Drawings - Sheet MP102.pdf

PDF 712 KB Posted

Attached to
Foster Dam Oil Spill Prevention System (OSPS): Oil Accountability Test
Solicitation number
W9127N25QA073
Issued by

About this file

The provided file is a technical drawing (Sheet MP102) depicting a detailed schematic for an Oil Spill Prevention System (OSPS) piping configuration at Foster Dam. The drawing includes multiple views - a Plan-Sump Piping Elevation at 550.0, a Cross Section-Sump Piping Elevation, and an OWS (Oil-Water Separator) Piping Isometric View. The technical drawing shows complex piping routes, valve placements, wall penetrations, access ladders, and structural details for what appears to be an oil containment and management system. Specific engineering elements like vent structures, sample points, and interconnected piping systems are meticulously illustrated with precise measurements and annotations.

This drawing is associated with the US Army Corps of Engineers solicitation (W9127N25QA073) for a performance test of the Foster Dam OSPS in Oregon. The solicitation is a 100% Small Business Set-Aside under NAICS Code 561210 with a $47 million size standard, seeking a firm fixed-price contract to conduct a comprehensive system performance evaluation. Prospective contractors must be registered in SAM.gov, and the solicitation follows FAR Part 13 Simplified Acquisition Procedures. The opportunity is specifically for Facilities Support Services, with potential contractors invited to submit quotes for testing the oil spill prevention infrastructure detailed in this technical drawing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .