Drawings- Upgrade Station Chilled Water.pdf
PDF 33 MB Posted
- Solicitation number
- 36C24226B0010
About this file
This is a comprehensive set of architectural and engineering drawings for a chilled water system upgrade project at the VA New York Harbor Healthcare System's Brooklyn Campus. The project involves renovating mechanical spaces on the 6th and 7th floors of Building 1, with work focused on installing a new 20-ton air-cooled chiller (CH-1), air handling unit (AHU-1), associated pumps, and related mechanical, electrical, and plumbing infrastructure. The project includes demolition of existing mechanical equipment, installation of new HVAC systems, chilled water piping, electrical connections, and modifications to ensure proper integration with the existing building systems.
Key technical components include a Trane air-cooled modular chiller with a 20-ton capacity, an air handling unit serving the IV Prep and Ante Rooms with continuous 24/7 operation, two in-line pumps (P1 and P2), an electric unit heater, exhaust fans, and a gas leak detection system. The project requires extensive coordination across mechanical, electrical, and architectural disciplines, with careful attention to infection control, life safety requirements, and minimal disruption to hospital operations. The work is being performed under VA solicitation number 36C24226B0010, with a focus on upgrading the central chilled water station to improve the facility's HVAC infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
6/1 4/2
9 1
2:3 9:0
3 P M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
FULLY SPRINKLERED
Office of Construction and Facilities Management U.S. Department of Veterans Affairs
PhaseARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
VA U.S. Department of Veterans Affairs
LIST OF DRAWINGS
PROJECT CONTACT DIRECTORY
LOCATION MAP
CONTRACT OFFICER / SPECIALIST CONTRACTING OFFICER REPRESENTATIVE (COR) ARCHITECT / MEP/FP & STRUCTURAL ENGINEERS acela architects + engineers, pc 2633 Moravian Avenue Allentown, PA 18103
APPROVALS
PROJECT INFORMATION
NO
T
FO
R
CO
NS
TR
UC
TI
ON
C :\U se rs
\n kh ua t\D oc um en ts
\2 4-
U
SD
VA
-0
1_
VA
B R
O O
KL
YN
_U pd at e
C hi lle r W at er
-C
EN
TR
AL
_n kh ua t4
7S R
3.
rv t
GI101
COVER SHEET
03/07/2025
NY HARBOR HEALTHCARE SYSTEM - BROOKLYN CAMPUS
BLDG. #: 1
630A4-22-413UPGRADE STATION CHILLED WATER
P&ID
NY HARBOR HEALTHCARE SYSTEM - BROOKLYN CAMPUS
100% CONSTRUCTION DOCUMENTS
800 POLY PLACE, BROOKLYN NY 11209
John Situ Phone: (347) 237-7076 e-mail: John.Situ@va.gov 800 Poly Place, Brooklyn, NY 11209
Jean Paul Phone: (XXX) XXX-XXX xXXXXX e-mail: Jean.Paul@va.gov 800 Poly Place, Brooklyn, NY 11209
Elizabeth Chung (Facility Program Manager) Phone: (347) 205-1950 e-mail: Elizabeth.Chung@va.gov 800 Poly Place, Brooklyn, NY 11209
Yeung Yingie Phone: (XXX) XXX-XXX xXXXXX e-mail: Yeung.Yingie@va.gov 800 Poly Place, Brooklyn, NY 11209
VA Job # 22-02-BK
UPGRADE STATION CHILLED WATER
P&ID
PROJECT #: 630A4-22-413
24-USDVA-01
PAPM
DEPARTMENT OF VETERANS AFFAIRS
BLDG. #: 1
GENERAL INFORMATION
GI101 COVER SHEET
GI102 GENERAL INFORMATION
GI103 GENERAL INFORMATION
GI201 LIFE SAFETY PLAN
GENERAL CONTRACT
GC301 ICRA DETAILS AND NOTES
GC401 PARTITION TYPES
GC501 DOOR & WINDOW SCHEDULES & DETAILS
ARCHITECTURAL
AE101 OVERALL PLANS
AE102 6TH FLOOR - DEMOLITION/NEW WORK PLANS, RCP, ELEVATIONS
AE103 7TH FLOOR - DEMOLITION/NEW WORK PLANS, RCP, ELEVATIONS
FIRE PROTECTION
FP101 FIRE PROTECTION PLAN
PLUMBING
P101 PLUMBING PLAN
MECHANICAL
MD101 MECHANICAL DEMOLITION PLAN - 6TH FLOOR
MH001 LEGEND AND ABBREVIATIONS
MH101 MECHANICAL PLANS -6TH AND 8TH FLOOR
MH102 MECHANICAL PLANS - 7TH FLOOR
MH500 DETAILS
MH600 SCHEDULES
MH700 CONTROLS DIAGRAM
MH701 CONTROLS DIAGRAM
ELECTRICAL
ED101 ELECTRICAL DEMOLITION PLANS
E001 ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
E601 ELECTRICAL DETAILS
EP101 ELECTRICAL FLOOR PLANS
EP102 ELECTRICAL RISER DIAGRAM
STRUCTURAL
SS001 GENERAL NOTES
SF101 STRUCTURAL FRAMING PLAN
SF201 TYPICAL COLD FORMED FRAMING DETAILS
Revisions: Date:
CENTER LINE
DETAIL INDICATIOR
DIMENSION LINE
NEW DOOR OPENING / BORROWED LIGHT INDENTIFIER
- SEE DOOR SCHEDULE, DETAILS AND ELEVATIONS SHEET
DRAWING BLOCK TITLE, TYPICAL
INTERIOR ELEVATION INDICATOR
BUILDING SECTION INDICATOR
TYPICAL DETAIL INDICATOR
COLUMN GRID
GENERAL CONSTRUCTION KEYNOTE TAG
WALL OR PARTITION TYPE
FIRE EXTINGUISHER CABINET
CORNER GUARD
NORTH ARROW
CG
FEC
A
DETAIL NUMBER
SHEET NUMBER
XX-XX
0' - 1"
XX-XX
CL
XX-XX
x'-x" SPOT ELEVATION
1 REVISION ID TAG
REVISION CLOUD
BREAK LINE
X
EXISTING DOOR OPENING
1 View Name 1/8" = 1'-0"
N
PROJECT
NORTH
1/8" = 1'-0"
0' 8'4' 16'2'
GRAPHIC SCALE
X INTERIOR SIGNAGE TAG
PLACE DOOR
TAG HERE
E###
REFLECTED CEILING KEYNOTE TAG
XXXXX
HRDW NEW DOOR TAG
DOOR NUMBER
HARDWARE SET,
SEE SPECS
EXISTING DOOR TAGXXXXX
A101
XX-XX
BUILDING ELEVATION INDICATOR
FURNITURE, FIXTURE, EQUIPMENT INDICATOR
COLUMN GRID - NEW
COLUMN GRID - EXISTING1
1i
DD ROOM TAG - ROOM NAME AND NUMBER
LIFE SAFTEY ROOM TAG - ROOM NAME, NUMBER AND AREA
Room name
150 SF
Room name
1i
XXXXX
HRDW
PLACE DOOR
TAG HERE
& AND
@ AT
C CENTERLINE
# NUMBER
AB ANCHOR BOLT
ABV ABOVE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH
DISABILITIES ACT
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALUM ALUMINUM
ALT ALTERNATE
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AUTO AUTOMATIC
AVG AVERAGE
BD BOARD
BLDG BUILDING
BLK BLOCK
BM BEAM
BOT BOTTOM
BRG BEARING
BEL BELOW
BR BUMPER RAIL
BRK BRICK
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CCT CUBICLE CURTAIN TRACK
CG CORNER GUARD
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CT CERAMIC TILE
CLG CEILING
CL CLOSET
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONT CONTINUOUS
CPT CARPET
CU CUBIC
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DN DOWN
DO DOOR OPENING
DOZ DOZEN
DP DAMPPROOFING
DR DOOR
DWG DRAWING
DWGS DRAWINGS
DWR DRAWER
E EAST
EA EXHAUST AIR, EACH
EL ELEVATION
ELEV ELEVATION
ELEC ELECTRICAL
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXP EXPANSION
EJ EXPANSION JOINT
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISH FLOOR
FHC FIRE HOSE CABINET
FIN FINISH
FLR FLOOR
FLUOR FLUORESCENT
FO __ FACE OF __
FOC FACE OF CONCRETE
FOS FACE OF STUD
FOW FACE OF WALL
FRPF FIREPROOF(ING)
FR FIRE RATING, FRAME
FRMG FRAMING
FS FULL SIZE
FT FOOT OR FEET
FTG FOOTING
FUR FURRING
FUT FUTURE
GC GENERAL CONTRACTOR
GA GAUGE
GAL GALLON
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GL GLASS
GND GROUND
GR GRADE
GWB GYPSUM WALLBOARD
GYP BD GYPSUM WALLBOARD
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDWR HARDWARE
HDWD HARDWOOD
HT HEIGHT
HNDRL HANDRAIL
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMF HOLLOW METAL FRAME
HR HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HVAC HEATING, VENTILATION, AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER
INCL INCLUDE(D)
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JST JOIST
JT JOINT
KP KICK PLATE
KO KNOCKOUT
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBS POUNDS
