DS 260000000034 New Haven Sec 5-10 and Plank 1-1.docx
DOCX document 10 MB Posted
- Solicitation number
- DS 761 260000000034 1
- Issued by
- Michigan
About this file
This is a Direct Solicitation document issued by the Michigan Department of Environment, Great Lakes, and Energy for the plugging, drilling, re-drilling, and site restoration of 12 orphan wells located in Gratiot and Montcalm Counties. The project encompasses eleven wells in Gratiot County (Shuttleworth 1, MCGC 18, J.E. Stoffs Et Al 1, MCGC D-2, Eliza Standish 1, F.M. Brown 1, MCGC 11, MCGC 12, MCGC 14, MCGC NH 328A, and MCGC NH 357A) and one well in Montcalm County (Plank 1-1), all gas storage wellheads with orbit valves operated by New Haven Energy LLC. Eligible bidders are limited to vendors who have been awarded contracts through prequalification RFPs numbered 210000000834, 220000000547, 220000001850, 220000002631, and 240000000951. A mandatory pre-bid meeting is scheduled for Thursday, July 9, 2026, at 10:00 a.m. Eastern at the New Haven Compressor Station site, with attendance required for proposal submission eligibility. The proposal deadline is Tuesday, July 21, 2026, at 3:00 p.m. Eastern, with answers to bidder questions posted by Thursday, July 16, 2026. A pre-construction meeting will be held at a date to be determined, with project commencement anticipated following that meeting.
Proposals will be evaluated on technical criteria weighted at 100 points across four categories: Key Personnel (25 points), Business Owned Equipment List (25 points), Company's Technical Experience and Ability (25 points), and Vendor Questions Worksheet (25 points), with a minimum threshold of 80 points required for award consideration. The award will be based on best value to the state rather than lowest price. Bidders must submit detailed pricing through an attached pricing matrix, project timelines broken into minimum categories of Site Prep, Mobilization/Demobilization, Plugging, and Site Restoration, and all rated unit prices for potential change orders. All awarded contractors and subcontractors must comply with Davis-Bacon prevailing wage requirements, as federal funds will be used for this project. Proposals must be submitted electronically through the SIGMA VSS system in modifiable native formats with file sizes limited to 6 MB per document, with full submission required prior to the deadline.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF MICHIGAN
Department of Environment, Great Lakes, and Energy New Haven Energy LLC Section 5-10 and Plank 1-1 Orphan Well Plugging Project (Gratiot and Montcalm County) – 12 Wells
Direct Solicitation No. 260000000034 Solicitation Manager Name: Lisa VanOstran Direct Phone: 517-599-7680 Email: vanostranl@michigan.gov
This is a Direct Solicitation (DS) for:
Plugging, drilling, re-drilling, and site restoration at following wells eleven located in Gratiot County: Shuttleworth 1, MCGC 18, Stoffs 1, MCGC D-2, Standish 1, F.M. Brown 1, MCGC 11, MCGC 12, MCGC 14, MCGC NH 328A, and MCGC NH 357A. One additional well, the Plank 1-1 is located in Montcalm County and is also part of this DS.
Only vendors who have been awarded a Contract through the prequalification process under RFP# 210000000834, 220000000547, 220000001850, 220000002631 and 240000000951 are eligible to submit a proposal for these services. All terms, conditions, specifications agreed upon during the RFP process remain in effect for this project.
DS Timeline
| Event |
| Time |
| Date |
| DS issue date |
| N/A |
| Monday, June 29, 2026 |
| Pre-Bid Meeting |
| 10:00 a.m. Eastern |
| Thursday, July 9, 2026 |
| Deadline for bidders to submit questions about this DS |
| 3:00 p.m. Eastern |
| Tuesday, July 14, 2026 |
| Anticipated date the State will post answers to bidder questions on www.michigan.gov/SIGMAVSS |
| Thursday, July 16, 2026 |
| Proposal deadline* |
| 3:00 p.m. Eastern |
| Tuesday, July 21, 2026 |
| Pre-construction meeting |
TBD
Anticipated project begin date
TBD
*A bidder’s proposal received at 3:00:01 p.m. Eastern is late and subject to disqualification.
This DS is subject to change. Check www.michigan.gov/SIGMAVSS for current information.
