Summary of work And Specificatons

Re-ROOFING ARSR Facility

Silver City, NM

1.0 PROJECT GENERAL INFORMATION

The selected contractor shall furnish all labor, materials, services, trained personnel, bonds, insurance, security, instrumentation, and equipment as needed to complete the demolition of the existing roof, and the installation of a new PVC membrane roof system on the Air Route Surveillance

Radar (ARSR) equipment room(s) at the Silver City (SVC) Radar Site located approximately 20 miles from Mule Creek, NM. Prior to installation, all of the equipment and material shall be reviewed and accepted by a Federal Aviation Administration (FAA) representative.

The following items are a summary of the project and are provided solely for the purpose of describing the general nature of the work. The Contractor is responsible for accomplishing all items of work identified in the applicable drawings, specifications, and provisions of the contract. The contractor shall follow all federal, state and local ordinances, regulations and requirements, as well as industry practices during the project.

A. General

1. The Silver City Radar (SVC) is an active operational facility which runs 7 days a week 24 hours per day

2. All work shall be coordinated with the FAA and be accomplished on a “Not to interfere with FAA operations” basis

3. Contractor shall be qualified for the work under Occupational Safety and Health Administration

(OSHA), Federal Standards and FAA Orders and Regulations, as well as State and Local

Regulations.

4. Personal Protective Equipment (PPE) will be utilized by anyone on site per OSHA Federal

Standards and FAA Orders and Regulations

5. Construction material shall be stored only in FAA approved areas

6. Construction staging shall be allowed only in the FAA approved areas

7. The Contractor shall provide temporary services required for construction. Water, electricity and toilet facilities are available to the contractor at the site. Coordination for these services shall be accomplished through the COR.

8. The Contractor shall clean up and restore the site grounds to its original condition after the work has been performed

9. The contractor's responsibilities include, but are not limited to, providing:

a. All necessary safeguards, including safe work practices and engineering controls, to ensure the health and safety of FAA employees and other persons in and around the work areas

b. Isolation and/or containment of work areas in accordance with applicable law and this specification, especially with regards to water and soil contamination

c. Coordination/procurement of all permits, approvals and authorizations required to perform site work; this includes notification as required by applicable law

d. Supplying all material, services, labor, equipment, instrumentation and PPE required to perform the required SOW

e. Final clean-up and restoration of all work area(s) to their original condition

f. All licenses and certifications required by applicable law for the purpose of removal, encapsulation or enclosure needed to complete this project

g. A qualified supervisor to be present during all project activities

h. Prior to commencing work, the contractor shall investigate the work area and agree on conditions with the Contracting Officers Representative (COR). A space-by-space pre-work damage report shall be completed by the COR and reviewed/signed by the contractor. Any discrepancies between the COR pre-work damage report and the contractor, shall be resolved prior to the contractor commencing site work

i. Submittals as required by this specification and/or task order requirements

B. Project Specific Information

1. Remove existing roofing system down to existing metal deck. Clean and paint any damaged decking found during removal. If decking is damaged to a greater extent, contact the COR for direction.

2. Remove all damaged sections of wood nailers under the metal coping and install new to match existing.

3. Install a new Flat Stock and tapered rigid insulation, new fully adhered Sika Sarnafil or approved equal PVC membrane roof system and new painted metal coping with 20 year warranty.

4. Remove and replace all roof mounted lightning bonding and grounding to match existing. Any components damaged during construction shall be replaced at the contractor’s expense.

5. Remove all existing sealants at all roof penetrations, clean and prepare all places that receive new sealant and install new sealant.

1. List of Drawings: These listed drawings are for information only, expressing existing conditions and construction details. The contractor shall verify dimensions, locations, and sizes on the applicable drawings prior to installation.

a).Drawing number Drawing Title

SVC-D-ARSR-A001 – Drawing shows existing building floor plan.

SW-E-6306-1 – Drawing shows original building floor plan and elevation

SW-E-6306-2 – Drawing shows existing building wall elevations and sections.

SW-D-6422-1 - Drawing show site and site location SW-D-10301 – Drawing shows roof location of HVAC units

Site Visit. - It is recommended that the Contractor perform a field inspection prior to bid submission in order to inform themselves of the specific working conditions applicable at the site and to ascertain the correct types/amounts of work to be performed. If the bidder chooses not to visit the site, he will nevertheless be charged with knowledge of conditions that a reasonable inspection would have disclosed. A site visit for prospective bidders will be scheduled by the CO previous to the bid due date.

1.2 APPLICABLE DOCUMENTS

B. Applicable Documents - All FAA, Military, Federal, and industrial codes or standards, specifications, and contract drawings referenced in this and the following divisions form a part of this specification and are applicable only to the extent they were used as a basis of this design. All references to codes, standards, specifications, and construction drawings refer to the latest editions (and any supplements) in effect on the date of the contract.

C. Applicable Publications - Applicable state and local rules, regulations, orders, and codes apply to this project, and are to be held above and any other applicable regulations, ordinances, and codes.

The publications and/or agencies are listed below form a part of this specification and to the extent referenced in text by basic designation only.