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LH LEFT HAND
LIN LINEAR
LIQ LIQUID
LKR LOCKER
LG LONG
LL LEAD LINED
LLV LONG LEG VERTICAL
LP LOW POINT
LRG LARGE
LT LIGHT
LT WT LIGHTWEIGHT
LVR LOUVER
MATL MATERIAL
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MP MOP PLATE
MTD MOUNTED
N NORTH
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER / DIMENSION
OH OPPOSITE HAND
OPG OPENING
OPP OPPOSITE
OH OVERHEAD
OZ OUNCE
PAV PAVING
PC PRECAST CONCRETE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PLBG PLUMBING
PMF PREMOLDED FILLER
PR PAIR
PT POINT
PTN PARTITION
QT QUARRY TILE
R RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE, RUBBER
BASE
RD ROOF DRAIN
RL ROOF LEADER
REF REFERENCE
REFR REFRIGERATOR
REQ'D REQUIRED
REV REVISION
RFI REQUEST FOR
INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
S SOUTH
SA SUPPLY AIR
SAN SANITARY
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SH SPRINKLER HEAD
SHT SHEET
SIM SIMILAR
SM SMOKE
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
STA STATION
STD STANDARD
STO STORAGE
STL STEEL
SS STAINLESS STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TEL TELEPHONE
TEMP TEMPERED
T&G TONGUE AND GROOVE
THK THICK
TOC TOP OF CONCRETE
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TOW TOP OF WALL
TV TELEVISION
TYP TYPICAL
UNFIN UNFINISHED
UON UNLESS OTHERWISE
NOTED
VB VAPOR BARRIER
VERT VERTICAL
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VTR VET THRU ROOF
W WEST
W/ WITH
WD WOOD
W/O WITHOUT
WP WATERPROOF
WT WEIGHT
WWF WELDED WIRE FRAME
WOOD
WOOD FINISH
ALUMINUM
STEEL
EARTH
GYPSUM - PLASTER
CMU (CONCRETE MASONRY UNIT)
RIGID INSULATION
BATT INSULATION
PLYWOOD
CONCRETE
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
C:
\U se rs\ nk hu at\ Do cu me nts \24
-U
SD
VA
-0
1_
VA
B
RO
OK
LY
N_ Up da te
Ch ille r W ate r-C
EN
TR
AL
_n kh ua t47
SR
3.r vt 5/9
/20
:01
:04 P
M
GI102
GENERAL INFORMATION
03/07/2025
NY HARBOR HEALTHCARE SYSTEM - BROOKLYN CAMPUS
BLDG. #: 1
630A4-22-413UPGRADE STATION CHILLED WATER
P&ID
100% CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
24-USDVA-01
VA Job # 22-02-BK
DesignerChecker
ARCHITECTURAL SYMBOLSABBREVIATIONS MATERIAL LEGEND
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
ALL DIMENSIONS OF NEW PARTITIONS/BARRIERS SHALL BE TAKEN TO FACE OF STUD. DIMENSIONS TO EXISTING WORK
SHALL BE TAKEN TO FACE OF FINISH SURFACE.
ALL DOOR FRAMES ARE TO BE LOCATED 4" FROM PERPENDICULAR WALL, UNO.
DO NOT SCALE DRAWINGS. DRAWINGS ARE CONCEPTUAL PLANS.
THE WORK OF THE CONTRACTOR SHALL INCLUDE ALL LABOR AND MATERIALS FOR ALL TRADES CONCERNED FOR
COMPLETING THE PROJECT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.
THE CONTRACTOR SHALL PROCURE, COMPLETE AND APPLY FOR ALL PERMITS AS REQUIRED TO CONSTRUCT THE PROJECT.
THE CONTRACTOR SHALL BE FAMILIAR WITH THE CONTRACT DOCUMENTS AND MUST VISIT THE SITE AND BE ACQUAINTED
WITH THE CONDITIONS AFFECTING THE WORK.
WORKMANSHIP. ALL WORK TO BE FIRST RATE, HIGH QUALITY, AND ACCOMPLISHED IN A WORKMANLIKE MANNER BY SKILLED CRAFTSMEN USING ACCEPTED PRACTICES AND METHODS APPROPRIATE TO THE TRADE INVOLVED.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY CLEANING UP OF THE WORK AREA. THE AREA SHALL BE CLEANED EACH DAY AND TRASH SHALL BE DISPOSED OF AT THE END OF EACH DAY. AT THE END OF THE PROJECT, THE CONTRACTOR
SHALL CLEAN THE WORK AREA THOROUGHLY.
ALL WORK SHALL BE GUARANTEED FOR ONE YEAR FROM THE TIME OF ACCEPTANCE BY THE OWNER UNLESS OTHERWISE
NOTED IN THE SPECIFICATIONS.
ALL PLUMBING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL PLUMBING CODE. INSTALL ALL WATER, WASTE AND VENT PIPING IN ACCORDANCE WITH ALL APPLICABLE CODES. REVIEW DRAWINGS AND PROVIDE ALL WORK FOR A COMPLETE AND OPERABLE SYSTEM, INCLUDING ALL INCIDENTALS, REQUIRED BY CODE AGENCIES AND LOCAL
GOVERNING BODIES.
VA PLUMBING DESIGN GUIDE - 2021
11. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL BUILDING CONDITIONS, COORDINATE ALL
DIMENSIONS IN FIELD AND VERIFY ALL LOCATIONS OF UTILITIES IN THE FIELD.
12. ALL HEATING, VENTILATING AND AIR CONDITIONING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL MECHANICAL AND ENERGY CODES (AS APPLICABLE), STATE CODES, AND ANY REQUIREMENTS OF THE
LOCAL AUTHORITIES HAVING JURISDICTION.
NFPA 90A - 2021
NFPA 99 - 2021
NFPA 101 - 2024
VA HVAC DESIGN GUIDE - 2023
13. THE COMPLETE ELECTRICAL SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL ELECTRICAL CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES.
NFPA 70 - 2023
NFPA 101 - 2024
VA ELECTRICAL DESIGN GUIDE - 2019
VA ELECTRICAL DESIGN MANUAL FOR REPLACEMENT HOSPITALS, CLINICAL ADDITIONS, ENERGY CENTERS, AND
LABORATORY BUILDINGS - 2015
VA LIGHTING DESIGN MANUAL - 2022
VA RADIOLOGY DESIGN MANUAL - 2022
VA PHYSICAL SECURITY DESIGN MANUAL FOR LIFE SAFETY PROTECTED FACILITIES - 2023
14. THE COMPLETE FIRE PROTECTION SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL FIRE PROTECTION CODE.
NFPA 101 - 2024
NFPA 13 - 2022
NFPA 14 - 2019
NFPA 72 - 2022
VA FIRE PROTECTION DESIGN GUIDE - 2023, 9TH EDITION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
THE CONTRACTOR SHALL COORDINATE WITH THE VA HOSPITAL'S JCAHO INSPECTION SCHEDULE WITH THE COR. NO CONTRACTOR WORK SHALL BE PERFORMED DURING TWO WEEKS IN EACH YEAR DURING A JCAHO INSPECTION.
BEFORE STARTING WORK IN PROJECT AREAS THAT WILL BE OCCUPIED DURING THE PERFORMANCE OF WORK, GC SHOULD COORDINATE WITH THE COR AND ARCHITECT THE OFF-HOURS SCHEDULE OF SUCH WORK. GC SHOULD AVOID CUTOVERS, SHUTDOWNS, CABLING, AND OUTLET INSTALLATION OF SERVICES THAT WILL DISRUPT THE DEPARTMENT/ AREA WORKING HOURS. ALL CONTRACTOR WORK SHOULD AVOID ANY PERFORMANCE WORK THAT WILL INTERRUPT
THE DEPARTMENT/AREA FUNCTION DURING NORMAL DAYTIME WORKING HOURS.
BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE RESPONSIBLE TO SET-UP TEMPORARY / PERMANENT CONSTRUCTION/ICRA BARRIERS WITH ANTEROOM AND MAINTAIN NEGATIVE PRESSURE.
ALL TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION PHASE AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE CONTRACTOR WILL BE RESPONSIBLE TO CLEAN AND PREPARE THE
AREA TO BE OCCUPIED BY MEDICAL CENTER STAFF AND RESIDENCE.
DIMENSIONS SUPERSEDE DRAWINGS. DO NOT SCALE PLANS. DIMENSIONS ARE TO THE FACE OF EXISTING MATERIALS UNLESS OTHERWISE NOTED. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED AT THE SITE BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL
DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATIONS AND ERECTION.
IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. ALL CONSTRUCTION WORK SHALL BE PERFORMED IN CONTRACTOR'S RESPONSIBILITY TO DETERMINE CONSTRUCTION PROCEDURES AND SEQUENCE AND TO INSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING CONSTRUCTION SHALL PROVIDE ADEQUATE SHORING AND BRACING DURING DEMOLITION AND CONSTRUCTION TO SUPPORT LOADS. SUCH MATERIAL SHALL BE REMOVED AT THE COMPLETION OF WORK AND SHALL REMAIN THE CONTRACTOR'S PROPERTY AFTER THE COMPLETION OF THE PROJECT.
DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR LOAD CARRYING
CAPACITY OR LOAD-DEFLECTION RATIO.
WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE REMOVED, RESTORE EXPOSED FINISHES OF CUT AND PATCHED AREAS AND EXTEND FINISH RESTORATION INTO ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE FINISHES, REMOVE SO TOTALLY, FROM PLANE TO PLANE, TREAT REMAINING SUBSURFACE TO RECEIVE NEW FINISHES
DESIGNATED.
WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. SHOWN TO BE RELOCATED SHALL BE COORDINATED BY THE CONTRACTOR WITH THE VA PRIOR TO START OF WORK IN EACH AREA. THE VA WILL REMOVE ALL ITEMS OF SALVAGEABLE VALUE, INCLUDING BUT NOT LIMITED TO DOORS, HARDWARE, MOVEABLE EQUIPMENT NOT ALREADY
DESIGNATED FOR REINSTALLATION/REUSE, PRIOR TO CONTRACTOR COMMENCING WORK.
WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENINGS SHALL BE PATCHED TO MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN.
IN GENERAL, WHEREVER SERVICES ARE REMOVED, THE OPENINGS SHALL BE PATCHED TO MATCH THE EXISTING ADJACENT SURFACES FINISH TEXTURE AND SHEEN. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK AND OTHER ITEMS CREATES OPENINGS IN THE WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH THE SAME MATERIALS AS ADJACENT CONSTRUCTION. MAINTAIN THE REQUIRED FIRE RATING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION. FILL IN ALL EXISTING OPENINGS THAT ARE NOT TO REMAIN, UNLESS
OTHERWISE NOTED. FINISH TO MATCH FINISH OF ADJACENT SURFACE.
WHERE CODED NOTE DESIGNATIONS ARE SHOWN AS "TYP" OR "TYPICAL" IT IS INTENDED THAT THE NOTE GENERALLY
REFERS TO ALL SIMILAR ITEMS OR SURFACES.
A HAZARDOUS MATERIALS SURVEY WAS NOT CONDUCTED. IT IS THE CONTRACTORS RESPONSIBILITY TO TAKE PROTECTIVE MEASURES FOR ITS WORKERS PRIOR TO THE BEGINNING OF ANY RENOVATION OR DEMOLITION WORK.
AFTER COMPLETION OF DEMOLITION, SCHEDULE A WALK-THROUGH WITH THE COR FOR REVIEW OF EXISTING
CONDITIONS.
PATCH, AND MATCH RATING TO EXISTING RATING OF ALL FIRE STOP AT ABANDONED PENETRATIONS THROUGH THE
CONCRETE FLOORS, WALLS, AND ROOF DECK.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
REFER TO SPECIFICATIONS SECTION 024119 - SELECTIVE DEMOLITION FOR ADDITIONAL REQUIREMENTS AND INFORMATION.
PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. ADDITIONAL DEMOLITION WILL BE REQUIRED OUTSIDE OF THIS LINE. ARCHITECTURAL DEMOLITION DRAWINGS ARE FOR SCHEMATIC PURPOSES. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH THE ENTIRE SET OF CONTRACT DOCUMENTS FOR FULL SCOPE OF DEMOLITION WORK REQUIRED FOR THE
PROJECT.
EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE NOT GUARANTEED TO BE COMPLETE. THE CONTRACTOR SHALL VEERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL
DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATION, ERECTION AND/OR INSTALLATION.
COORDINATE ALL NEW PENETRATIONS AND/OR OPENINGS WITH OTHER ASSOCIATED TRADES.
THE OWNER MAY SELECT AND TAG ITEMS FOR DEMOLITION TO BE SALVAGED. THE CONTRACTOR SHALL REMOVE SELECTED ITEMS FROM SCOPE OF WORK AND DELIVER TO THE OWNER'S LOCATION WITHIN THE EXISTING FACILITY.
CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE TO SCOPE OF WORK AREA ENSURING NO DUST WILL BE TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING
DEVICE AT DUST PROOF BARRICADE TO CONFIRM PRESSURE.
THE FACILITY'S EXISTING SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION DURING THE ENTIRE
CONSTRUCTION PHASE.
ALL DEMOLITION WORK BEING DONE OUTSIDE OF TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS AND MINIMIZE DISRUPTION TO VISITORS, RESIDENTS AND STAFF. COORDINATE
LOCATION OF BARRIERS WITH OWNER.
REMOVE PARTITIONS INDICATED FROM THE FLOOR TO THE UNDERSIDE OF THE STRUCTURE ABOVE.
PREPARE ALL ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND SCHEDULED FINISH. EXISTING WALLS SHOWN TO BE REMOVED SHALL BE DEMOLISHED COMPLETELY. THIS INCLUDES THE REMOVAL OF REINFORCEMENT, SOFFITS, DOORS, WINDOWS, FRAMES AND OVERHEAD BRACING. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR DISCONNECTION AND REMOVAL OF EXISTING UTILITIES AND DEVICES LOCATED WITHIN AREAS SCHEDULED TO BE DEMOLISHED.
SOME ITEMS MAY BE INDICATED IN THE DEMOLITION DRAWINGS AND DEMOLITION NOTES WHICH ARE NOT NECESSARILY DEMOLITION WORK BUT ARE INCLUDED TO DESCRIBE THE OVERALL SCOPE OF THE PROJECT AND TO AID IN THE DEMOLITION COORDINATION. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK REQUIRED TO COMPLETE THE INTENDED WORK OF THE
OVEERALL PROJECT.
FLOORING DEMOLITION INCLUDES THE REMOVAL OF EXISTING FLOOR FINISHES, INCLUDING VCT, SHEET VINYL, CERAMIC TILE, QUARRY TILE, CARPET AND OTHER FINISHES, GROUTS, MASTICS AND SETTING BEDS COMPLETE TO EXISTING CONCRETE FLOOR SLAB OR OTHER SUBSTRATE READY FOR NEW FLOOR FINISHES. FLOOR PREP SHALL BE BY THE INSTALLING CONTRACTOR.
REMOVE MISCELLANEOUS ITEMS WITHIN LIMITS OF DEMOLITION. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.
DEMOLITION OF CEILINGS INCLUDES GRID, TILE, SUPPORTS, SOFFITS AMD RELATED ITEMS. COORDINATE WITH ELECTRICAL WORK ON REMOVAL OF LIGHTS, CONDUIT, TIES, SUPPORTS AND RELATED WIRING. COORDINATE WITH MECHANICAL ON REMOVAL
OF DIFFUSERS GRILLS, AND RELATED DUCTWORK EQUIPMENT CONTAINED THEREIN.
PLUG ABANDONED FLOOR OPENINGS WITH NEW CONCRETE. PLUG SHALL MATCH EXISTING SLAB DEPTH AND BE STRUCTURALLY
SOUND TO CARRY FLOOR LOAD OF 100 LBS. / SQ. FT. UNLESS NOTED OTHERWISE.
ALL FIRE RATED ASSEMBLIES (COLUMNS, SHAFTS, WALLS, ETC.) SHALL BE MAINTAINED OR BE RELOCATED / PATCHED. MATCH
EXISTING FIRE RATING UNLESS NOTED OTHERWISE.
REMOVE EXISTING DOORS, FRAMES, SIDELIGHTS, ANCHORS, THRESHOLDS AND HARDWARE AS INDICATED WITHIN LIMITS OF CONSTRUCTION. PATCH AND REPAIR WALL AND FLOOR TO MATCH EXISTING. OWNER SHALL HAVE THE RIGHT TO SALVAGE ANY AND ALL DOORS AND HARDWARE. CONTRACTOR SHALL VERIFY DOORS FOR SALVAGE OR RELOCATION PRIOR TO COMMENCING
DEMOLITION.
WHERE NEW DOORS ARE INDICATED, CUT OPENINGS IN EXISTING WALL. PREPARE OPENINGS FOR NEW DOOR. PATCH REQUIRED WALLS TO MATCH EXISTING. PROVIDE LINTELS AS REQUIRED FOR NEW OPENINGS. PREPARE SURFACES FOR SCHEDULED
FINISHES.
PROTECT EXISTING FINISHED WORK & EQUIPMENT WHICH IS TO REMAIN IN AREAS OF DEMOLITION WORK.
AFTER THE REMOVAL OF ICRA WALLS, CLEAN AND PATCH EXISTING WALLS AND CEILINGS EFFECTED BY CONSTRUCTION AND
MATCH EXISTING FINISHES.
REMOVE ALL PLUMBING FIXTURES AS INDICATED WITHIN THE LIMITS OF CONSTRUCTION. CAP ALL PLUMBING LINES NOT REQUIRED BY NEW CONSTRUCTION. COORDINATE WITH PLUMBING PLANS FOR ADDITIONAL INFORMATION. REMOVE ALL ACCESSORIES ASSOCIATED WITH PLUMBING, INCLUDING PARTITIONS, GRAB BARS, DISPENSERS, RACKS, SHELVING, SINK BASE, DISPOSALS, ETC.
EXAM ROOMS SHALL HAVE REMOVAL OF ALL FLOORING, PLUMBING AND ELECTRICAL IN FLOORS, PLUMBING FIXTURES AND
CASEWORK AS INDICATED IN DEMOLITION DRAWINGS, TYPICAL.
1.
2.
3.
4.
5.
6.
7.
1.
2.
3.
4.
5.
1.
2.
3.
4.
GENERAL NOTES:
EXISTING CONDITIONS HAVE BEEN SHOWN FROM GENERAL SPACE OBSERVATIONS AND EXISTING DRAWINGS. RESPECTIVE TRADES SHALL CONDUCT A COMPLETE FIELD SURVEY OF EXISTING CONDITIONS PRIOR TO SUBMISSION OF BID PRICE. NO ADDITIONAL PAYMENT WILL BE MADE FOR CLAIMS THAT ARISE FROM LACK OF KNOWLEDGE OF EXISTING CONDITIONS.
ALL FINISHES SHALL COMPLY WITH AND BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE LOCAL CODES AND ORDINANCES; NFPA
101 SECTION 10.2.
THE CONTRACTOR SHALL GUARANTEE ALL WORK AND MATERIALS FOR A MINIMUM OF TWELVE (12) MONTHS AFTER THE DATE OF FINAL COMPLETION TO CONTRACTOR UNDER THE CONTRACT. ANY ITEMS DEEMED TO BE DEFECTIVE SHALL BE REPLACED AT CONTRACTORS SOLE EXPENSE, BUT AT OWNER'S OPTION AND CONVENIENCE, BE REPAIRED, REPLACED OR RE-PERFORMED.
ALL GYPSUM BOARD SOFFITS AND HEADERS WITHIN THE SCOPE LIMIT LINES TO BE PAINTED CEILING WHITE UNLESS NOTED
OTHERWISE.
FINISH DRAWINGS SUPERSEDE ARCHITECTURAL DRAWINGS FOR FINISH MATERIALS, COLORS AND LOCATIONS ONLY.
FINISH SAMPLES SHALL BE SUBMITTED TO COR FOR APPROVAL BEFORE PURCHASING AND INSTALLATION.
FINAL COUNTERTOP GROMMET LOCATIONS TO BE FIELD VERIFIED.
FLOORING NOTES:
CONTRACTOR IS TO FIELD VERIFY ALL EXISTING CONDITIONS AND NOTIFY COR OF ANY DISCREPANCIES.
PROVIDE NEW RUBBER BASE AND FLOOR COVERINGS AS SPECIFIED THROUGHOUT. CONTRACTOR TO PREP FLOORS AS NECESSARY
FOR NEW FINISHES.
CONTRACTOR TO PROVIDE TEMPORARY PROTECTION ON ALL NEW FLOORING.
CONTRACTOR TO CLEAR CAULK AT ALL DOOR FRAMES WHERE NEW RESILIENT FLOORING HAS BEEN INSTALLED WITHIN SCOPE LIMITS.
TRANSITION AND REDUCING STRIPS ARE TO BE INSTALLED AT ALL CHANGES IN FLOOR MATERIAL AND/OR ELEVATION THAT OCCURS IN AREAS TO BE NEWLY FINISHED. VERIFY WITH COR EACH CONDITION AND TYPE OF TRANSITION AND/OR REDUCING STRIP TO BE USED PRIOR TO INSTALLATION. FLOAT FLOOR AS REQUIRED FOR SMOOTH/FLUSH TRANSITION BETWEEN MATERIAL CHANGES. TRANSITION
TO BE INSTALLED AT CENTER OF DOOR.
WALL NOTES:
PREP WALLS FOR NEW FINISHES, PATCH AND REPAIR WALLS TO CREATE A SMOOTH UNIFORM FINISH.
CONTRACTOR TO APPLY AT LEAST TWO COATS OF PAINT. EACH COAT TO BE EQUAL TO 1.6 MIL. APPLY MORE IF NECESSARY TO COVER
EXISTING COLOR.
CONTRACTOR IS TO PREP WALLS AS NECESSARY FOR NEW WALL BASE.
CONTRACTOR SHALL PAINT ALL MISC. METAL ITEMS SUCH AS ELECTRICAL PANEL COVERS, COUNTERTOP SUPPORT BRACKERTS, ELECTRICAL WIRE MOLD, ETC. TO MATCH ADJACENT WALL COLOR. SEE WALL FINISH SCHEDULE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
C:
\U se rs\ nk hu at\ Do cu me nts \24
-U
SD
VA
-0
1_
VA
B
RO
OK
LY
N_ Up da te
Ch ille r W ate r-C
EN
TR
AL
_n kh ua t47
SR
3.r vt 5/9
/20
:01
:12 P
M
GI103
GENERAL INFORMATION
03/07/2025
NY HARBOR HEALTHCARE SYSTEM - BROOKLYN CAMPUS
BLDG. #: 1
630A4-22-413UPGRADE STATION CHILLED WATER
P&ID
100% CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
24-USDVA-01
VA Job # 22-02-BK
DesignerChecker
GENERAL CONSTRUCTION NOTES
GENERAL CONDITION NOTES
GENERAL DEMOLITION NOTESGENERAL NOTES - INTERIOR FINISHES
LIFE SAFETY CODE INFORMATION
DESCRIPTION OF WORK :
NO CHANGE IN USE OR OCCUPANCY.
APPLICABLE CODES:
BUILDING CONSTRUCTION TYPE:
BUILDING FULLY SPRINKLED: YES
OCCUPANCY / USES:
COMMON PATH OF TRAVEL:
TRAVEL DISTANCES:
- IBC 2018
- NFPA 70 - 2020
- NFPA 101 - 2024
- VA ELECTRICAL DESIGN GUIDE - 2019
- VA ELECTRICAL DESIGN MANUAL FOR REPLACEMENT HOSPITALS, CLINICAL ADDITIONS, ENERGY CENTERS, AND LABORATORY BUILDINGS - 2015
- VA LIGHTING DESIGN MANUAL - 2008
- VA RADIOLOGY DESIGN MANUAL - 2008
- VA PHYSICAL SECURITY DESIGN MANUAL FOR LIFE SAFETY PROTECTED FACILITIES - 2015
- VA FIRE PROTECTION DESIGN MANUAL - 2023, 9TH EDITION
DEAD END CORRIDOR:
BUILDING SIZE/ SF PER FLOOR: GROSS:
SIXTH FLOOR: 27,406.00 SF
SEVENTH FLOOR: 27,230.00 SF
TOTAL SCOPE BLDG. AREA: 54,636.00 SF
BUILDING HEIGHT
EXISTING BUILDING HEIGHT = 200'-2", 17 STORIES, VERIFIED EXISTING BUILDING HEIGHT WITH COR.
IBC TABLE 504.3 ALLOWABLE BUILDING HEIGHT IN FEET ABOVE GRADE = UL (UNLIMITED) TYPE 1A
SPRINKLERED BUILDING.
A USES TRAVEL =
B USES TRAVEL =
SPRINKLED NON SPRINKLEDOCCUPANCY
SPRINKLED NON SPRINKLEDOCCUPANCY
I USES TRAVEL I-1 =
1-2,1-3 =
I-4 =
REQUIRED NUMBER OF EXIT:
FIRE RATING LEGEND
BARRIER OPENING RATINGSYMBOL
(NUMBER SHOWS OPENING RATING)
SM SM
60 60
90 90
E60 E60
E90 E90
CORRIDOR ( SMOKE BARRIER)
ONE HOUR
TWO HOUR
EXISTING
POSITIVE LATCH DOOR HARDWARE
60 MIN.
90 MIN.
EXISTING
SMOKE COMPARTMENT
FIRE EXTINGUISHER
EXIT DIRECTIONAL SIGNAGE
INDICATES PATH OF TRAVEL TO POINT OF EXIT (FROM COMMON PATH
OF TRAVEL)
INDICATES COMMON PATH OF TRAVEL TO POINT OF DECISION
NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY. REFER TO THE PARTITION SCHEDULE FOR FIRE RESISTIVE REFERENCES.
EXISTING STAIR
.3"/OCC
CODE MIN:
PROVIDED:
36" *
WIDTH PER OCCUPANT (2024 NFPA TABLE 7.3.3.1)
OCCUPANTS (AREA/OCC. LOAD FACTOR)
NIM WIDTH (0.3" X OCC.)
CODE MIN (2024 NFPA 7.2.2.2.1.2)
CLEARANCE PROVIDED
* 2024 NFPA TABLE 7.2.2.2.1.1(b) EXISTING STAIRS
STAIRS
CORRIDOORS
DOORS
CORRIDOR
.2"/OCC
CODE MIN:
PROVIDED:
44"
EXISTING DOOR
.2"/OCC
CODE MIN:
PROVIDED:
32"
WIDTH PER OCCUPANT (2024 NFPA TABLE 7.3.3.1)
OCCUPANTS (AREA/OCC. LOAD FACTOR)
NIM WIDTH (0.2" X OCC.)
CODE MIN (2024 NFPA 7.2.1.2.3.2.)
CLEARANCE PROVIDED
CLEARANCE SHOWN W/ DOOR OPEN 90° BETWEEN STOP & OPEN DOOR FACE
WIDTH PER OCCUPANT (2024 NFPA TABLE 7.3.3.1)
OCCUPANTS (AREA/OCC. LOAD FACTOR)
NIM WIDTH (0.2" X OCC.)
