Drawings- Upgrade Station Chilled Water.pdf

PDF 33 MB Posted

Attached to
Y1DA--NRM-CONST 630A4-22-413 Upgrade Station Chilled Water for P&ID
Solicitation number
36C24226B0010
Issued by

About this file

This is a comprehensive set of architectural and engineering drawings for a chilled water system upgrade project at the VA New York Harbor Healthcare System's Brooklyn Campus. The project involves renovating mechanical spaces on the 6th and 7th floors of Building 1, with work focused on installing a new 20-ton air-cooled chiller (CH-1), air handling unit (AHU-1), associated pumps, and related mechanical, electrical, and plumbing infrastructure. The project includes demolition of existing mechanical equipment, installation of new HVAC systems, chilled water piping, electrical connections, and modifications to ensure proper integration with the existing building systems.

Key technical components include a Trane air-cooled modular chiller with a 20-ton capacity, an air handling unit serving the IV Prep and Ante Rooms with continuous 24/7 operation, two in-line pumps (P1 and P2), an electric unit heater, exhaust fans, and a gas leak detection system. The project requires extensive coordination across mechanical, electrical, and architectural disciplines, with careful attention to infection control, life safety requirements, and minimal disruption to hospital operations. The work is being performed under VA solicitation number 36C24226B0010, with a focus on upgrading the central chilled water station to improve the facility's HVAC infrastructure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

6/1 4/2

9 1

2:3 9:0

3 P M

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

FULLY SPRINKLERED

Office of Construction and Facilities Management U.S. Department of Veterans Affairs

PhaseARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

VA U.S. Department of Veterans Affairs

LIST OF DRAWINGS

PROJECT CONTACT DIRECTORY

LOCATION MAP

CONTRACT OFFICER / SPECIALIST CONTRACTING OFFICER REPRESENTATIVE (COR) ARCHITECT / MEP/FP & STRUCTURAL ENGINEERS acela architects + engineers, pc 2633 Moravian Avenue Allentown, PA 18103

APPROVALS

PROJECT INFORMATION

NO

T

FO

R

CO

NS

TR

UC

TI

ON

C :\U se rs

\n kh ua t\D oc um en ts

\2 4-

U

SD

VA

-0

1_

VA

B R

O O

KL

YN

_U pd at e

C hi lle r W at er

-C

EN

TR

AL

_n kh ua t4

7S R

3.

rv t

GI101

COVER SHEET

03/07/2025

NY HARBOR HEALTHCARE SYSTEM - BROOKLYN CAMPUS

BLDG. #: 1

630A4-22-413UPGRADE STATION CHILLED WATER

P&ID

NY HARBOR HEALTHCARE SYSTEM - BROOKLYN CAMPUS

100% CONSTRUCTION DOCUMENTS

800 POLY PLACE, BROOKLYN NY 11209

John Situ Phone: (347) 237-7076 e-mail: John.Situ@va.gov 800 Poly Place, Brooklyn, NY 11209

Jean Paul Phone: (XXX) XXX-XXX xXXXXX e-mail: Jean.Paul@va.gov 800 Poly Place, Brooklyn, NY 11209

Elizabeth Chung (Facility Program Manager) Phone: (347) 205-1950 e-mail: Elizabeth.Chung@va.gov 800 Poly Place, Brooklyn, NY 11209

Yeung Yingie Phone: (XXX) XXX-XXX xXXXXX e-mail: Yeung.Yingie@va.gov 800 Poly Place, Brooklyn, NY 11209

VA Job # 22-02-BK

UPGRADE STATION CHILLED WATER

P&ID

PROJECT #: 630A4-22-413

24-USDVA-01

PAPM

DEPARTMENT OF VETERANS AFFAIRS

BLDG. #: 1

GENERAL INFORMATION

GI101 COVER SHEET

GI102 GENERAL INFORMATION

GI103 GENERAL INFORMATION

GI201 LIFE SAFETY PLAN

GENERAL CONTRACT

GC301 ICRA DETAILS AND NOTES

GC401 PARTITION TYPES

GC501 DOOR & WINDOW SCHEDULES & DETAILS

ARCHITECTURAL

AE101 OVERALL PLANS

AE102 6TH FLOOR - DEMOLITION/NEW WORK PLANS, RCP, ELEVATIONS

AE103 7TH FLOOR - DEMOLITION/NEW WORK PLANS, RCP, ELEVATIONS

FIRE PROTECTION

FP101 FIRE PROTECTION PLAN

PLUMBING

P101 PLUMBING PLAN

MECHANICAL

MD101 MECHANICAL DEMOLITION PLAN - 6TH FLOOR

MH001 LEGEND AND ABBREVIATIONS

MH101 MECHANICAL PLANS -6TH AND 8TH FLOOR

MH102 MECHANICAL PLANS - 7TH FLOOR

MH500 DETAILS

MH600 SCHEDULES

MH700 CONTROLS DIAGRAM

MH701 CONTROLS DIAGRAM

ELECTRICAL

ED101 ELECTRICAL DEMOLITION PLANS

E001 ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

E601 ELECTRICAL DETAILS

EP101 ELECTRICAL FLOOR PLANS

EP102 ELECTRICAL RISER DIAGRAM

STRUCTURAL

SS001 GENERAL NOTES

SF101 STRUCTURAL FRAMING PLAN

SF201 TYPICAL COLD FORMED FRAMING DETAILS

Revisions: Date:

CENTER LINE

DETAIL INDICATIOR

DIMENSION LINE

NEW DOOR OPENING / BORROWED LIGHT INDENTIFIER

- SEE DOOR SCHEDULE, DETAILS AND ELEVATIONS SHEET

DRAWING BLOCK TITLE, TYPICAL

INTERIOR ELEVATION INDICATOR

BUILDING SECTION INDICATOR

TYPICAL DETAIL INDICATOR

COLUMN GRID

GENERAL CONSTRUCTION KEYNOTE TAG

WALL OR PARTITION TYPE

FIRE EXTINGUISHER CABINET

CORNER GUARD

NORTH ARROW

CG

FEC

A

DETAIL NUMBER

SHEET NUMBER

XX-XX

0' - 1"

XX-XX

CL

XX-XX

x'-x" SPOT ELEVATION

1 REVISION ID TAG

REVISION CLOUD

BREAK LINE

X

EXISTING DOOR OPENING

1 View Name 1/8" = 1'-0"

N

PROJECT

NORTH

1/8" = 1'-0"

0' 8'4' 16'2'

GRAPHIC SCALE

X INTERIOR SIGNAGE TAG

PLACE DOOR

TAG HERE

E###

REFLECTED CEILING KEYNOTE TAG

XXXXX

HRDW NEW DOOR TAG

DOOR NUMBER

HARDWARE SET,

SEE SPECS

EXISTING DOOR TAGXXXXX

A101

XX-XX

BUILDING ELEVATION INDICATOR

FURNITURE, FIXTURE, EQUIPMENT INDICATOR

COLUMN GRID - NEW

COLUMN GRID - EXISTING1

1i

DD ROOM TAG - ROOM NAME AND NUMBER

LIFE SAFTEY ROOM TAG - ROOM NAME, NUMBER AND AREA

Room name

150 SF

Room name

1i

XXXXX

HRDW

PLACE DOOR

TAG HERE

& AND

@ AT

C CENTERLINE

# NUMBER

AB ANCHOR BOLT

ABV ABOVE

ACT ACOUSTIC CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH

DISABILITIES ACT

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

ALUM ALUMINUM

ALT ALTERNATE

AP ACCESS PANEL

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AUTO AUTOMATIC

AVG AVERAGE

BD BOARD

BLDG BUILDING

BLK BLOCK

BM BEAM

BOT BOTTOM

BRG BEARING

BEL BELOW

BR BUMPER RAIL

BRK BRICK

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CCT CUBICLE CURTAIN TRACK

CG CORNER GUARD

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CT CERAMIC TILE

CLG CEILING

CL CLOSET

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CONT CONTINUOUS

CPT CARPET

CU CUBIC

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM DIMENSION

DISP DISPENSER

DN DOWN

DO DOOR OPENING

DOZ DOZEN

DP DAMPPROOFING

DR DOOR

DWG DRAWING

DWGS DRAWINGS

DWR DRAWER

E EAST

EA EXHAUST AIR, EACH

EL ELEVATION

ELEV ELEVATION

ELEC ELECTRICAL

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

EP ELECTRICAL PANELBOARD

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXP EXPANSION

EJ EXPANSION JOINT

EXIST EXISTING

EXT EXTERIOR

FA FIRE ALARM

FB FACE BRICK

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

CONNECTION

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FF FINISH FLOOR

FHC FIRE HOSE CABINET

FIN FINISH

FLR FLOOR

FLUOR FLUORESCENT

FO __ FACE OF __

FOC FACE OF CONCRETE

FOS FACE OF STUD

FOW FACE OF WALL

FRPF FIREPROOF(ING)

FR FIRE RATING, FRAME

FRMG FRAMING

FS FULL SIZE

FT FOOT OR FEET

FTG FOOTING

FUR FURRING

FUT FUTURE

GC GENERAL CONTRACTOR

GA GAUGE

GAL GALLON

GALV GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GL GLASS

GND GROUND

GR GRADE

GWB GYPSUM WALLBOARD

GYP BD GYPSUM WALLBOARD

HB HOSE BIBB

HC HOLLOW CORE

HD HEAD

HDWR HARDWARE

HDWD HARDWOOD

HT HEIGHT

HNDRL HANDRAIL

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMF HOLLOW METAL FRAME

HR HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HP HIGH POINT

HR HOUR

HVAC HEATING, VENTILATION, AIR

CONDITIONING

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE

DIAMETER

INCL INCLUDE(D)

