and labor and on the air conditioner compressor.

Shelter manufacturer shall provide the FAA with certificates of guarantees and warranties normally provided by manufacturers of all equipment and materials not listed above.

Warranties for the shelter and all products used on or in the shelter, including but not limited to any and all electrical, heat and AC components, will begin for the FAA at such time the shelter arrives at its final destination. Holding, staging, or storage areas - such as at the manufacturer’s storage are not considered the final destination

Should Read As:

The shelter manufacturer shall provide a warranty for three (3) years on the shelter against defects in materials, leaks (including but not limited to door gasket leaks and factory wall penetrations), workmanship, corrosion, and design deficiencies, and shall make repairs and replacements at no cost to the FAA. Repairs made shall resemble a like new condition. The shelter manufacturer shall have the capability to make all repairs at the delivery site.

This warranty shall also cover all components including but not limited to: doors, door seals, door mechanisms, hoods, vents, and all electrical and/or mechanical components The air conditioning system is warranted for a minimum of three years (3) on parts and labor and on the air conditioner compressor.

Shelter manufacturer shall provide the FAA with certificates of guarantees and warranties normally provided by manufacturers of all equipment and materials not listed above.

Warranties for the shelter and all products used on or in the shelter, including but not limited to any and all electrical, heat and AC components, will begin for the FAA at such time the shelter arrives at its final destination. Holding, staging, or storage areas - such as at the manufacturer’s storage are not considered the final destination.

END OF CLARIFICATION

Amendment 002 does not change the due date of offers.

Offers are due no later than 2:00 PM Pacific Time (PT), May 26, 2017, as stated in the RFO.

File details come from the government source that posted it. Updated .