MANDATORY PRE-PROPOSAL MEETING
A pre-proposal meeting will be held on Thursday, July 9, 2026 at 10:00 a.m. Eastern. Only those Contractors who attend the meeting will be able to submit a proposal. The meeting will be held at the project site:
Site Location: The meeting will commence at the entrance driveway at the New Haven Compressor Station, which is located on north side of W. Fillmore Road, approximately 0.25 miles west of the intersection with Warner Road and West Fillmore Road, in New Haven Township, Section 4, Gratiot County. It will be the Contractor’s responsibility to visit well locations to gather important information for project bid. See well location map below in this DS document.
The purpose of the pre-proposal meeting will be to inspect the site and discuss the work to be performed. Statements made by the Solicitation Manager or designee at a pre-proposal meeting are not considered modifications to the DS. If, however, the Solicitation Manager determines modifications to the DS are warranted after the meeting, modifications will be posted in writing on www.michigan.gov/SIGMAVSS as explained in the Modifications section of this document.
The meeting will start promptly at 10:00 a.m. EST
MODIFICATIONS
The State may modify this DS at any time. Modifications will be posted on www.michigan.gov/SIGMAVSS. This is the only method by which the DS may be modified.
QUESTIONS
Bidder questions about this DS must be emailed to the Solicitation Manager or posted on www.michigan.gov/SIGMAVSS no later than the time and date specified on the Cover Page. In the interest of transparency, only written questions are accepted. Answers to questions will be posted on www.michigan.gov/SIGMAVSS. Submit questions using the format below; a Microsoft Excel format or similar is suggested.
| Q # |
| Document and Section |
| Page # |
| Bidder Question |
DELIVERY OF PROPOSAL
Electronic – The bidder must submit its proposal, all attachments, and any modifications or withdrawals electronically through www.michigan.gov/SIGMAVSS. The bidder should submit all documents in a modifiable (native) format (examples include but are not limited to Microsoft Word or Excel and Google Docs or Sheets). In addition to submitting documents in a modifiable format, the bidder may also submit copies of documents in PDF. Attachment file size is limited to 6 MB per document. Bidder’s failure to submit a proposal as required may result in disqualification. The proposal and attachments must be fully uploaded and submitted prior to the proposal deadline. Do not wait until the last minute to submit a proposal, as the SIGMA VSS system requires the entry of certain information, in addition to uploading and submitting the materials. The SIGMA VSS system will not allow a proposal to be submitted after the proposal deadline identified in the solicitation Closing On/Closing Date fields (Summary view/Detail view), even if a portion of the proposal has been uploaded.
Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 284-0540 or (888) 734-9749. The Solicitation Manager will not provide assistance related to the submittal of the proposal and all attachments on the day of the proposal deadline. Responsibility for a complete submission lies with the bidder.
EVALUATION PROCESS
If all mandatory minimum requirements are met, the State will evaluate each proposal based on the following factors:
| Technical Evaluation Criteria |
| Weight |
| 1. |
| Key Personnel – (adequate personnel available to perform the work requested) |
| 25 |
| 2. |
| Business Owned Equipment List – (equipment adequate to perform the work requested) |
| 25 |
| 3. |
| Company’s Technical Experience and Ability – (experience/ability relative to the work requested) |
| 25 |
| 4. |
| Vendor Questions Worksheet (experience relative to the work requested) |
| 25 |
| Total |
| 100 |
Only those proposals receiving 80 or more technical evaluation points will be considered for award.
The State may utilize all bidder information, without regard to a proposal’s technical score, to determine fair market value for goods or services sought. The State is not obligated to accept the lowest price proposal. If applicable, the State’s evaluation will include consideration of a bidder’s qualified disabled veterans/service-disabled veteran owned business (QDV/SDVOB) status under MCL 18.1261(8). Additional information on the SDVOB preference is available at: Michigan.gov/SDVOB.
