No. 2734 U.S. Department of Transportation Federal Aviation Administration
LCH RCAG
Security Fence Addition
Lake Charles Regional Airport
Specifications
PREPARED BY:
Infrastructure Support Center – Kansas City
AJW-2C15D
DATE: December, 2016
Contents:
Contents:
1- General Specifications:
2- General Execution Requirements:
3- Applicable Standards/References:
4- Drawings 5- Scope of Work:
6- Submittals:
7- Quality Assurance:
8- Products:
9- Execution:
10 - Photos
The following specifications and advisements constitute the working portion of the contract between the Contractor and the Federal Aviation Administration, an Agency of the Federal Government. The Contracting Officer (CO) assigned to this contract shall be the only individual with authority to speak for and contractually bind the FAA. All communications, authorizations, approvals, changes, modifications, etc. involving this contract shall be with and through the CO. Any action not approved by the CO shall not bind the FAA.
1- General Specifications:
1.1-Contracting Officers Representative (COR) The Contracting Officer (CO) may assign a COR to oversee the work on the project and act as a technical point of contact. A letter dating the COR's responsibilities and authority will be issued when a COR is assigned.
1.2-Site Location/Access
The LCH RCAG site is located off Lake Charles Regional Airport and approximately one mile South of Iowa, LA and 15 miles East of Lake Charles, LA. Currently, the facility has an existing fence and gate. The RCAG building is also secured and access inside will only be approved by the facility manager and when escorted by a badged FAA employee. The RCAG facility must remain operational during the work. Storage location & parking of contractor materials and vehicles/equipment shall be coordinated with the COR during performance of the work so as to maintain access to the building by FAA personnel. The FAA reserves the right to stop the work, without any prior warning, any time if the FAA deems an emergency condition exists.
1.3-Site Inspection
It is recommended that the Contractor perform a field inspection prior to bid submission in order to inform himself/herself of the specific working conditions applicable at the site and to ascertain the correct types/amounts of work to be performed. If the bidder chooses not to visit the site, he will nevertheless be charged with knowledge of conditions that a reasonable inspection would have disclosed. A site visit date will be set up by the Contracting Officer (CO) and the Facility Manager. Prospective bidders shall contact the CO for the date and time. Prior to the start of work the Contractor shall decide to his/her satisfaction that all specifications contained herein are workable and shall notify the Contracting Officer of any conflicts
1.4-Coordination
The Contractor, at no expense to the FAA, will procure all construction and working permits required by local and state agencies. Contractor to sequence, coordinate, and integrate installing electrical materials and equipment for efficient flow of work.
Coordinate installation and connection of underground and overhead utilities and services, including provisions for electricity-metering components.
The Contractor must not take advantage of any apparent error, omission, discrepancy, or ambiguity on the Drawings or Specifications. If any error, omission, discrepancy, or ambiguity is found by the Contractor in the Drawings or Specifications, the Contractor must refer the same to the Contracting Officer (CO) prior to beginning work on affected task(s), for interpretation and decision, and such decision must be final.
The CO must have the right to correct apparent errors or omissions in the Drawings and Specifications and to make such interpretations as he / she may deem necessary for the proper fulfillment of the Contract Documents. During the course of the work, should any conflicts, ambiguities, or discrepancies be found that are not addressed or any discrepancies between the Drawings and the Specifications to which the Contractor has failed to call attention before submitting the offer, then the CO will interpret the intent of the Drawings and Specifications and the Contractor hereby agrees to abide by the CO’s interpretation and agrees to carry out the work in accordance with the decision of the CO. In such event the Contractor will be held to have included in the offer the most proper material and/or method of construction in order to fulfill the intent of the Contract Documents.
1.5-Existing Utilities
Prior to digging, Contractor shall ensure identification and marking of all utilities and cable runs on site. Locations of cables shown in the plan drawings are approximate only.
Contractor to field verify all pertinent dimensions and locations in area of construction.
Contractor shall be responsible for coordination with appropriate owners for locating all such buried cables and utilities.
Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify COR not less than 2 days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without COR's written permission.
2- General Execution Requirements:
2.1-Pre-Construction Meeting The Contractor must attend a Pre-Construction Meeting prior to starting work at a location agreed upon between the contractor and the Contracting Officer (CO).
2.2-Work Hours Work shall be performed during a scheduled work week of 40 hours. The Contractor shall furnish a statement of the number of hours, days, and times to be worked per week along with the number of persons on site. The start and stop times shall typically be coordinated with the schedules of the FAA COR or facility personnel providing escort to minimize or prevent the need for overtime work by FAA personnel. Any work outside of this shift will be considered overtime work.
2.3-Sanitary Facilities / Water Source
Sanitary facilities and water are not available at the site. The contractor shall supply water as needed and a Johnny-On-The-Spot type restroom facility for the use throughout completion of the contract. The unit shall be kept clean, stabilized to prevent blow-over, and shall be serviced weekly.
2.4-Electrical Power
The contractor shall provide portable generators to furnish adequate electrical power that will be required for all construction work. The use of the electrical power from the facility will NOT be allowed.
2.5-Protection of Existing Property
Work and storage space is limited at the site. The Contractor shall confine the movement and storage of vehicles, equipment, and materials to such routes, times, and locations, as may be designated by the COR. The Contractor shall take all precautions necessary to protect the existing facilities, equipment, buildings, towers, buried and overhead cabling, etc… during the contract. Any areas damaged by the Contractor, his employees, or any subcontractors shall be repaired by the Contractor at no additional cost to the Government. Repairs shall be approved by the COR and shall match the original. The Contractor shall provide all temporary covers, enclosures, etc..., required to protect the existing facilities.
2.6-Workmanship
All work must be accomplished by experienced workers in accordance with the highest standards of the various work trades involved. The Contractor shall be responsible for safety on the work site. It is the responsibility of the Contractor to eliminate hazards, which may result in tripping, electrical shock, fire, falling objects, environmental hazards, vehicular accidents, etc. The Contractor shall comply with all safety precautions required by OSHA.
2.7-Disposal
Disposal of rubbish, debris, and loose materials will be off the site at the Contractor's expense or as directed by the COR or SSC designee. All construction waste must be managed and disposed of in a state-permitted Municipal Solid Waste landfill or construction waste facility. Contractor shall remove debris, or loose materials dropped or tracked onto FAA property.
2.8-Construction Limits
The contractor shall confine operations, activities, material storage and employee parking within the facility plot. The Contractor shall not deviate from the limits without written permission from the FAA.
2.9-Filed Measurements
The contractor shall verify layout information for chain-link fences and gates shown on Drawings in relation to actual field conditions and existing structures and utilities. Verify dimensions by field measurements.
2.10-Project Schedules / Sequence of work
The Contractor shall prepare a detailed construction schedule for the project. The schedule shall be coordinated with the COR and include all milestone activities. Submit the Construction Schedule to the (CO) within ten (10) calendar days after contract award.
2.11-FAA Holiday Moratorium
No work shall be scheduled or take place during the week of and the weekend preceding and following: the Thanksgiving, Christmas, and New Year’s holidays. Only emergency work to restore critical services to the Facility will be considered and a moratorium waiver must be submitted and approved. The moratorium period will not be counted against the contract construction duration of the project. Verify exact dates with CO).
2.12-Contractor-Furnished Material (CFM)
The Contractor shall furnish all plant, labor, material and equipment in strict accordance with this specification and the contract drawings. All required materials not specifically listed on the construction drawings as Government-Furnished Material (GFM) shall be supplied by the Contractor. Contractor shall be responsible for verifying the required quantities and comparing this list to the government furnished material. The Contractor shall thoroughly review the GFM items noted on the construction drawings to determine what items are supplied as CFM.
2.13-Installation All work and materials must be applied or installed in accordance with the applicable manufacturer’s latest instructions and specifications. Any variations to the instructions or specifications must be called to the COR’s attention prior to application or installation.
3- Applicable Standards/References:
All work to be performed and materials to be supplied under this contract shall conform to the following professional societies:
• Concrete work shall conform to the standards of American Concrete Institute (ACI.)
• American Society for Testing and Materials
1. A 121: Zinc-Coated (Galvanized) Steel Barbed Wire
2. A 123: Specifications for Zinc (Hot-Galvanized) Coatings on Products
Fabricated from Rolled, Pressed and Forged Steel Shapes, Plates, Bars and Strip.
3. A 392: Zinc-Coated Steel Chain-Link Fence Fabric
4. B 117: Standard Test Method of Salt Spray (Fog) Testing
5. F 567: Standard Practice for Installation of Chain-Link Fence.
6. F 1083: Standard Specifications for Pipe, Steel, Hot-Dipped Zinc-Coated
(Galvanized) Welded, for Fence Structures.
• All grounding work included under this project shall be accomplished to meet or exceed the provisions
1. Federal Aviation Administration Handbook FAA-HDBK-010 Recommended
Practices and Procedures for Lightning and Surge Protection, Grounding, Bonding, and Shielding Implementation.
2. Federal Aviation Administration Specification FAA-STD-019e; Lightning & Surge Protection, Grounding, Bonding, & Shielding Requirements for Facilities & Electronic Equipment.
3. NEC Code
4- Drawings
The following drawings are included as part of the contract documents:
A. LCH-D-RCAG-G001 Cover Sheet and Index of Drawings.
B. LCH-D-RCAG-C001 Existing Fence Modifications C. LCH-D-RCAG-C002 Proposed Fence Layout D. LCH-D-RCAG-C003 Class ‘F’ Chain Link Fence and Gate Details.
E. LCH-D-RCAG-E008 Grounding & Bonding Details.
Reference drawings list:
F. LCH-D-RCAG-R001 Survey.
5- Scope of Work:
The contractor shall perform the following work which includes but is not limited to the following:
1. Verify the existence and the location of all utilities and buried cables prior to any construction work. Verify the FAA lease limits by finding property corners.
2. Remove and salvage the existing FAA standard signage (NO TRESSPASSING, ETC.) Remove and dispose the existing 12’ gate.
3. Remove and dispose 378’ of the existing perimeter fence as follows– (see drawing
no. LCH-D-RCAG-C001 for fence removal locations which are indicated by the “cloud”):
a. The entire North Run of the existing fence (approximately 188’)
b. Approximately 180’ of the existing fence West run.
c. Approximately 10’ of the existing fence East run.
4. Install a wood panel at the Northeast end (location 1) of the remaining existing fence as indicated in drawing no. LCH-D-RCAG-C001 – detail no.3.
5. Install a treated timber end post at Southwest end (location 2) of the remaining existing fence.
6. Fill and compact all removed fence post holes with clean fill dirt. Cover the top of the post holes with 2” compacted aggregate.
7. Verify and stake locations of the proposed chain link fence lines and gate prior to the fence installation.
8. Layout and install the 7’ high chain link fence with 1’ intruder guard. The fence fabric shall not be more than 2 inches off the ground underneath – see drawing no. LCH-D- RCAG-C002 for proposed fence location. The total length of the proposed new fence is approximately 688’. Do not tie the proposed chain link fence to the remaining of the existing fence at any point along the fence line.
9. Spray soil sterilant at the ground within 20’ on each side of run 1, 3, and 4 of the proposed fence line. Spray soil sterilant at the ground within 20’ on the East side (inside the fenced area) of run 1 of the proposed fence. Place additional gravel around new fence posts.
10. Install 12’ double leaf gate on the north side of the plot – see drawing no. LCH-D- RCAG-C002 for gate location. The gate shall also have the 1’ intruder guard. Install the salvaged FAA standard signage (NO TRESSPASSING, ETC.)
11. Install the grounding system as detailed in drawing no. LCH-D-RCAG-E008.
12. Replace the driveway corrugated metal pipe with a new 18” x 26’ reinforced concrete pipe (RCP.) After the removal of the existing pipe, carefully compact the material underneath the pipe. Place additional backfill if needed to maintain the existing drainage pattern. Install the new RCP and place and compact the new backfill material in layers not exceed 8” compacted thickness. Each layer shall be compacted at 85 percent and before the placement of the subsequent layer.
13. Clean and restore all disturbed area to original condition.
6- Submittals:
Submit the following for approval following contract award:
A. Construction schedule/sequence of work. The schedule shall be arranged in chronological order.
B. Product Data: Material descriptions, construction details, dimensions of individual components and profiles, and finishes for the following:
1. Fence and gate posts, rails, tension wire and fittings.
2. Chain-link fabric, reinforcements, and attachments.
3. Gates and hardware.
4. Barbed wire.
5. Driveway reinforced concrete pipe (RCP).
C. Shop Drawings: Show locations of fence, each gate, posts, rails, and tension wires and details of extended posts, extension arms, gate swing, or other operation, hardware, and accessories. Indicate materials, dimensions, sizes, weights, and finishes of components. Include plans, elevations, sections, gate swing and other required installation and operational clearances, and details of post anchorage, footings and attachment and bracing.
D. Product Certificates: Signed by manufacturers of chain-link fences and gates certifying that products furnished comply with requirements.
E. Qualification Data: For firms and persons specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.
F. Concrete mix design / batch information.
7- Quality Assurance:
A. Manufacturer: Company operating in the United States having U.S. manufacturing facility/facilities specializing in manufacturing chain link fence products with at least 5 years experience.
B. Installer Qualifications: An experienced installer who has completed chain-link fences and gates similar in material, design, and extent to those indicated for this Project and whose work has resulted in construction with a record of successful in-service performance.
C. Source Limitations for Chain-Link Fences and Gates: Obtain chain-link fences and primary personnel gates, including accessories, fittings and fastenings from a single source.
8- Products:
8.1-Chain-link fence fabric
A. Steel Chain-Link Fence Fabric: Height indicated on Drawings. Provide fabric fabricated in one-piece widths for fencing, not less than 84 inches high with 2-inch No. 9-gage (0.1483-inch diameter) wire.
1. Zinc-Coated Fabric: Comply with ASTM A 392 Class 2 and FS: RR-R-191, Type I, with zinc coating applied to steel wire before weaving with the following minimum coating weight:
a. Not less than 1.2 oz. /sq. ft. of uncoated wire surface.
2. Coat selvage ends of fabric that is metallic coated during the weaving process with manufacturer's standard clear protective coating B. Selvage: Twisted and barbed finish at top and bottom selvage
8.2-Industrial fence framing
A. Round Steel Pipe: Standard weight, Schedule 40, galvanized steel pipe complying with
ASTM F 1083 and RR-F-191 for Class F steel fence.
1. External and Internal Coating Type A consisting of not less than 1.8 oz/sq. ft.
zinc.
B. Terminal Posts: Standard weight, Schedule 40 3.375-inch O.D. galvanized steel pipe.
C. Post Brace Rails: Provide brace rail with truss rod assembly for each gate, end, and pull post. Provide two brace rails extending in opposing directions, each with truss rod assembly, for each corner post and for pull posts. Provide rail ends and clamps for attaching rails to posts.
1. Minimum 1.660 inches OD pipe.
D. Extended Members: Extend end and corner posts above top of chain-link fabric 12 inches as required to attach barbed wire assemblies.
8.3-Tension wire
A. General: Extend horizontal tension wire along the top and bottom of fence fabric.
B. Galvanized 9-gage, coiled spring wire, provided within the bottom 4 inches of the fabric.
Zinc coating shall weight 1.6 ounces per square foot minimum. Attach to fence fabric with 9-gage rings on 14-inch centers. Crimp rings tight to prevent noise. No loose or rattling equipment will be allowed.
8.4-Gates
A. General:
1. Gate for Class F Fence: Conform to FS-RR-F-191.
2. Gate shall be manually operated, self-closing, with provisions for padlocks.
3. Hinges: Provide large bearing surfaces for clamping in position. Hinges shall not twist of turn under action of the gate. Gates shall be capable of being opened and closed easily by one person and shall be arranged so they may swing back parallel to the fence. Latches, stops and keepers shall be provided for gates, unless otherwise shown on drawings. Keepers shall consist of a substantial mechanical device for securing and supporting the gate in the full open position.
Spring, forked or pig-ear latches shall be provided for gates, except as noted on drawings. Provide heavily galvanized steel hinge, latches, stops, and keepers.
B. Industrial swing gate
1. General: Comply with FS RR-F-191 for the swing double vehicle gate
2. Metal Pipe and Tubing: Galvanized steel. Comply with ASTM F 1083 and ASTM
F 1043 for materials and protective coatings.
3. Metal Pipe and Tubing: Galvanized steel. Comply with ASTM F 1083 and ASTM
F 1043 for materials and protective coatings.
4. Frames and Bracing: Fabricate from round galvanized steel tubing with outside dimension and weight according to FS RR-F-191 for the following gate fabric height:
a. Gate fabric height shall match the fence fabric height.
5. Gate Posts: Fabricate members from round galvanized steel pipe with outside dimension and minimum weight according to FS-RR-F-191 for the following gate characteristics:
a. Gate fabric heights of 7 feet.
b. Gate Opening Width: Over 12 feet but not over 30 feet.
6. Extended Gate Posts and Frame Members: Extend gate posts and frame end members above top of chain-link fabric at both ends of gate frame as indicated on Drawings as required to attach barbed wire assemblies.
7. Hardware: Latches permitting operation from both sides of gate, locking devices assemblies and stops fabricated from galvanized steel. Fabricate latches with integral eye openings for padlocking; padlock accessible from both sides of gate.
8.5-Fittings
A. General: Provide fittings for a complete fence installation, including special fittings for corners.
B. For steel fences, stretcher bar and tension wire bands or clamps shall be 11-gage
(0.1205-inch diameter) minimum thickness galvanized pressed steel bands; ties for attaching fabric to line posts shall be equal to 6-gage (0.0162 inch diameter) galvanized steel wire; ties for attaching fabric to top and brace rails shall be equal to 9-gage (0.1483 inch diameter) galvanized steel wire; and hog rings shall be equal to 9-gage (0.143-inch diameter) galvanized steel wire, except that stretcher bar clamps, ties and hog rings may be of aluminum conforming to the requirements of FS – RR- F-191.
C. Post and Line Caps: Hot-dip galvanized pressed steel or hot-dip galvanized cast iron. Provide weathertight closure cap for each post. Provide line post caps with loop to receive tension wire.
D. Stretcher Bars: Fabricate one piece lengths equal to full height of fabric with a minimum cross section of 1/4-inch by 3/4-inch. Provide one stretcher bar of each gate, end post, and two for each corner or pull post.
E. Stretcher Bar Bands: Heavy pressed steel, spaced not over 14 inches on center to secure stretcher bars to end, corner, pull and gate posts. Bands shall be within 4 inches of the top and bottom of fence fabric.
F. Barbed Wire Arms: Twelve-gage pressed steel increasing the height of the fence to 8 feet overall. The arms shall extend 45 degrees from the horizontal. Arms shall be capable of withstanding without failure 250 pounds downward pull at the outermost end of the arm. Fasten wires to the arm slots of heavy pins. Use 1. Type I, single slanted arm.
G. Tie Wires, Clips, and Fasteners: Provide the following types:
1. Standard Round Wire Ties: For attaching chain-link fabric to posts, rails, and frames, complying with the following:
a. Hot-Dip Galvanized Steel: Nine-gage wire; galvanized coating thickness matching coating thickness of chain-link fence fabric. Spaced at 14 inches o.c.
H. Pipe Sleeves: For posts set into concrete, provide preset hot-dip galvanized steel pipe sleeves not less than 6 inches long with inside dimensions not less than 1/2 inch more than outside dimension of post, and flat steel plate forming bottom closure
8.6-Barbed Wire
Twisted Aluminized Steel Barbed Wire: Comply with RR-F-191 for the following three-strand barbed wire:
1. Standard Size and Construction: 12-gage line wire with 14-gage diameter, 4-point round barbs spaced not more than 4 inches o.c.
8.7-Cast-in-place concrete
A. General: Comply with ACI 301 for cast-in-place concrete.
B. Materials: Portland cement complying with ASTM C 150, aggregates complying with
ASTM C 33, and potable water.
1. Concrete Mixes: Cement shall conform to Specification for Portland Cement
ASTM C-150, Type I, or Specification for Air-Entraining Portland Cement ASTM C-175, Type 1A, unless otherwise specified. The concrete shall have a minimum 28-day compressive strength of 3,000 PSI, a maximum slump of 4 inches, and a maximum aggregate size of 1-inch. The concrete mix shall contain an air-entraining admixture. Air content shall be 5 to 7 percent. The Contractor shall give the COR a certificate from the concrete supplier, bearing the intended job mix and certifying that the concrete delivered will meet the above requirements.
The Contractor shall obtain approval of the job mix from the COR prior to placing concrete.
8.8-Driveway Pipe
A. General: Comply with ASTM C76 B. Use Reinforced Concrete Pipe Class III, Wall A, B, or C pipe.
8.9- Aggregate
A. Furnish gravel complying with 1003.03.01 base course aggregate per applicable Louisiana State DOT Specifications with the following gradation:
U.S. (Metric) Sieve Size Percent Passing By Weight (Mass)
1 ½ inches (37.5 mm) 100 1 inch (25 mm) 90 - 100
3/4 inch (19.0 mm) 70 - 100 No. 4 (4.75 mm) 35 - 65
No. 40 (425 µm) 12 - 32 No. 200 (75 µm) 5 - 12
B. The aggregate shall be delivered to the site in a moist condition that will readily compact. The addition of water will be required if compaction of the aggregate cannot be obtained due to a lack of moisture.
9- Execution:
9.1-Examination / clearing fence line
A. Examine areas and conditions, with Installer present, for compliance with requirements for a verified survey of property lines and legal boundaries, site clearing, earthwork, pavement work, and other conditions affecting performance.
B. Do not begin installation before final grading is completed, unless otherwise permitted by COR. Proceed with installation only after unsatisfactory conditions have been corrected.
9.2-Preparation
A. Stake locations of fence lines, gates, and terminal posts. Indicate locations of utilities, underground structures, benchmarks, and property monuments.
9.3- General Installation
A. Install chain-link fencing to comply with FS RR-F-191. Install fencing on established boundary lines inside property line, or as indicated on the Drawings.
B. Post Excavation: Drill or hand-excavate holes for posts to diameters and spacings indicated, in firm, undisturbed or compacted soil.
1. Drill holes for post footings in firm, undisturbed or compacted soil. Holes shall have a diameter equal to 4 times the diameter of the post except where otherwise indicated on the drawings.
2. Excavate hole depths approximately 3 inches deeper than post bottom with bottom of line posts set not less than 48 inches in concrete base.
C. Post Setting: Set terminal and line posts in concrete footing. Protect portion of posts aboveground from concrete splatter. Place concrete around posts and vibrate or tamp for consolidation. Verify that posts are set plumb, aligned, and at correct height and spacing, and hold in position during placement and finishing operations until concrete is sufficiently cured.
1. Maximum spacing between line posts is 10 feet.
2. Set keepers, stops, sleeves, and other accessories into concrete as required.
3. All posts shall be able to pass a pull test when a force of 48 pounds is applied perpendicular to the fence at the top of the post. The post should not deflect more than 1 inch at the location where the force is applied.
4. Post tops shall be riveted or shall be spot-welded. No loose or rattling fittings will be allowed.
9.4-Chain-link fence installation
A. Terminal Posts: Locate terminal end, corner, and gate posts and terminal pull posts at changes in horizontal or vertical alignment of 15 degrees or more.
B. Post Bracing Assemblies: Install according to FS RR-F-191, maintaining plumb position and alignment of fencing. Install braces at end and gate posts and at both sides of corner and pull posts. Install so posts are plumb when diagonal rod is under proper tension. Posts shall be braced before the wire fencing is placed.
C. Tension Wire: Install according to FS RR-F-191, maintaining plumb position and alignment of fencing. Pull wire taut, without sags. Fasten fabric to tension wire with
0.120-inch- diameter hog rings of same material and finish as fabric wire, spaced a maximum of 24 inches o.c. Install tension wire in locations indicated before stretching fabric.
1. Bottom Tension Wire: Install tension wire within 6 inches of bottom of fabric and tie to each post with not less than same gage and type of wire.
D. Top Rail: Install according to FS RR-F-191, maintaining plumb position and alignment of fencing. Run rail continuously through line post caps, bending to radius for curved runs and terminating into rail end attached to posts or post caps fabricated to receive rail at terminal posts. Provide expansion couplings as recommended by fencing manufacturer.
E. Intermediate Rails: Install in one piece at post-height center span, spanning between posts, using fittings, special offset fittings, and accessories.
F. Chain-Link Fabric: Apply fabric to outside of enclosing framework. Leave 1 inch between finish grade or surface and bottom selvage, unless otherwise indicated.
Pull fabric taut and tie to posts, rails, and tension wires. Anchor to framework so fabric remains under tension after pulling force is released.
G. Tension or Stretcher Bars: Provide two stretcher bars for each pull post. Thread through fabric and secure to end, corner, pull, and gate posts with tension bands spaced not more than 14 inches o.c.
H. Tie Wires: Use wire of proper length to firmly secure fabric to line posts and rails.
Attach wire at one end to chain-link fabric, wrap wire around post a minimum of 180 degrees, and attach other end to chain-link fabric. Bend ends of wire to minimize hazard to individuals and clothing.
1. Maximum Spacing: Tie fabric to line posts 12 inches o.c. and to braces 24 inches o.c.
I. Fasteners: Install nuts for tension bands and carriage bolts on the side of the fence opposite the fabric side.
J. Barbed Wire: Install 3 strands of barbed wire parallel on each extension arm, on the exterior side of fence (away from the Government property), unless otherwise shown. Barbed wire support arms shall have a tight press-fit or shall be spot-welded to preclude surreptitious removal. At end and gate posts, barbed wire shall be wrapped once around the posts and clipped and the ends of the horizontal wires tied with a snug tight twist. Each longitudinal wire shall be stapled to each post with a clip designed for use with steel posts. No loose or rattling fittings will be allowed.
Pull wire taut to ninety pounds of tension.
9.5-Gate Installation
A. Install swing gate posts in accordance with ASTM F 567.
B. Gate locations and sizes shown on Drawings. Fabric shall be attached to the side of the gate frame that will be away from the Government property when the gate is installed in the closed position. Fabric shall be securely attached to the gate frame at intervals not exceeding 15 inches. Attachment to the vertical members of the gate frame shall be made through stretcher bars.
C. Install gates according to manufacturer's written instructions, level, plumb, and secure for full opening without interference. Attach fabric as for fencing. Attach hardware using tamper-resistant or concealed means. Install ground-set items in concrete for anchorage. Adjust hardware for smooth operation and lubricate where necessary.
D. Hinges, latches, stops and keepers for Class “F” fence gates shall conform to the requirements of FS-RR-F-191. All latches shall be arranged for locking the gates in the closed position.
E. Gates shall be hung on two hinges attached in such a manner that the gates cannot be lifted off. Gates for Class “F” fences shall be installed to swing opposite to the slope of the extension arms, and if a driveway passes through a gate at an angle, the gate shall be hung on the side giving the greatest clear opening. To insure positive latching, the leg of the gatepost of fences on which the latch is placed shall be in all cases installed at right angles to the line of the gate in its closed position.
F. Stops shall be provided for holding gates in an open position. The stop for engaging the plunger-bar latch shall be set in concrete. Keepers shall be located to support the free end of the gate in the full open position.
G. Adjust gate to operate smoothly, easily, and quietly, free from binding, warp, excessive deflection, distortion, nonalignment, misplacement, disruption, or malfunction, throughout entire operational range. Confirm that latches and locks engage accurately and securely without forcing or binding.
H. Lubricate hardware, gate operator and other moving parts.
9.6-Grounding
Refer to FAA-STD-019e; Lightning & Surge Protection, Grounding, Bonding, & Shielding Requirements for Facilities & Electronic Equipment
Surface Preparation All surfaces to be bonded shall be thoroughly cleaned to remove all dirt, grease, oxides, nonconductive films, or other foreign material. Paints and other coatings shall be removed to expose the base metal.
Bond Protection All bonds shall be protected against weather, corrosive atmospheres, vibration, and mechanical damage. Under dry conditions, apply a compatible corrosion preventive or sealant, within 24 hours of assembly of the bond materials. Under conditions exceeding 60% humidity, seal the bond with a compatible corrosion preventive or sealant within 1 hour of joining.
Lightning Protection for Fences and Gates
A. A ground rod shall be installed at spacings no greater than 100 feet, and bonded to a fence post with a 4/0 AWG stranded copper conductor, exothermically welded.
B. Install a 1 inch by 1/8 inch flexible tinned copper bond strap or an insulated 4/0 AWG flexible (welding) copper conductor from any gate to the adjacent post (exothermic welding is recommended). Install the bonding strap from the gate to the post so it will not limit full motion of the gate.
C. Exothermically weld a 4/0 AWG bare copper conductor from the posts at each side of the gate to ground rods installed at each side of the gate.
D. Connect the conductor to the gateposts at a height no greater than one foot above grade. Interconnect the ground rods at either side of the gate with an exothermically welded 4/0 AWG bare copper conductor buried a minimum of 18 inches below grade.
E. Bond across any terminations in the security wire using a short piece of the security wire material and UL listed bonding connectors. Bond the security wires to the fence posts at intervals of approximately 40 feet using a 6 AWG stranded tinned copper conductor and UL listed bonding connectors. Attach the metallic fence fabric to the fence posts with wire ties of the same material.
F. For gates, a horizontal bare 6 AWG stranded tinned copper conductor shall be threaded continuously through the gate fabric and mechanically bonded to the vertical gate rails.
9.7-Driveway Pipe Installation
A. Location: Replace the existing corrugated metal pipe with a new Reinforced Concrete Pipe at the same location
B. Backfilling: Use crushed aggregate as a backfill material.
C. Placement and Compaction: thoroughly hand compact the backfill material under the pipe haunches and then dynamically compact in layers not exceeding 8 inches compacted thickness. Initially compact under the haunches of the pipe by hand tamping or other acceptable means, until reaching a level in which the dynamic tamping can commence. Compact each lift by applying at least eight passes of a hand operated, dynamic mechanical compaction device over the surface of each lift.
10 - Photos Photos are for clarification purposes only; refer to scope of work and requirements for detailed work items.
The RCAG facility facing South
Driveway corrugated metal pipe – to be removed and replaced
Existing fence and gate to be removed and disposed – see drawings for fence removal details
Existing FAA signage shall be removed, salvaged, and reinstalled on the new gate
| Contents: |
| 1- General Specifications: |
| 2- General Execution Requirements: |
| 3- Applicable Standards/References: |
| 4- Drawings |
| 5- Scope of Work: |
| 6- Submittals: |
| 7- Quality Assurance: |
| 8- Products: |
| 9- Execution: |
| 10 - Photos |