OMB Control No. 2120-0595 (SF-30) FAA Template No. 11 (Reverse) (8/97)
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 21
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0004 09/02/2016 SO-16-02052
6. ISSUED BY 7. ADMINISTRATED BY (If other than Item 6)
Federal Aviation Administration SAME AS BLOCK 7
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
DTFAEN-16-R-00112
9B. DATED (SEE ITEM 11)
09/02/2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
*TO BE COMPLETED BY VENDOR IF NOT COMPLETE 10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation on as amended, by one of the following methods:
(a) By completing Item 8 and 15, and returning 1 copies of the amendment; (b) acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hours and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO.
AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment 0004 to SIR- Request for Proposals DTFAEN-16-R-00112 is being executed to publish Answers and Clarifications to RFIs. Please see attached.
No other changes or updates added.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Regina Singleton
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign)
BY
(Signature of Contracting Officer) 09/02/2016
DTFAEN‐16‐R‐00112 – TPA HVAC Rehabilitation – Pre‐Bid RFIs
1) Who is the roof manufacturer and installer?
Installer: Travis P. Sheckler
Sheckler Contracting, Inc
7214 Church Street
Conneaut Lake, PA 16316
(814) 510‐9100
Manufacturer: Sarnafil
Richard Hartley
800‐443‐0223 (office)
678‐672‐7993 (cell)
2) Will temporary cooling be required in the areas of renovation and what will be acceptable?
Drawing M000, Note 1, lists requirements for temporary heating/cooling of critical areas. This must be maintained at all times. Admin areas must be capable of cooling as designed during normal business hours (Note F, M000). System can be taken off‐line during non‐business hours.
3) Who are the two approved control vendors, do you have specific contacts?
Specification section 23 09 23 lists the information for approved Controls vendors.
4) What is the Window scope, page A154 states window seals, and plates are to be removed and replaced but the onsite FAA personnel said that the window glass would be replaced by another contractor due to existing damage. Is there overlap in the two projects? Please clarify.
All work related to the cab windows should be disregarded. No work should be performed on the cab window seals, fasteners, or plates.
5) Please clarify the concrete crack repair work and what type of repair should be made. Would the
FAA consider providing linear footages for each type of repair?
Notes 1 through 3 of Detail 2 on A154 clarify the concrete repair work to be performed, including limits of work and acceptable products. Crack repair is limited to the top level of the concrete shaft wall module.
6) I found a section in the specifications that could raise the cost by ten thousand dollars, possibly more, and they haven’t asked for this in many years. – if you would, Please submit the following questions to the FAA for clarification:
a. Specifications section 1.14 TRAINING, (item B14): This section mentions sending 2 FAA employees for factory training for 3 days. In addition, to provide an option for 2‐3 week system engineering class.
Bid note: On recent projects, training has consisted of 2‐8 hr sessions on close of project and 1‐8 hr session at their discretion, typically 6 months after initial training.
Question: Is it acceptable to qualify our bid to the above mentioned bid note in lieu of the current section 1.14?
Yes, the proposed training hours should in the bid note should be used in lieu of the requirements listed in 23 09 23 1.14. The training should still cover curriculum mentioned in
1.14.B.1‐13. Factory classroom training will not be required.
7) Is the entire catwalk to be prepped as needed and coated? This would include all structural support members, railings, and grating walkway.
No work is to be done to the catwalk support members, railings, or grating.
8) If the intention was only to prep the steel sill beam area, where would the stopping/break point be?
A154, Detail 2 lists the work that is to be done to the sill beam.
9) Does the entire metal wall panel around cab perimeter under windows get prepped/coated?
Metal panels around the cab perimeter are not to be prepped and coated. Failed/cracked seals should be repaired at noted in Detail 2 of A154.
10) Can exterior elevation drawing be provided for accurate take off of this area?
Record drawings are attached. Please note that Contractor is responsible for field verifying all dimensions. Drawings provided are to give a general idea of the dimensions.
11) Also at the prebid meeting that no asbestos would be abated or disturbed during this project but an abatement spec and third party monitoring spec were included, please clarify whether these are needed or not.
Asbestos abatement is not a requirement of this project.
12) After reviewing the Acoustical Ceiling section 09 51 13, approved manufacturers are listed for the ceiling grid system but no manufacturers are listed for the acoustical panels. Do you want to give us preferred panels and finishes?
Please see the attached that lists acoustical panel types. ACT‐2 should be used in the TRACON and Cab, and ACT‐1 should be used everywhere else ceiling is being replaced.
13) Note 3 on Equipment Feeder Schedule on Dwg. E500 directs removal of all existing conduit and installing new. This would increase costs significantly and have a greater impact on facility operations. Do you really want to remove the existing conduit and install new?
Existing conduit should be reused to the maximum extent possible
14) What Brand, Style and Model are the existing Panelboards that need new Circuit Breakers?
(Panels A, B, J, and LBND)
Existing panelboards were examined on 2nd pre‐bid site visit
15) Can all RTUs be provided with Integral Disconnect Switches?
Yes
16) Dwg A153 (Note 1) provides for epoxy encapsulation of VCT Flooring (ACM Tile & Mastic) at the junction level.
a. Has the FAA considered that proper application of epoxy coverings over VCT will require removal of all wax/surface contaminants as well as abrasion of VCT surfaces as floor prep? The presence of ACM precludes any abrasive prep work; the high foot‐traffic and location in close proximity to the CAB also makes epoxy encapsulation of VCT flooring a poor choice of remedy.
b. Is the FAA prepared to forgo epoxy manufacturer recommendations & apply the coating with minimal surface preparation? If so, this may yield less than desired appearance and performance results.
c. Has the FAA considered installing another layer of VCT or ESD carpeting as an encapsulate material?
Contractor should provide a layer of VCT to encapsulate existing ACM tile. Epoxy encapsulation will not be necessary. See attached spec section for VCT.
17) Dwg E102 (Lightning Protection Notes 2 & 3) requires recertification of existing lightning protection system & a UL cert letter for entire building. A search of UL listings for valid UL certificates revealed that one does not exist; there is not a current certification for the TPA ATCT facility (please provide certificate number if available). It is impossible to price these requirements without first inspecting the existing facilities, obtaining a list of exceptions and estimating remedial work that may be required to bring the facility into UL compliance.
UL recertification will not be required.
18) Dwg A154 (detail 2/A154) requires removal of existing caulking & control joints. Feedback from
RL James, a reputable company (specialized in exterior building remediation) with experience at the TPA ATCT, indicates that they are unwilling to bid the work because “...based upon our past experience and what we know of the deterioration of the existing structure. The vertical steel supporting the roof and glass is too far gone to take a chance trying to clean it up and coat it.
We had one panel of glass crack just from cutting out the sealants because we released all the stress it is under from the corroded steel. Also, I don't know what you would have left to fasten the metal strips to once you removed them.”
a. Is the FAA aware of this concern/issue/risk?
See response to Question 4. No work will be required at Cab window seals, fasteners, or plates.
19) Please clarify the scope depicted on Dwg C100. Note 11 states that the only new items are the re‐striping of the parking stalls and directional traffic arrows.
a. Note 5 directs re‐striping of all Aisles – is this correct?
Aisles are to be re‐striped as well.
b. In Note 12 there are only 104 parking stalls called out. Does the additional handicapped parking stall near the chiller pad get re‐striped (total of 105)?
Both handicapped parking stalls near the chillers are to be re‐striped. Actual number of parking stalls is 106.
c. If there is new fencing, where is it shown as new or mentioned in the site plan?
See A600 for fencing requirements.
d. Verify the scope includes or excludes a new canopy (Note 9), new stair (Note 10), new ramp & handrails (Note 8), and parking lot re‐surfacing (Note 1).
Scope includes all of the above.
e. If handrails are included in the scope, what areas are included? The drawing depicts handrails at the ramp, canopy area, and near the access to general parking.
Extents of new handrail are shown in Detail 1, A600.
f. Please define which signs are new and how many; see the callout at the handicapped parking stall near the chiller pad?
No new signage will be required.
g. Specification section 01 10 00‐1 states that the parking lot will be re‐paved – is this incorrect?
Parking lot is to be re‐surfaced, not re‐paved.
20) Ceiling grid replacement‐ In the rooms where ceiling grids will be replaced, is it acceptable to reuse serviceable edge angle? This will reduce cost and completion time.
Edge angle can be re‐used if is in serviceable condition. New ceiling grid should match edge angle. If not able to match, then all edges should be replaced as well.
21) It appears that there are numerous runs of miscellaneous wiring and conduit that are not supported above the suspended ceiling & in many areas laying directly on the grid system (see pictures from site visit). What is the contractor's responsibility for these items during ceiling removal and replacement?
Contractor will be responsible for temporarily supporting all wiring and conduit that is resting on ceiling during ceiling removal and replacement.
22) There are several damaged areas in the existing parking lot surface (see pictures from site visit).
Do these require excavation & repair prior to resurfacing? If so, can you please establish an area or budget for bid purposes?
Damaged areas will need to be repaired prior to resurfacing.
23) Currently the access is blocked in the SW of the parking area due to overhead construction.
When will this work be completed and access granted to permit lot resurfacing & striping?
Work will be completed prior to Notice to Proceed being issued.
24) Please confirm that there are 106 parking spaces to stripe, including two handicapped spaces near the Tech Ops building. Also confirm that no signage is required in any location.
Confirmed.
25) Confirm that all work performed inside the base building & tower spaces will begin after 5pm and in some critical operational areas after midnight.
Notes C and E on M100 state general work times in occupied areas.
26) M807 shows several devices as newly provided and installed. We believe this is in error as there are sufficient existing data points that can be reused from the existing system into the new system. Please confirm.
It is not the intent to add any new devices to the existing chilled water system.
27) The existing wiring is installed in a “Free wire” arrangement – the specifications call for control wiring to be installed in conduit. We are seeking a waiver to install the new control wiring bundled in J‐Hooks or other similar type approved hangers above accessible ceilings and to install conduit only in areas where the ceilings are exposed to the joist.
Controls wiring in concealed areas is allowed to be neatly bundled and supported by J‐hooks. All exposed wiring should be installed in conduit.
28) We have previously installed CAB access stairs similar to the requirement in A602; discovered that the design is not constructible. Subsequently, we proposed a design that was implemented at the CAE ATCT. Will the FAA consider an alternate installation method for the pull down stair assembly to be installed in the CAB?
Yes.
29) A600, detail 1/A600 depicts new guardrail (height extension) for the smaller stair area as well as the first 11’ of the ramp. What type of transition is required at the end of the 11’ extensions;
are abrupt 90 degrees acceptable?
Yes.
30) A603, detail 4/A603 shows bronze U‐bolt clamps but no other details. What grounding/bonding is required for the new fence, gates and stair assembly?
Grounding/bonding of the new fence will not be required.
31) S300, detail G/S301 shows the stair landing extending over the base building roof parapet. The Parapet height above the roof is 24”; what provision is made for the elevation transition? Will rooftop guardrails similar to Safety Rail 2000 also be required at this area or the link area?
Contractor to provide prefabricated roof stairs with integral handrails (see attachment for an example) or separate steps and guardrails at the main roof to access the stair platform at the parapet. Provide guardrails similar to the Safety Rail 2000 system at the link roof.
32) A603, detail 1/603 depicts a 7’0” fence but detail 1/A600 shows an 8’ high lockable fence; which is correct?
Fence should be 8’ high.
33) A603, Fence Note #2 directs mow strips under fencing; are you sure that this is required in this particular application/location? It appears that the 12” mow strip would overlap the perimeter stair base plates as well as the stair framing on the outside edge (see detail 1/S300).
Mow strip is not required.
34) M103, Note #2 directs repainting the drain pan and entire unit. Have you considered replacing the unit? Repainting these items will not yield any lasting results.
We will not be replacing the entire unit. Contractor should include repainting in their bid proposal.
35) A154, detail 2/A154 directs removal of existing caulk and coat with zinc‐rich paint; the area of concern is the underside of the CAB glass framing (see pictures from site visit). Much of the exterior skin material is deteriorated and in some areas nonexistent. Please describe what action should be taken.
The existing façade should be reconditioned using the attached product, FastSteel. After this is complete, the zinc‐rich primer should be used as originally specified on 2/A154.
FEDERAL AVIATION ADMINISTRATION JANUARY 15, 2016
CHARLOTTE-DOUGLAS ATCT AND TRACON FAA-CLT-1103700
ACOUSTICAL PANEL CEILINGS 09 51 13 - 4
provide products selected by COR from each manufacturer's full range that comply with requirements indicated for type, pattern, color, light reflectance, acoustical performance, edge detail, and size.
C. Broad Spectrum Antimicrobial Fungicide and Bactericide Treatment: Provide acoustical panels treated with manufacturer's standard antimicrobial formulation that inhibits fungus, mold, mildew, and gram-positive and gram-negative bacteria and showing no mold, mildew, or bacterial growth when tested according to ASTM D 3273 and evaluated according to ASTM D 3274 or ASTM G 21.
2.2 ACOUSTICAL PANELS FOR ACOUSTICAL PANEL CEILING
A. ACT-1: Fiberglass Ceiling Panels: Subject to compliance with requirements, provide the product indicated on Drawings, or approved equal.
1. Modular Size: 24” x 24” x 1-1/2”
2. Edge Profile: Reveal
3. Color: White
4. NRC: 1.00
5. CAC: 26
6. Light Reflectance: 0.84
7. Antimicrobial Treatment: Broad spectrum fungicide and bactericide based.
8. Fire Rating: Class A
9. Grid Type: 15/16”
B. ACT-2: Fiberglass Ceiling Panels: Subject to compliance with requirements, provide the product indicated on Drawings, or approved equal.
1. Modular Size: 24” x 24” x 1-1/2”
2. Edge Profile: Reveal
3. Color: Black
4. NRC: 1.00
5. CAC: 26
6. Light Reflectance: 0.03
7. Antimicrobial Treatment: Broad spectrum fungicide and bactericide based.
8. Fire Rating: Class A
9. Grid Type: 15/16”
C. ACT-3: Ceramic and Mineral Fiber Composite Panels: Subject to compliance with requirements, provide the product indicated on Drawings, or approved equal.
1. Modular Size: 24” x 24” x 5/8”
2. Edge Profile: Square Lay-In
3. Color: White
4. NRC: 0.55
5. CAC: 26
6. Light Reflectance: 0.82
7. Antimicrobial Treatment: Broad spectrum fungicide and bactericide based.
2.2 ACOUSTICAL PANELS FOR ACOUSTICAL PANEL CEILING
A. ACT-1: Fiberglass Ceiling Panels: Subject to compliance with requirements, provide the g g j product indicated on Drawings, or approved equal.
1. Modular Size: 24” x 24” x 1-1/2”
2. Edge Profile: Reveal 3.
g Color: White
4. NRC: 1.00
5. CAC: 26
6. Light Reflectance: 0.84 7.
g Antimicrobial Treatment: Broad spectrum fungicide and bactericide based.
8. Fire Rating: Class A 9.
g Grid Type: 15/16”
B. ACT-2: Fiberglass Ceiling Panels: Subject to compliance with requirements, provide theg g j product indicated on Drawings, or approved equal.
1. Modular Size: 24” x 24” x 1-1/2”
2. Edge Profile: Reveal 3.
g Color: Black
4. NRC: 1.00
5. CAC: 26
6. Light Reflectance: 0.03 7.
g Antimicrobial Treatment: Broad spectrum fungicide and bactericide based.
8. Fire Rating: Class A 9.
g Grid Type: 15/16”
FEDERAL AVIATION ADMINISTRATION AUGUST 2016
FAA-TPA-1300598
RESILIENT TILE FLOORING 09 65 19 - 1
SECTION 09 65 19 - RESILIENT TILE FLOORING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Vinyl composition floor tile.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Samples for Initial Selection: For each type of floor tile indicated.
C. Qualification Data: For qualified Installer.
D. Maintenance Data: For each type of floor tile to include in maintenance manuals.
1.3 QUALITY ASSURANCE
A. Installer Qualifications: A qualified installer who employs workers for this Project who are competent in techniques required by manufacturer for floor tile installation method indicated.
1. Engage an installer who employs workers for this Project who are trained or certified by manufacturer for installation techniques required.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Store floor tile and installation materials in dry spaces protected from the weather, with ambient temperatures maintained within range recommended by manufacturer, but not less than 50 deg F or more than 90 deg F. Store floor tiles on flat surfaces.
1.5 PROJECT CONDITIONS
A. Maintain ambient temperatures within range recommended by manufacturer, but not less than 70 deg F or more than 95 deg F, in spaces to receive floor tile during the following time periods:
1. 48 hours before installation.
2. During installation.
3. 48 hours after installation.
B. Until Substantial Completion, maintain ambient temperatures within range recommended by manufacturer, but not less than 55 deg F or more than 95 deg F.
RESILIENT TILE FLOORING 09 65 19 - 2
C. Close spaces to traffic during floor tile installation.
D. Close spaces to traffic for 48 hours after floor tile installation.
E. Install floor tile after other finishing operations, including painting, have been completed.
1.6 EXTRA MATERIALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Floor Tile: Furnish 1 box for every 50 boxes or fraction thereof, of each type, color, and pattern of floor tile installed but not less than two (2) unopened boxes of each size, color and type of tile.
PART 2 - PRODUCTS
2.1 VINYL COMPOSITION FLOOR TILE
A. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following:
1. AB ColorPlus, American Biltrite (Canada) Ltd.
2. Armstrong World Industries, Inc.
3. Congoleum Corporation
4. Mannington Mills, Inc.
5. Tarkett, Inc.; NAFCO, Azrock
6. Vinylasa Tile, Distributed by American Tile Inc.
B. Tile Standard: ASTM F 1066, Class 1, solid-color tile
C. Wearing Surface: Smooth
D. Thickness: 0.125 inch
E. Size: 12 by 12 inches.
F. Colors and Patterns: If not otherwise indicated, to be selected by COTR from full range of industry colors.
2.2 INSTALLATION MATERIALS
A. Trowelable Leveling and Patching Compounds: Latex-modified, portland cement based or blended hydraulic-cement-based formulation provided or approved by manufacturer for applications indicated.
B. Adhesives: Water-resistant type recommended by manufacturer to suit floor tile and substrate conditions indicated.
RESILIENT TILE FLOORING 09 65 19 - 3
C. Seamless-Installation Accessories:
1. Heat-Welding Bead: Manufacturer's solid-strand product for heat welding seams.
a. Color: Match floor tile
2. Chemical-Bonding Compound: Manufacturer's product for chemically bonding seams.
D. Floor Polish: Provide protective liquid floor polish products as recommended by manufacturer.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, with Installer present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.
B. Verify that finishes of substrates comply with tolerances and other requirements specified in other Sections and that substrates are free of cracks, ridges, depressions, scale, and foreign deposits that might interfere with adhesion of floor tile.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Prepare substrates according to manufacturer's written instructions to ensure adhesion of resilient products.
B. Concrete Substrates: Prepare according to ASTM F 710.
1. Verify that substrates are dry and free of curing compounds, sealers, and hardeners.
2. Remove substrate coatings and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, using mechanical methods recommended by manufacturer. Do not use solvents.
3. Alkalinity and Adhesion Testing: Perform tests recommended by manufacturer. Proceed with installation only after substrates pass testing.
4. Moisture Testing: Perform tests recommended by manufacturer. Proceed with installation only after substrates pass testing.
C. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound and remove bumps and ridges to produce a uniform and smooth substrate.
D. Do not install floor tiles until they are same temperature as space where they are to be installed.
1. Move resilient products and installation materials into spaces where they will be installed at least 48 hours in advance of installation.
RESILIENT TILE FLOORING 09 65 19 - 4
E. Sweep and vacuum clean substrates to be covered by resilient products immediately before installation.
3.3 FLOOR TILE INSTALLATION
A. Comply with manufacturer's written instructions for installing floor tile.
B. Lay out floor tiles from center marks established with principal walls, discounting minor offsets, so tiles at opposite edges of room are of equal width. Adjust as necessary to avoid using cut widths that equal less than one-half tile at perimeter.
1. Lay tiles square with room axis
C. Match floor tiles for color and pattern by selecting tiles from cartons in the same sequence as manufactured and packaged, if so numbered. Discard broken, cracked, chipped, or deformed tiles.
1. Lay tiles with grain direction alternating in adjacent tiles (basket-weave pattern.
D. Scribe, cut, and fit floor tiles to butt neatly and tightly to vertical surfaces and permanent fixtures including built-in furniture, cabinets, pipes, outlets, and door frames.
E. Extend floor tiles into toe spaces, door reveals, closets, and similar openings. Extend floor tiles to center of door openings.
F. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on floor tiles as marked on substrates. Use chalk or other nonpermanent, nonstaining marking device.
G. Install floor tiles on covers for telephone and electrical ducts, building expansion-joint covers, and similar items in finished floor areas. Maintain overall continuity of color and pattern between pieces of tile installed on covers and adjoining tiles. Tightly adhere tile edges to substrates that abut covers and to cover perimeters.
H. Adhere floor tiles to flooring substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other surface imperfections.
3.4 CLEANING AND PROTECTION
A. Comply with manufacturer's written instructions for cleaning and protection of floor tile.
B. Perform the following operations immediately after completing floor tile installation:
1. Remove adhesive and other blemishes from exposed surfaces.
2. Sweep and vacuum surfaces thoroughly.
3. Damp-mop surfaces to remove marks and soil.
RESILIENT TILE FLOORING 09 65 19 - 5
C. Protect floor tile products from mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period.
D. Cover floor tile until Substantial Completion.
END OF SECTION 09 65 19
RESILIENT TILE FLOORING 09 65 19 - 6
THIS PAGE INTENTIONALLY LEFT BLANK
Rebuild...
• Stripped threads
• Small machine parts
• Rust-damaged metal
Form...
• Custom tools, handles
• Prototype parts
• Anchor machines
Repair...
• Leaking pipes
• Ductwork
• Cracks and voids in metal
STEEL-REINFORCED EPOXY PUTTY STICK
FastSteel®
Repair and rebuild anything made of steel
Made in U.S.A.
• The ultimate solution for small or emergency repairs
• Easy-to-use and mistake-proof
• Bonds instantly with superior strength
• Saves hundreds of dollars in repairs
• Belongs in every toolbox
Seals leaks in pipe joints!
Fills cracks and voids in metal!
Repairs engines;
also rebuilds small parts!
FastSteel Steel-Reinforced Epoxy Putty Stick Product Description FastSteel is a hand-mixable, non-rusting, steel-reinforced epoxy putty that quickly repairs or rebuilds anything made of steel. After mixing, it forms an industrial-strength polymer compound that can be molded into shapes or used to build up, patch and repair steel components. Each handy stick contains pre-measured portions of activator and base throughout — no measuring or mixing tools are necessary. The consistency (like modeling clay) eliminates drips and runs and facilitates adhesion to the substrate.
After 60 minutes the application can be drilled, tapped, ground, machined, filed, and painted. FastSteel cures to a dark gray metallic color. Suitable for interior or exterior use, it is resistant to water, chemicals, and temperature extremes. FastSteel contains no VOCs or solvents. It's non-flammable and releases no noxious fumes. It won't shrink or pull away. The unused portion stays fresh for future use when saved in its original package.
Performance Data* SHELF LIFE AT 75°F (24°C) 24 months minimum SHORE D HARDNESS AT FULL CURE (24 hrs) 80
LAP SHEAR TENSILE STRENGTH
On steel (1" x 1" x 1/16") 900 lbs (6.2 MPa) COMPRESSIVE STRENGTH 8,000 psi (55 MPa) DENSITY 18.5 lb/gal, 2.2 gm/cm3
SHRINKAGE <1%
NON-VOLATILE CONTENT 100%
ELECTRICAL RESISTANCE 30,000 megohms-cm DIELECTRIC STRENGTH 300 volts/mil
TEMPERATURE LIMITS
Continuous -40° to 250°F (-40° to 121°C) Intermittent -40° to 300°F (-40° to 149°C)
CHEMICAL RESISTANCE
Resistant to hydrocarbons, ketones, alcohols, esters, halocarbons, aqueous salt solutions and dilute acids and bases.
NOT INTENDED FOR STRUCTURAL APPLICATIONS
*Not to be used for specification purposes.
Applicable Standards Certified by NSF International to NSF/ANSI Standard 61 for drinking water contact.
Availability
How To Use Before applying, roughen and clean the area to be repaired.
Wear impervious gloves when mixing or handling uncured FastSteel. Then follow these easy steps.
1. Cut or twist off required amount.
2.Mix by kneading with gloved fingers to a uniform color. If mixing is difficult, warm FastSteel to room temperature or slightly above.
3. Apply to surface to be repaired within 2 minutes of mixing.
Force into any cracks or holes and strike off excess material, preferably with a tool moistened with clean water.
When applying to a damp, wet or slowly leaking area, work the mixed material forcefully into the surface and apply pressure until adhesion begins to take effect.
For best results: Use damp fingers for easier mixing application, and smooth appearance of the cured compound.
Remove excess material before hardening begins.
Curing: FastSteel has a 3- to 5-minute work life. Functional cure occurs in 60 minutes.
MINUTE
WORK
LIFE
Mixed Color
STEEL GRAY
4019-0213
1. Cut 2. Mix 3. Apply
© Polymeric Systems, Inc. 2013
Polymeric Systems, Inc., is a part of Whitford Worldwide. For more information, please contact Polymeric Systems or Whitford Ltd. at:
Polymeric Systems, Inc.
47 Park Avenue Elverson, PA 19520
888-EPOXY FIX (888-376-9934)
Tel: +[1] (610) 286-2500 Email: sales@polymericsystems.com Website: polymericsystems.com In the EU contact:
Whitford Ltd.
11 Stuart Road, Manor Park Runcorn, Cheshire, UK WA7 1TH Tel: +[44] (0) 1928 571000 Email: salesuk@whitfordww.com Website: whitfordww.com
FastSteel is one in a family of Specialty Epoxy Putties originated and manufactured by Polymeric Systems, Inc. Also look for QuikCopper,® QuikPlastik,® QuikAluminum,® AquaMend,®
QuikWood,® RepairitQuik,® QuikTitanium® and InstaCrete.® Our epoxy putties give you the ability to fix just about anything.
Packaging Options FastSteel is available in 3.5" (2 oz) and 7" (4 oz) lengths, individually packaged in a reusable clear plastic tube with trilingual (English, Spanish, French) instructions and plastic friction top. The display carton holds 12 or 24 - 3.5” sticks or 12 - 7” sticks (packed 2 display cartons per master carton), or bulk-packed 24 sticks per shipper carton. Display cartons are also sold separately for refillable, point-of-purchase display.
3.5" sticks are also available in blister packs (12 per carton);
printer minimum applies. Contact Sales for acrylic display rack supplier information.
Blister Packs
Pop-Up Cardboard Display Carton
Acrylic Display Racks
W A R N
IN
G
• Contains Epoxy Resin and Tri (dimethylaminomethyl) phenol. Skin and eye irritant/sensitizer. Direct product contact may cause allergic reaction in some individuals. Wear impervious gloves when mixing or handling uncured product.
Avoid contact with eyes. • Inhalation of dust may be harmful; wear dust mask and protective eyewear when sanding cured product. • Ingestion of product may be harmful. • KEEP OUT OF REACH OF CHILDREN. • See product insert or SDS for additional information.
NON-WARRANTY: ALL RECOMMENDATIONS, STATEMENTS AND TECHNICAL DATA CONTAINED HEREIN ARE BASED ON TESTS WE BELIEVE TO BE RELIABLE AND CORRECT, BUT ACCURACY AND COMPLETENESS OF SAID TESTS ARE NOT GUARANTEED AND ARE NOT TO BE CONSTRUED AS A WARRANTY, EITHER EXPRESS OR IMPLIED. USER SHALL RELY ON HIS OWN INFORMATION AND TESTS TO DETERMINE SUITABILITY OF THE PRODUCT FOR THE INTENDED USE, AND USER ASSUMES ALL RISK AND LIABILITY RESULTING FROM THIS USE OF THE PRODUCT. MANUFACTURER’S SOLE RESPONSIBILITY SHALL BE TO REPLACE THAT PORTION OF THE PRODUCT OF THE MANUFACTURER THAT PROVES TO BE DEFECTIVE.
MANUFACTURER SHALL NOT BE LIABLE TO THE BUYER OR ANY THIRD PARTY FOR INJURY, LOSS OR DAMAGE DIRECTLY OR INDIRECTLY RESULTING FROM USE OF, OR INABILITY TO USE, THE PRODUCT. RECOMMENDATIONS OR STATEMENTS OTHER THAN THOSE CONTAINED IN A WRITTEN AGREEMENT SIGNED BY AN OFFICER OF THE MANUFACTURER SHALL NOT BE BINDING UPON THE MANUFACTURER.
| DTFAEN-16-R-00112 Amendment 0004 |
| Pre-Bid RFI - Combined - FAA Responses (2) |
| Pre-Bid RFI - Combined - FAA Responses |
| ATCT Catwalk Plans and Details |
| ATCT Catwalk Plans and Details |