INSUL INSULATION

INT INTERIOR

INV INVERT

JAN JANITOR

JST JOIST

JT JOINT

KP KICK PLATE

KO KNOCKOUT

L LENGTH

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LBS POUNDS

LED LIGHT EMITTING DIODE

LF LINEAR FEET

LH LEFT HAND

LIN LINEAR

LIQ LIQUID

LKR LOCKER

LG LONG

LL LEAD LINED

LLV LONG LEG VERTICAL

LP LOW POINT

LRG LARGE

LT LIGHT

LT WT LIGHTWEIGHT

LVR LOUVER

MATL MATERIAL

MAS MASONRY

MAX MAXIMUM

MECH MECHANICAL

MTL METAL

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MP MOP PLATE

MTD MOUNTED

N NORTH

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER / DIMENSION

OH OPPOSITE HAND

OPG OPENING

OPP OPPOSITE

OH OVERHEAD

OZ OUNCE

PAV PAVING

PC PRECAST CONCRETE

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PLBG PLUMBING

PMF PREMOLDED FILLER

PR PAIR

PT POINT

PTN PARTITION

QT QUARRY TILE

R RISER

RA RETURN AIR

RAD RADIUS

RB RESILIENT BASE, RUBBER

BASE

RD ROOF DRAIN

RL ROOF LEADER

REF REFERENCE

REFR REFRIGERATOR

REQ'D REQUIRED

REV REVISION

RFI REQUEST FOR

INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

S SOUTH

SA SUPPLY AIR

SAN SANITARY

SC SOLID CORE

SCHED SCHEDULE

SECT SECTION

SH SPRINKLER HEAD

SHT SHEET

SIM SIMILAR

SM SMOKE

SPEC SPECIFICATION

SPKR SPEAKER

SQ SQUARE

STA STATION

STD STANDARD

STO STORAGE

STL STEEL

SS STAINLESS STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

SYM SYMMETRICAL

SYS SYSTEM

T TREAD

TEL TELEPHONE

TEMP TEMPERED

T&G TONGUE AND GROOVE

THK THICK

TOC TOP OF CONCRETE

TOP TOP OF PAVEMENT

TOS TOP OF STEEL

TOW TOP OF WALL

TV TELEVISION

TYP TYPICAL

UNFIN UNFINISHED

UON UNLESS OTHERWISE

NOTED

VB VAPOR BARRIER

VERT VERTICAL

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VTR VET THRU ROOF

W WEST

W/ WITH

WD WOOD

W/O WITHOUT

WP WATERPROOF

WT WEIGHT

WWF WELDED WIRE FRAME

WOOD

WOOD FINISH

ALUMINUM

STEEL

EARTH

GYPSUM - PLASTER

CMU (CONCRETE MASONRY UNIT)

RIGID INSULATION

BATT INSULATION

PLYWOOD

CONCRETE

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE REMOVED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

C:

\U se rs\ nk hu at\ Do cu me nts \24

-U

SD

VA

-0

1_

VA

B

RO

OK

LY

N_ Up da te

Ch ille r W ate r-C

EN

TR

AL

_n kh ua t47

SR

3.r vt 5/9

/20

:01

:04 P

M

GI102

GENERAL INFORMATION

03/07/2025

NY HARBOR HEALTHCARE SYSTEM - BROOKLYN CAMPUS

BLDG. #: 1

630A4-22-413UPGRADE STATION CHILLED WATER

P&ID

100% CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

24-USDVA-01

VA Job # 22-02-BK

DesignerChecker

ARCHITECTURAL SYMBOLSABBREVIATIONS MATERIAL LEGEND

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

ALL DIMENSIONS OF NEW PARTITIONS/BARRIERS SHALL BE TAKEN TO FACE OF STUD. DIMENSIONS TO EXISTING WORK

SHALL BE TAKEN TO FACE OF FINISH SURFACE.

ALL DOOR FRAMES ARE TO BE LOCATED 4" FROM PERPENDICULAR WALL, UNO.

DO NOT SCALE DRAWINGS. DRAWINGS ARE CONCEPTUAL PLANS.

THE WORK OF THE CONTRACTOR SHALL INCLUDE ALL LABOR AND MATERIALS FOR ALL TRADES CONCERNED FOR

COMPLETING THE PROJECT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.

THE CONTRACTOR SHALL PROCURE, COMPLETE AND APPLY FOR ALL PERMITS AS REQUIRED TO CONSTRUCT THE PROJECT.

THE CONTRACTOR SHALL BE FAMILIAR WITH THE CONTRACT DOCUMENTS AND MUST VISIT THE SITE AND BE ACQUAINTED

WITH THE CONDITIONS AFFECTING THE WORK.

WORKMANSHIP. ALL WORK TO BE FIRST RATE, HIGH QUALITY, AND ACCOMPLISHED IN A WORKMANLIKE MANNER BY SKILLED CRAFTSMEN USING ACCEPTED PRACTICES AND METHODS APPROPRIATE TO THE TRADE INVOLVED.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY CLEANING UP OF THE WORK AREA. THE AREA SHALL BE CLEANED EACH DAY AND TRASH SHALL BE DISPOSED OF AT THE END OF EACH DAY. AT THE END OF THE PROJECT, THE CONTRACTOR

SHALL CLEAN THE WORK AREA THOROUGHLY.

ALL WORK SHALL BE GUARANTEED FOR ONE YEAR FROM THE TIME OF ACCEPTANCE BY THE OWNER UNLESS OTHERWISE

NOTED IN THE SPECIFICATIONS.

ALL PLUMBING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL PLUMBING CODE. INSTALL ALL WATER, WASTE AND VENT PIPING IN ACCORDANCE WITH ALL APPLICABLE CODES. REVIEW DRAWINGS AND PROVIDE ALL WORK FOR A COMPLETE AND OPERABLE SYSTEM, INCLUDING ALL INCIDENTALS, REQUIRED BY CODE AGENCIES AND LOCAL

GOVERNING BODIES.

VA PLUMBING DESIGN GUIDE - 2021

11. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL BUILDING CONDITIONS, COORDINATE ALL

DIMENSIONS IN FIELD AND VERIFY ALL LOCATIONS OF UTILITIES IN THE FIELD.

12. ALL HEATING, VENTILATING AND AIR CONDITIONING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL MECHANICAL AND ENERGY CODES (AS APPLICABLE), STATE CODES, AND ANY REQUIREMENTS OF THE

LOCAL AUTHORITIES HAVING JURISDICTION.

NFPA 90A - 2021

NFPA 99 - 2021

NFPA 101 - 2024

VA HVAC DESIGN GUIDE - 2023

13. THE COMPLETE ELECTRICAL SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL ELECTRICAL CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES.

NFPA 70 - 2023

NFPA 101 - 2024

VA ELECTRICAL DESIGN GUIDE - 2019

VA ELECTRICAL DESIGN MANUAL FOR REPLACEMENT HOSPITALS, CLINICAL ADDITIONS, ENERGY CENTERS, AND

LABORATORY BUILDINGS - 2015

VA LIGHTING DESIGN MANUAL - 2022

VA RADIOLOGY DESIGN MANUAL - 2022

VA PHYSICAL SECURITY DESIGN MANUAL FOR LIFE SAFETY PROTECTED FACILITIES - 2023

14. THE COMPLETE FIRE PROTECTION SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL FIRE PROTECTION CODE.

NFPA 101 - 2024

NFPA 13 - 2022

NFPA 14 - 2019

NFPA 72 - 2022

VA FIRE PROTECTION DESIGN GUIDE - 2023, 9TH EDITION

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

THE CONTRACTOR SHALL COORDINATE WITH THE VA HOSPITAL'S JCAHO INSPECTION SCHEDULE WITH THE COR. NO CONTRACTOR WORK SHALL BE PERFORMED DURING TWO WEEKS IN EACH YEAR DURING A JCAHO INSPECTION.

BEFORE STARTING WORK IN PROJECT AREAS THAT WILL BE OCCUPIED DURING THE PERFORMANCE OF WORK, GC SHOULD COORDINATE WITH THE COR AND ARCHITECT THE OFF-HOURS SCHEDULE OF SUCH WORK. GC SHOULD AVOID CUTOVERS, SHUTDOWNS, CABLING, AND OUTLET INSTALLATION OF SERVICES THAT WILL DISRUPT THE DEPARTMENT/ AREA WORKING HOURS. ALL CONTRACTOR WORK SHOULD AVOID ANY PERFORMANCE WORK THAT WILL INTERRUPT

THE DEPARTMENT/AREA FUNCTION DURING NORMAL DAYTIME WORKING HOURS.

BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE RESPONSIBLE TO SET-UP TEMPORARY / PERMANENT CONSTRUCTION/ICRA BARRIERS WITH ANTEROOM AND MAINTAIN NEGATIVE PRESSURE.

ALL TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION PHASE AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE CONTRACTOR WILL BE RESPONSIBLE TO CLEAN AND PREPARE THE

AREA TO BE OCCUPIED BY MEDICAL CENTER STAFF AND RESIDENCE.

DIMENSIONS SUPERSEDE DRAWINGS. DO NOT SCALE PLANS. DIMENSIONS ARE TO THE FACE OF EXISTING MATERIALS UNLESS OTHERWISE NOTED. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED AT THE SITE BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL

DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATIONS AND ERECTION.

IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. ALL CONSTRUCTION WORK SHALL BE PERFORMED IN CONTRACTOR'S RESPONSIBILITY TO DETERMINE CONSTRUCTION PROCEDURES AND SEQUENCE AND TO INSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING CONSTRUCTION SHALL PROVIDE ADEQUATE SHORING AND BRACING DURING DEMOLITION AND CONSTRUCTION TO SUPPORT LOADS. SUCH MATERIAL SHALL BE REMOVED AT THE COMPLETION OF WORK AND SHALL REMAIN THE CONTRACTOR'S PROPERTY AFTER THE COMPLETION OF THE PROJECT.

DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR LOAD CARRYING

CAPACITY OR LOAD-DEFLECTION RATIO.

WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE REMOVED, RESTORE EXPOSED FINISHES OF CUT AND PATCHED AREAS AND EXTEND FINISH RESTORATION INTO ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE FINISHES, REMOVE SO TOTALLY, FROM PLANE TO PLANE, TREAT REMAINING SUBSURFACE TO RECEIVE NEW FINISHES

DESIGNATED.

WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. SHOWN TO BE RELOCATED SHALL BE COORDINATED BY THE CONTRACTOR WITH THE VA PRIOR TO START OF WORK IN EACH AREA. THE VA WILL REMOVE ALL ITEMS OF SALVAGEABLE VALUE, INCLUDING BUT NOT LIMITED TO DOORS, HARDWARE, MOVEABLE EQUIPMENT NOT ALREADY

DESIGNATED FOR REINSTALLATION/REUSE, PRIOR TO CONTRACTOR COMMENCING WORK.

WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENINGS SHALL BE PATCHED TO MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN.

IN GENERAL, WHEREVER SERVICES ARE REMOVED, THE OPENINGS SHALL BE PATCHED TO MATCH THE EXISTING ADJACENT SURFACES FINISH TEXTURE AND SHEEN. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK AND OTHER ITEMS CREATES OPENINGS IN THE WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH THE SAME MATERIALS AS ADJACENT CONSTRUCTION. MAINTAIN THE REQUIRED FIRE RATING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION. FILL IN ALL EXISTING OPENINGS THAT ARE NOT TO REMAIN, UNLESS

OTHERWISE NOTED. FINISH TO MATCH FINISH OF ADJACENT SURFACE.

WHERE CODED NOTE DESIGNATIONS ARE SHOWN AS "TYP" OR "TYPICAL" IT IS INTENDED THAT THE NOTE GENERALLY

REFERS TO ALL SIMILAR ITEMS OR SURFACES.

A HAZARDOUS MATERIALS SURVEY WAS NOT CONDUCTED. IT IS THE CONTRACTORS RESPONSIBILITY TO TAKE PROTECTIVE MEASURES FOR ITS WORKERS PRIOR TO THE BEGINNING OF ANY RENOVATION OR DEMOLITION WORK.

AFTER COMPLETION OF DEMOLITION, SCHEDULE A WALK-THROUGH WITH THE COR FOR REVIEW OF EXISTING

CONDITIONS.

PATCH, AND MATCH RATING TO EXISTING RATING OF ALL FIRE STOP AT ABANDONED PENETRATIONS THROUGH THE

CONCRETE FLOORS, WALLS, AND ROOF DECK.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

REFER TO SPECIFICATIONS SECTION 024119 - SELECTIVE DEMOLITION FOR ADDITIONAL REQUIREMENTS AND INFORMATION.

PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. ADDITIONAL DEMOLITION WILL BE REQUIRED OUTSIDE OF THIS LINE. ARCHITECTURAL DEMOLITION DRAWINGS ARE FOR SCHEMATIC PURPOSES. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH THE ENTIRE SET OF CONTRACT DOCUMENTS FOR FULL SCOPE OF DEMOLITION WORK REQUIRED FOR THE

PROJECT.

EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE NOT GUARANTEED TO BE COMPLETE. THE CONTRACTOR SHALL VEERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL

DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATION, ERECTION AND/OR INSTALLATION.

COORDINATE ALL NEW PENETRATIONS AND/OR OPENINGS WITH OTHER ASSOCIATED TRADES.

THE OWNER MAY SELECT AND TAG ITEMS FOR DEMOLITION TO BE SALVAGED. THE CONTRACTOR SHALL REMOVE SELECTED ITEMS FROM SCOPE OF WORK AND DELIVER TO THE OWNER'S LOCATION WITHIN THE EXISTING FACILITY.

CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE TO SCOPE OF WORK AREA ENSURING NO DUST WILL BE TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING

DEVICE AT DUST PROOF BARRICADE TO CONFIRM PRESSURE.

THE FACILITY'S EXISTING SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION DURING THE ENTIRE

CONSTRUCTION PHASE.

ALL DEMOLITION WORK BEING DONE OUTSIDE OF TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS AND MINIMIZE DISRUPTION TO VISITORS, RESIDENTS AND STAFF. COORDINATE

LOCATION OF BARRIERS WITH OWNER.

REMOVE PARTITIONS INDICATED FROM THE FLOOR TO THE UNDERSIDE OF THE STRUCTURE ABOVE.

PREPARE ALL ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND SCHEDULED FINISH. EXISTING WALLS SHOWN TO BE REMOVED SHALL BE DEMOLISHED COMPLETELY. THIS INCLUDES THE REMOVAL OF REINFORCEMENT, SOFFITS, DOORS, WINDOWS, FRAMES AND OVERHEAD BRACING. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR DISCONNECTION AND REMOVAL OF EXISTING UTILITIES AND DEVICES LOCATED WITHIN AREAS SCHEDULED TO BE DEMOLISHED.

SOME ITEMS MAY BE INDICATED IN THE DEMOLITION DRAWINGS AND DEMOLITION NOTES WHICH ARE NOT NECESSARILY DEMOLITION WORK BUT ARE INCLUDED TO DESCRIBE THE OVERALL SCOPE OF THE PROJECT AND TO AID IN THE DEMOLITION COORDINATION. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK REQUIRED TO COMPLETE THE INTENDED WORK OF THE

OVEERALL PROJECT.

FLOORING DEMOLITION INCLUDES THE REMOVAL OF EXISTING FLOOR FINISHES, INCLUDING VCT, SHEET VINYL, CERAMIC TILE, QUARRY TILE, CARPET AND OTHER FINISHES, GROUTS, MASTICS AND SETTING BEDS COMPLETE TO EXISTING CONCRETE FLOOR SLAB OR OTHER SUBSTRATE READY FOR NEW FLOOR FINISHES. FLOOR PREP SHALL BE BY THE INSTALLING CONTRACTOR.

REMOVE MISCELLANEOUS ITEMS WITHIN LIMITS OF DEMOLITION. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.

DEMOLITION OF CEILINGS INCLUDES GRID, TILE, SUPPORTS, SOFFITS AMD RELATED ITEMS. COORDINATE WITH ELECTRICAL WORK ON REMOVAL OF LIGHTS, CONDUIT, TIES, SUPPORTS AND RELATED WIRING. COORDINATE WITH MECHANICAL ON REMOVAL

OF DIFFUSERS GRILLS, AND RELATED DUCTWORK EQUIPMENT CONTAINED THEREIN.

PLUG ABANDONED FLOOR OPENINGS WITH NEW CONCRETE. PLUG SHALL MATCH EXISTING SLAB DEPTH AND BE STRUCTURALLY

SOUND TO CARRY FLOOR LOAD OF 100 LBS. / SQ. FT. UNLESS NOTED OTHERWISE.

ALL FIRE RATED ASSEMBLIES (COLUMNS, SHAFTS, WALLS, ETC.) SHALL BE MAINTAINED OR BE RELOCATED / PATCHED. MATCH

EXISTING FIRE RATING UNLESS NOTED OTHERWISE.

REMOVE EXISTING DOORS, FRAMES, SIDELIGHTS, ANCHORS, THRESHOLDS AND HARDWARE AS INDICATED WITHIN LIMITS OF CONSTRUCTION. PATCH AND REPAIR WALL AND FLOOR TO MATCH EXISTING. OWNER SHALL HAVE THE RIGHT TO SALVAGE ANY AND ALL DOORS AND HARDWARE. CONTRACTOR SHALL VERIFY DOORS FOR SALVAGE OR RELOCATION PRIOR TO COMMENCING

DEMOLITION.

WHERE NEW DOORS ARE INDICATED, CUT OPENINGS IN EXISTING WALL. PREPARE OPENINGS FOR NEW DOOR. PATCH REQUIRED WALLS TO MATCH EXISTING. PROVIDE LINTELS AS REQUIRED FOR NEW OPENINGS. PREPARE SURFACES FOR SCHEDULED

FINISHES.

PROTECT EXISTING FINISHED WORK & EQUIPMENT WHICH IS TO REMAIN IN AREAS OF DEMOLITION WORK.

AFTER THE REMOVAL OF ICRA WALLS, CLEAN AND PATCH EXISTING WALLS AND CEILINGS EFFECTED BY CONSTRUCTION AND

MATCH EXISTING FINISHES.

REMOVE ALL PLUMBING FIXTURES AS INDICATED WITHIN THE LIMITS OF CONSTRUCTION. CAP ALL PLUMBING LINES NOT REQUIRED BY NEW CONSTRUCTION. COORDINATE WITH PLUMBING PLANS FOR ADDITIONAL INFORMATION. REMOVE ALL ACCESSORIES ASSOCIATED WITH PLUMBING, INCLUDING PARTITIONS, GRAB BARS, DISPENSERS, RACKS, SHELVING, SINK BASE, DISPOSALS, ETC.

EXAM ROOMS SHALL HAVE REMOVAL OF ALL FLOORING, PLUMBING AND ELECTRICAL IN FLOORS, PLUMBING FIXTURES AND

CASEWORK AS INDICATED IN DEMOLITION DRAWINGS, TYPICAL.

1.

2.

3.

4.

5.

6.

7.

1.

2.

3.

4.

5.

1.

2.

3.

4.

GENERAL NOTES:

EXISTING CONDITIONS HAVE BEEN SHOWN FROM GENERAL SPACE OBSERVATIONS AND EXISTING DRAWINGS. RESPECTIVE TRADES SHALL CONDUCT A COMPLETE FIELD SURVEY OF EXISTING CONDITIONS PRIOR TO SUBMISSION OF BID PRICE. NO ADDITIONAL PAYMENT WILL BE MADE FOR CLAIMS THAT ARISE FROM LACK OF KNOWLEDGE OF EXISTING CONDITIONS.

ALL FINISHES SHALL COMPLY WITH AND BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE LOCAL CODES AND ORDINANCES; NFPA

101 SECTION 10.2.

THE CONTRACTOR SHALL GUARANTEE ALL WORK AND MATERIALS FOR A MINIMUM OF TWELVE (12) MONTHS AFTER THE DATE OF FINAL COMPLETION TO CONTRACTOR UNDER THE CONTRACT. ANY ITEMS DEEMED TO BE DEFECTIVE SHALL BE REPLACED AT CONTRACTORS SOLE EXPENSE, BUT AT OWNER'S OPTION AND CONVENIENCE, BE REPAIRED, REPLACED OR RE-PERFORMED.

ALL GYPSUM BOARD SOFFITS AND HEADERS WITHIN THE SCOPE LIMIT LINES TO BE PAINTED CEILING WHITE UNLESS NOTED

OTHERWISE.

FINISH DRAWINGS SUPERSEDE ARCHITECTURAL DRAWINGS FOR FINISH MATERIALS, COLORS AND LOCATIONS ONLY.

FINISH SAMPLES SHALL BE SUBMITTED TO COR FOR APPROVAL BEFORE PURCHASING AND INSTALLATION.

FINAL COUNTERTOP GROMMET LOCATIONS TO BE FIELD VERIFIED.

FLOORING NOTES:

CONTRACTOR IS TO FIELD VERIFY ALL EXISTING CONDITIONS AND NOTIFY COR OF ANY DISCREPANCIES.

PROVIDE NEW RUBBER BASE AND FLOOR COVERINGS AS SPECIFIED THROUGHOUT. CONTRACTOR TO PREP FLOORS AS NECESSARY

FOR NEW FINISHES.

CONTRACTOR TO PROVIDE TEMPORARY PROTECTION ON ALL NEW FLOORING.

CONTRACTOR TO CLEAR CAULK AT ALL DOOR FRAMES WHERE NEW RESILIENT FLOORING HAS BEEN INSTALLED WITHIN SCOPE LIMITS.

TRANSITION AND REDUCING STRIPS ARE TO BE INSTALLED AT ALL CHANGES IN FLOOR MATERIAL AND/OR ELEVATION THAT OCCURS IN AREAS TO BE NEWLY FINISHED. VERIFY WITH COR EACH CONDITION AND TYPE OF TRANSITION AND/OR REDUCING STRIP TO BE USED PRIOR TO INSTALLATION. FLOAT FLOOR AS REQUIRED FOR SMOOTH/FLUSH TRANSITION BETWEEN MATERIAL CHANGES. TRANSITION

TO BE INSTALLED AT CENTER OF DOOR.

WALL NOTES:

PREP WALLS FOR NEW FINISHES, PATCH AND REPAIR WALLS TO CREATE A SMOOTH UNIFORM FINISH.

CONTRACTOR TO APPLY AT LEAST TWO COATS OF PAINT. EACH COAT TO BE EQUAL TO 1.6 MIL. APPLY MORE IF NECESSARY TO COVER

EXISTING COLOR.

CONTRACTOR IS TO PREP WALLS AS NECESSARY FOR NEW WALL BASE.

CONTRACTOR SHALL PAINT ALL MISC. METAL ITEMS SUCH AS ELECTRICAL PANEL COVERS, COUNTERTOP SUPPORT BRACKERTS, ELECTRICAL WIRE MOLD, ETC. TO MATCH ADJACENT WALL COLOR. SEE WALL FINISH SCHEDULE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

C:

\U se rs\ nk hu at\ Do cu me nts \24

-U

SD

VA

-0

1_

VA

B

RO

OK

LY

N_ Up da te

Ch ille r W ate r-C

EN

TR

AL

_n kh ua t47

SR

3.r vt 5/9

/20

:01

:12 P

M

GI103

GENERAL INFORMATION

03/07/2025

NY HARBOR HEALTHCARE SYSTEM - BROOKLYN CAMPUS

BLDG. #: 1

630A4-22-413UPGRADE STATION CHILLED WATER

P&ID

100% CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

24-USDVA-01

VA Job # 22-02-BK

DesignerChecker

GENERAL CONSTRUCTION NOTES

GENERAL CONDITION NOTES

GENERAL DEMOLITION NOTESGENERAL NOTES - INTERIOR FINISHES

LIFE SAFETY CODE INFORMATION

DESCRIPTION OF WORK :

NO CHANGE IN USE OR OCCUPANCY.

APPLICABLE CODES:

BUILDING CONSTRUCTION TYPE:

BUILDING FULLY SPRINKLED: YES

OCCUPANCY / USES:

COMMON PATH OF TRAVEL:

TRAVEL DISTANCES:

- IBC 2018

- NFPA 70 - 2020

- NFPA 101 - 2024

- VA ELECTRICAL DESIGN GUIDE - 2019

- VA ELECTRICAL DESIGN MANUAL FOR REPLACEMENT HOSPITALS, CLINICAL ADDITIONS, ENERGY CENTERS, AND LABORATORY BUILDINGS - 2015

- VA LIGHTING DESIGN MANUAL - 2008

- VA RADIOLOGY DESIGN MANUAL - 2008

- VA PHYSICAL SECURITY DESIGN MANUAL FOR LIFE SAFETY PROTECTED FACILITIES - 2015

- VA FIRE PROTECTION DESIGN MANUAL - 2023, 9TH EDITION

DEAD END CORRIDOR:

BUILDING SIZE/ SF PER FLOOR: GROSS:

SIXTH FLOOR: 27,406.00 SF

SEVENTH FLOOR: 27,230.00 SF

TOTAL SCOPE BLDG. AREA: 54,636.00 SF

BUILDING HEIGHT

EXISTING BUILDING HEIGHT = 200'-2", 17 STORIES, VERIFIED EXISTING BUILDING HEIGHT WITH COR.

IBC TABLE 504.3 ALLOWABLE BUILDING HEIGHT IN FEET ABOVE GRADE = UL (UNLIMITED) TYPE 1A

SPRINKLERED BUILDING.

A USES TRAVEL =

B USES TRAVEL =

SPRINKLED NON SPRINKLEDOCCUPANCY

SPRINKLED NON SPRINKLEDOCCUPANCY

I USES TRAVEL I-1 =

1-2,1-3 =

I-4 =

REQUIRED NUMBER OF EXIT:

FIRE RATING LEGEND

BARRIER OPENING RATINGSYMBOL

(NUMBER SHOWS OPENING RATING)

SM SM

60 60

90 90

E60 E60

E90 E90

CORRIDOR ( SMOKE BARRIER)

ONE HOUR

TWO HOUR

EXISTING

POSITIVE LATCH DOOR HARDWARE

60 MIN.

90 MIN.

EXISTING

SMOKE COMPARTMENT

FIRE EXTINGUISHER

EXIT DIRECTIONAL SIGNAGE

INDICATES PATH OF TRAVEL TO POINT OF EXIT (FROM COMMON PATH

OF TRAVEL)

INDICATES COMMON PATH OF TRAVEL TO POINT OF DECISION

NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY. REFER TO THE PARTITION SCHEDULE FOR FIRE RESISTIVE REFERENCES.

EXISTING STAIR

.3"/OCC

CODE MIN:

PROVIDED:

36" *

WIDTH PER OCCUPANT (2024 NFPA TABLE 7.3.3.1)

OCCUPANTS (AREA/OCC. LOAD FACTOR)

NIM WIDTH (0.3" X OCC.)

CODE MIN (2024 NFPA 7.2.2.2.1.2)

CLEARANCE PROVIDED

* 2024 NFPA TABLE 7.2.2.2.1.1(b) EXISTING STAIRS

STAIRS

CORRIDOORS

DOORS

CORRIDOR

.2"/OCC

CODE MIN:

PROVIDED:

44"

EXISTING DOOR

.2"/OCC

CODE MIN:

PROVIDED:

32"

WIDTH PER OCCUPANT (2024 NFPA TABLE 7.3.3.1)

OCCUPANTS (AREA/OCC. LOAD FACTOR)

NIM WIDTH (0.2" X OCC.)

CODE MIN (2024 NFPA 7.2.1.2.3.2.)

CLEARANCE PROVIDED

CLEARANCE SHOWN W/ DOOR OPEN 90° BETWEEN STOP & OPEN DOOR FACE

WIDTH PER OCCUPANT (2024 NFPA TABLE 7.3.3.1)

OCCUPANTS (AREA/OCC. LOAD FACTOR)

NIM WIDTH (0.2" X OCC.)

CODE MIN (2024 NFPA 39.2.3.2)

CLEARANCE PROVIDED

CLEARANCE SHOWN BETWEEN FACE OF WALLS

S USES TRAVEL S-1 =

S-2 =

A USES TRAVEL =

B USES TRAVEL =

I USES TRAVEL I-1 =

1-2,1-3 =

I-4 =

S USES TRAVEL S-1 =

S-2 =

A USES TRAVEL =

B USES TRAVEL =

SPRINKLED NON SPRINKLEDOCCUPANCY

I USES TRAVEL I-1 =

1-3 =

I-4 =

S USES TRAVEL

CHAPTER 6: CLASSIFICATION OF OCCUPANCY AND HAZARD OF CONTENTS

6.1.11 BUSINESS OCCUPANCY

250 FT

300 FT

250 FT

400 FT

200 FT

200 FT

200 FT

300 FT

250 FT

200 FT

200 FT

NOT PERMITTED

NOT PERMITTED

150 FT

CONSTRUCTION TYPE

NFPA 101 2024 CHAPTER 39, EXISTING BUSINESS OCCUPANCIES.

IBC 2018 TABLE 601, TYPE 1A CONSTRUCTION.

100 FT MAXIMUM

100 FT MAXIMUM

100 FT MAXIMUM

100 FT MAXIMUM

75 FT MAXIMUM

75 FT MAXIMUM

75 FT MAXIMUM

75 FT MAXIMUM

100 FT MAXIMUM

75 FT MAXIMUM

NOT PERMITTED

NOT PERMITTED

NOT PERMITTED

2 EXITS PER TABLE 1006.3.2

50 FT

50 FT

50 T

20 FT

20 FT

20 FT

50 FT

50 FT

XX FT

20 FT

20 FT

XX FT

TRAVEL DISTANCE = 78'

EXISTING STAIR

.3"/OCC

CODE MIN:

PROVIDED:

36" *

48"

21"

EXISTING DOOR

.2"/OCC

CODE MIN:

PROVIDED:

32" 36"

14"

EXISTING DOOR

.2"/OCC

CODE MIN:

PROVIDED:

32" 84"

14"

TRAVEL DISTANCE = 69'

E90

E9

E9

E9

E9

E9

E9

E9

E9

E90

E90 E90

E9

E9

E90

E9

E9

E9

E9

E9

E9

E9

E9

E90 E90

E9

E9

E9

E9

E9

E9

E9

E9

E9

E9

E9

E9

E90 E90

E90 E90

E9

E9

E9

E9

E90

E9

E9

E9

E9

E90

TRAVEL DISTANCE = 76'

EXISTING STAIR

.3"/OCC

CODE MIN:

PROVIDED:

36" *

48"

21"

EXISTING DOOR

.2"/OCC

CODE MIN:

PROVIDED:

32" 36"

14"

DISTANCE TO SMOKE

BARRIER = 162'

COMMON PATH OF TRAVEL = 36'

EXISTING DOOR

.2"/OCC

CODE MIN:

PROVIDED:

32" 84"

14"

339 SF

MECHANICAL ROOM

7-222

E90

E9

E9

E9

E9

E90 E90

E9

E9

E90

E9

E9

E9

E9

E9

E9

E9

E9

E9

E9

E90

E90

E9

E9

E9

E9

E9

E9

E9

E9

E90

E90 E90

E9

E9

E9

E9

E9

E9

E9

E9

E90 E90

E90 E90

E9

E9

E9

E9

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

C:

\U se rs\ nk hu at\ Do cu me nts \24

-U

SD

VA

-0

1_

VA

B

RO

OK

LY

N_ Up da te

Ch ille r W ate r-C

EN

TR

AL

_n kh ua t47

SR

3.r vt 5/9

/20

:01

:25 P

M

GI201

LIFE SAFETY PLAN

03/07/2025

NY HARBOR HEALTHCARE SYSTEM - BROOKLYN CAMPUS

BLDG. #: 1

630A4-22-413UPGRADE STATION CHILLED WATER

P&ID

100% CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

24-USDVA-01

VA Job # 22-02-BK

DesignerChecker

3/64" = 1'-0"1 6TH FLOOR LIFE SAFETY

3/64" = 1'-0"2 7TH FLOOR LIFE SAFETY

EXISTING OR ICRA WALL

EXISTING OR

ICRA DOOR

PROVIDE STICKY WALK-OFF MAT

(TYP. EACH SIDE OF DOOR)

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

PRECAUTIONS DURING CONSTRUCTION

EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.

IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.

PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.

WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING DRY WALL FOR BARRIERS.

SEAL UNUSED DOORS WITH DUCT TAPE IN THE CONSTRUCTION AREA.

BLOCK OFF AND SEAL AIR VENTS IN THE CONSTRUCTION AREA.

PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

REMOVE CONSTRUCTION WASTE DAILY.

PROVIDE TEMPORARY 1 HR. FIRE BARRIER PARTITIONS AS INDICATED AND SEAL UNUSED DOORS AT PERIMETER OF THE WORK AREA WITH PAINTER'S TAPE TO SEAL AREA FROM NON-WORK AREA BEFORE

CONSTRUCTION BEGINS.

MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA FILTER EQUIPPED AIR FILTRATION UNITS. COORDINATE LOCATION OF WINDOW AND ABOVE FLOOR PENETRATIONS WITH COR.

SPACE SHALL BE CONTINUOUSLY MONITORED. BALL IN THE WALL IS NOT ACCEPTABLE. PATCH FLOOR

PENETRATION AND REPLACE WINDOW GLAZING AFTER CONSTRUCTION AS REQUIRED TO MATCH

EXISTING.

CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS OR BY

COVERING IN PLASTIC AND SEALING WITH DUCT TAPE. REMOVE WASTE DAILY EITHER AFTER 5 PM

AND BEFORE 7 AM.

USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF TRANSPORT CONTAINERS

THROUGH THE FACILITY.

SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.

CONSTRUCT AN AIRTIGHT ONE-HOUR RATED ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS

THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE; OR WEAR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK

SITE.

ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST

BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.

STEP 1 - TYPE: USING THE FOLLOWING, IDENTIFY THE PROJECT CONSTRUCTION ACTIVITY TYPE (A-D). THE CONSTRUCTION ACTIVITY TYPES ARE DEFINED BY THE AMOUNT OF DUST GENERATED, THE DURATION OF THE ACTIVITY, AND THE AMOUNT OF SHARED HVAC SYSTEMS. CONTACT THE VABHS ENGINEERING DEPARTMENT OR INFECTION CONTROL DEPARTMENT IF ANY ACTIVITY IS QUESTIONABLE UNDER THESE

GUIDELINES

TYPE A - INSPECTION AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT IS NOT LIMITED TO:

1. REMOVAL OF CEILING TILES FOR VISUAL INSPECTION ONLY AND IMMEDIATE REPLACEMENT

2. PAINTING, BUT NOT SANDING

3. WALL COVERING

4. ELECTRICAL TRIM WORK

5. MINOR PLUMBING

6. ACTIVITIES THAT DO NOT GENERATE DUST, INVOLVE WALL CUTTING, REQUIRE EXTENDED

CEILINGS ACCESS

TYPE B - SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST. INCLUDES, BUT IS

NOT LIMITED TO:

1. INSTALLATION OR TELEPHONE AND COMPUTER CABLING

2. ACCESS TO CHASE SPACES

3. CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED

TYPE C - WORK THAT GENERATES A MODERATE TO HIGH LEVEL OR DUST OR REQUIRES DEMOLITION OR

REMOVAL OF ANY FIXED COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO:

1. SANDING OF WALLS FOR PAINTING OR WALL COVERING

2. REMOVAL OR FLOOR COVERINGS, CEILING TILES AND CASEWORK

3. NEW WALL CONSTRUCTION

4. MINOR DUCTWORK OR ELECTRICAL WORK ABOVE CEILINGS

5. MAJOR CABLING ACTIVITIES

6. ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT

TYPE D - MAJOR DEMOLITION AND CONSTRUCTION PROJECTS, INCLUDES, BUT IS NOT LIMITED TO:

1. ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS

2. REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CEILING SYSTEM

3. NEW CONSTRUCTION

STEP 2 - RISK: USING THE FOLLOWING, IDENTIFY THE PATIENT RISK GROUP (1-4) THAT WILL BE AFFECTED, IF

MORE THAN ONE RISK GROUP WILL BE AFFECTED, SELECT THE HIGHER RISK GROUP

LOW RISK - GROUP 1: INCLUDES BUT IS NO LIMITED TO…

1. OFFICE AREAS, LIBRARY, CHAPEL

2. ENGINEERING SVC SPACE

3. FACILITY ENVIRONMENTAL MANAGEMENT SVC SPACE

MEDIUM RISK - GROUP 2: BUT IS NOT LIMITED TO…

1. AMBULATORY CARE UNIT (ACU)

2. AUDIOLOGY, SPEECH PATHOLOGY

3. OUTPATIENT CLINICS (EG, COUMADIN, CARDIOLOGY, GASTRO INTESTINAL, OPHTHALMOLOGY, PULMONARY RENAL)

4. ECHOCARDIOGRAPHY

5. FOOD SERVICE AREAS

6. LAUNDRY

7. ULTRASOUND

8. IMAGING (EG, RADIOLOGY/MRI)

9. NUCLEAR MEDICINE

10. PATHOLOGY & LABORATORY MEDICINE SERVICE (P&LMS)

11. POLYTRAUMA-KINESIO, OCCUPATIONAL, PHYSICAL THERAPY

12. PROSTHETICS

13. POOL AREA

14. RESPIRATORY THERAPY

15. SLEEP LABORATORY

HIGH RISK – GROUP 3: INCLUDES, BUT IS NOT LIMITED TO…

1. ADMISSION AREAS

2. AMBULATORY SURGERY UNIT (ASU)

3. EMERGENCY & URGENT CARE ROOMS

4. ENDOSCOPY

5. LABORATORIES

6. MEDICAL PROCEDURE UNIT (MPU)

7. MEDICAL SURGICAL DAY UNIT (MSDU)

8. PHARMACY

9. PATIENT WARDS (EG, LONG TERM CARE, MEDICAL, SURGICAL, SPINAL CORD INJURY, PSYCHIATRY)

10. SUPPLY, PROCESSING & DISTRIBUTION (SPD-NON-STERILE AREAS)

HIGHEST RISK – GROUP 4: INCLUDES. BUT IS NOT LIMITED TO…

1. AREAS CARING FOR IMMUNE COMPROMISED PATIENTS

2. INTENSIVE CARE UNITS (EG, CCU, MICU, PCU, SICU)

3. SUPPLY PROCESSING & DISTRIBUTION (SPD-STERILE AREAS)

4. ANESTHESIA AREAS POST-ANESTHESIA CARE UNITS (PACU)

5. CARDIAC CATHETER, ELECTROPHYSIOLOGY (EP) LABORATORIES

6. RADIATION THERAPY AREAS FOR CANCER TREATMENT

7. DENTAL, DERMATOLOGY, DIALYSIS ROOMS

8. NEGATIVE PRESSURE ISOLATION ROOMS

9. ANGIOGRAPHY, CYSTOSCOPY SUITES

10. PHARMACY ADMIXTURE AREAS

11. ONCOLOGY (RADIATION THERAPY)

12. OPERATING ROOMS

STEP 3 - CLASS: MATCH THE PATIENT RISK GROUP (LOW, MEDIUM, HIGH, HIGHEST) WITH THE PLANNED PROJECT CONSTRUCTION ACTIVITY TYPE (A, B, C, D) ON THE IC MATRIX TO DETERMINE THE CLASS PRECAUTION (I, II, III, IV) OR EXTENT OF INFECTIONS CONTROL ACTIVITIES REQUIRED. IF THE AREA IS NOT LISTED, DETERMINE THE LEVEL OF THE INFECTION CONTROL CLASSIFICATION NECESSARY FOR THE WORK BY MATCHING THE CONSTRUCTION ACTIVITY WITH THE DESIGNATED RISK GROUP IN THE MATRIX

AND PROVIDE THE ASSOCIATED INFECTION CONTROL PROCEDURES

APPLIES TO : E1,E2,E5,E6

APPLIES TO : E3

APPLIES TO : E1,E2,E5,E6

INFECTION CONTROL ACTIVITIES BY LEVEL PRECAUTIONS SEE ALSO SPECIFICATION SECTION 01 35 33 INFECTION CONTROL PROCEDURES

DURING PROJECT CONSTRUCTION UPON PROJECT COMPLETION

LE

VE

L I

LE

VE

L

II

CL

AS

S

III

CL

AS

S

IV

IN

A

DD

IT

IO

N

TO

C

LA

SS

I

IN

A

DD

IT

IO

N

TO

C

LA

SS

II

IN

A

DD

IT

IO

N

TO

C

LA

SS

II

I

A. KEEP AREA FREE OF DEBRIS & TRASH

B. IMMEDIATELY REINSTALL CEILING TILES DISPLACED FOR

INSPECTIONS. CLOSE ACCESS PANELS, ETC..UPON COMPLETION

OF WORK

C. TRAFFIC FLOW: DECREASE EXPOSURE OF PATIENT STAFF TO

CONSTRUCTION

D. UTILITY SHUTDOWNS: IF NECESSARY, SCHEDULE

INTERRUPTIONS DURING LOW ACTIVITY

E. PEST CONTROL: ADDRESS ANY VISIBLE SIGNS OF BIRDS,

INSECTS, RODENTS, OR OTHER VERMIN

F. HOUSEKEEPING BROOM & WET MOP SURFACES DAILY AND AS

NEEDED TO CONTROL DEBRIS/DUST

G. EXECUTE WORK BY METHODS TO MINIMIZE DUST

PRODUCTION & MIGRATION FROM CONSTRUCTION

OPERATIONS

H. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE

FACILITY MUST BE FREE OF CONTAMINENTS AND LOOSE

MATERIALS

A. PERFORM CLEAN UP AND DISPOSAL IN

ACCORDANCE WITH CONTRACT

REQUIREMENTS AND INFECTION CONTROL

PROCEDURES SPECIFCATION SECTION 01 35 33

A. DUST CONTAINMENT BARRIERS SECURE AT PERIMETER EDGES

B. CEILING TILES IN PLACE AT ADJACENT AREAS OUTSIDE BARRIER

C. WATER MIST WORK SURFACES TO CONTROL DUST WHILE

CUTTING

D. UNUSED OPENINGS (DOORS, WINDOWS PROPERLY CLOSED

AND SEALED WITH MASKING TAPE

E. BLOCK-OFF, SEAL, REMOVE OR ISOLATE HVAC SYSTEM AIR

VENTS TO PREVENT CONTAMINATION MIGRATION. REBALANCE

SYSTEM TI ADDRESS DIFFUSER ISOLATION.

F. PLACE WALK-OFF MAT AT WORK AREAS TO PREVENT

TRACKING

OF CONSTRUCTION DUST INTO SURROUNDING AREAS

G. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM

DISPERSING INTO ATMOSPHERE. HEPA VACUUMS, AUTOMATIC

SELF-CLOSING CONSTRUCTION DOORS. APPROPRIATE

EXHAUST MACHINES, DEBRIS CHUTES

H. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE

DUST BEFORE LEAVING THE WORK AREA

I. CONTAIN ALL TRACH AND DEBRIS IN THE WORKING AREA.

PERFORM DAILY CLEANING AND DISPOSAL OF TRASH

(COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT

ROUTE.

J. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE

WORK AREA MUST BE IN SEALED CONTAINERD AND/OR

CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE

AREA.

K. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A

HARD LID) MUST BE USED TO TRANSPORT TRASH AND DEBRIS

FROM THE CONSTRUCTION AREAS. THESE CONTRAINER MUST

BE DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBIRS

BEFORE LEAVING THE CONTAINED WORK AREA.

A. INSPECT ADJACENT AREAS FOR DUST MIGRATION AND

CORRECT IMMEDIATELY

B. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING

NFPA 241 REQUIREMENTS. BARRIERS MUST EXTEND TO THE

CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK

ABOVE.

C. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES

MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST

RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY AFFIXED

TO FLOOR AND CEILING (OR FLOOR/ROOF DECK ABOVE) AND

SECURE FROM MOVEMENT OR DAMAGE.

D. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA AIR FILTERED MACHINES. INSTALL A

DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC,

MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK

CONTAINMENT TO CONTINUALLY MONITOR AND DOCUMENT

NEGATIVE PRESSURIZATION. THE “BALL IN THE WALL” OR

SIMILAR APPARATUS ARE NOT ACCEPTABLE.

E. DISINFECT TOOLS AND EQUIPMENT PRIOR TO ENTRY

AND EXIT FROM STERILE AND INVASIVE PROCEDURE AREAS

F. COMPLETE ALL CRITICAL BARRIERS, I.E. SHEETROCK,

PLYWOOD, PLASTIC TO SEAL AREA FROM NON-WORK AREA OR

IMPLEMENT CONTROL CUBE METHOD (CONTAINER WITH

SUITABLE COVER AND SEALED CONNECTION TO WORK

SITE WITH HEPA VACUUM FOR CLEANING PRIOR TO EXIT)

G. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS,

INCLUDING FLOORS AND CEILING, USING APPROVED MATERIALS

(UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).

H. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS

I. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE

PRESSURIZATION OF THE ENTIRE WORKSPACE BY USE OF HEPA

EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A

WORK SPECIFIC WAIVER IS APPROVED BY VHA’S OFFICE OF

HEALTHCARE ENGINEERING); THIS MUST BE MAINTAINED

CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT.

EXHAUST DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS

25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND

WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED.

EXHAUSTING DISCHARGED AIR INTO SHARED OR

RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST

SYSTEMS (E.G., BATHROOM EXHAUST) IS PROHIBITED.

A. CLEAN REMAINING IMPACTED AREAS WITH HEPA

VACUUM

B. MOP/WIPE REMAINING IMPACTED AREAS WITH

APPROVED DISINFECTANT

C. TIGHTLY COVER MATERIAL TRANSPORT

RECEPTACLES/CARTS. CONTAIN

CONSTRUCTION WASTE IN TIGHTLY COVERED

CONTAINERS BEFORE TRANSPORT

D. DO NOT REMOVE BARRIERS FROM WORK

AREAS UNTIL COMPLETED PROJECT IS

THOROUGHLY CLEANED AND INSPECTED BY THE

SAFETY OFFICER AND INFECTION CONTROL

PRACTITIONER

E. CLEAN & REMOVE BARRIER MATERIALS

CAREFULLY TO MINIMIZE SPREADING OF DIRT

AND DEBRIS ASSOCIATED WITH

CONSTRUCTION

F. REFER TO INFECTION CONTROL SECTION 01 35 33

FOR ADDITIONAL REQUIREMENTS

A. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO

INSTALL FINAL BARRIER.

B. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE

PRESSURE CONTROL, ANTEROOM MUST BE LARGE ENOUGH

FOR EQUIPMENT STAGING, CART CLEANING, WORKERS ’ PPE AND

CLEANING.

C. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN

AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK AREA

ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF COVER

SUITS IS ACCEPTABLE. WORKERS MUST WEAR SHOE COVERS

ORHAVE A METHOD TO CLEAN SHOES IN ANTEROOM SHOE

COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM

TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE

COVERS MUST BE CHANGED IMMEDIATELY.

PATIENT RISK GROUP: PROJECT CONSTRUCTION ACTIVITY TYPE:

TYPE A TYPE B TYPE C TYPE D

I

I

I

II

LOW RISK - GROUP 1

MEDIUM RISK - GROUP 2

HIGH RISK - GROUP 3

HIGHEST RISK - GROUP 4

II

II

II

III

II

III

IV

IV

III

IV

IV

IV

SPECIAL NOTE: INFECTION CONTROL CONSULTATION IS REQUIRED WHEN THE CONSTRUCTION ACTIVITY

AND RISK GROUP INDICATE THAT CLASS III OR CLASS IV PRECAUTIONS ARE NECESSARY.

STEP 4 - INFECTION CONTROL ACTIVITIES: REQUIRED INFECTION CONTROL ACTIVITIES BY

LEVEL PRECAUTIONS

DURING PROJECT CONSTRUCTION . . . ARE DESCRIBED IN THE TABLE BELOW

UPON PROJECT COMPLETION…ARE DESCRIBED IN THE TABLE BELOW

TAPE PLASTIC TO WALL

EXISTING DOOR & FRAME

PROVIDE ZIPPER DOOR IN

PLASTIC

NOTE:

1. APPLICABLE TO PENETRATIONS OF 1 HOUR FIRE RATED

MEMBRANES, IN ACCORDANCE WITH NFPA 101. REFER

TO SPECIFICATIONS SECTION 07 84 00, FIRE STOPPING

SYSTEMS

2. PENETRATIONS OF 2 HOUR OR MORE REQUIRE FIRE

DAMPER PER NFPA 90A SECTION 5.3.1.1. REFER TO

MECHANICAL DRAWINGS FOR DETAIL

INSULATED PIPE

OR DUCT

FLOOR

FIRESTOP MATERIAL

3/4" [19mm] APPROVED

FIRESTOP INSULATION WITH

VAPOR BARRIER

PIPE SLEEVE WHERE

SPECIFIED

1/4" [6.4mm]∅ ANCHOR ROD

FOR NEW CONSTRUCTION

WELD

[2 5m m

[1 m m

[1 m m

FLOOR OR DECK PENETRATION

PARTITION OR CHASE PENETRATION

[150mm] [150mm]

MASONRY PARTITION

PARTITION SUPPORT

FIRESTOP

MATERIAL

[150mm] [150mm]

3/4" [19mm] APPROVED FIRESTOP

INSULATION WITH VAPOR BARRIER

DRYWALL PARTITION

INSULATED

PIPE OR

DUCT

6" 6"

6" 6"

6" 6"

CONTINUOUS METAL STUD BOTTOM TRACK

SET IN CONTINUOUS BEAD OF SEALANT.

LINE OF FINISHED FLOOR, SEE ROOM FINISH

SCHEDULE FOR FLOOR & BASE TYPE

UNDERSIDE OF ROOF OR FLOOR DECK

LINE OF CEILING SYSTEM, SEE ROOM

FINISH SCHEDULE FOR TYPE & HEIGHT

3 5/8" METAL STUDS @ 16" OC, TYPICAL

(1) LAYER 5/8" TYPE 'X' GYPSUM

BOARD BOTH SIDES

SECTION

CONTINUOUS 3 1/2" SOUND

ATTENUATION BATTS AS SCHEDULE

CONTINUOUS METAL HORIZONTAL BRIDGING

CHANNEL @ MID HEIGHT, TYPICAL

PLAN

T1

0'

7/

8"

FIRE CAULK IN ACCORDANCE WITH UL 419

5/8" FULL HEIGHT TYPE 'X' GYPSUM BOARD

BOTH SIDES

1-HR RATED METAL STUD PARTITION

CONTINUOUS METAL STUD TOP TRACK.

PROVIDE DEFLECTION TRACK AT ROOF

FIRE CAULK IN ACCORDANCE WITH UL 419

RUBBER BASE. SEE FINISH SCHEDULE BOTH SIDES

ASSEMBLY: UL-U419

STC: 50

NOTE: ANY PENETRATIONS THROUGH PARTITION ARE TO BE FIRE CAULKED

LINE OF FINISHED FLOOR, SEE ROOM FINISH

SCHEDULE FOR FLOOR & BASE TYPE

FACE OF EXISTING WALL

3 5/8" METAL STUDS @ 16" O.C., TYPICAL

(1) LAYER 5/8" TYPE 'X' GYPSUM

BOARD BOTH SIDES

SECTION

PLAN

T2

0'

7/

8"

1-HR RATED

FIRE CAULK IN ACCORDANCE WITH UL 419

ASSEMBLY: UL-U419

STC: 50

NOTE: ANY PENETRATIONS THROUGH PARTITION ARE TO BE FIRE CAULKED

TEMPORARY CONSTRUCTION BARRIER

CONTINUOUS METAL STUD BOTTOM TRACK

SET IN CONTINUOUS BEAD OF SEALANT

CONTINUOUS 3 1/2" SOUND

ATTENUATION BATTS AS SCHEDULE

CONTINUOUS METAL HORIZONTAL

BRIDGING CHANNEL @ MID HEIGHT,

TYPICAL

FIRE CAULK IN

ACCORDANCE WITH UL 419

METAL STUD FRAMING W/ 5/8" TYPE

'X' GYPSUM BOARD, ONE SIDE

5/8" TYPE 'X' GYPSUM BOARD BOTH SIDES

RUBBER BASE. SEE FINISH

SCHEDULE BOTH SIDES

LINE OF CEILING SYSTEM, SEE ROOM

FINISH SCHEDULE FOR TYPE & HEIGHT

ACCESS ZIPPER

LINE OF FINISHED FLOOR, SEE ROOM FINISH

SCHEDULE FOR FLOOR & BASE TYPE

CONTINUOUSLY SEAL FIRE RETARDANT

POLYSTYRENE TO EXISTING FINISHED

FLOOR.

6-MIL FIRE RETARDANT POLYSTYRENE,

SEE SPECIFICATIONS. PROVIDE ZIPPER

ACCESS WHERE REQUIRED

EXISTING UNDERSIDE OF DECK

T3 FIRE RETARDANT DUST CONTROL BARRIER

CONTINUOUSLY SECURE AND SEAL EDGE OF FIRE

RETARDANT POLYSTYRENE TO UNDERSIDE OF

DECK

EXISTING FINISHED CEILING SYSTEM. REMOVE AND

REINSTALL CEILING PANELS AS REQUIRED

CONTINUOUSLY SECURE FIRE RETARDANT

POLYSTYRENE SHEET TO UNDERSIDE OF METAL

CEILING TRACK AND ABOVE METAL CEILING TRACK

SECURE AND SEAL ALL SIDES OF

EXISTING DUCTS, CONDUIT, PIPES, ETC.

6-MIL FIRE RETARDANT

POLYSTYRENE

CONTINUOUSLY SECURE EDGE OF FIRE

RETARDANT POLYSTYRENE TO

EXISTING HOLLOW METAL FRAME

EXISTING HOLLOW METAL

FRAME

EXISTING DOOR SYSTEM

BEYOND

CONTINUOUSLY SECURE/SEAL FIRE

RETARDANT POLYSTYRENE TO EXISTING

WALL. TYPICAL ALL WALLS AS REQUIRED.

PATCH/REPAIR EXISTING WALLS AS

REQUIRED TO MATCH EXISTING PRIOR TO

CONSTRUCTION

T4

FIRE RETARDANT DUST CONTROL

DETAIL AT DOORGLAZING PANEL REMOVAL

EXISTING WALL

CONSTRUCTION TO REMAIN

EXISTING GLAZING PANEL TO BE

REMOVED FROM EXISTING WINDOW

SYSTEM PRIOR TO START OF

ABATEMENT. GC TO STORE GLAZING

PANEL IN A SAFE LOCATION UNTIL

WORK IS COMPLETE AND REPLACE

TO IT'S EXISTING CONDITION. IF

DAMAGED, GC WILL REPLACE TO

MATCH EXISTING

EXISTING ALUMINUM FRAME

TO REMAIN

HEPA EXHAUST

EXISTING WALL CONSTRUCTION

TO REMAIN

PROVIDE HEPA FILTRATION EXHAUST

DUCTING THROUGH NEW

TEMPORARY PLYWOOD PANEL

EXISTING ALUMINUM FRAME TO REMAIN

PROVIDE 3/4" FIRE TREATED

PLYWOOD PANEL WITHIN

EXISTING ALUMINUM FRAME

1.

NOTE:

GENERAL CONTRACTOR TO LOCATE

PER QUANTITIES REQUIRED.

PROVIDE DUCT SEALING TAPE

AROUND PENETRATION (TYPICAL)

EXTERIORINTERIOR EXTERIOR

INTERIOR

(NEGATIVE SPACE)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

C:

\U se rs\ nk hu at\ Do cu me nts \24

-U

SD

VA

-0

1_

VA

B

RO

OK

LY

N_ Up da te

Ch ille r W ate r-C

EN

TR

AL

_n kh ua t47

SR

3.r vt 5/9

/20

:00

:28 P

M

GC301

ICRA DETAILS AND NOTES

03/07/2025

NY HARBOR HEALTHCARE SYSTEM - BROOKLYN CAMPUS

BLDG. #: 1

630A4-22-413UPGRADE STATION CHILLED WATER

P&ID

100% CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

24-USDVA-01

VA Job # 22-02-BK

DesignerChecker

3/4" = 1'-0"B STICKY WALK - OFF MAT DETAIL

ICRA CONTROL POLICYICRA POLICY MATRIX

3/4" = 1'-0"C HEPA SYSTEM DOOR SEALING

1/2" = 1'-0"1 PIPE/DUCT PENETRATION OF SMOKE/FIRE BARRIERS DETAIL

1 1/2" = 1'-0"A TYPICAL HEPA FILTRATION THROUGH WINDOW DETAIL

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

DO NOT SCALE DRAWINGS. CONTRACTOR(S) ARE TO VERIFY SITE DIMENSIONS AND

CONDITIONS PRIOR TO WORK

CONSTRUCTION SHOULD BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE

APPLICABLE CODES INCLUDING ACCESSIBILITY STANDARDS AND THE REQUIREMENTS OF

"AMERICANS WITH DISABILITIES ACT." AND VA BARRIER GUIDELINES

CONTRACTOR(S) SHALL VISIT THE SITE AND CORRELATE THE REQUIREMENTS OF THE

DOCUMENTS WITH THE EXISTING CONDITIONS

DRAWINGS ARE DIAGRAMMATIC AND SINCE EXISTING CONDITIONS, INCLUDING AREAS

ABOVE ACCESSIBLE CEILINGS MAY AFFECT NEW WORK, THE CONTRACTOR SHALL

COORDINATE AND ALTER NEW WORK TO PROPERLY FIT THE EXISTING CONDITIONS. THE

WORK SHALL BE PERFORMED AT NO EXTRA COST. THE CONTRACTOR SHALL VERIFY ALL

CONDITIONS AND DIMENSIONS AT THE JOB SITE PRIOR TO THE START OF

CONSTRUCTION. IF DISCREPANCIES ARE FOUND, THE ARCHITECT SHALL BE NOTIFIED

FOR CLARIFICATION BEFORE COMMENCING WITH THE WORK

DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE SHOWN. WHEN SPECIFIC

DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BE DETERMINED, CONSULT THE

ARCHITECT BEFORE PROCEEDING WITH THE WORK

SOME MASONRY AND LUMBER DIMENSIONS SHOWN ON THE DRAWINGS ARE NOMINAL

DIMENSIONS

CONTRACTOR(S) SHALL COORDINATE ACTUAL DIMENSIONS WITH THE JOB CONDITIONS.

REPORT ALL DISCREPANCIES TO THE ARCHITECT

EXISTING CONDITIONS SHOWN ON THIS DRAWING ARE NOT GUARANTEED TO BE

COMPLETE. THE CONTRACTOR(S) SHALL FIELD VERIFY ALL EXISTING CONDITIONS,

DIMENSIONS AND MATERIALS REQUIRED FOR CONTRACTED WORK. REPORT ALL

DISCREPANCIES TO THE ARCHITECT PRIOR TO FABRICATION AND ERECTION

THE TERM 'PATCH TO MATCH' OR 'CUTTING AND PATCHING' DENOTES THAT REPAIR WORK

IS NECESSARY TO CONSTRUCT A FLOOR, BASE, WAINSCOT, WALL OR CEILING TO MATCH

THE EXISTING SURFACE FINISH, TEXTURE AND SHEEN

WHERE NEW OPENINGS OCCUR IN STRUCTURAL BEARING WALL, CONTRACTOR IS

RESPONSIBLE FOR TEMPORARY SUPPORTS AND / OR SHORING AS REQUIRED FOR

INSTALLATION OF LINTELS

WHERE EXISTING DOORWAYS ARE TO BE FILLED IN, CONTRACTOR IS RESPONSIBLE FOR

FIELD VERIFYING WALL WIDTHS

THE GENERAL CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ALL ACCESS

DOORS, ACCESS PANELS AND FRAMES, INCLUDING, BUT NOT LIMITED TO THOSE SPECIFIC

IN CONSTRUCTION DOCUMENTS AND FURNISHED BY OTHER CONTRACTORS. ALL

ACCESS DOORS AND PANEL LOCATIONS TO BE COORDINATED AND APPROVED BY THE

ARCHITECT PRIOR TO THE INSTALLATION. THE GENERAL CONTRACTOR IS RESPONSIBLE

FOR PAINTING ALL ACCESS PANELS AND ACCESS DOORS. GENERAL CONTRACTOR IS

RESPONSIBLE FOR COORDINATING ALL PAINT COLORS WITH THE ARCHITECT PRIOR TO

COMMENCING WITH WORK

WHEN POWER AND DATA RECEPTACLES ARE INTENDED TO BE ADJACENT, THEY SHOULD

BE PLACED NO MORE THAN 1'-0" APART

FIRE RESISTANCE RATING

1. FIRE RATING INDICATED ON A WALL SHALL MEAN THE ENTIRE LENGTH AND HEIGHT OF

WALL TO BE FIRE RATED

2. ALL PIPING, DUCTS, CABINETS, ETC. THAT PENETRATE WALLS SHALL BE INSTALLED IN A

MANNER THAT WILL PRESERVE THE FIRE RESISTANCE RATING OF THAT WALL

3. PRESERVE ALL FIRE RESISTANT RATINGS OF EXISTING WALL UNLESS NOTED OTHERWISE

DIMENSIONING

1. ALL NEW INTERIOR PARTITIONS ARE DIMENSIONED TO FACE OF STUD. WHERE

DIMENSION IS TAKE TO EXISTING PARTITION IT IS TAKEN TO FACE OF EXISTING PARTITION.

THE CONTRACTOR SHALL COORDINATE FINISH DIMENSIONS AND FACE OF WALL

DIMENSIONS WITH FINISH SCHEDULE WHEN CRITICAL TO THE INSTALLATION OF MILLWORK

OR EQUIPMENT

CONT METAL BOTTOM TRACK

SET IN CONT BEAD OF

ACCOUSTICAL SEALANT.

LINE OF FINISHED FLOOR, SEE ROOM

FINISH SCHEDULE FOR FLOOR & BASE

TYPE

UNDERSIDE OF ROOF OR FLOOR DECK

EXISTING FRAMED CONSTRUCTION

EXTEND TO DECK AS REQUIRED

EXISTING FINISH TO REMAIN.

PROTECT IN PLACE

SECTION

CONTINUOUS METAL HORIZONTAL

BRIDGING CHANNEL @ MID HEIGHT, TYP.

A1

0'

7/

8"

ONE LAYER (1) 5/8" SOUND

ATTENUATED GWB BOTH SIDES

EXISTING STUD PARTITIONS

CONTINUOUS METAL TOP TRACK. PROVIDE

DEFLECTION TRACK AT ROOF

PLAN

CONT METAL BOTTOM TRACK SET IN CONT

BEAD OF ACOUSTICAL SEALANT.

LINE OF FINISHED FLOOR, SEE ROOM

FINISH SCHEDULE FOR FLOOR & BASE

TYPE

UNDERSIDE OF ROOF OR FLOOR DECK

3 5/8" METAL STUDS @ 16" OC, TYP

(1) LAYER 5/8" THK. GWB BOTH SIDES

SECTION

CONTINUOUS METAL HORIZONTAL

BRIDGING CHANNEL @ MID HEIGHT, TYP.

A2

M

AT

C H

E

XI

ST

IN

G

FULL HGT 5/8" GWB BOTH SIDES

INFILL DETAIL AT DOOR AND WALL

PLAN

EXISTING WALL CONSTRUCTION

AT RATED WALL

ACOUSTICAL SEALANT

MECHANICAL ROOM

ACOUSTICAL SEALANT

FILL CAVITY WITH SOUND

ATTENUATED BATTS

MECHANICAL ROOM

EXISTING FINISH TO REMAIN.

PROTECT IN PLACE

MECHANICAL ROOM FILL CAVITY WITH SOUND

ATTENUATED BATTS

ONE LAYER (1) 5/8" SOUND

ATTENUATED GWB BOTH SIDES

MECHANICAL ROOM

FILL CAVITY WITH SOUND

ATTENUATED BATTS

ACOUSTICAL SEALANT

FILL CAVITY WITH SOUND

ATTENUATED BATTS

CONT METAL STUD BOTTOM TRACK

SET IN CONT BEAD OF SEALANT.

LINE OF FINISHED FLOOR, SEE ROOM

FINISH SCHEDULE FOR FLOOR & BASE

TYPE

LINE OF CEILING SYSTEM, SEE ROOM

FINISH SCHEDULE FOR TYPE & HEIGHT

SECTION

CONTINUOUS METAL HORIZONTAL

BRIDGING CHANNEL @ MID HEIGHT, TYP.

A3

3/8" ACOUSTICAL SEALANT

METAL STUD PARTITION

UNDERSIDE OF ROOF OR FLOOR DECK

FULL HGT GWB ONE SIDE

CONTINUOUS METAL STUD TOP TRACK.

PROVIDE…