CODE MIN (2024 NFPA 39.2.3.2)
CLEARANCE PROVIDED
CLEARANCE SHOWN BETWEEN FACE OF WALLS
S USES TRAVEL S-1 =
S-2 =
A USES TRAVEL =
B USES TRAVEL =
I USES TRAVEL I-1 =
1-2,1-3 =
I-4 =
S USES TRAVEL S-1 =
S-2 =
A USES TRAVEL =
B USES TRAVEL =
SPRINKLED NON SPRINKLEDOCCUPANCY
I USES TRAVEL I-1 =
1-3 =
I-4 =
S USES TRAVEL
CHAPTER 6: CLASSIFICATION OF OCCUPANCY AND HAZARD OF CONTENTS
6.1.11 BUSINESS OCCUPANCY
250 FT
300 FT
250 FT
400 FT
200 FT
200 FT
200 FT
300 FT
250 FT
200 FT
200 FT
NOT PERMITTED
NOT PERMITTED
150 FT
CONSTRUCTION TYPE
NFPA 101 2024 CHAPTER 39, EXISTING BUSINESS OCCUPANCIES.
IBC 2018 TABLE 601, TYPE 1A CONSTRUCTION.
100 FT MAXIMUM
100 FT MAXIMUM
100 FT MAXIMUM
100 FT MAXIMUM
75 FT MAXIMUM
75 FT MAXIMUM
75 FT MAXIMUM
75 FT MAXIMUM
100 FT MAXIMUM
75 FT MAXIMUM
NOT PERMITTED
NOT PERMITTED
NOT PERMITTED
2 EXITS PER TABLE 1006.3.2
50 FT
50 FT
50 T
20 FT
20 FT
20 FT
50 FT
50 FT
XX FT
20 FT
20 FT
XX FT
TRAVEL DISTANCE = 78'
EXISTING STAIR
.3"/OCC
CODE MIN:
PROVIDED:
36" *
48"
21"
EXISTING DOOR
.2"/OCC
CODE MIN:
PROVIDED:
32" 36"
14"
EXISTING DOOR
.2"/OCC
CODE MIN:
PROVIDED:
32" 84"
14"
TRAVEL DISTANCE = 69'
E90
E9
E9
E9
E9
E9
E9
E9
E9
E90
E90 E90
E9
E9
E90
E9
E9
E9
E9
E9
E9
E9
E9
E90 E90
E9
E9
E9
E9
E9
E9
E9
E9
E9
E9
E9
E9
E90 E90
E90 E90
E9
E9
E9
E9
E90
E9
E9
E9
E9
E90
TRAVEL DISTANCE = 76'
EXISTING STAIR
.3"/OCC
CODE MIN:
PROVIDED:
36" *
48"
21"
EXISTING DOOR
.2"/OCC
CODE MIN:
PROVIDED:
32" 36"
14"
DISTANCE TO SMOKE
BARRIER = 162'
COMMON PATH OF TRAVEL = 36'
EXISTING DOOR
.2"/OCC
CODE MIN:
PROVIDED:
32" 84"
14"
339 SF
MECHANICAL ROOM
7-222
E90
E9
E9
E9
E9
E90 E90
E9
E9
E90
E9
E9
E9
E9
E9
E9
E9
E9
E9
E9
E90
E90
E9
E9
E9
E9
E9
E9
E9
E9
E90
E90 E90
E9
E9
E9
E9
E9
E9
E9
E9
E90 E90
E90 E90
E9
E9
E9
E9
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
C:
\U se rs\ nk hu at\ Do cu me nts \24
-U
SD
VA
-0
1_
VA
B
RO
OK
LY
N_ Up da te
Ch ille r W ate r-C
EN
TR
AL
_n kh ua t47
SR
3.r vt 5/9
/20
:01
:25 P
M
GI201
LIFE SAFETY PLAN
03/07/2025
NY HARBOR HEALTHCARE SYSTEM - BROOKLYN CAMPUS
BLDG. #: 1
630A4-22-413UPGRADE STATION CHILLED WATER
P&ID
100% CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
24-USDVA-01
VA Job # 22-02-BK
DesignerChecker
3/64" = 1'-0"1 6TH FLOOR LIFE SAFETY
3/64" = 1'-0"2 7TH FLOOR LIFE SAFETY
EXISTING OR ICRA WALL
EXISTING OR
ICRA DOOR
PROVIDE STICKY WALK-OFF MAT
(TYP. EACH SIDE OF DOOR)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
PRECAUTIONS DURING CONSTRUCTION
EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.
PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING DRY WALL FOR BARRIERS.
SEAL UNUSED DOORS WITH DUCT TAPE IN THE CONSTRUCTION AREA.
BLOCK OFF AND SEAL AIR VENTS IN THE CONSTRUCTION AREA.
PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
REMOVE CONSTRUCTION WASTE DAILY.
PROVIDE TEMPORARY 1 HR. FIRE BARRIER PARTITIONS AS INDICATED AND SEAL UNUSED DOORS AT PERIMETER OF THE WORK AREA WITH PAINTER'S TAPE TO SEAL AREA FROM NON-WORK AREA BEFORE
CONSTRUCTION BEGINS.
MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA FILTER EQUIPPED AIR FILTRATION UNITS. COORDINATE LOCATION OF WINDOW AND ABOVE FLOOR PENETRATIONS WITH COR.
SPACE SHALL BE CONTINUOUSLY MONITORED. BALL IN THE WALL IS NOT ACCEPTABLE. PATCH FLOOR
PENETRATION AND REPLACE WINDOW GLAZING AFTER CONSTRUCTION AS REQUIRED TO MATCH
EXISTING.
CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS OR BY
COVERING IN PLASTIC AND SEALING WITH DUCT TAPE. REMOVE WASTE DAILY EITHER AFTER 5 PM
AND BEFORE 7 AM.
USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF TRANSPORT CONTAINERS
THROUGH THE FACILITY.
SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.
CONSTRUCT AN AIRTIGHT ONE-HOUR RATED ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE; OR WEAR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK
SITE.
ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST
BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
STEP 1 - TYPE: USING THE FOLLOWING, IDENTIFY THE PROJECT CONSTRUCTION ACTIVITY TYPE (A-D). THE CONSTRUCTION ACTIVITY TYPES ARE DEFINED BY THE AMOUNT OF DUST GENERATED, THE DURATION OF THE ACTIVITY, AND THE AMOUNT OF SHARED HVAC SYSTEMS. CONTACT THE VABHS ENGINEERING DEPARTMENT OR INFECTION CONTROL DEPARTMENT IF ANY ACTIVITY IS QUESTIONABLE UNDER THESE
GUIDELINES
TYPE A - INSPECTION AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT IS NOT LIMITED TO:
1. REMOVAL OF CEILING TILES FOR VISUAL INSPECTION ONLY AND IMMEDIATE REPLACEMENT
2. PAINTING, BUT NOT SANDING
3. WALL COVERING
4. ELECTRICAL TRIM WORK
5. MINOR PLUMBING
6. ACTIVITIES THAT DO NOT GENERATE DUST, INVOLVE WALL CUTTING, REQUIRE EXTENDED
CEILINGS ACCESS
TYPE B - SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST. INCLUDES, BUT IS
NOT LIMITED TO:
1. INSTALLATION OR TELEPHONE AND COMPUTER CABLING
2. ACCESS TO CHASE SPACES
3. CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED
TYPE C - WORK THAT GENERATES A MODERATE TO HIGH LEVEL OR DUST OR REQUIRES DEMOLITION OR
REMOVAL OF ANY FIXED COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO:
1. SANDING OF WALLS FOR PAINTING OR WALL COVERING
2. REMOVAL OR FLOOR COVERINGS, CEILING TILES AND CASEWORK
3. NEW WALL CONSTRUCTION
4. MINOR DUCTWORK OR ELECTRICAL WORK ABOVE CEILINGS
5. MAJOR CABLING ACTIVITIES
6. ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT
TYPE D - MAJOR DEMOLITION AND CONSTRUCTION PROJECTS, INCLUDES, BUT IS NOT LIMITED TO:
1. ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS
2. REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CEILING SYSTEM
3. NEW CONSTRUCTION
STEP 2 - RISK: USING THE FOLLOWING, IDENTIFY THE PATIENT RISK GROUP (1-4) THAT WILL BE AFFECTED, IF
MORE THAN ONE RISK GROUP WILL BE AFFECTED, SELECT THE HIGHER RISK GROUP
LOW RISK - GROUP 1: INCLUDES BUT IS NO LIMITED TO…
1. OFFICE AREAS, LIBRARY, CHAPEL
2. ENGINEERING SVC SPACE
3. FACILITY ENVIRONMENTAL MANAGEMENT SVC SPACE
MEDIUM RISK - GROUP 2: BUT IS NOT LIMITED TO…
1. AMBULATORY CARE UNIT (ACU)
2. AUDIOLOGY, SPEECH PATHOLOGY
3. OUTPATIENT CLINICS (EG, COUMADIN, CARDIOLOGY, GASTRO INTESTINAL, OPHTHALMOLOGY, PULMONARY RENAL)
4. ECHOCARDIOGRAPHY
5. FOOD SERVICE AREAS
6. LAUNDRY
7. ULTRASOUND
8. IMAGING (EG, RADIOLOGY/MRI)
9. NUCLEAR MEDICINE
10. PATHOLOGY & LABORATORY MEDICINE SERVICE (P&LMS)
11. POLYTRAUMA-KINESIO, OCCUPATIONAL, PHYSICAL THERAPY
12. PROSTHETICS
13. POOL AREA
14. RESPIRATORY THERAPY
15. SLEEP LABORATORY
HIGH RISK – GROUP 3: INCLUDES, BUT IS NOT LIMITED TO…
1. ADMISSION AREAS
2. AMBULATORY SURGERY UNIT (ASU)
3. EMERGENCY & URGENT CARE ROOMS
4. ENDOSCOPY
5. LABORATORIES
6. MEDICAL PROCEDURE UNIT (MPU)