SCHEDULE A - STATEMENT OF WORK
Properly Plug and Abandon 12 Wells and Restore Locations in Gratiot and Montcalm Counties
| Well Name |
| Permit Number |
| Operator of Record |
| Comments |
| Shuttleworth 1 |
| 26779 |
| New Haven Energy LLC |
| Gas storage wellhead with orbit valve |
| MCGC 18 |
| 23452 |
| New Haven Energy LLC |
| Gas storage wellhead with orbit valve |
| J. E. Stoffs Et Al 1 |
| 3641 |
| New Haven Energy LLC |
| Gas storage wellhead with orbit valve |
| MCGC D-2 |
| 22186 |
| New Haven Energy LLC |
| Gas storage wellhead with orbit valve |
| Eliza Standish 1 |
| 3899 |
| New Haven Energy LLC |
| Gas storage wellhead with orbit valve |
| F.M. Brown 1 |
| 3630 |
| New Haven Energy LLC |
| Gas storage wellhead with orbit valve |
| MCGC 11 |
| 22132 |
| New Haven Energy LLC |
| Gas storage wellhead with orbit valve |
| MCGC 12 |
| 22133 |
| New Haven Energy LLC |
| Gas storage wellhead with orbit valve |
| MCGC 14 |
| 22135 |
| New Haven Energy LLC |
| Gas storage wellhead with orbit valve |
| MCGC NH 328A |
| 30886 |
| New Haven Energy LLC |
| Gas storage wellhead with orbit valve |
| MCGC NH 357A |
| 32242 |
| New Haven Energy LLC |
| Gas storage wellhead with orbit valve |
| Plank 1-1 |
| 60175 |
| New Haven Energy LLC |
| Gas storage wellhead with orbit valve |
Prior to mobilization, a pre-construction meeting will be conducted with the successful vendor to review and confirm items.
SCHEDULE B – PRICING MATRIX
New Haven Energy LLC Section 5 – 10 and Plank 1-1 Orphan Well Plugging Project (Gratiot and Montcalm County) – 12 Wells
SEE ATTACHED PRICING MATRIX FOR BID TABLE
BID AMOUNT (should be the same as Grand Total from Pricing Matrix)
Bidders should provide pricing for ALL items in the ‘Price per Unit’ column of the pricing matrix (even if not necessarily needed for this project). These ‘per unit’ prices are referred to as ‘rated items’ by EGLE staff in the event a change order or approved change to the scope of work is required to complete the project.
Should an award result from this DS, all rates quoted in response to this DS will be firm for the duration of the project. No price changes will be permitted.
Bidders must submit a project timeline in conjunction with their Schedule B - Pricing Matrix. The timeline must be broken down into a minimum of four categories as follows: Site Prep, Mobilization/Demobilization, Plugging, Site Restoration.
An example of a single well project timeline might look like this: 1 day to clear/grub the site, 1 day to mobilize to site, 1 day to rig up, 3 days to plug well and flush/abandon/remove flowline, 1 day to rig down, 2 days to restore site for a total of 9 days to plug the well and finish project.
An example of a multi-well and facility project might look like this: 3 days to clear/grub locations, 1 day to mobilize equipment to project area, 50 days to plug wells (includes time needed to mob between wells, and address flowlines), 15 days to decommission facilities, 5 days to restore sites, 1 day to demobilize equipment from project area for a total of 75 days to complete the project.
The state will review your estimated timeline and pricing to determine the winning bidder. The winning bidder will be the bidder that we determine provides the best value to the state.
The winning bidder and all of its subcontractors must adhere to Davis Bacon Prevailing Wages for this project. It is the responsibility of the winning bidder to ensure that its subcontractor’s pricing for this bid includes Davis Bacon Prevailing Wages.
Please make sure that when you obtain pricing for this bid. that you inform all subcontractors that they must adhere to Davis Bacon Prevailing Wages. The state will not approve a change order related to improper bidding due to the awarded contractor or its subcontractor failing to include Davis Bacon Prevailing Wage rates when calculating their bids.
Federal funds will be used on this project. The awarded Contractor must comply with the Davis-Bacon Act as agreed upon in the signed Contract (Master Agreement) within the Federal Provisions Addendum.
Davis-Bacon Act (Prevailing Wage) If this Contract is a prime construction contract in excess of $2,000, the Contractor (and its Subcontractors) must comply with the Davis-Bacon Act (40 USC 3141-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”), and during performance of this Contract the Contractor agrees as follows:
1) All transactions regarding this contract shall be done in compliance with the Davis-Bacon Act (40 U.S.C. 3141- 3144, and 3146-3148) and the requirements of 29 C.F.R. pt. 5 as may be applicable. The contractor shall comply with 40 U.S.C. 3141-3144, and 3146-3148 and the requirements of 29 C.F.R. pt. 5 as applicable.
2) Contractors are required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor.
3) Additionally, contractors are required to pay wages not less than once a week.
Print Name
Print Title
Signature
Date
NEW HAVEN ENERGY PRE-BID MEETING LOCATION MAP
NEW HAVEN ENERGY WELL PLUGGING LOCATION MAP
image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg image17.jpeg image18.jpeg image19.jpeg image20.jpeg image21.jpeg image22.jpeg image23.jpeg image24.jpeg image25.jpeg image26.jpeg
File details come from the government source that posted it. Updated .