ATTACHMENT (B)
DATA REQUIREMENTS DESCRIPTION
1. TITLE 2. NUMBER
Completed Work Card Package DRD-3
3. USE 4. DATE
November 19, 2020 Contractual documentation of completed work.
5. PREPARED BY:
Rosalia Toberman
6. APPROVED BY:
Charles E. Irving
7. INTERRELATIONSHIP 8. DUE DATE:
IAW Section 11.0 of the SOW Upon completion of FCF
9. PREPARATION INFORMATION
Inspection: The C-Check and O&A work cards will provide for verification buyoff of tasks by mechanics and inspectors. The Contractor shall provide aircraft inspectors to verify that work is performed in accordance with technical specifications and that the workmanship is airworthy. The inspectors shall ensure that all inspection documentation is completed in accordance with the work cards. The completed set of work cards shall be delivered to the Government upon completion of the FCF.
Submit reports via email to the following addresses:
(1) Contracting Officer (Rosalia Toberman – Code 210) rosalia.toberman-1@nasa.gov
(2) Contracting Officer’s Representative (Charles Irving Code 320), charles.e.irving@nasa.gov
A-22 (1/97)