Contract Summary
This is an Invitation for Bid (IFB) issued by the California Department of Education for Mechanical Room Pipe Insulation Services at the Diagnostic Center Southern California. The project involves furnishing all labor, materials, tools, equipment, transportation, supervision, licenses, and insurance necessary to install fiberglass insulation on chilled water supply and return piping and complete installation of thermal insulation and protective jacketing for hydronic hot water supply and return piping. The scope includes insulation of piping ranging from 0.5 inches to 6 inches in diameter, with specific footage requirements for each pipe size, as well as insulation of valves, flanges, and pipe support installations with metal shields. A mandatory site inspection is scheduled for December 1, 2026 at 10:00 a.m. at 4339 State University Drive, Los Angeles, California 90032; bidders who do not attend or arrive more than 10 minutes late will be disqualified. Sealed bids are due by December 15, 2026 at 2:00 p.m. PST, with public bid opening on December 17, 2026 at 11:30 a.m. PST. The contract commencement date is April 1, 2027, or upon contract approval by the Department of General Services, whichever is later, with work to be completed within 20 working days from the written notice to commence.
Bidders must possess a valid C-2 Insulation and Acoustical Contractor's License and be registered with the Department of Industrial Relations. A bid bond equal to 10 percent of the bid amount is required, and performance and payment bonds in the amount of 100 percent of the contract price are required for bids exceeding $10,000 and $25,000 respectively. Compensation is structured as a lump sum final payment upon completion and state acceptance of the work. A five percent small business preference, not to exceed $50,000, is available to certified small businesses or non-small businesses subcontracting 25 percent of their bid to certified small businesses. A Disabled Veteran Business Enterprise (DVBE) incentive of 3 to 5 percent is available based on confirmed DVBE participation levels, with $10,000 of the final payment withheld pending submission of a completed Prime Contractor's Certification DVBE Subcontracting Report. The contract is subject to California prevailing wage requirements, with the wage category specified as Asbestos Worker and Heat and Frost Insulator. Liquidated damages of $100 per working day apply for delays beyond the 20-day completion period, except when delays result from state or utility failures.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
California Department of Education Invitation For Bid (IFB)
Diagnostic Center Southern California
IFB DS260195 Mechanical Room Pipe Insulation Services (rev. 8/26/2026)
I. TABLE OF CONTENTS
NOTICE
INSTRUCTIONS TO BIDDERS
EXHIBIT A – Scope of Work EXHIBIT B – Budget Detail & Contractor’s Bid Form EXHIBIT C – General Terms and Conditions (GTC 02/2025) EXHIBIT D – Special Terms and Conditions EXHIBIT E – Additional Provisions EXHIBIT F – Bonds and Insurance
ATTACHMENTS
II. REQUIRED FORMS
The following items are for your use in preparing a bid on the attached project. The items with the asterisk (*) need to be returned as part of the bid submission package before the time listed at the place indicated on the Invitation for Bid for your bid to be considered for this project.
* Exhibit B – Contractor’s Bid Form
* Exhibit F – Bonds and Insurance (as applicable)
* Attachment 1 – Non-Collusion Declaration (PCC 7106)
* Attachment 2 – Bidder Certification
* Attachment 3 – Bidder’s Bond
* Attachment 4 – Payment Bond Certification
* Attachment 5a/5b – Darfur Contracting Act Certification / Darfur Contracting Act
Certification Supplemental
* Attachment 6 – California Civil Rights Laws Certification (CO-005)
Attachment 7 – Protest Procedures for Invitation for Bid
* Small Business Preference and Certification Request (Std 811) (Only required if
Bidder is requesting the Small Business preference) Form is located here:
https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std811.pdf
* Contractor Certification Clauses (CCC 04/2017) located here:
https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services- Resources-List-Folder/Standard-Contract-Language
* Payee Data Record (Std 204) located here:
https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf
* Bidder Declaration (GSPD-05-105) (Only required if Bidder proposes to use any subcontractors) Form is located here:
https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std811.pdf https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf
NOTICE
DS260195, Mechanical Room Pipe Insulation Services
• The deadline for submission of sealed bids is Tuesday, December 15, 2026 at 2:00 pm PST. The bids will be publicly opened and read on Thursday, December 17, 2026 at 11:30 am PST at the California Department of Education, Fiscal and Administrative Services Division, 1430 N Street, Suite 2213, Room 2315, Sacramento, CA 95814.
• Bids shall be for the performance of all manpower, labor, tools, materials, equipment, transportation, supervision, licenses, bonds and insurance certificates necessary to provide Chilled Water Pipe Insulation and Hydronic Heating Hot Water Pipe Insulation. All works shall be in accordance with plans and specifications as described in Exhibits A, B, C, D, E, and F.
• Bid packages can be obtained by submitting a request to Kourtney Twist by phone at (916) 322- 2482 or by e-mail at ktwist@cde.ca.gov or Alex Cost by e-mail at acost@cde.ca.gov or by phone at
(916) 323-6185.
• A Mandatory Site Inspection will be held Tuesday, December 1, 2026 at 10:00am. The site inspection will be conducted at the Diagnostic Center Southern California (DCSC) located at 4339 State University Drive, Los Angeles, CA 90032. Bidders not attending will not be allowed to submit a bid for this project.
• The Contractor shall possess a C-2 Insulation and Acoustical Contractor’s License to bid the project. Prospective bidders may examine/obtain plans, specifications, and bid forms by attending the mandatory walk through at the above address. See Attachment 2, Bidder Certification.
• 5% small business preference, not to exceed $50,000, will be granted to a certified small businesses or to a non-small business if 25% of their bid is subcontracted to a certified small business.
• The Contractor shall be required to provide a payment bond, Payment Bond to Accompany Construction Contract Form Std 807 (see Attachment 4), in the amount of one hundred percent (100%) of the contract price involving a bid in excess of $25,000. A Performance Bond in the amount of one hundred percent (100%) must accompany every contract involving a bid in excess of $10,000 and if progress payments will be made. See Exhibit F, Article I, Contract Bonds.
• The low responsive and responsible bidder will be required to enter into a contractual agreement in the form of a State of California "Standard Agreement, STD Form 213" which shall be binding upon the State of California only after approval by the State. The contract is not binding on either party unless and until it is approved by appropriate authorized state agencies. All nonexempt state contracts of $5,000 or more are subject to state contractor nondiscrimination and compliance requirements pursuant to Government Code Section 12990 and California Code of Regulations, Title 2, Division 4, Section 11119. See Exhibit D, Article I, Standard California Nondiscrimination Construction Contract Specifications.
• Pursuant to Section 1770 of the Labor Code, the Department of Industrial Relations (DIR) has ascertained the general prevailing wage rates applicable for the county in which the work is completed. Copies of the wage rates are on file. See Exhibit E, Article II, Prevailing Wage. No Contractor or subcontractor may be awarded a contract for a public works project unless registered with DIR pursuant to Labor Code 1725.5. The prevailing wage category for this solicitation is:
Asbestos Worker, Heat and Frost Insulator.
• No bidder or proposed subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code
1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
mailto:ktwist@cde.ca.gov mailto:acost@cde.ca.gov
INSTRUCTIONS TO BIDDERS
I. GENERAL
These instructions form a part of the contract documents and shall have the same force as any other contract document, including the Special Provisions.
II. EXAMINATION OF BID DOCUMENTS AND SITE
A. Bidders shall carefully examine the Invitation for Bid (IFB) document. They shall investigate conditions, character, quality and quantity of surface, and sub-surface materials or obstacles to be encountered. Any failure by bidders to acquaint themselves with site conditions and available information will not relieve them from responsibility for estimating properly the difficulty or cost of successfully performing the work.
B. Questions pertaining to the Plans and/or Specifications which may arise during the bidding period shall be directed to the CDE Contract Monitor, Jaime Arceo, by phone at (323) 686-4512, or by e-mail at jarceo@dcs-cde.ca.gov or CDE Contract Analyst, Kourtney Twist, by phone at (916) 322-2482, or by e-mail at ktwist@cde.ca.gov.
III. DISCREPANCIES
A. Any discrepancies, omissions, ambiguities, or conflicts in or among the contract documents, or doubts as to meaning shall be brought to the CDE's attention.
B. All interpretations of the contract documents will be in the form of written addenda. Addenda will be sent to all bidders to whom the IFB is sent. All addenda become part of the contract documents. Any oral representations issued by the CDE shall be of no force or effect. Bidders are responsible for determining that they have received all addenda.
IV. IFB SCHEDULE
Activity Action Date
Invitation for Bid Advertisement November 17, 2026
Mandatory Site Inspection December 1, 2026 at 10:00 am PST
Bids Due December 15, 2026 at 2:00 pm PST
Public Bid Opening December 17, 2026 at 11:30 am PST
Contract Start Date April 1, 2027, or upon contract/DGS approval, whichever is later mailto:jarceo@dcs-cde.ca.gov mailto:ktwist@cde.ca.gov
V. MANDATORY SITE INSPECTION
A Mandatory Site Inspection is scheduled for Tuesday, December 1, 2026 at 10:00 am PST at the Diagnostic Center Southern California (DCSC), located at 4339 State University Drive, Los Angeles, CA 90032.
Attendees must arrive on time and be present at the Mandatory Site Inspection until it has been concluded by CDE staff. Attendees more than 10 minutes late to the Mandatory Site Inspection will not be allowed to participate. Attendees must report to the Front Office. Please bring a copy of the IFB with you to the Mandatory Site Inspection.
Note: Bids from Contractors who do not attend, or who are more than 10 minutes late, or who leave the mandatory site inspection early will be rejected and returned unopened
VI. BIDS
A. Each bid shall be submitted on EXHIBIT B – CONTRACTOR’S BID FORM provided and shall be filled out/signed in the same name, style, manner, and license number as the bidder is licensed with the Contractors State License Board.
B. Amounts shall be written out in figures, followed by the amount written out in numbers.
C. Each bid shall have listed therein the name and address of each subcontractor to whom the bidder proposes to subcontract portions of the work in an amount in excess of one-half of one percent (1/2%) of the total bid in accordance with the Subletting and Subcontracting Fair Practices Act, commencing at Section 4100 of the Public Contract Code.
D. Bids shall include the cost of all items shown on the Plans, mentioned in
Specifications, or reasonably inferred therefrom as necessary to complete the work within the intent of the contract documents.
E. Bids shall include all applicable federal, state and other taxes, together with the cost of all permits, licenses and the like, which may be required under various laws and regulations.
F. Bids shall not be qualified. Any bids modifying the conditions of the IFB will be disqualified. Deviations from the Plans and/or Specifications shall not be considered and shall be cause for rejection of bids.
G. Bids shall be submitted in a sealed envelope marked "Sealed Bid – Mechanical
Room Pipe Insulation Services – Do Not Open". To prevent premature opening, place sealed bid envelope within another envelope, and deliver to the CDE before the time listed on the IFB. The outer envelope must have the return address of the bidder. Faxed bids will not be accepted.
H. No bids will be accepted after the time set for the bid opening. It is the responsibility of the bidder to assure delivery of the bid documents to the proper place and before the time of bid opening as listed on the IFB. Any bid received after the scheduled closing time for receipt of bids will be returned unopened.
I. Bids will be opened and read publicly at the time and place specified on the IFB, or as changed by an "Addendum” to the contract documents.
J. Any bid may be withdrawn prior to the hour fixed in the IFB, provided a request for withdrawal is submitted in writing by the bidder or his/her duly authorized representative and filed at the place shown on the IFB. An oral, telegraphic, telephonic, or faxed request to withdraw a bid proposal is not acceptable. No bids may be withdrawn after the bid opening.
K. The CDE reserves the right to disregard minor irregularities (e.g., not affecting the scope, price, statutory mandate, etc.) in the bid responses.
L. The method that shall be used as a "tie-breaker" in the event of a two-way (or more) tie of the responsive/responsible lowest bid will be to place the names of the bidders in a container to be drawn. The first name drawn will be the proposed awardee. The remaining bidder(s) name(s) will be drawn sequentially and noted in case, upon validation, the proposed awardee selected through the tie-breaking process fails to perform. All interested parties are invited to attend the process.
Small business bidders, meeting the IFB specifications in XIV. Preference
Programs, shall have precedence over non-small business bidders in that the application of any bidder preference for which non-small business bidders may be eligible under any other provision of law shall not result in the denial of the award to a small business bidder.
In the event of a precise tie between the low responsible bid of bidder meeting the specifications of a small business, and the low responsible bid of a bidder meeting the specifications of a disabled veteran-owned small business, the contract shall be awarded to the veteran-owned small business.
THE STATE RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS
VII. BID SUBMISSION REQUIREMENTS
All bid package documents must bear the original signature of the individual authorized to bind the contract. No electronic signatures will be accepted as original. Original signature shall mean a manual handwritten signature or mark in wet ink.
Bid package must include the following completed documents:
1. Exhibit B, Contractor’s Bid Form: Contractor's Bid Form must be completed and submitted with an original signature by the individual legally authorized to bind the bidder. Proposal form must contain the proposed bid cost written out in figures, followed by the amount written out in numbers.
2. Insurance: The bidder must possess and provide a copy of the insurance certificates outlined in Exhibit F, Articles II and III. Proof of coverage and limits are required in the bid package. Additional insured language will be required as a condition of contract award.
3. License: Photocopy of valid C-2 Insulation and Acoustical Contractor's License, as issued by the California Department of Consumer Affairs, Contractors State License Board.
4. Attachment 1 Non-Collusion Declaration (PCC 7106) must be fully completed, signed and dated with an original signature and notarized.
5. Attachment 2, Bidder’s Certification must be fully completed, signed and dated with an original signature.
6. Attachment 3, Bidder’s Bond: must be fully completed, signed and dated with an original signature and notarized. See Article XI. Bonds and Insurance.
7. Attachment 4 Payment Bond Certification must be fully completed, signed and dated with an original signature
8. Attachment 5a Darfur Contracting Act Certification, OR Attachment 5b Darfur Contracting Act Certification Supplemental must be fully completed, signed and dated with an original signature.
9. Attachment 6, California Civil Rights Laws Certification (CO-005) must be fully completed, signed and dated with an original signature.
10. Contractor Certification Clauses (CCC 04/2017) must be signed and dated with an original signature. The CCC 04/2017 can be found at:
https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services- Resources-List-Folder/Standard-Contract-Language
11. Payee Data Record (Std 204) must be completed and submitted with an original signature. The STD 204 form can be found at:
https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf
12. Conditional Attachments:
• Subcontracting: If bidder intends to subcontract any portion of the work outlined in Exhibit A, Scope of Work, the Bidder Declaration (GSPD-05-105) form must be completed and submitted with original signature. The GSPD-05-105 form can be found at: https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf
• Small Business Preference: If bidder intends to apply for the Small Business Preference the Small Business Preference and Certification Request (Std. 811) form must be completed and submitted with original signature. Form is located here: https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std811.pdf.
The bidder must include proof of Small Business certification, if applying for the preference. Certification can be verified on Cal eProcure at https://caleprocure.ca.gov/pages/PublicSearch/supplier-search.aspx
Information regarding this preference program may be obtained on the DGS website, https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement- Division-Resources-List-Folder/How-to-do-business-with-the-state-of-California
• DVBE Incentive Option: If bidder intends to apply for the DVBE Incentive the following documents are required. Failure to submit any of the documents for this bid will not be cause for bid rejection; however, DVBE incentive will not be considered or granted for your bid.
https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdfj https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std811.pdf https://caleprocure.ca.gov/pages/PublicSearch/supplier-search.aspx https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division-Resources-List-Folder/How-to-do-business-with-the-state-of-California https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division-Resources-List-Folder/How-to-do-business-with-the-state-of-California o Bidder Declaration (GSPD-05-105). Bids must include a GSPD-05-105 form completed in accordance with the instructions on the form. The GSPD-05- 105 form can be found at:
https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf.
o DVBE Certification. Bids must include a copy of the DVBE certification for each DVBE contractor/subcontractor. DVBE certification can be verified and printed from Cal eProcure at https://caleprocure.ca.gov/pages/PublicSearch/supplier-search.aspx
VIII. BIDDERS
A. The CDE will not award a contract, nor is a bidder eligible to bid for or receive a contract for the work described herein, if, in the preceding five (5) years, that contractor has been convicted of violating a state or federal law respecting the employment of undocumented aliens (Public Contract Code § 6101).
B. Before submitting bids, all bidders must be licensed for the appropriate classification in accordance with provisions in Division 3, Chapter 9, of the California Business and Professions Code. The class of Contractors License required for this project is C-2 Insulation and Acoustical Contractor's License, and is listed in EXHIBIT A – SCOPE OF WORK.
No bidder may bid on work of any kind for which they are not properly licensed by the Contractors State License Board. Joint venture bidders must possess a joint venture license.
C. All Contractors and subcontractors who bid or work on a public works project must register with the Department of Industrial Relations (DIR) Contractor registration program. (Labor Code 1725.5, with limited exceptions under Labor Code 1771.1(a)).
No Contractor or subcontractor may be awarded a contract for public works project unless registered with DIR pursuant to Labor Code 1725.5
Prior to contract award, the CDE will verify Contractor and subcontractor, if any, registration status on the DIR’s database of registered Contractors and subcontractors.
Upon contract award, the CDE will submit to DIR a contract award notice (PWC-
100) for this public works project.
D. All bidders submitting bids as a corporation shall be currently qualified to do business in California. The corporation shall be listed as "in good standing" with the California Office of the Secretary of State.
IX. EXECUTIVE ORDER N-6-22 – RUSSIA SANCTIONS
On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals.
“Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid or proposal, Contractor represents that it is not a target of Economic
Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.
X. GENERATIVE ARTIFICIAL INTELLIGENCE (GenAI) DISCLOSURE NOTIFICATION
The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI, while balancing the risks of these technologies.
Bidder/Offeror must notify the State in writing if it: (1) intends to provide GenAI as a deliverable to the State; or (2), intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts: (i) functionality of a State system, (ii) risk to the State, or (iii) Contract performance. For avoidance of doubt, the term "materially impacts" shall have the meaning set forth in State Administrative Manual (SAM) 4986.2.
Failure to report GenAI to the State may result in disqualification. The State reserves its right to seek any and all relief it may be entitled to as a result of such non-disclosure.
Upon notification by a Bidder/Offeror of GenAI as required, the state reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the state.
Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
XI. BONDS AND INSURANCE
A. Bidder’s Bond:
Bids must include enclosed cash, a cashier's check, certified check, or a bidder's bond, executed as surety by a corporation authorized to issue surety bonds in the State of California, made payable to "California Department of Education," in an amount equal to at least ten percent (10%) of the bid amount. No such bid shall be considered unless one of the forms of bidder's security is enclosed therewith. If bidder's security is a bidder's bond, it must be executed on the form provided by the State or on an equivalent form (see Attachment 3). Personal checks are not acceptable.
Within ten (10) working days after formal award of the contract, the CDE will return the bidder's security (other than bidder's bonds) and accompanying bid except apparent low bidder and apparent second low bidder meeting bid requirements in making the bid award. Retained bidder's security will be held until the contract has been fully executed and approved, after which all bidders’ security, except bidder's bonds, will be returned.
B. Additional Insured Language Requirement https://www.dgs.ca.gov/Resources/SAM/TOC/4900/4986-2 https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV§ionNum=11549.64.&highlight=true&keyword=Generative%20Artificial%20Intelligence
Prior to the approval of the contract the Contractor shall furnish a Certificate(s) of Insurance for Workers' Compensation Insurance and Liability Insurance to the and applicable bonds required to the State as described in the Exhibit F – Bonds And Insurance.
XII. CONTRACT
A. The State reserves the right to not award a contract for this project. If the contract is awarded, it will be awarded to the lowest responsive and responsible bidder whose bid complies with all prescribed requirements, including "Small Business Bidder" preference, and "Disabled Veteran Business Enterprise" Program, in accordance with California Code of Regulations and/or Public Contract Code as applicable.
B. Once awarded, the Contractor shall sign the contract documents and return them within ten (10) working days, not including Saturdays, Sundays, and State holidays, after state contract documents have been received for signature.
Failure to provide the required signed contract documents within the ten (10) working days, not including Saturdays, Sundays, and State holidays, may invalidate the contract award which would be cause for forfeiture of bidder's security.
The State may award to the next lowest responsive and responsible bidder and avail itself of all legal remedies provided by statute.
C. The contract shall be binding only upon approval by the State.
XIII. DVBE PROGRAM REQUIREMENT
Section 10115 et seq. of Public Contract Code, and Section 999 et seq. of the Military and Veterans Code requires a goal of three percent (3%) certified California Disabled Veteran Business Enterprise (DVBE) participation for all contracts on an agency-wide basis of $25,000.00 and over unless exempted due to the services provided.
This solicitation is exempt from DVBE participation, however the DVBE incentive still applies (see Article XIV. Preference Programs).
The CDE is committed to achieving legislatively established goals for the participation of DVBEs in all contracting and seeks to use certified California DVBE business whenever possible.
XIV. PREFERENCE PROGRAMS
A. Small Business Preference
A five percent (5%) bid preference is available and will be applied in accordance with Attachment 5. The small business preference will be applied to those bidders declaring their eligibility by completing Attachment 5. The bidder must include proof of Small Business certification, if applying for the preference. Certification can be verified on Cal eProcure at https://caleprocure.ca.gov/pages/PublicSearch/supplier-search.aspx
Information regarding this preference program may be obtained on the DGS website, https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division-Resources-https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division-Resources-List-Folder/How-to-do-business-with-the-state-of-California
List-Folder/How-to-do-business-with-the-state-of-California
B. DVBE Incentive Option
In accordance with Section 999.5(a) of the Military and Veterans Code, an incentive will be given to responsive and responsible bidders who provide DVBE participation as outlined below. The incentive amount for awards based on the lowest responsive/ responsible bid received will vary in conjunction with the percentage of DVBE participation. The incentive is only given to those bidders who are responsive to the DVBE Program Requirements and DVBE participation in the resulting contract. The following represents the percentages that will be applied:
• Confirmed DVBE Participation of 5% or more, the DVBE Incentive is 5%.
• Confirmed DVBE Participation of 4% to 4.99%, the DVBE Incentive is 4%.
• Confirmed DVBE Participation of 3% to 3.99%, the DVBE Incentive is 3%.
In order to receive the incentive bidders must document DVBE participation commitment by completing and submitting the Bidder Declaration (GSPD-05-105) with the Bid. The GSPD-05-105 form can be found at:
https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf.
The bidder must also include proof of DVBE certification, if applying for the incentive.
Certification can be verified on Cal eProcure at https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division-Resources-List-Folder/How-to-do-business-with-the-state-of-California
EXHIBIT A – SCOPE OF WORK
I. GENERAL SCOPE
The Contractor will furnish all labor, tools, materials, transportation, ladders, lifts, equipment, services, supervision, licenses and insurance certificates necessary to install fiberglass insulation on chilled water supply and return piping and hydronic piping, as well as complete installation of thermal insulation and protective jacketing for the hydronic hot water supply (HWS) and hot water return (HWR) piping, as described herein.
II. CONTRACT MONITORS
The CDE assigns Jaime Arceo, jarceo@dcs-cde.ca.gov, (323) 686-4512, as the State Contract Monitor to oversee this project. Said State Contract Monitor is not authorized by the State to make any commitments or make any changes which will affect the price, terms or conditions of this agreement without a formal contract amendment.
The Contractor must assign a Contractor Contract Monitor to oversee this project. Said Contractor Contract Monitor is not authorized by the State to make any commitments or make any changes which will affect the price, terms or conditions of this agreement without a formal contract amendment.
III. LOCATION
All work will be performed at the Diagnostic Center Southern California (DCSC) located at 4339 State University Drive, Los Angeles, CA 90032.
IV. CONTRACTOR CLASSIFICATION
It has been determined by the CDE that the following Contractor’s license classification is required for this project:
C-2 Insulation and Acoustical Contractor's License
V. COMMENCEMENT, TIME EXTENSION, AND LIQUIDATED DAMAGES
A. The Contractor agrees to complete the work of this contract within 20 working days, beginning from the date of written notice to commence work. Work cannot commence until the “start meeting” has taken place, see Exhibit E. Additional Provisions, Article X. Cooperation Between Contractor and State, section A.
B. At the discretion of the CDE, an extension in the contract time may be granted in the event a delay is caused by weather which does not permit the execution of the work of this contract in accordance with the above number of working days. Requests for extension in the contract time must be submitted in writing via post mail, within five
(5) working days of the weather related delay, by the Contractor to the CDE Contract Monitor. Requests submitted past five working days of the weather related delay will be honored solely at the discretion of the CDE.
C. Time is of the essence for this contract and the CDE will sustain damage if the work is not completed in the time herein specified. Therefore, the Contractor must pay to the CDE the sum of $100 for each and every working day's delay in finishing the work of the Contract in excess of the number of days specified. However, the Contractor shall not be assessed liquidated damages when the delay is caused by the failure of the CDE or the owner of any utility to provide for removal or relocation of an existing utility, facility, or to perform work as indicated in these specifications.
It is also agreed that these monies will be deducted from final payment to the
Contractor.
VI. PIPING LIST
Chilled Water Supply & Return Piping
Hot Water Supply & Return Piping
1. 6” @ appx 60 ft Length 3” @ appx 150 ft
2. 5” @ appx 80 _ ft Length 2 1/2” @ appx 80 ft
3. 4” @ appx 170 _ ft Length 2” @ appx 170 ft
4. 3” @ few_ ft Length 1/2” @ appx 60 ft
5. 2” @ few_ ft Length
Additionally, the Contractor will be responsible for providing and installing the following:
A. Pipe support metal shields with polyiso urethane insert.
B. Chilled water and hot water wraparound labels.
C. Materials to insulate four (4) 3-way valves and flanges including white mastic vapor barrier sealer. Two (2) will be for the chilled water and two (2) will be for the heating hot water lines.
D. Polyvinyl chloride (PVC) elbow covers.
VII. MATERIALS SPECIFICATIONS & TECHNICAL REQUIREMENTS
A. Chilled Water Pipe Insulation: Rigid, Pre‑formed fiberglass pipe insulation sections designed for chilled water service (e.g., Johns Manville Micro-Lok HP) sized for the specific pipe diameter. Minimum thermal conductivity and density compliant with California Energy Code, Title 24. Factory‑applied All‑Service Jacket (ASJ) with an integrated vapor retarder, white finish. Thickness sized according to the pipe size, and operating temperature to keep the outer surface above the dew point required to prevent condensation. The insulation thickness, vapor barrier and jacketing shall comply with contract drawings and technical specifications, and minimum requirements of California Energy Code (Title 24).
• Approved vapor‑retarder mastic shall be required for chilled water system.
• Pressure‑sensitive vapor barrier tape shall be compatible with insulation jacket.