7. MEDICAL SURGICAL DAY UNIT (MSDU)
8. PHARMACY
9. PATIENT WARDS (EG, LONG TERM CARE, MEDICAL, SURGICAL, SPINAL CORD INJURY, PSYCHIATRY)
10. SUPPLY, PROCESSING & DISTRIBUTION (SPD-NON-STERILE AREAS)
HIGHEST RISK – GROUP 4: INCLUDES. BUT IS NOT LIMITED TO…
1. AREAS CARING FOR IMMUNE COMPROMISED PATIENTS
2. INTENSIVE CARE UNITS (EG, CCU, MICU, PCU, SICU)
3. SUPPLY PROCESSING & DISTRIBUTION (SPD-STERILE AREAS)
4. ANESTHESIA AREAS POST-ANESTHESIA CARE UNITS (PACU)
5. CARDIAC CATHETER, ELECTROPHYSIOLOGY (EP) LABORATORIES
6. RADIATION THERAPY AREAS FOR CANCER TREATMENT
7. DENTAL, DERMATOLOGY, DIALYSIS ROOMS
8. NEGATIVE PRESSURE ISOLATION ROOMS
9. ANGIOGRAPHY, CYSTOSCOPY SUITES
10. PHARMACY ADMIXTURE AREAS
11. ONCOLOGY (RADIATION THERAPY)
12. OPERATING ROOMS
STEP 3 - CLASS: MATCH THE PATIENT RISK GROUP (LOW, MEDIUM, HIGH, HIGHEST) WITH THE PLANNED PROJECT CONSTRUCTION ACTIVITY TYPE (A, B, C, D) ON THE IC MATRIX TO DETERMINE THE CLASS PRECAUTION (I, II, III, IV) OR EXTENT OF INFECTIONS CONTROL ACTIVITIES REQUIRED. IF THE AREA IS NOT LISTED, DETERMINE THE LEVEL OF THE INFECTION CONTROL CLASSIFICATION NECESSARY FOR THE WORK BY MATCHING THE CONSTRUCTION ACTIVITY WITH THE DESIGNATED RISK GROUP IN THE MATRIX
AND PROVIDE THE ASSOCIATED INFECTION CONTROL PROCEDURES
APPLIES TO : E1,E2,E5,E6
APPLIES TO : E3
APPLIES TO : E1,E2,E5,E6
INFECTION CONTROL ACTIVITIES BY LEVEL PRECAUTIONS SEE ALSO SPECIFICATION SECTION 01 35 33 INFECTION CONTROL PROCEDURES
DURING PROJECT CONSTRUCTION UPON PROJECT COMPLETION
LE
VE
L I
LE
VE
L
II
CL
AS
S
III
CL
AS
S
IV
IN
A
DD
IT
IO
N
TO
C
LA
SS
I
IN
A
DD
IT
IO
N
TO
C
LA
SS
II
IN
A
DD
IT
IO
N
TO
C
LA
SS
II
I
A. KEEP AREA FREE OF DEBRIS & TRASH
B. IMMEDIATELY REINSTALL CEILING TILES DISPLACED FOR
INSPECTIONS. CLOSE ACCESS PANELS, ETC..UPON COMPLETION
OF WORK
C. TRAFFIC FLOW: DECREASE EXPOSURE OF PATIENT STAFF TO
CONSTRUCTION
D. UTILITY SHUTDOWNS: IF NECESSARY, SCHEDULE
INTERRUPTIONS DURING LOW ACTIVITY
E. PEST CONTROL: ADDRESS ANY VISIBLE SIGNS OF BIRDS,
INSECTS, RODENTS, OR OTHER VERMIN
F. HOUSEKEEPING BROOM & WET MOP SURFACES DAILY AND AS
NEEDED TO CONTROL DEBRIS/DUST
G. EXECUTE WORK BY METHODS TO MINIMIZE DUST
PRODUCTION & MIGRATION FROM CONSTRUCTION
OPERATIONS
H. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE
FACILITY MUST BE FREE OF CONTAMINENTS AND LOOSE
MATERIALS
A. PERFORM CLEAN UP AND DISPOSAL IN
ACCORDANCE WITH CONTRACT
REQUIREMENTS AND INFECTION CONTROL
PROCEDURES SPECIFCATION SECTION 01 35 33
A. DUST CONTAINMENT BARRIERS SECURE AT PERIMETER EDGES
B. CEILING TILES IN PLACE AT ADJACENT AREAS OUTSIDE BARRIER
C. WATER MIST WORK SURFACES TO CONTROL DUST WHILE
CUTTING
D. UNUSED OPENINGS (DOORS, WINDOWS PROPERLY CLOSED
AND SEALED WITH MASKING TAPE
E. BLOCK-OFF, SEAL, REMOVE OR ISOLATE HVAC SYSTEM AIR
VENTS TO PREVENT CONTAMINATION MIGRATION. REBALANCE
SYSTEM TI ADDRESS DIFFUSER ISOLATION.
F. PLACE WALK-OFF MAT AT WORK AREAS TO PREVENT
TRACKING
OF CONSTRUCTION DUST INTO SURROUNDING AREAS
G. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM
DISPERSING INTO ATMOSPHERE. HEPA VACUUMS, AUTOMATIC
SELF-CLOSING CONSTRUCTION DOORS. APPROPRIATE
EXHAUST MACHINES, DEBRIS CHUTES
H. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE
DUST BEFORE LEAVING THE WORK AREA
I. CONTAIN ALL TRACH AND DEBRIS IN THE WORKING AREA.
PERFORM DAILY CLEANING AND DISPOSAL OF TRASH
(COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT
ROUTE.
J. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE
WORK AREA MUST BE IN SEALED CONTAINERD AND/OR
CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE
AREA.
K. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A
HARD LID) MUST BE USED TO TRANSPORT TRASH AND DEBRIS
FROM THE CONSTRUCTION AREAS. THESE CONTRAINER MUST
BE DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBIRS
BEFORE LEAVING THE CONTAINED WORK AREA.
A. INSPECT ADJACENT AREAS FOR DUST MIGRATION AND
CORRECT IMMEDIATELY
B. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING
NFPA 241 REQUIREMENTS. BARRIERS MUST EXTEND TO THE
CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK
ABOVE.
C. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES
MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST
RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY AFFIXED
TO FLOOR AND CEILING (OR FLOOR/ROOF DECK ABOVE) AND
SECURE FROM MOVEMENT OR DAMAGE.
D. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE
UTILIZING HEPA AIR FILTERED MACHINES. INSTALL A
DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC,
MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK
CONTAINMENT TO CONTINUALLY MONITOR AND DOCUMENT
NEGATIVE PRESSURIZATION. THE “BALL IN THE WALL” OR
SIMILAR APPARATUS ARE NOT ACCEPTABLE.
E. DISINFECT TOOLS AND EQUIPMENT PRIOR TO ENTRY
AND EXIT FROM STERILE AND INVASIVE PROCEDURE AREAS
F. COMPLETE ALL CRITICAL BARRIERS, I.E. SHEETROCK,
PLYWOOD, PLASTIC TO SEAL AREA FROM NON-WORK AREA OR
IMPLEMENT CONTROL CUBE METHOD (CONTAINER WITH
SUITABLE COVER AND SEALED CONNECTION TO WORK
SITE WITH HEPA VACUUM FOR CLEANING PRIOR TO EXIT)
G. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS,
INCLUDING FLOORS AND CEILING, USING APPROVED MATERIALS
(UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).
H. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS
I. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE
PRESSURIZATION OF THE ENTIRE WORKSPACE BY USE OF HEPA
EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A
WORK SPECIFIC WAIVER IS APPROVED BY VHA’S OFFICE OF
HEALTHCARE ENGINEERING); THIS MUST BE MAINTAINED
CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT.
EXHAUST DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS
25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND
WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED.
EXHAUSTING DISCHARGED AIR INTO SHARED OR
RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST
SYSTEMS (E.G., BATHROOM EXHAUST) IS PROHIBITED.
A. CLEAN REMAINING IMPACTED AREAS WITH HEPA
VACUUM
B. MOP/WIPE REMAINING IMPACTED AREAS WITH
APPROVED DISINFECTANT
C. TIGHTLY COVER MATERIAL TRANSPORT
RECEPTACLES/CARTS. CONTAIN
CONSTRUCTION WASTE IN TIGHTLY COVERED
CONTAINERS BEFORE TRANSPORT
D. DO NOT REMOVE BARRIERS FROM WORK
AREAS UNTIL COMPLETED PROJECT IS
THOROUGHLY CLEANED AND INSPECTED BY THE
SAFETY OFFICER AND INFECTION CONTROL
PRACTITIONER
E. CLEAN & REMOVE BARRIER MATERIALS
CAREFULLY TO MINIMIZE SPREADING OF DIRT
AND DEBRIS ASSOCIATED WITH
CONSTRUCTION
F. REFER TO INFECTION CONTROL SECTION 01 35 33
FOR ADDITIONAL REQUIREMENTS
A. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO
INSTALL FINAL BARRIER.
B. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE
PRESSURE CONTROL, ANTEROOM MUST BE LARGE ENOUGH
FOR EQUIPMENT STAGING, CART CLEANING, WORKERS ’ PPE AND
CLEANING.
C. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN
AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK AREA
ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF COVER
SUITS IS ACCEPTABLE. WORKERS MUST WEAR SHOE COVERS
ORHAVE A METHOD TO CLEAN SHOES IN ANTEROOM SHOE
COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM
TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE
COVERS MUST BE CHANGED IMMEDIATELY.
PATIENT RISK GROUP: PROJECT CONSTRUCTION ACTIVITY TYPE:
TYPE A TYPE B TYPE C TYPE D
I
I
I
II
LOW RISK - GROUP 1
MEDIUM RISK - GROUP 2
HIGH RISK - GROUP 3
HIGHEST RISK - GROUP 4
II
II
II
III
II
III
IV
IV
III
IV
IV
IV
SPECIAL NOTE: INFECTION CONTROL CONSULTATION IS REQUIRED WHEN THE CONSTRUCTION ACTIVITY
AND RISK GROUP INDICATE THAT CLASS III OR CLASS IV PRECAUTIONS ARE NECESSARY.
STEP 4 - INFECTION CONTROL ACTIVITIES: REQUIRED INFECTION CONTROL ACTIVITIES BY
LEVEL PRECAUTIONS
DURING PROJECT CONSTRUCTION . . . ARE DESCRIBED IN THE TABLE BELOW
UPON PROJECT COMPLETION…ARE DESCRIBED IN THE TABLE BELOW
TAPE PLASTIC TO WALL
EXISTING DOOR & FRAME
PROVIDE ZIPPER DOOR IN
PLASTIC
NOTE:
1. APPLICABLE TO PENETRATIONS OF 1 HOUR FIRE RATED
MEMBRANES, IN ACCORDANCE WITH NFPA 101. REFER
TO SPECIFICATIONS SECTION 07 84 00, FIRE STOPPING
SYSTEMS
2. PENETRATIONS OF 2 HOUR OR MORE REQUIRE FIRE
DAMPER PER NFPA 90A SECTION 5.3.1.1. REFER TO
MECHANICAL DRAWINGS FOR DETAIL
INSULATED PIPE
OR DUCT
FLOOR
FIRESTOP MATERIAL
3/4" [19mm] APPROVED
FIRESTOP INSULATION WITH
VAPOR BARRIER
PIPE SLEEVE WHERE
SPECIFIED
1/4" [6.4mm]∅ ANCHOR ROD
FOR NEW CONSTRUCTION
WELD
[2 5m m
[1 m m
[1 m m
FLOOR OR DECK PENETRATION
PARTITION OR CHASE PENETRATION
[150mm] [150mm]
MASONRY PARTITION
PARTITION SUPPORT
FIRESTOP
MATERIAL
[150mm] [150mm]
3/4" [19mm] APPROVED FIRESTOP
INSULATION WITH VAPOR BARRIER
DRYWALL PARTITION
INSULATED
PIPE OR
DUCT
6" 6"
6" 6"
6" 6"
CONTINUOUS METAL STUD BOTTOM TRACK
SET IN CONTINUOUS BEAD OF SEALANT.
LINE OF FINISHED FLOOR, SEE ROOM FINISH
SCHEDULE FOR FLOOR & BASE TYPE
UNDERSIDE OF ROOF OR FLOOR DECK
LINE OF CEILING SYSTEM, SEE ROOM
FINISH SCHEDULE FOR TYPE & HEIGHT
3 5/8" METAL STUDS @ 16" OC, TYPICAL
(1) LAYER 5/8" TYPE 'X' GYPSUM
BOARD BOTH SIDES
SECTION
CONTINUOUS 3 1/2" SOUND
ATTENUATION BATTS AS SCHEDULE
CONTINUOUS METAL HORIZONTAL BRIDGING
CHANNEL @ MID HEIGHT, TYPICAL
PLAN
T1
0'
7/
8"
FIRE CAULK IN ACCORDANCE WITH UL 419
5/8" FULL HEIGHT TYPE 'X' GYPSUM BOARD
BOTH SIDES
1-HR RATED METAL STUD PARTITION
CONTINUOUS METAL STUD TOP TRACK.
PROVIDE DEFLECTION TRACK AT ROOF
FIRE CAULK IN ACCORDANCE WITH UL 419
RUBBER BASE. SEE FINISH SCHEDULE BOTH SIDES
ASSEMBLY: UL-U419
STC: 50
NOTE: ANY PENETRATIONS THROUGH PARTITION ARE TO BE FIRE CAULKED
LINE OF FINISHED FLOOR, SEE ROOM FINISH
SCHEDULE FOR FLOOR & BASE TYPE
FACE OF EXISTING WALL
3 5/8" METAL STUDS @ 16" O.C., TYPICAL
(1) LAYER 5/8" TYPE 'X' GYPSUM
BOARD BOTH SIDES
SECTION
PLAN
T2
0'
7/
8"
1-HR RATED
FIRE CAULK IN ACCORDANCE WITH UL 419
ASSEMBLY: UL-U419
STC: 50
NOTE: ANY PENETRATIONS THROUGH PARTITION ARE TO BE FIRE CAULKED
TEMPORARY CONSTRUCTION BARRIER
CONTINUOUS METAL STUD BOTTOM TRACK
SET IN CONTINUOUS BEAD OF SEALANT
CONTINUOUS 3 1/2" SOUND
ATTENUATION BATTS AS SCHEDULE
CONTINUOUS METAL HORIZONTAL
BRIDGING CHANNEL @ MID HEIGHT,
TYPICAL
FIRE CAULK IN
ACCORDANCE WITH UL 419
METAL STUD FRAMING W/ 5/8" TYPE
'X' GYPSUM BOARD, ONE SIDE
5/8" TYPE 'X' GYPSUM BOARD BOTH SIDES
RUBBER BASE. SEE FINISH
SCHEDULE BOTH SIDES
LINE OF CEILING SYSTEM, SEE ROOM
FINISH SCHEDULE FOR TYPE & HEIGHT
ACCESS ZIPPER
LINE OF FINISHED FLOOR, SEE ROOM FINISH
SCHEDULE FOR FLOOR & BASE TYPE
CONTINUOUSLY SEAL FIRE RETARDANT
POLYSTYRENE TO EXISTING FINISHED
FLOOR.
6-MIL FIRE RETARDANT POLYSTYRENE,
SEE SPECIFICATIONS. PROVIDE ZIPPER
ACCESS WHERE REQUIRED
EXISTING UNDERSIDE OF DECK
T3 FIRE RETARDANT DUST CONTROL BARRIER
CONTINUOUSLY SECURE AND SEAL EDGE OF FIRE
RETARDANT POLYSTYRENE TO UNDERSIDE OF
DECK
EXISTING FINISHED CEILING SYSTEM. REMOVE AND
REINSTALL CEILING PANELS AS REQUIRED
CONTINUOUSLY SECURE FIRE RETARDANT
POLYSTYRENE SHEET TO UNDERSIDE OF METAL
CEILING TRACK AND ABOVE METAL CEILING TRACK
SECURE AND SEAL ALL SIDES OF
EXISTING DUCTS, CONDUIT, PIPES, ETC.
6-MIL FIRE RETARDANT
POLYSTYRENE
CONTINUOUSLY SECURE EDGE OF FIRE
RETARDANT POLYSTYRENE TO
EXISTING HOLLOW METAL FRAME
EXISTING HOLLOW METAL
FRAME
EXISTING DOOR SYSTEM
BEYOND
CONTINUOUSLY SECURE/SEAL FIRE
RETARDANT POLYSTYRENE TO EXISTING
WALL. TYPICAL ALL WALLS AS REQUIRED.
PATCH/REPAIR EXISTING WALLS AS
REQUIRED TO MATCH EXISTING PRIOR TO
CONSTRUCTION
T4
FIRE RETARDANT DUST CONTROL
DETAIL AT DOORGLAZING PANEL REMOVAL
EXISTING WALL
CONSTRUCTION TO REMAIN
EXISTING GLAZING PANEL TO BE
REMOVED FROM EXISTING WINDOW
SYSTEM PRIOR TO START OF
ABATEMENT. GC TO STORE GLAZING
PANEL IN A SAFE LOCATION UNTIL
WORK IS COMPLETE AND REPLACE
TO IT'S EXISTING CONDITION. IF
DAMAGED, GC WILL REPLACE TO
MATCH EXISTING
EXISTING ALUMINUM FRAME
TO REMAIN
HEPA EXHAUST
EXISTING WALL CONSTRUCTION
TO REMAIN
PROVIDE HEPA FILTRATION EXHAUST
DUCTING THROUGH NEW
TEMPORARY PLYWOOD PANEL
EXISTING ALUMINUM FRAME TO REMAIN
PROVIDE 3/4" FIRE TREATED
PLYWOOD PANEL WITHIN
EXISTING ALUMINUM FRAME
1.
NOTE:
GENERAL CONTRACTOR TO LOCATE
PER QUANTITIES REQUIRED.
