DTFAEN-16-R-00166 Amendment 0003.doc
DOC document 2 MB Posted
- Attached to
- Amendment 0003 Replace Exterior Metal Doors, Savannah Air Traffic Control Tower, Savannah, GA************
- Solicitation number
- DTFAEN-16-R-00166
About this file
DTFAEN-16-R-00166 Amendment 0003 (doc)
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE |
| OF PAGES |
| 1 |
| 2 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 0003 |
| 09/08/2016 |
| SO-16-02046 |
6. ISSUED BY
7. ADMINISTRATED BY (If other than Item 6)
Federal Aviation Administration
SAME AS BLOCK 7
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
FORMCHECKBOX
FORMCHECKBOX
9A.
AMENDMENT OF SOLICITATION NO.
DTFAEN-16-R-00166
9B.
DATED (SEE ITEM 11)
09/08/2016 10A.
MODIFICATION OF CONTRACT/ORDER NO.
*TO BE COMPLETED BY VENDOR IF NOT COMPLETE
10B.
DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is FORMCHECKBOX extended FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation on as amended, by one of the following methods:
(2) By completing Item 8 and 15, and returning 1 copies of the amendment; (b) acknowledging receipt of this amendment on each copy of the offer submitted; or © By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hours and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.
FORMCHECKBOX
FORMCHECKBOX
B.
THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
FORMCHECKBOX
D. OTHER (Specify type of modification and authority)
FORMCHECKBOX
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment 0003 to SIR- Request for Proposals DTFAEN-16-R-00166 is being executed to publish Final Specifications and Answers and Clarifications to RFIs. Please see attached.
No other changes or updates added.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
| Regina Singleton |
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
| (Signature of person authorized to sign) |
| BY |
(Signature of Contracting Officer) 09/08/2016
RFIs for Exterior Metal Door Replacement
Savannah Air Traffic Control Tower, Savannah, GA
DTFAEN-16-R-00166
1. Does this project require certified payroll using Davis-Bacon Wages?
Yes
2. Is a general contractor’s license required to do this work?
Yes
3. Are there specifications for the doors, frames and hardware available for this project?
Yes – to be attached to solicitation
4. Can a material lift or crane be used to put the required material at each floor level?
Yes – however, depending on the height of the crane/lift a crane permit or NOTAM may be required. If a permit is required it will take several months to process. The elevator can be used to move material, but all surfaces must be protected from damage.
5. Is a fire rating required for any or some of the doors?
The doors are exterior doors and no fire rating is required.
6. On the 2nd floor, the doors for the elevator and stairwell have a small rectangular window. The plans for this project only show a window on one door (elevation D) for the stairwell. Do we price the project as drawn or do we include a window for the elevator door (elevation A) as well?
Yes – use elevation D with the window for the elevator door.
7. Instead of saw cutting in a reglet in the concrete wall (to act as a drip edge), can a metal drip edge be fastened (installed) instead? There should be a cost savings for this option and the end result will look better.
The installation of a metal drip edge is unacceptable. Saw cut the reglet in the concrete wall as called for in the contract plans and specifications.
8. Please clarify the sequence of work notes. For example, do all of the stair doors (#1) get replaced at the same time on each level, then repeat for #2, #3, & #4, or, can we work on a floor-to-floor basis?
Refer to Drawing SAV-D-1203950-A001, Sequence of Work Notes for the order for working on the doors. It is preferred that the contractor start at the top floor and work on a floor to floor basis. All work must be completed and accepted by the FAA prior to proceeding to the next floor.
OMB Control No. 2120-0595 (SF-30) FAA Template No. 11 (8/97)
File details come from the government source that posted it. Updated .