1. Code of Federal Regulations (CFR):

a. OSHA General Industry Safety and Health Standards (29 CFR 1910), OSHA Construction

Industry Standards (29 CFR 1926). OSHA 2202 is a condensed version of 29 CFR 1926. This includes but is not limited to:

1) Occupational Safety and Health Act of 1970 (Public Law 91-596) Standards, Vol. I-V

2) 29 CFR 1926.59 (OSHA) Hazard Communications

3) 29 CFR 1910.20, Subpart C (OSHA), General Safety and Health Provisions

2. Federal Standard (313A): Preparation and the Submission of Material Safety Data Sheets

3. National Electrical Code, latest edition.

4. International Building Code, latest edition.

1.3 DEFINITIONS

A. Federal Aviation Administration (FAA) - The terms "Federal Aviation Administration" (FAA) and "government" as used herein denote the "owner".

B. Project Engineer (PE) - The term "Project Engineer (PE)” as used herein denotes the "Government’s representative".

C. Contracting Officer (CO) - The term "Contracting Officer" (CO) as used herein denotes the person designated to act for the Government in the performance of this contract.

D. Contracting Officer Representative (COR) - The term “Contracting Officer's Representative “(COR) as used herein denotes the representative of the Contracting Officer at the job site.

E. Contractor and Subcontractor - The term "Contractor" as used herein denotes the firm who will perform and complete the work required by the Contract. The term "subcontractor" as used herein denotes the person or firm retained by the Contractor to perform a particular unit of work required by the Contractor. Subcontractors shall be required to meet all specifications required of the

Contractor.

CONSTRUCTION CONDITIONS

A. Pre-construction Conference - The Contractor shall attend a pre-construction conference at the time and location specified by the CO. Requirements for material disposal, security and safety will be discussed. Use of facility restrooms, water, and power will also be discussed. Compliance with these procedures while on site is mandatory.

B. Conflict Resolution - The Contractor shall meet standards, specifications, and drawings as specified herein. The specifications and drawings shall rule in all cases. Specifications shall govern over drawings. If any conflict should exist between site drawings (location-specific drawings) and standard drawings (drawings not referring to a particular location), the site drawings shall govern. In the event of dimensional discrepancies or omissions, the Contractor shall field verify and correct the information, and notify the COR. No work shall be done until agreement has been made with the

COR. In cases where regulations and/or contract documents are conflicting, or discrepancies occur, the more stringent requirement shall be followed and enforced.

C. Inspection

1. Access for Inspection - The Contractor shall allow the COR complete access to all portions of the work. Portions of the work buried, enclosed, or disguised, shall be inspected by the COR before being obscured by the next operation of the Contractor. In all cases, the COR shall be informed accordingly and given access to the work. Work obscured before inspection and acceptance by the COR, may, at the option of the COR be opened for inspection at no additional cost to

Government.

The COR will inspect all work in progress up to completion and final Contractor’s Acceptance

Inspection (CAI) including all materials, tools, and equipment. Such inspection may extend to all or a part of the work for the preparation, fabrication or manufacture of the materials to be used.

The COR will notify the Contractor of any non-compliance with the contract specifications and/or drawings, and may reject workmanship or materials accordingly.

2. Contractor's Acceptance Inspection (CAI) - After substantial completion of all the Contractor's work, a CAI will be conducted between the Contractor and Government. The COR will review the contract documents and verify that the Contractor has completed all required work. If work remains to be completed, an itemized list will be prepared, and the contractor at no additional cost to the Government shall complete the remaining tasks correctly. A Joint Acceptance

Inspection (JAI) requires FAA personnel to be present. It may be held concurrently with the CAI.

D. Project Coordination - The Contractor shall be required to coordinate his/her construction activities with the FAA through the COR. All work which affects the Facility shall be coordinated and approved by FAA personnel through the COR at least forty-eight (48) hours in advance of the scheduled work. Failure to notify and obtain the necessary approval may result in a rescheduling of the work. If weather conditions or aircraft operations preclude a scheduled shutdown of an existing

FAA facility, the Contractor shall reschedule the work. The Contractor will be required to coordinate all power shutdowns of existing facilities with the FAA, through the COR, seventy-two (72) hours in advance. Each shutdown shall be limited and off-peak hours shall be required for testing or power shutdowns, with the facility placed back in service at the end of the workday, or as stipulated by the

FAA.

E. Layout of Work - The Contractor shall field verify measurements and work from the established base lines and bench marks indicated on the drawings and shall be responsible for all measurements in connection therewith. The Contractor shall furnish, at his/her own expense, all stakes, templates, platforms, equipment, tools, materials, and labor as may be required in laying out any part of the work from the base lines and bench marks previously established. The Contractor will be held responsible for the execution of the work as detailed in the plans and specifications. It shall be the responsibility of the Contractor to maintain and preserve all stakes and other marks previously established until authorized to remove them.

F. Permits, Inspection, Licenses, Certificates - The Contractor shall obtain and pay fees for permits, inspections, licenses, or certificates required by Federal, State and City/Town officials as necessary to perform the work, prior to starting construction, and in a timely manner to avoid delays in starting the job. The Contractor shall submit evidence that they have obtained all required permits, inspections, licenses, and/or certificates.

G. Compliance with Local and Other Codes - The Contractor shall comply with local and other codes and standards. Where the requirements of the specifications and drawings exceed those of the local or other codes, the Contractor shall comply with the requirements of the specifications and drawings.

H. Stop Work Orders - When the Contractor or subcontractors are notified by the COR of any non-compliance with the provisions of the contract and the action(s) to be taken, the Contractor shall correct the unsafe or unhealthy condition. Action that are life threatening, that pertain to air monitoring or quality requirements, or other serious violations shall be corrected immediately. Non-serious violations shall be corrected within 24 hours of the non-compliance notice. The COR may stop the work with a “stop work order” if the Contractor fails to comply promptly with all or any part of the work being performed. When, in the opinion of the COR, satisfactory corrective action has been taken to correct the unsafe and unhealthy condition, the Contractor may resume work. The

Contractor shall not be allowed any extension of time or compensation for damages by reason of or in connection with such work stoppage. In this circumstance, the entire work area and/or affected surrounding areas can be wet wiped and cleaned by the contractor at no expense to the government or COR.

I. Schedules

1. Schedule - The Contractor shall, within ten (10) calendar days from date of award of contract, submit to the CO for approval a practical project schedule. The schedule shall show the order in which the Contractor proposes to carry out the work, the date on which he/she will start the several salient features (including procurement of materials, plant and equipment) and the contemplated dates for completing the work. The schedule shall be in the form of a progress chart of suitable scale to indicate the approximate percentage of work scheduled for completion at any time. The Contractor shall enter on the chart the actual progress at such intervals as directed by the CO. The project schedule shall include a milestone schedule for payments. The milestones should be stated with requested reimbursement for each milestone (based upon actual costs, overhead and profit).

2. Progress Schedule - The Contractor, if requested by the CO, shall submit a progress schedule at such intervals as directed by the CO. If the Contractor fails to submit a progress schedule within three (3) business days, the CO may withhold approval of progress payment estimates until the

Contractor submits the required progress schedule.

3. Hours of Work – Shall be approved by the COR, all work shall be accomplished during normal business hours specified by the COR. No work is allowed on weekends and Federal holidays unless approved by the COR in writing.

4. The commencement of work shall be coordinated and decided between the Contracting Officer, Contractor, Project Engineer, District/SSC Manager and the Contracting Officer Representative.

J. Site Access - Access to the site will be via a pre-determined route identified and agreed upon at the pre-construction conference.

K. Water/Restroom. - Water source and restroom is available on site.

L. Special Permits - The Contractor shall obtain and submit evidence of all necessary permits for the work. The Contractor shall abide by all requirements dictated by the city, state, federal, airport authority or municipality for such permits without any additional cost to the government.

M. Cleanup - The work site shall be kept clean and orderly during the progress of work. After final inspection, but before final acceptance of the work, all exterior surfaces of the new work shall be cleaned of dirt, mud, or oil accumulations. All debris shall be removed from the general site area.

N. O & M - Upon completion of the facility modifications, the Contractor shall provide operation and maintenance instructions for all new materials and equipment. The contractor shall submit a draft electronic copy of O&M’s and upon final approval still submittal two hard copies and one electronic copy to the COR. This information will then be retained by the COR (and the FAA) and used to reflect the as-constructed conditions.

O. Warranties - Documentation for the warranties shall be provided to the government upon completion of the project. Warranty shall provide for repair or replacement of the complete roofing system, including insulation and flashings, if leaking is caused by defects in materials or workmanship. These

Warranties shall be incorporated into the O&M Manuals.

1.5 SAFETY

A. Safety Plan - OSHA and FAA safety standards will be enforced. In keeping with such standards, the

Contractor shall at a minimum provide a Safety Plan with the purpose of maintaining a safe working environment for construction workers employed on site. The safety plan shall require a statement that the current Occupation Safety and Health Act (OSHA) regulations on safety in the construction industry, OSHA Title 29, Part 1910 and Part 1926, as well as FAA safety regulations are followed. The plan will be used by the COR to insure that the work is accomplished in accordance with accepted safety practices.

B. Trained Personnel - Personnel shall be properly trained in the usage of all equipment for which they will be required to use during the Contract. The COR may request documentation or other evidence of training at any time. Personnel without adequate training will be prohibited from using such equipment.

C. Lock-Out/Tag-Out – The Contractor shall employ and detail lock-out/tag-out procedures to employees working with and around electrical systems. When accessing an electrical panel, a FAA technician must be present prior to interrupting and energizing the breakers. Usage of the existing power, outlets and lighting in the work area must be approved in advance by the COR. The contractor shall coordinate comprehensive lockout procedures regarding power to the work area, with the COR.

D. Material Safety Data Sheets - The Contractor shall have Material Safety Data Sheets (MSDS) conforming to Federal Standard 313A, written by the manufacturer, for all materials containing chemicals or other substances which may pose a hazard. One (1) copy of each MSDS shall be submitted to the COR and one (1) copy of each MSDS shall be kept on file at the job site at all times.

The Contractor and subcontractors will be prohibited from handling any material which does not have an applicable MSDS on file at the site until such MSDS arrives on site.

E. Safety Equipment - The Contractor shall provide safety equipment including, but not limited to, a

Red Cross approved First-Aid kit and the appropriate number of annually inspected, charged fire extinguishers with the proper NFPA rating.

F. Personal Protective Equipment (PPE): The contractor shall provide employees with PPE in accordance with applicable law. Protective clothing and respiratory protection shall be worn at all times when workers may be exposed to hazardous materials during any phase of the project.

G. HAZCOM Program (If Applicable) - The Contractor shall have a hazard communications (HAZCOM) program. The Contractor and each subcontractor shall submit a copy of their HAZCOM program as well as a copy of their current OSHA 200 form, if requested.

H. Work Practices - Although OSHA regulations and the Contractor's Safety Plan will usually apply, the

COR may consider certain work practices to be unsafe in accordance with Public Law 91-596, Part 5a and 5b. The COR may stop any operation which is in violation of the OSHA standards or fails to comply with the safety plan or other safe work practices.