PROVIDE DUCT SEALING TAPE
AROUND PENETRATION (TYPICAL)
EXTERIORINTERIOR EXTERIOR
INTERIOR
(NEGATIVE SPACE)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
C:
\U se rs\ nk hu at\ Do cu me nts \24
-U
SD
VA
-0
1_
VA
B
RO
OK
LY
N_ Up da te
Ch ille r W ate r-C
EN
TR
AL
_n kh ua t47
SR
3.r vt 5/9
/20
:00
:28 P
M
GC301
ICRA DETAILS AND NOTES
03/07/2025
NY HARBOR HEALTHCARE SYSTEM - BROOKLYN CAMPUS
BLDG. #: 1
630A4-22-413UPGRADE STATION CHILLED WATER
P&ID
100% CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
24-USDVA-01
VA Job # 22-02-BK
DesignerChecker
3/4" = 1'-0"B STICKY WALK - OFF MAT DETAIL
ICRA CONTROL POLICYICRA POLICY MATRIX
3/4" = 1'-0"C HEPA SYSTEM DOOR SEALING
1/2" = 1'-0"1 PIPE/DUCT PENETRATION OF SMOKE/FIRE BARRIERS DETAIL
1 1/2" = 1'-0"A TYPICAL HEPA FILTRATION THROUGH WINDOW DETAIL
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
DO NOT SCALE DRAWINGS. CONTRACTOR(S) ARE TO VERIFY SITE DIMENSIONS AND
CONDITIONS PRIOR TO WORK
CONSTRUCTION SHOULD BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE
APPLICABLE CODES INCLUDING ACCESSIBILITY STANDARDS AND THE REQUIREMENTS OF
"AMERICANS WITH DISABILITIES ACT." AND VA BARRIER GUIDELINES
CONTRACTOR(S) SHALL VISIT THE SITE AND CORRELATE THE REQUIREMENTS OF THE
DOCUMENTS WITH THE EXISTING CONDITIONS
DRAWINGS ARE DIAGRAMMATIC AND SINCE EXISTING CONDITIONS, INCLUDING AREAS
ABOVE ACCESSIBLE CEILINGS MAY AFFECT NEW WORK, THE CONTRACTOR SHALL
COORDINATE AND ALTER NEW WORK TO PROPERLY FIT THE EXISTING CONDITIONS. THE
WORK SHALL BE PERFORMED AT NO EXTRA COST. THE CONTRACTOR SHALL VERIFY ALL
CONDITIONS AND DIMENSIONS AT THE JOB SITE PRIOR TO THE START OF
CONSTRUCTION. IF DISCREPANCIES ARE FOUND, THE ARCHITECT SHALL BE NOTIFIED
FOR CLARIFICATION BEFORE COMMENCING WITH THE WORK
DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE SHOWN. WHEN SPECIFIC
DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BE DETERMINED, CONSULT THE
ARCHITECT BEFORE PROCEEDING WITH THE WORK
SOME MASONRY AND LUMBER DIMENSIONS SHOWN ON THE DRAWINGS ARE NOMINAL
DIMENSIONS
CONTRACTOR(S) SHALL COORDINATE ACTUAL DIMENSIONS WITH THE JOB CONDITIONS.
REPORT ALL DISCREPANCIES TO THE ARCHITECT
EXISTING CONDITIONS SHOWN ON THIS DRAWING ARE NOT GUARANTEED TO BE
COMPLETE. THE CONTRACTOR(S) SHALL FIELD VERIFY ALL EXISTING CONDITIONS,
DIMENSIONS AND MATERIALS REQUIRED FOR CONTRACTED WORK. REPORT ALL
DISCREPANCIES TO THE ARCHITECT PRIOR TO FABRICATION AND ERECTION
THE TERM 'PATCH TO MATCH' OR 'CUTTING AND PATCHING' DENOTES THAT REPAIR WORK
IS NECESSARY TO CONSTRUCT A FLOOR, BASE, WAINSCOT, WALL OR CEILING TO MATCH
THE EXISTING SURFACE FINISH, TEXTURE AND SHEEN
WHERE NEW OPENINGS OCCUR IN STRUCTURAL BEARING WALL, CONTRACTOR IS
RESPONSIBLE FOR TEMPORARY SUPPORTS AND / OR SHORING AS REQUIRED FOR
INSTALLATION OF LINTELS
WHERE EXISTING DOORWAYS ARE TO BE FILLED IN, CONTRACTOR IS RESPONSIBLE FOR
FIELD VERIFYING WALL WIDTHS
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ALL ACCESS
DOORS, ACCESS PANELS AND FRAMES, INCLUDING, BUT NOT LIMITED TO THOSE SPECIFIC
IN CONSTRUCTION DOCUMENTS AND FURNISHED BY OTHER CONTRACTORS. ALL
ACCESS DOORS AND PANEL LOCATIONS TO BE COORDINATED AND APPROVED BY THE
ARCHITECT PRIOR TO THE INSTALLATION. THE GENERAL CONTRACTOR IS RESPONSIBLE
FOR PAINTING ALL ACCESS PANELS AND ACCESS DOORS. GENERAL CONTRACTOR IS
RESPONSIBLE FOR COORDINATING ALL PAINT COLORS WITH THE ARCHITECT PRIOR TO
COMMENCING WITH WORK
WHEN POWER AND DATA RECEPTACLES ARE INTENDED TO BE ADJACENT, THEY SHOULD
BE PLACED NO MORE THAN 1'-0" APART
FIRE RESISTANCE RATING
1. FIRE RATING INDICATED ON A WALL SHALL MEAN THE ENTIRE LENGTH AND HEIGHT OF
WALL TO BE FIRE RATED
2. ALL PIPING, DUCTS, CABINETS, ETC. THAT PENETRATE WALLS SHALL BE INSTALLED IN A
MANNER THAT WILL PRESERVE THE FIRE RESISTANCE RATING OF THAT WALL
3. PRESERVE ALL FIRE RESISTANT RATINGS OF EXISTING WALL UNLESS NOTED OTHERWISE
DIMENSIONING
1. ALL NEW INTERIOR PARTITIONS ARE DIMENSIONED TO FACE OF STUD. WHERE
DIMENSION IS TAKE TO EXISTING PARTITION IT IS TAKEN TO FACE OF EXISTING PARTITION.
THE CONTRACTOR SHALL COORDINATE FINISH DIMENSIONS AND FACE OF WALL
DIMENSIONS WITH FINISH SCHEDULE WHEN CRITICAL TO THE INSTALLATION OF MILLWORK
OR EQUIPMENT
CONT METAL BOTTOM TRACK
SET IN CONT BEAD OF
ACCOUSTICAL SEALANT.
LINE OF FINISHED FLOOR, SEE ROOM
FINISH SCHEDULE FOR FLOOR & BASE
TYPE
UNDERSIDE OF ROOF OR FLOOR DECK
EXISTING FRAMED CONSTRUCTION
EXTEND TO DECK AS REQUIRED
EXISTING FINISH TO REMAIN.
PROTECT IN PLACE
SECTION
CONTINUOUS METAL HORIZONTAL
BRIDGING CHANNEL @ MID HEIGHT, TYP.
A1
0'
7/
8"
ONE LAYER (1) 5/8" SOUND
ATTENUATED GWB BOTH SIDES
EXISTING STUD PARTITIONS
CONTINUOUS METAL TOP TRACK. PROVIDE
DEFLECTION TRACK AT ROOF
PLAN
CONT METAL BOTTOM TRACK SET IN CONT
BEAD OF ACOUSTICAL SEALANT.
LINE OF FINISHED FLOOR, SEE ROOM
FINISH SCHEDULE FOR FLOOR & BASE
TYPE
UNDERSIDE OF ROOF OR FLOOR DECK
3 5/8" METAL STUDS @ 16" OC, TYP
(1) LAYER 5/8" THK. GWB BOTH SIDES
SECTION
CONTINUOUS METAL HORIZONTAL
BRIDGING CHANNEL @ MID HEIGHT, TYP.
A2
M
AT
C H
E
XI
ST
IN
G
FULL HGT 5/8" GWB BOTH SIDES
INFILL DETAIL AT DOOR AND WALL
PLAN
EXISTING WALL CONSTRUCTION
AT RATED WALL
ACOUSTICAL SEALANT
MECHANICAL ROOM
ACOUSTICAL SEALANT
FILL CAVITY WITH SOUND
ATTENUATED BATTS
MECHANICAL ROOM
EXISTING FINISH TO REMAIN.
PROTECT IN PLACE
MECHANICAL ROOM FILL CAVITY WITH SOUND
ATTENUATED BATTS
ONE LAYER (1) 5/8" SOUND
ATTENUATED GWB BOTH SIDES
MECHANICAL ROOM
FILL CAVITY WITH SOUND
ATTENUATED BATTS
ACOUSTICAL SEALANT
FILL CAVITY WITH SOUND
ATTENUATED BATTS
CONT METAL STUD BOTTOM TRACK
SET IN CONT BEAD OF SEALANT.
LINE OF FINISHED FLOOR, SEE ROOM
FINISH SCHEDULE FOR FLOOR & BASE
TYPE
LINE OF CEILING SYSTEM, SEE ROOM
FINISH SCHEDULE FOR TYPE & HEIGHT
SECTION
CONTINUOUS METAL HORIZONTAL
BRIDGING CHANNEL @ MID HEIGHT, TYP.
A3
3/8" ACOUSTICAL SEALANT
METAL STUD PARTITION
UNDERSIDE OF ROOF OR FLOOR DECK
FULL HGT GWB ONE SIDE
CONTINUOUS METAL STUD TOP TRACK.
PROVIDE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .