DS 270000000004 SCHEDULE B - PRICING MATRIX Columbus Oil Project.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Columbus Oil Turn-key Well Plug. Project Cass Cty
Solicitation number
DS 761 270000000004 1
Issued by
Calhoun County, Michigan

About this file

This is a pricing matrix for the Columbus Oil Orphan Well Plugging Project in Cass County, Michigan, administered by the Michigan Department of Environment, Great Lakes, and Energy (EGLE). The project involves plugging 22 wells and requires bidders to submit detailed unit pricing for all line items listed in the matrix, regardless of anticipated use. The pricing matrix encompasses a comprehensive range of services and materials including contractor supervision, labor, equipment rental (rigs, pumps, tanks, heavy machinery), wellhead equipment (casing, tubing, drill bits, bridge plugs), drilling fluids and additives, cementing services, wireline services, waste disposal, and transportation services. Bidders must provide quantity estimates and unit pricing for each item, submit a project timeline assuming 10-hour workdays, and obtain EGLE Project Manager approval before mobilizing, using, or charging for any items not pre-approved or for specialized equipment and supplies.

Pricing for all line items is submitted at zero dollars pending bidder proposal; bidders must provide actual unit prices for each listed service and material. An overhead percentage may be applied only to materials or services not already included in Schedule B line items and specifically not to hourly or daily rates already listed. Additional line items may be added to the pricing matrix if necessary materials are required for proper well plugging. Key restrictions include limiting invoicing to one Contractor Site Supervisor per day unless authorized otherwise, prohibiting double-billing when rig crews perform general labor duties, and requiring prior approval for any rental, purchase, or deployment of specialized equipment. All pricing submissions must account for potential scope changes, change orders, or conversion to time-and-materials billing, with the matrix serving as the baseline rate structure for project invoicing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE B - PRICING MATRIX
Columbus Oil Orphan Well Plugging Project (Cass County) - 22 Wells
Project Resource ItemItem DescriptionUnitPriceTotal for ProjectVendor Item?
Quantityper(Y/N)
Unit
1Contractor Site Supervisorday$0.00
2Contractor Site Supervisor mileagemile$0.00
3Per diem (meals & lodging)day$0.00
4Laborer (this rate is to be utilized but is not limited to Roustabout, Heavy Equipment Operator, Tool Hand, General Laborer type work. See note at bottom of Schedule B for more information.)hour$0.00
5Pick-up Truck mileage (all descriptions)mile$0.00
6Pole Rig-3 man crewhour$0.00
7Single Derrick Rig-3 man crewhour$0.00
8Double Derrick Rig-3 man crewhour$0.00
9Pit Liner Material (20 mil PVC)roll$0.00
10Rig Anchors and/or Basebeam (install/remove, includes all labor and materials)site$0.00
11Mobile Arc Welder (inc. ½” steel plate for capping)hour$0.00
12BOP Rental (hydraulic) - Includes all parts such as but not limited to accumulator, annular (hydril), pipe rams, blind rams, etc
12 A4 1/2”day$0.00
12 B5 1/2"day$0.00
12 C7”day$0.00
12 D7 5/8”day$0.00
12 E8 5/8”day$0.00
12 F9 5/8”day$0.00
12 G10 3/4"day$0.00
12H11 3/4”day$0.00
13Tubing/Workstring (rental) - rental fees to include any necessary post use pipe inspections
13 A1.9" tubingfoot$0.00
13 B2 3/8" tubingfoot$0.00
13 C2 7/8" tubingfoot$0.00
13 DDrill Collarsfoot$0.00
14Drill Bits (rental)
14 A3.5" - 7"bit$0.00
14 B7 1/8" - 11"bit$0.00
14 C11 1/8" - 16"bit$0.00
15Well Casing
15 A5 1/2" 15.5#/ftfoot$0.00
15 B8 5/8" 24#/ftfoot$0.00
15 C10 3/4" 32#/ftfoot$0.00
15 D11 3/4" 42#/ftfoot$0.00
15 E16" 75#/ftfoot$0.00
16Power Swivel Unithour$0.00
17Power Swivel Unit Operator (also can run mud pump)hour$0.00
18Rental 100 bbl. Half Tankday$0.00
19Rental - Mud Mixing System - includes mixing system and pit(s)day$0.00
20Mud Engineerhour$0.00
21Mixed Mud Drilling Fluidbbl$0.00
22Baritesx$0.00
23Shale Shakerday$0.00
24Rental Frac Tank (water and brine storage)day$0.00
25Casing Cutters (wireline)
25 A(jet cutter) 4 1/2”job$0.00
25 B(jet cutter) 5 1/2"job$0.00
25 C(jet cutter) 7"job$0.00
25 D(jet cutter) 8 5/8"job$0.00
25 ECollar busterjob$0.00
26Casing Cutters (mechanical/hydraulic)
26 A4 ½”job$0.00
26 B5 ½”job$0.00
26 C7"job$0.00
26 D8 5/8"job$0.00
27Casing Spear
27 A3.5" - 8.625"job$0.00
27 B9" - 14"job$0.00
28Mechanical/Electrical Plugs/Fishing Tools
28 A4.5” Cast Iron Bridge Plugea.$0.00
28 B4.5” Cement Retainerea.$0.00
28 C5.5" Cast Iron Bridge Plugea.$0.00
28 D5.5” Cement Retainerea.$0.00
28 E7” Cast Iron Bridge Plugea.$0.00
28 F7” Cement Retainerea.$0.00
28 G8 5/8” Cast Iron Bridge Plugea.$0.00
28 H8 5/8” Cement Retainerea.$0.00
28 I9 5/8” Cast Iron Bridge Plugea.$0.00
28 J9 5/8” Cement Retainerea.$0.00
28 K10” Cast Iron Bridge Plugea.$0.00
28 L10” Cement Retainerea.$0.00
29Wireline Services (inc. operator, and hands/riggers)
29 AElectric logging (Gamma Log, CCL, Freepoint)job$0.00
29 ACement Bond Logjob$0.00
29 CPerforatingjob$0.00
29 DSetting Mechanical Plugsjob$0.00
30Fresh Water Chargebbl.$0.00
31Duplex/Triplex Mud Pumpday$0.00
32Cementing Services
32 ACementerhour$0.00
32 BPump Truck Operatorhour$0.00
32 CBulk Truck Operatorhour$0.00
32 DCement Pump Truck OThour$0.00
32 ECement Pump Truck Mileagemile$0.00
33Cement
33 AStandard Cement (Type 1L)sx$0.00
33 BClass H Cementsx$0.00
33 C50/50 Poz. Cementsx$0.00
33 DGas Block Additivesx$0.00
34Cement Handling Chargesx$0.00
35Cement Transportation Chargeton/mile$0.00
36Calcium Chloridesx$0.00
37Cellophane Flake (LCM)sx$0.00
38Bentonitesx$0.00
39Flarejob$0.00
40H2S Scavenger Fluidbbl$0.00
41H2S Safety Companyday$0.00
42Enclosed (sealed) frac tank for H2Sday$0.00
43Waste Disposal Services
43 APump, Transport, and Disposal of All Generated or Collected Liquids. Per bbl price should include all labor and equipmentbbl$0.00
43 BExcavate, Transport, and Disposal of Contaminated Soil to Landfill. Per ton price should include all labor, equipmentton$0.00
44Pole Truck (tandem axle) - for moving stock tanks, etc.hour$0.00
45Crane - for lifting large heavy tanks and equipmenthour$0.00
46Dozerhour$0.00
46 ADozer - Standby Ratehour$0.00
47Backhoehour$0.00
47 ABackhoe - Standby Ratehour$0.00
48Excavatorhour$0.00
48 AExcavator - Standby Ratehour$0.00
49Skid Steerhour$0.00
49 ASkid Steer - Standby Ratehour$0.00
50Tele Handlerhour$0.00
50 ATele Handler - Standby Ratehour$0.00
5110,000 Square Feet of Composite Matsday$0.00
52Tractor & Low Boy/Float Transportationhour$0.00
53Dump truck w/Operator (10cy dump)hour$0.00
54Dump truck w/Operator (20 cy lead dump)hour$0.00
55Dump truck w/Operator (30 cy dump or train)hour$0.00
5670 bbl. Water Truck w/ Vac. Pumphour$0.00
57120-150 bbl Water Tanker w/ Vac. Pumphour$0.00
58Water Truck Operatorhour$0.00
59Vacuum Truck/Cuscohour$0.00
60Vacuum Truck Operatorhour$0.00
61Hot Oilerhour$0.00
62Overhead % for subcontracted services, rentals, & materials%