• Molded fiberglass fittings or field‑fabricated segments approved for installation.
• PVC fittings must be provided with white mastic vapor barrier sealer B. Hydronic Heating hot water Pipe Insulation: All materials must be new, approved by the State’s Contract Monitor, and meet fire safety standards. Insulation Type shall be molded fiberglass or mineral fiber with an ASJ. Insulation must meet a minimum R-3 value or as specified by the 2021 International Energy Conservation Code/American Society of Heating, Refrigerating and Air-Conditioning Engineers (IECC/ASHRAE) 90.1 for fluids above 105°F.The ASJ indoor jacketing shall be factory-applied ASJ with self-sealing laps, white finish. Materials must have a Flame-
Spread Index of twenty-five (25) or less and a Smoke-Developed Index of fifty (50) or less for indoor installation.
C. Fire Rating: Must meet a flame spread/smoke developed rating of 25/50 and approved for use in return air plenums.
D. Where a discrepancy exists: the greater thickness shall apply.
Nominal Pipe Size Chilled Water
Min. Thickness (40°F
- 60°F Fluid)
Standard for Condensation Control for Chilled Water
< 1-1/2" 1.0 inch 1.0 inch 1-1/2" to 4" 1.0 inch 1.5 inches 5" to 6" 1.0 inch 1.5 to 2.0 inches 8" + 1.0 inch 2.0 inches
Conductivity Calculation: If the specific insulation's conductivity ($K$) falls outside the ranges below, the Title 24 thickness equation shall be used to determine the adjusted minimum thickness ($T$).
The following schedule applies to systems operating in the standard 141°F to 200°F temperature range (typical for heating supply and return): Minimum Hot Water Pipe Insulation Thickness (Inches)
Nominal Pipe Size
(NPS)
Insulation Thickness (Heating Hot Water 141°F–200°F)
< 1" 1.5" 1" to < 1.5" 1.5" 1.5" to < 4" 2.0" 4" to < 8" 2.0" 8" and Larger 2.0"
Key Technical Considerations
Material Conductivity: This schedule assumes standard fiberglass insulation with a conductivity (k) of 0.25 to 0.29 Btu•in/(h•ft²•°F). If using an alternate material, the thickness must be recalculated using the code-prescribed formula.
Exceptions: A reduction in thickness (but not below 1") may be permitted for piping 1.5" or smaller located in partitions within conditioned spaces.
VIII. INSTALLATION REQUIREMENTS AND STANDARDS
A. Installation requirements and standards for Chilled Water insulation Install insulation on all bare exposed chilled water supply and return piping as indicated on drawings or referenced herein, including but not limited to:
• Straight pipe runs
• Elbows, tees, reducers
Fluid Operating Temp Range (°F)
Conductivity ($Btu \cdot in / h \cdot ft^2 \cdot °F$)
40°F – 60°F 0.21 – 0.27 https://urldefense.com/v3/__https:/energycodeace.com/content/section-1203-requirements-for-pipe-insulation-nonresidentia__;!!KlnUNGHvdQ!-c2EeWuQj633vnrC7ggMlKM3gWng4aqVuJ_64ZITppysIpm7NjWuFhJR3XYgA8803Lfo45IZ6Cmd7xizXjHzg5UjqIc$
• Valves, flanges, and unions
• Pipe supports, using insulation saddles or shields where required
Sealing Joints: All longitudinal seams must be sealed using the factory-applied pressure-sensitive adhesive strip. Circumferential (butt) joints must be sealed with matching vapor retarder tape.
Vapor Dams: Apply vapor-barrier mastic at all "dead ends" (valves, flanges, and supports) and at regular intervals (e.g., every twenty (20) feet) to prevent moisture from traveling along the pipe length if a leak occurs.
Fittings & Valves: Insulate valves, elbows, and tees using pre-molded PVC covers or mitered fiberglass sections. These must be fully sealed with mastic and tape to maintain vapor barrier continuity.
Supports & Hangers: Hangers should be installed on the outside of the insulation using a high-density insert (like calcium silicate or cellular glass) and a metal shield to prevent the insulation from crushing and breaking the vapor seal.
Insulation: Shall be installed tight to pipe surface without voids or compression, maintain continuous coverage throughout the system, Be properly aligned with straight, neat seams Vapor Barrier Retarder: Insulation on chilled water and refrigerant suction piping located outside conditioned spaces must include a Class I or Class II vapor retarder. Longitudinal and circumferential joints shall be sealed vapor‑tight. All penetrations, fittings, and terminations shall be sealed with approved mastic.
Jacket & Vapor Barrier: Any damaged jacketing or vapor barrier shall be repaired immediately to maintain vapor integrity.
B. Installation requirements and standards for Hydronic Hot Water insulation
Verify that all piping is clean and dry before applying insulation. Install insulation continuously through wall and floor penetrations. Butt joints must be tightly sealed with 3-inch wide matching vapor barrier tape. Insulate fittings (elbows, tees, valves) with pre-molded or field-fabricated covers of equal thermal performance to the straight pipe insulation. Provide removable, re-sealable insulation jackets for components requiring frequent maintenance, such as strainers or pump heads.
Protection: Use oversized hangers with insulation shields and rigid inserts (e.g., calcium silicate or high-density foam) at support points to prevent compression of the insulation.
C. The Contractor shall notify the CDE Contract Monitor if there isn’t adequate clearance for insulation thickness and maintenance access.
D. Insulation shall not be installed until piping has successfully passed required inspections.
E. Installed insulation shall be protected from moisture, physical damage, and contamination.
F. Damaged or improperly installed insulation shall be replaced at no additional cost.
IX. CONTRACTOR REQUIREMENTS:
A. The Contractor must possess a valid and current C-2 Insulation and Acoustical license issued by the Department of Consumer Affairs, Contractor’s State License Board.
B. The Contractor must be fully knowledgeable, and capable, of completing the insulation and repairs of the specified insulation on the chilled water and hot water distribution piping systems.
C. The Contractor must be knowledgeable of, and responsible for, adherence to, and compliance with all safety rules, regulations, and work practices covering operations associated with the scope of the project.
D. Work shall be performed by experienced insulation mechanics familiar with public works requirements.
X. REGULATORY REQUIREMENTS
A. The Contractor must cooperate with the DCSC authorities and shall observe and comply with all regulations presently in force on school grounds and laws of the State of California.
B. All work under this contract must comply with the current edition of the California Code of Regulations and with the most current adopted editions of the following, including all amendments in effect at the time of construction:
•California Building Code (CBC) •California Mechanical Code (CMC) •California Energy Code (Title 24, Part 6) •California Fire Code (CCR Title 19) •California Labor Code §§ 1720–1861 (Public Works) •DIR Public Works Contractor Registration requirements •American Society for Testing and Materials (ASTM) C547 – Mineral Fiber Pipe Insulation •ASTM C921 – Fibrous Glass Pipe Insulation •ASHRAE 90.1 Energy Standard •Manufacturer’s published installation instructions o In the event of conflict, the more stringent requirement shall govern.
C. Prevailing Wage and Labor Compliance
• This project is subject to California Prevailing Wage laws.
• Contractor and all subcontractors shall be DIR‑registered prior to bid submission and throughout the duration of the project.
• Certified payroll records shall be submitted in accordance with DIR requirements.
• Contractor shall comply with apprentice employment and ratio requirements.
XI. HOURS/TIME OF WORK:
A. All work at the DCSC, except for tasks requiring utility interruptions, must be done between the daylight hours of 7:00 a.m. and 4:00 p.m., Monday through Friday. Any change to these time periods must be approved by the CDE Contract Monitor in advance.
B. The Contractor may request to schedule work for Saturday and Sunday, and after normal business hours, at no additional cost to the State, with prior written approval from the CDE Contract Monitor, and only under special circumstances and a minimum of seventy-two (72) hour prior notice.
XII. COORDINATION
A. Entrance for use of occupants and access thereto must be kept clean and clear of materials, equipment, refuse, etc., at all times.
B. The Contractor must remove from the construction areas all trash and debris as it accumulates and dispose of it at no additional cost to the CDE.
C. At the completion and acceptance of the work, the Contractor must remove from the site all debris and surplus materials resulting from his work and dispose of off grounds at no additional cost to the CDE.
D. The Contractor must retain a competent superintendent at the job site, to represent the Contractor and to direct the performance of the work under this contract any time work is being done.
E. It is the Contractor’s responsibility to be self informed regarding any and all peculiarities and limitations of the area and availability for this work.
F. The Contractor and all employees working on site are required to sign in daily at the reception’s desk in the front lobby of the building. The Contractor’s employees will be required to present a valid state issued driver’s license or a valid state issued identification card. If valid identification cannot be provided, access to the DCSC will not be granted.
G. The Contractor and all of its employees will be issued a visitor’s badge to be worn at all times while on the DCSC site.
H. The Contractor and all of its employees will be escorted at all times by the CDE Contract Monitor, or CDE designee, while on site.
I. The Contractor will be aware of, and follow, all health and safety laws and policies set forth by the federal, state, and local governments, as well as policies prescribed by the
DCSC.
XIII. CONTRACT CLOSEOUT
Upon completion of work the Contractor will request a final inspection with the CDE Contract Monitor.
XIV. SPECIAL PROJECT PROCEDURES
A. The Contractor is responsible for thoroughly investigating the site and satisfying itself of the accuracy of the data on information provided prior to starting work. Any damage caused to the school’s utilities, buildings, landscape and or exterior will be the responsibility of contractor to repair, at no additional cost to the CDE.
B. The Contractor will report to the CDE Contract Monitor and /or CDE authorized designee each morning with the number of staff on campus grounds daily.
C. The Contractor is required to take all precautions and employee heightened safety controls during the process of work. The Contractor will include a submittal indicating area of work, the time involved with Mechanical Room Pipe Insulation Services and clearly identify specific area that may need to be blocked off. The CDE Contract
Monitor will review the submittal; after the schedule has been approved arrangements will be made with the Contractor to begin work. The schedule may be altered after review by the CDE Contract Monitor if the contract schedules conflicts with the operation of the facility.
D. Heavy equipment must be kept off the grass areas, sidewalks and planted areas.
When it becomes necessary to use heavy equipment in these areas, the Contractor is to contact the CDE Contract Monitor 24 hours in advance to allow the landscape department to secure the sprinkler, systems flag sprinkler heads, and valve boxes.
XV. PROJECT MEETINGS
The Contractor or his representative must be available for weekly construction meetings during the period work, if needed.
XVI. SUBMITTALS
A. The Contractor shall provide the following submittals to the CDE Contract Monitor for review and approval before ordering materials. The CDE Contract Monitor shall have five (5) calendar days to review and respond to the submittals.
1. Insulation materials
2. Jacketing materials
3. Vapor retarder
4. Pressure‑sensitive vapor barrier tape
5. Pipe Support
6. Project Schedule
B. The CDE Contract Monitor shall provide Contractor with lay down plan showing proposed location of employee parking, materials storage, shop facilities, and other major work areas for acceptance prior to site mobilization.