I. Designated Foreman - When any construction activity is conducted at the site, the presence of a designated, competent contractor’s foreman is required at the job site. The foreman must be qualified and capable of organizing and coordinating all activities of the Contractor and his subcontractors, and keeping a safe job site.

J. Work Force - The Contractor shall at all times, when construction activities are conducted, have a substantial number of workers for each task to proceed expeditiously and without generating delay, for lack of man-power.

2.0 CONTRACTOR-FURNISHED MATERIAL AND EQUIPMENT

2.1 MATERIAL DELIVERIES

All material deliveries made under this contract shall be arranged for delivery to the Contractor's material staging area. This area shall be located as determined at the pre-construction conference.

Materials shall be delivered to the jobsite in the manufacturer's original unopened packages, clearly marked with the manufacturer's name, brand name, and description of contents. Time limited materials shall be used before shelf life expires. Materials shall be stored in clean, dry areas.

Storage temperatures shall be as specified by the manufacturer. A maximum of one day's supply of materials may be stored on the roof when distributed so as not to exceed the roof live load limit.

These materials shall be kept dry and clean until application.

2.2 STORAGE AND PROTECTION

The Contractor, through the COR, shall secure from FAA all necessary clearances for storage areas on site, including any time limitations upon the use of such areas. The storage and protection of

Contractor material and construction areas shall be the sole responsibility of the Contractor. The

Contractor shall provide at their own expense all fencing, shelters and security personnel as may be necessary for the protection of the material and equipment, including in the case of inclement weather.

2.3 PERTINENT INFORMATION

Any pertinent information listed about the contractor-furnished material and equipment shall be submitted to the COR.

3.2 CONTRACTOR USE OF PREMISES

A. Use of the Site - Do not disturb site beyond the areas in which work is required.

B. Driveways and Entrances - Keep driveways and entrances serving the premises clear and available to the Government, the Government’s employees, and emergency vehicles at all time. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

C. Use of the Existing Building - Repair damage caused by construction operations. Take all precautions necessary to protect the building and surrounding areas during the construction period.

END OF SECTION

SECTION II - ROOFING:

GENERAL ROOFING NOTES

A. This specification is based on installation of a PVC membrane roofing system with a 20-year warranty as manufactured by Sika Sarnafil. Equal roofing systems of other manufacturer’s will be considered, if they can be demonstrated to be an equal product with the same warranty as required above.

B. Prior to beginning work, the Contractor shall decide to his satisfaction that all specifications/proposed details contained herein are workable and in accordance w/ the manufacturer’s requirements for issuance of the required warranty. Notify the Contracting Officer of any conflicts.

C. The Contractor shall perform all work by competent, trained, and properly equipped personnel in strict accordance with good roofing practices, applicable industry standards, and the drawings and specifications.

D. The Contractor shall observe all published safety prevention policies and practices relating to the application of the roofing system and related work. All federal, state, and local codes shall be followed.

E. The Contractor shall follow application, safety, and other information as published in the most current edition of the Sika Sarnafil Roofing System Technical Specifications or most current edition of technical specifications from the approved equal.

WORK INCLUDED

A. Work under this section covers the installation of a new Sika Sarnafil, or equal fully adhered PVC membrane roofing system on the Federal Aviation Administration Silver City, (SVC) ARSR Equipment rooms. In addition, the Contractor shall include all related items of work as noted herein or indicated on the drawings or otherwise required to complete the specified elements of work and provide the necessary warranties for this work.

B. The Contractor shall remove the existing roofing including all existing insulation, flashing/terminations, etc. The Contractor shall properly dispose of all materials off site. The Contractor shall install new tapered insulation board, wood nailers, PVC membrane, and associated flashings, edge metal, all in accordance with the roof system manufacturer’s requirements.

PART 1 – GENERAL ROOFING

1.01 SUMMARY

A. This Section includes the following:

1. Adhered PVC sheet roofing.

2. Polyisocyanurate Insulation.

B. Scope of Work: The phased installation of the new roof system will be installed in such a manner as to maintain the watertight integrity of the structure on a daily basis. Over the cleaned and prepared substrate, the insulation assembly, and a 72 mil minimum PVC single ply membrane shall be installed to the PVC Roofing manufacturer’s requirements. All flashing membranes and PVC coated clad metal will be installed in accordance with PVC Roofing manufacturer's specifications or recommendations. The completed PVC roof system, PVC Roofing manufacturer's supplied accessories, and polyisocyanurate shall be installed in such a manner so that the PVC Roofing

Manufacturer's Twenty (20) year Full Systems (NDL) Warranty can be issued upon successful completion of the roofing project.

C. Summary of Work: In order to provide a complete warrantable roof system, roofing contractor is to provide all labor, tools, equipment, and materials to complete the reroofing project. Such materials that are required, but are not necessarily limited to:

1. 72-mil minimum, PVC membrane.

2. 72-mil minimum fiberglass reinforced membrane for certain flashing details,

3. Metal plates and screws for the attachment of the specified insulation to the decking.

4. Polyisocyanurate insulation,

5. Painted Metal Coping

D. Related Work: The work includes but is not necessarily limited to the installation of:

1. Wood blocking

2. Polyisocyanurate Insulation

3. Attachment metal fasteners and plates

4. Low rise urethane adhesive

5. PVC roof membrane

6. PVC roof membrane securement bars, plates, and metal fasteners

7. PVC roof membrane flashings

8. Fabricated galvanized metal and PVC coated metal flashings

9. Sealants and adhesives

1.02 REFERENCES

A. Roofing Terminology: Refer to ASTM D1079 for definition of terms related to roofing work not otherwise defined in this Section.

B. American Society for Testing and Materials (ASTM)

1. ASTM D 570 – 1981 (R 1988) Water Absorption of Plastics

2. ASTM D 638 – 1991 Plastic Tensile Properties Testing

3. ASTM D 751 – 1989 Coated Fabric Tensile Testing

4. ASTM D 882 – 1991 Thin Plastic Film Tensile Testing

5. ASTM D 1004 – 1990 Initial Tear Resistance of Plastic Film and Sheeting

6. ASTM D 1204 – 1984 Linear Dimensional Changes of Nonrigid Thermoplastic Sheeting or Film at

Elevated Temperature

7. ASTM D 2136 – 1984 (R 1989) Coated Fabrics – Low-Temperature Bend Test

8. ASTM D 2565 – 1982 Operating Xenon Arc-Type Light Exposure Apparatus With and Without

Water for Exposure of Plastics

9. ASTM D 3045 – 1974 ( 1984) Heat Aging of Plastics Without Load

10. ASTM D 4434 – 1987 Poly (Vinyl Chloride) Sheet Roofing

11. ASTM E 108 – 1991 (Rev. A) Fire Tests of Roof Coatings

12. ASTM G 21 – 1990 Determining Resistance of Synthetic Polymeric Materials to Fungi

13. ASTM G 53 – 1991 Operating Light – and Water-Exposure Apparatus (Fluorescent UV-

Condensation Type) for Exposure of Nonmetallic Materials

1.03 Not Used.

1.04 PERFORMANCE REQUIREMENTS

A. General Requirements: Provide an installed thermoplastic single ply roofing system, flashings and related work that are watertight and will not permit the passage of liquid water, that will withstand wind loads, thermally induced movement, and exposure to weather without failure.

B. Material Compatibility: Provide roofing materials that are compatible with one another under conditions of service and application required, as demonstrated by roofing system manufacturer based on testing and field experience.

C. Performance Requirements: Provide roofing membrane system (including membrane, base flashings, and component materials) that shall be made watertight and shall withstand the design pressures that meet ASCE 7 – “Minimum Design Loads for Buildings and Other Structures.” Uplift requirements will be based upon the basic wind velocity pressures for the project according to American Society of Civil Engineers (ASCE) 7 for the specific project conditions. Calculations shall be based upon:

1. Wind Speed at 3 second gust: 90 mph.

2. Project Exposure Category: C.

Provide a Certification that the roof installed meets these criteria.

D. Roofing System Design: Provide a membrane roofing system that is identical to systems that have been successfully tested by a qualified testing and inspecting agency to resist uplift pressure calculated according to ASCE 7 for the above specified Wind Speed.

E. Underwriters Laboratories Inc. (UL):

1. UL RMSD – 2007 Roofing Materials and Systems Directory

2. UL 790 – 2007 Fire Resistance of Roofing Coverings Materials

3. Exterior Fire Exposure Classification: Class A, ASTM E 108, for application and slopes shown.

F. American National Standards Institute (ANSI)

G. American Architectural Manufacturer’s Association (AAMA)

H. Occupational Safety and Health ACT (OSHA)

1.05 SUBMITTALS

A. Product Data: Submit latest edition of manufacturer’s roofing and base flashing specifications including list of materials proposed for use, installation procedures, and manufacturer’s Product Safety Data Sheets.

B. Shop Drawings: Include plans, sections, and details of the following:

1. Base flashings, edge metal, and membrane terminations.

2. Furnish project construction schedule for approval.

C. Samples for Verifications: Of the following products:

1. One sample of sheet roofing.

2. One sample of the membrane fasteners and securement bars or plates.

3. One sample of the specified tapered polyisocyanurate insulation.

4. One sample of the insulation metal plates and screws.

5. One sample of painted metal coping

D. Certificates:

1. Installer shall submit confirmation that installers are in compliance with the Quality Assurance

Section 1.06 of this document.

2. Installer shall submit written certification that there are no undocumented workers being employed by them or by any subcontractor on this project are covered by workmen's compensation.

3. Manufacturer's written certifications of approval / acceptance of these specifications and details.

4. Product Test Reports -Based on evaluation of comprehensive tests performed by a qualified testing agency, verifying compliance of copings, PVC etc. with performance requirements.

E. Warranty: Sample copy of 20-year (NDL) Full System manufacturer's warranty stating obligations, remedies, limitations, and exclusions of warranty.

F. Inspection Report: Copy of roofing system manufacturer's final inspection report of completed roofing installation.

1.06 QUALITY ASSURANCE

A. Installer Qualifications: Engage an experienced installer to perform work of this Section who has specialized in installing roofing similar to that required for this Project and who is approved, authorized or licensed by the roofing system manufacturer for a minimum of five (5) years to install manufacturer’s products. Roofing contractor shall have completed at least one project of the PVC manufacturer’s roofing products within the past six- (6) months prior to the date of this specification.

B. Installer’s Roofing Mechanics Qualifications: The roofing mechanics engaged with the operation of the thermoplastic hot air welding equipment must be trained and authorized by the thermoplastic manufacturer. The roofing mechanic must have at least five years experience of operating hand and/or robotic hot air welding equipment for hot air welding thermoplastic membranes. Only those roofing mechanics with five years experience will be allow to “hot air weld” the thermoplastic materials/membranes for this project. Roofing contractor must provide requested documentation for each roofing mechanic that is allowed to use the hot air welding equipment for the referenced roofing project(s).

C. Manufacturer Qualifications: Provide primary products, including each component of the single ply membrane system and related flashings produced by a single manufacturer, which has produced that type system successfully for not less than 20 years. Provide secondary products, including insulation, coated metal flashings, fasteners, vapor/air barrier sheets, and other accessories, which are acceptable to the single ply membrane manufacturer for use with roofing system indicated.

D. Manufacturer PVC membrane shall meet the following characteristics:

1. Protective membrane surface coating to resist accumulation of air borne contaminants such as dust and dirt.

2. PVC Membrane Minimum Energy Star Requirements:

a. Initial reflectivity not less than 0.83

b. Initial emissivity not less than 0.92

c. Solar reflective index (SRI) not less than 104.

3. Certification that the PVC membrane is within 2.0 mil thickness of the specified membrane thickness. ASTM D751 or D638 nominal thickness of +/- 10 percent will not be acceptable for measurement of membrane thickness.

E. Fire-Tested-Response Characteristics: Provide roofing materials with the fire-tested-response characteristics indicated as determined by testing identical products per test method indicated by UL, FM, or another testing and inspecting agency acceptable to authorities having jurisdiction.

Identify materials with appropriate markings of applicable testing and inspecting agency.

1. Exterior Fire-Test Exposure: Class A, ASTM E 108, for application and slopes indicated.

2. Fire-Resistance Ratings: ASTM E 119, for fire-resistance-rated roof assemblies of which roofing materials are a part.

F. Factory Technical Representative: Arrange, schedule and pay, if required by manufacturer, for services of manufacturer’s technical representative to be on site a minimum of one time each week during the installation of manufacturer’s roofing system.

G. Contractor's Responsibility: Any failure by the COR or Manufacturer's Representative to detect, pinpoint, or object to any defect or noncompliance of these specifications of work in progress or completed work shall not relieve the contractor, or reduce, or in any way limit, his responsibility of full performance of work required of him under these specifications.

1.07 DELIVERY, STORAGE AND HANDLING

A. Deliver roofing materials to project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, and directions for storing and mixing with other components. Deliver materials in sufficient quantity to allow work to proceed without interruption.

B. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within temperature range required by roofing system manufacturer.

1. Discard and legally dispose of liquid material that cannot be applied within its stated shelf life.

C. Store and protect materials, including roofing insulation from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Store all materials in a dry location.

Use pallets to support all materials from roof deck. Distribute the load to stay within live load limits of the roof construction. Remove unused materials from the roof at the end of each day’s work.

Comply with roofing manufacturer's written instructions for handling, storing, and protecting during installation.

D. Handle and store roofing materials and place equipment in a manner to avoid permanent deflection of deck.

1.08 PROJECT CONDITIONS

A. Weather Limitations: Proceed with roofing work only when existing and forecasted weather conditions permit roofing to be installed according to manufacturer’s written instructions and warranty requirements.

B. The Applicator shall conduct fastener pullout tests in accordance with the latest revision of the

SPRI/ANSI Fastener Pullout Standard to help verify condition of deck/substrate and to confirm expected pullout values.

C. The PVC adhered membrane shall not be installed under the following conditions without consulting

PVC manufacturer for precautionary steps:

1. The roof assembly permits interior air to pressurize the membrane underside.

2. Any exterior wall has 10% or more of the surface area comprised of opening doors or windows.

3. The wall/deck intersection permits air entry into the wall flashing area.

D. Protective wear shall be worn when using solvents or adhesives or as required by job conditions.

E. Environmental Requirements:

1. Apply roofing in dry weather.

2. Do not expose roof components and flashing in inclement weather or when it is predicted 30% or more possibility for inclement weather.

3. When ambient temperature is below 40 degrees Fahrenheit, expose only enough sensitive cements, sealants, and adhesives as required for use within a four-hour period.

4. Do not expose membrane and accessories to a constant temperature of 180 degrees Fahrenheit.

F. Protection:

1. Provide special protection and avoid traffic on completed areas of membrane installation.

2. Restore to original condition or replace work or materials damaged during handling of roof materials.

3. Take precautions as required to protect adjacent work and structures.

G. Emergency Equipment: Maintain on site equipment necessary to apply emergency temporary edge seal in event of sudden storms or inclement weather.

H. Restrictions:

1. Comply with General Requirements on use of site.

2. Smoking is prohibited on roof area.

3. Maintain facility and all utility services in a functional condition.

4. Provide sanitary facilities for employees.

1.09 WARRANTY

A. General Warranty: The warranties specified in this Article shall not deprive the Owner of other rights the Owner may have under other provisions of the Contractor Documents and shall be in addition to, and run concurrent with, other warranties made by the Contractor under requirements of the Contract Documents.

B. Roofing Manufacturer’s Warranty: Submit a written warranty, without monetary limitation, with all available options, including flashing endorsement, manufacturer's roof insulation and roofing manufacturer’s accessories, signed by roofing system manufacturer’s agreeing to promptly repair leaks resulting from defects in materials or workmanship for the following warranty period:

1. A 20-Year Full Systems Warranty shall be issued upon completion of the roofing project.

2. The warranty shall guarantee the entire roof system and associated work against defective materials and workmanship of installation, with NO exclusions for ponding of water.

3. Warranty shall include a wind speed warranty for 90 mph.

C. Contractor's Warranty: Submit roofing Installer's workmanship warranty, on a notarized written warranty form, signed by Installer, covering Work of this Section, including membrane roofing, sheet flashing, roof insulation, fasteners, and air or vapor retarders, if any, for the following warranty period:

1. Warranty Period: Five (5) years from date of Substantial Completion.

PART 2 – ROOFING PRODUCTS

2.01 MANUFACTURERS

A. The components of the roof system are to be products of a single manufacturer or approved by the PVC manufacturer, prior to proposal submittal date, as to provide the specified system warranty.

B. Specifications are based on Sarnafil G410; PVC single-ply roofing systems as manufactured by Sika

Sarnafil, Inc. (Canton, MA). If the contractor wishes to propose an or equal system, the proposed system must meet or exceed the specifications and must be produced by a manufacturer which has manufactured and installed roof materials and systems of the type specified for a minimum of twenty (20) years, and who maintains a single source responsibility for the total roofing systems.

2.02 PVC SHEET

A. The following physical characteristics are based on Sika Sarnafil EnergySmart® G410 fiberglass reinforced PVC membrane with a lacquer coating.

B. PVC Sheet: Uniform, flexible sheet formed from polyvinyl chloride, complying with ASTM D 4434-87, of the following type, grade, polymer thickness, and exposed face color:

1. Classification Type II fiberglass-reinforced PVC.

2. PVC Thickness: 72 mils, +/- 2.0 mils.

3. UL Class: A.

4. Exposed Face Color: Reflective Grey

C. Physical Properties:

Parameters

ASTM

Test Method

Project Requirement

Overall Thickness, min., mil D751 72 Reinforcing Material - Fiberglass Breaking Strength, lbf/in (N) D751 100 (445) Elongation at Break, min. % D751 250/220 Seam strength, min. (% of original) D751 75 Retention of Properties After Heat Aging D3045 - Tensile Strength, min., (% of original) D751 90 Elongation, min., (% of original) D751 90 Tearing Resistance, min., lbf (N) D1004 20.5 (91) Low Temperature Bend, -40ºF (-40ºC) D2136 Pass Accelerated Weathering Test (Xenon Arc) G154 10,000 Hours Cracking (7x magnification) - None Discoloration (by observation) - Negligible Crazing (7 x magnification) - None Linear Dimensional Change, max. D1204 -0.01% Weight Change After Immersion in Water, max.

D570 1.8%

Static Puncture Resistance, 33 lbf (15 kg) D5602 Pass Dynamic Puncture Resistance, 7.3 ft-lbf (10 J)

D5635 Pass

2.03 AUXILIARY MATERIALS

A. General: Furnish auxiliary materials recommended by roofing system manufacturer for intended use and compatible with membrane roofing materials.

1. Furnish liquid-type auxiliary materials that meet VOC limits of authorities having jurisdictions.

B. Flashing and Flashing Accessories: As recommended by the Thermoplastic sheet manufacturer's printed instructions for reinforced sheet flashing of same material, type, and color as sheet membrane.

C. Asphalt Resistant PVC Membrane: A 60 mil PVC flashing membrane used to resist asphalt and many other rooftop contaminates. Either side of the PVC flashing membrane can be exposed to weather conditions which allows it to cover rooftop contaminates or act as a sacrificial layer for contaminates being emitted onto the roof.

D. Roof Expansion Joints: Roof membrane manufacturer's bellows-type expansion joint compatible with roofing system membrane.

E. Fasteners: Manufacturer approved corrosion resistant steel screws of the appropriate size for fasteners for roof membrane and insulation attachment and for sheet metal flashing. Fasteners for the membrane shall be supplied by the thermoplastic manufacturer and are to be installed as recommended by PVC sheet manufacturer's printed instructions.

F. Membrane Bonding Adhesive: A water-based or contact adhesive used to attach membrane to the horizontal or near-horizontal substrate. Application rates are to be as recommended by thermoplastic sheet manufacturer's printed instructions.

G. Membrane Flashing Bonding Adhesive: A solvent-based reactivating-type adhesive used to attach the flashing membrane to the substrate, either horizontally or vertically. Application rates are to be as recommended by thermoplastic sheet manufacturer's printed instructions. The solvent-based reactivating-type adhesive is to install in such a manner to develop a bond between the membrane and the substrate to which the membrane is to be attached.

H. Metal Termination Bars: Manufacturer’s standard aluminum bars, approximately 1-inch (25-mm) wide, roll formed and pre-punched every 6 inches on center.

I. Metal Reglet: Manufacturer’s 6063T5 extruded aluminum counterflashing, approximately 2.25 inches wide and 0.10 inch thick, pre-punched at 8 inches on center for attachment to the wall or curb. Use prefabricated mitered inside and outside corners where walls intersect.

J. Sealants: Membrane manufacturer’s approved sealant shall be used to seal penetrations through the membrane system and at miscellaneous sealant applications that come in contact with roof systems components.

K. Vapor/Air Retarder Membrane: As required by manufacturer to meet specific wind design or vapor retarder requirements. The vapor/air retarder membrane shall be a minimum of 10-mil.

Polyethylene sheeting, which will be used as an air barrier to protect the roof from positive pressure to the underside of the roofing system or a vapor retarder for the roofing system.

L. Membrane Securement Bar: An approved, heavy-duty 14 gauge, galvanized or stainless, roll-formed steel bar used to attach membrane to the roof deck. The formed steel is pre-punched with holes every 1 inch on center to allow various fastener spacing options.

M. Sealing Tape: A high performance sealant tape with superior surface tack that remains elastic and is designed to bond the PVC membrane and a variety of metals. Sealing tape strip is used to seal the metal roof edge and metal copings of buildings reducing air infiltration into the roof assembly, behind the PVC membrane flashing at termination details, and to seal the overlaps of the air/vapor retarder membrane.

N. Sarnadrain-RAC: PVC coated, heavy-duty aluminum drain insert that mechanically seals to the drainpipe interior. Sarnadrain-RAC is made of 0.080 inch (2mm) thick 6063 aluminum with a urethane seal installed at the end of the drainpipe. The large 14-inch x 14-inch (0.36m x 0.36 m) drain strainer is also made of 0.080 inch (2mm) thick aluminum stock. The flange dimensions of Sarnadrain-RAC are 18-inches x 18-inches (0.46 m x 0.46 m).

O. Miscellaneous Accessories: Provide pourable sealants, performed cone and vent sheet flashings, performed inside and outside corner sheet flashings, T-joint covers, termination reglets, and other accessories as recommended by roofing system manufacturer for intended use.

P. Other miscellaneous materials shall be of the “best grade” available and to be approved in writing by the roofing manufacturer, prior to use, for the specific application.

2.04 INSULATION

A. General: Provide preformed roof insulation boards that comply with requirements, selected from manufacturer’s standard sizes and of thickness indicated.

B. Flat Stock and Tapered Insulation: Polyisocyanurate Insulation Board shall be compatible with the membrane as recommended in thermoplastic sheet manufacturer's printed instructions. The polyisocyanurate insulation shall be composed of a closed-cell polyiso foam core integrally laminated to heavy, durable and dimensionally stable coated-glass facers. The insulation shall have the following characteristics:

1. Dimensional Stability: (Length and Width) ASTM D 2126 < 2 %

2. ASTM C 1289, Type II, Class 1, Grade 3 (25 psi)

3. Compressive Strength: (10% Deformation) ASTM D 1621 25 psi (172 kPa)

4. Water Absorption: ASTM C 209 / ASTM D 2842 < 1 % / < 3.5 %

5. Moisture Vapor: Transmission ASTM E 96 < 1.0 perm (85.0ng/ (Pa•s•m2))

6. Product Density: ASTM D 1622 Nominal 2.0 pcf (32.04 kg/m3)

7. Flame Spread: ASTM E 84 (Full 10 min. Test) 40–60

8. Smoke Developed: ASTM E 84 (Full 10 min. Test) 50–170

9. Tensile Strength: ASTM D 1623 >730 psf (35 kPa)

10. Service Temperature: -40ºF to 200º F

C. Insulation Minimum Thickness: 1.50 inches.

D. Tapered Crickets and Saddles: A minimum of ½ inch per foot.

E. Tapered Roof Insulation: A minimum of ¼ inch per foot.

F. Insulation Average LTTR-value: 30.

2.06 INSULATION ACCESSORIES

A. General: Furnish roof insulation accessories recommended by insulation manufacturer for intended use and compatible with sheet material.

B. Fasteners: Factory-coated steel fasteners and metal plates meeting corrosion-resistance provisions of FM 4470, designed for fastening roof insulation to substrate, and acceptable to roofing system manufacturer.

2.07 COPING

Manufacture and install copings that are listed in FMG’s “Approval Guide” (www.fmgglobal.com) and approved for Windstorm Classification, Class 1-110. Identify material with FMG’s Marking.

Manufactured coping system consisting of formed-metal coping cap in section lengths not exceeding 12feet, concealed anchorage, concealed splice plates with same finish as coping caps.

Coping system shall be designed in accordance with Wind Design Standard for Edge Systems Used with Low Slope Roofing Systems, ANSI/SPRI/FM 4435/ES-1

Minimum gauges for exposed faces shall be determined from the table below

Exposed Face

Galvanized Steel

Cold Rolled Copper

Formed Aluminum

Stainless Steel

Up to 4 in 24 ga 16 oz. 0.032 in. 26 ga

>4 in. – 8 in. 24 ga 16 oz. 0.040 in. 24 ga

>8 in. – 10 in. 22 ga 20 oz. 0.05 in. 24 ga

>10 in. – 16in 20 ga 20 oz. 0.063 in. 22 ga http://www.fmgglobal.com/

2.08 MISCELLANEOUS FASTNERS AND ANCHORS

All fasteners, anchors, nails, straps, bars, etc. shall be post-galvanized steel, aluminum or stainless steel. Mixing metal types and methods of contact shall be assembled in such a manner as to avoid galvanic corrosion. Fasteners for attachment of metal to masonry shall be expansion type fasteners with stainless steel pins. All concrete fasteners and anchors shall have a minimum embedment of 1¼ inch (32 mm) and shall be approved for such use by the fastener manufacturer. All miscellaneous wood fasteners and anchors used for flashings shall have a minimum embedment of 1 inch (25 mm), stainless steel, and to be approved for such use by the fastener manufacturer.

PART 3 – ROOFING EXECUTION

3.01 EXAMINATION

A. Examine and verify that receiving substrate surfaces of the structure have no defects or errors, which would result in poor or potentially…