Grand Total ($) $0.00

NOTES:
1. You must submit a project timeline as outlined in RFQ document. Please assume 10-hour days.
2. Provide Quantity and Price/Unit for all items listed in the Bid Table, even if the item is not likely to be used for the project. We call this 'Rated Items' and have requested the unit pricing in the event
the Scope of Work changes, a change order is necessary, or we move to a time and materials billing.
3. Bidder cannot mobilize, use, or charge for items in the pricing matrix without prior approval from EGLE Project Manager.
4. Only 1 Contractor Site Supervisor can be invoiced per day of onsite work, unless authorized and/or approved by EGLE project manager.
5. Rental and/or purchase of any specialized equipment, supplies, services, or materials must have prior approval from EGLE Project Manager.
6. Overhead % cannot be added to the hourly or daily rates of items already included on Schedule B when invoicing.
7. If a material, such as 'casing' is needed to properly plug the well and is not listed on this pricing matrix, it will be invoiced at cost plus the 'Overhead %'
8. Laborer includes but is not limited to: Roustabout, Heavy Equipment Operator, Tool Hand, and other similar positions. The Laborer rate will also be used by the rig crew when they are completing work activities not assoicated
with the rig, including but not limited to: laying mats, moving equipment, loading/offloading equipment and supplies or other similar general labor duties. Rig crew cannot be invoiced at the Laborer and 'Rig Crew'
line items at the same time, as that would be double-billing.
9. You may add additional lines to this pricing matrix at the BOTTOM if needed.