C. The Contractor must submit to the CDE Contract Monitor the following data:
1. Contracting license number and issue date.
2. Furnish Material Safety Data Sheets on the following: patching materials, primers, sealers, under coaters and finish coats prior to start of work.
3. Cut sheets on materials needed to complete work.
4. The Contractor must provide a project schedule before work begins and provides an updated schedule at each weekly construction meeting.
XVII. FIELD QUALITY CONTROL
A. The Contractor will notify the CDE Contract Monitor to request an inspection for work complete in each area identified on the project schedule. The CDE Contract Monitor or his representative shall inspect each area upon receipt of request.
B. The CDE Contract Monitor will provide observation reports periodically during phases of work identifying contract deficiencies. Contractor shall correct deficiencies identified during inspection promptly.
C. All materials shall be new, first‑quality, and delivered in original, unopened packaging bearing manufacturer’s identification.
D. Mockups: The Contractor shall provide a 10-foot mockup section including one elbow, one tee, and one valve to demonstrate workmanship standards.
XVIII. SAFETY
A. Contractor shall comply with California Division of Occupational Safey and Health
(Cal/OSHA) regulations and site‑specific safety requirements.
B. Provide all required personal protective equipment .
C. Maintain safe access and egress for building occupants and workers.
XIX. EXCLUSIONS
The following tasks are outside the scope of this contract. Contact the DCS Contract Monitor for direction if any one of the following items are encountered.
A. Asbestos or hazardous material abatement B. Removal of existing insulation C. Firestopping or fireproofing D. Insulation of mechanical equipment (e.g., pumps, chillers)
XX. WARRANTY:
Contractor shall provide a minimum one (1) year warranty on workmanship and vapor barrier integrity commencing from date of final acceptance.
EXHIBIT B – BUDGET DETAIL AND PAYMENT PROVISIONS
I. INVOICING AND PAYMENT
Payment made by the School, as a lump sum final payment, upon the Supervisor of Building Trades acceptance and approval of the job. The State agrees to compensate the Contractor for actual expenditures incurred in accordance with the costs specified in
EXHIBIT B – CONTRACTOR’S BID FORM.
Invoices shall include the Agreement Number DS260195 and shall be submitted in arrears at the end of the contract period in duplicate to:
Diagnostic Center Southern California
4339 State University Drive Los Angeles, CA 90032 Attention: Jaime Arceo
Email: jarceo@dcs-cde.ca.gov
II. BUDGET CONTINGENCY CLAUSE (Rev. 04/2025)
A. It is mutually understood between the parties that this Agreement may have been written before ascertaining the availability of federal and/or state funds, for the mutual benefit of both parties in order to avoid program and fiscal delays that would occur if the Agreement were executed after that determination was made.
B. This Agreement is valid and enforceable only if sufficient funds are made available to the State by the United States and/or California Government for the purpose of this program. In addition, this Agreement is subject to any additional restrictions, limitations, or conditions, imposed by the federal or California government that may affect the provisions, terms or funding of this Agreement in any manner.
C. It is mutually agreed that if the Congress or the State Legislature does not appropriate sufficient funds for the program or the federal or state executive branch does not disburse sufficient funds, this Agreement shall be amended to reflect any reduction in funds actually received by CDE.
D. Pursuant to GC, Section 927.13, no late payment penalty shall accrue during any time period for which there is no Budget Act in effect, nor on any payment or refund that is the result of a federally mandated program or that is directly dependent upon the receipt of funds by a state agency.
E. CDE has the option to terminate the Agreement under the 30-day termination clause or to amend the Agreement to reflect any reduction in funds that the CDE actually receives.
III. PAYMENT
Payment will be made in accordance with, and within the time specified in, Government Code Chapter 4.5, commencing with Section 927.
IV. PROGRESS PAYMENTS
Progress payments will not apply to this contract. All contracts of $10,000 or less and/or less than three months in duration shall be one payment (lump sum) for the entire contract at the end of the contract period.
V. PROGRESS SCHEDULE AND BID COST BREAKDOWN
A. Prior to commencing the work, the Contractor shall submit to the CDE Contract
Monitor a practicable progress schedule of operations preferably in chart form.
The schedule of operations shall show the order in which the Contractor proposes to carry out the work, the day on which he/she will start each subdivision of the work, and contemplated day of completion of such subdivision.
When required by the CDE Contract Monitor the Contractor shall submit an adjusted progress schedule to reflect changed conditions. Progress schedule and adjusted progress schedule shall be consistent in all respects with time requirements of the contract and shall be subject to review and modification by
B. Prior to starting work, the Contractor shall furnish to the CDE Contract Monitor in writing a breakdown by subcontractor and/or sub-subcontractor of bid costs.
VI. TRAVEL AND SUBSISTENCE PAYMENTS
The Contractor shall make travel and subsistence payments to each worker needed to execute the work, as such travel and subsistence payments are defined in the applicable collective bargaining agreements filed in accordance with Labor Code, Section 1773.1(8).
VII. ELECTRONIC CERTIFIED PAYROLL RECORDS
All Contractors must furnish electronic certified payroll records to the Labor
Commissioner in their eCPR data system.
VIII. DVBE PARTICIPATION WITHHOLD (1/1/2022)
In accordance with the requirements set forth in the Military and Veterans Code (MVC), Section 999.7, the State shall withhold from the final payment amount to the Contractor, $10,000.00, or the full final…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .