Drawings March 2025.pdf
PDF 6 MB Posted
- Solicitation number
- W912WJ25Q0027
About this file
These are technical design drawings for the Spillway Bridge Painting and Concrete Repair project at Barre Falls Dam in Hubbardston, Massachusetts, prepared by the U.S. Army Corps of Engineers New England District in March 2025. The comprehensive set of 8 engineering drawings provides detailed specifications for bridge painting, concrete repairs, and structural modifications, including:
Specific technical details include plans for painting steel end frames, bearings, and girder ends, with careful noting of existing lead-based paint requirements. The drawings cover multiple technical aspects such as bridge framing plans, end bracing frame details, concrete repair specifications, bridge bearing details, expansion joint filler requirements, and abutment repair locations. The drawings include precise measurements, structural views, repair techniques, and annotated notes for contractor implementation, with scales ranging from 1:1 to 1:20 and comprehensive views including plan, section, and detailed views of specific structural components.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ25Q0027-0001.pdf | ||
| Specifications March 2025.pdf | ||
| Solicitation W912WJ25Q0027.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
New England District
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL
OF ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET
APPROVED FOR TECHNICAL ADEQUACY BY:
TECHNICAL LEAD ENGINEER DATE
DATE
DATE
DATE
DATE
APPROVED BY:
APPROVAL RECOMMENDED BY:
CHIEF, ENGINEERING DIVISION
This project was designed by the U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents, within the scope of their employment as required by ER 1110-1-8152.
REVIEWED BY:
CHIEF, GEOTECHNICAL/WATER RESOURCES BRANCH
REVIEWED BY:
CHIEF, DESIGN BRANCH
CHIEF, GEO-ENVIRONMENTAL ENGINEERING BRANCH
SPILLWAY BRIDGE PAINTING
AND CONCRETE REPAIR
BARRE FALLS DAM
HUBBARDSTON, MASSACHUSETTS
MARCH 2025
G-001
C O
VE
R
S H
EE
T
AN
D
IN
D
EX
L.
B
EV
ER
AG
E
L.
B
EV
ER
AG
E
B.
P
AU
L
J.
K
ED
ZI
ER
SK
I
AN
SI
D N
.T .S
M
AR
C H
INDEX TO DRAWINGS
SHEET NO. DESIGN FILE SHEET TITLE
1 G-001 CON-BF-526_G-001.DWG COVER SHEET AND INDEX
2 G-101 CON-BF-526_G-101.DWG GENERAL PLAN
3 S-101 CON-BF-526_S-101.DWG STRUCTURAL PLAN VIEW
4 S-301 CON-BF-526_S-301.DWG STRUCTURAL END FRAME VIEW
5 S-302 CON-BF-526_S-302.DWG ABUTMENT AND BACKWALL VIEW
6 S-501 CON-BF-526_S-501.DWG STRUCTURAL DETAILS - BRIDGE BEARING DETAILS
7 S-502 CON-BF-526_S-502.DWG STRUCTURAL DETAILS - PREMOLDED JOINT FILLER DETAILS
8 S-503 CON-BF-526_S-503.DWG STRUCTURAL DETAILS - CONCRETE REPAIR DETAIL
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
SP
IL
LW
AY
B R
ID
G
E
PA
IN
TI
N G
AN
D
C O
N C
R
ET
E R
EP
AI
R
BA
R R
E
FA
LL
S
D
AM
H U
BB
AR
D
ST
O N
, M
AS
SA
C
H U
SE
TT
S
C O
N -B
F-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
HARTFORD
PROV.
CAP
E COD
BOSTON
CONCORD
PORTLAND
AUGUSTA
BANGOR
NOT TO SCALE
NEW
HAMPSHIRE
VERMONT
MONTPELIER
PROJECT
LOCATION
MAINE
CANADA
MASSACHUSETTS
R.I.
CANADA
REGIONAL MAP
ATLANTIC
OCEAN
SPRINGFIELD
CONNECTICUT
HUBBARDSTON
QUABBIN
BARRE
HUBBARDSTON
WORCESTER
122A
GARDNER
RESERVOIR
FITCHBURG
90 90
NOT TO SCALE
LOCATION MAP
PROJECT
LOCATION
INDEX TO RECORD DRAWINGS (FOR INFORMATION ONLY)
SHEET NO. DESIGN FILE SHEET TITLE
9 CT-I-3088 REFERENCE DRAWINGS.PDF REFERENCE - SPILLWAY DETAIL PLAN AND SECTIONS
10 CT-I-3089 REFERENCE DRAWINGS.PDF REFERENCE - SPILLWAY CONCRETE DETAILS NO. 1
11 CT-I-3090 REFERENCE DRAWINGS.PDF REFERENCE - SPILLWAY CONCRETE DETAILS NO. 2
12 CT-I-3091 REFERENCE DRAWINGS.PDF REFERENCE - ACCESS BRIDGE PLANS AND SECTIONS
13 CT-I-3092 REFERENCE DRAWINGS.PDF REFERENCE - ACCESS BRIDGE DETAILS
AutoCAD SHX Text N
AutoCAD SHX Text N
E6CD9LAJ
Text Box
W912WJ25Q0027
E6CD9LAJ
Text Box
W912WJ25Q0027
E6EPPJHK
Text Box
JK
OFFICE
GARAGE
HIGHWAY GUARD RAIL
G-101
G
EN
ER
AL
P
LA
N
L.
B
EV
ER
AG
E
L.
B
EV
ER
AG
E
B.
P
AU
L
J.
K
ED
ZI
ER
SK
I
AN
SI
D 1"
0'
M
AR
C H
SCALE: 1" = 20'
GENERAL PLANA1 20' 40'0
EXISTING WATER STORAGE TANK
NOT FOR CONTRACTOR USE VEHICLE ACCESS ROAD FROM DAM CREST
ROAD TO STORAGE AREA
PARKING LOT BY GARAGE
CONTRACTOR STORAGE AREA
FLAG POLE
℄ SPILLWAY
ACCESS BRIDGE
SEE SHEET S-101
℄ DAM
VEGETATIVE
GROUND SURFACE
SPILLWAY WEIR
CREST
NORTH
ABUTMENT
SOUTH
ABUTMENT
ROCKY LEDGES
BENEATH ABUTMENTS
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
SP
IL
LW
AY
B R
ID
G
E
PA
IN
TI
N G
AN
D
C O
N C
R
ET
E R
EP
AI
R
BA
R R
E
FA
LL
S
D
AM
H U
BB
AR
D
ST
O N
, M
AS
SA
C
H U
SE
TT
S
C O
N -B
F-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
GENERAL NOTES:
1. REFER TO PHOTO ATTACHMENTS TO THE SPECIFICATIONS
FOR FURTHER INFORMATION.
2. CONTRACTOR STORAGE AREA LOCATION IS APPROXIMATE.
FINAL LOCATION AND CONFIGURATION TO BE DISCUSSED
AND AGREED UPON AT THE PRECONSTRUCTION MEETING
WITH THE COR TO ENSURE UNIMPEDED ACCESS TO THE
GARAGE FOR BARRE FALLS DAM VEHICLES AND TRAILERS.
'-6
AutoCAD SHX Text N
E6CD9LAJ
Text Box
W912WJ25Q0027
E6EPPJHK
E6CD9LAJ
W912WJ25Q0027
E6EPPJHK
W912WJ25Q0027
E6EPPJHK
W912WJ25Q0027
E6EPPJHK
S-501
ST
R
U C
TR
U
AL
D
ET
AI
LS
BR
ID
G
E
BE
AR
IN
G D
ET
AI
LS
L.
B
EV
ER
AG
E
L.
B
EV
ER
AG
E
B.
P
AU
L
J.
K
ED
ZI
ER
SK
I
AN
SI
D 1-
1/ 2"
M
AR
C H
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
SP
IL
LW
AY
B R
ID
G
E
PA
IN
TI
N G
AN
D
C O
N C
R
ET
E R
EP
AI
R
BA
R R
E
FA
LL
S
D
AM
H U
BB
AR
D
ST
O N
, M
AS
SA
C
H U
SE
TT
S
C O
N -B
F-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
BEARING PAINTING NOTES:
1. PAINTING SHALL BE PERFORMED ON ALL PARTS OF BEARING
COMPONENTS, TO INCLUDE ATTACHED BOLTS AND NUTS.
2. PAINTING ON BEARING COMPONENTS SHALL NOT INTERFERE WITH
FREE MOTION OF BRIDGE DURING EXPANSION AND CONTRACTION
OF BRIDGE. PAINT SHALL NOT FORM CONNECTIONS IN BETWEEN
UPPER SHOES, LOWER SHOES, AND BEARING PLATES.
SCALE: 1-1/2" = 1' - 0"
FIXED BEARING TOP VIEWL2 SCALE: 1-1/2" = 1' - 0"
FIXED BEARING FRONT VIEWL6 SCALE: 1-1/2" = 1' - 0"
FIXED BEARING SIDE VIEWL10
1' -2
R0'-2"
0' -2
0'
-2
1'-8"
0' -1
0' -2
"0' -2
"0' -1
0'
-4
1' -0
/2
2'-0"
0' -3
0'-4 1/2"
0'-1 1/4" 0'-2" 0'-1 1/4"
SCALE: 1-1/2" = 1' - 0"
EXPANSION BEARING TOP VIEWF2 SCALE: 1-1/2" = 1' - 0"
EXPANSION BEARING FRONT VIEWF6 SCALE: 1-1/2" = 1' - 0"
EXPANSION BEARING SIDE VIEWF10
SCALE: 1-1/2" = 1' - 0"
BEARING UPPER SHOE TOP VIEWA2 SCALE: 1-1/2" = 1' - 0"
BEARING UPPER SHOE FRONT VIEWA6 SCALE: 1-1/2" = 1' - 0"
BEARING UPPER SHOE SIDE VIEWA10
1' 2'0 6"
1'-2"
1' -3
/4
R0'-3 1/4"
0'-4" 0'-4"
R0'-0 13/16"
2'-1 3/4"
0' -1
0"
0'-5 3/8" 0'-1 1/4"
0'-5 1/4" 0'-5 3/8"0'-5 1/4" 0'-2"
1' -2
0'
-0
/4
CURVED BOTTOM SURFACE
0' -3
0'-1 1/4" 0'-1 1/4"
1'-11 1/4"
R 0'
-3
/4
R0'-10"0' -0
/4
0'
-0
/2
0' -7
0' -0
/2
1'-0"
1' -0
0' -1
/4
0' -0
/2
0'-1 1/4"0'-4"
0'-1 1/2"
0'-4"0'-1 1/4"
0' -5
/4
R0'-3 1/4"
SCALE: 1-1/2" = 1' - 0"
EXPANSION BEARING LOWER SHOE TOP VIEWF14
SCALE: 1-1/2" = 1' - 0"
EXPANSION BEARING LOWER SHOE SIDE VIEWA14
2'-10"
1' -2
R0'- 2"
1'-11"
0' -1
0"
TOOTH FOR
EXPANSION BEARING
0' -1
/4
0' -1
/4
0' -1
0'-2"
0'-1 3/4"
E6CD9LAJ
Text Box
W912WJ25Q0027
E6EPPJHK
S-502
R
U C
TR
U
AL
D
ET
AI
LS
PR
EM
O
LD
ED
J O
IN
T
FI
LL
ER
D
ET
AI
LS
L.
B
EV
ER
AG
E
L.
B
EV
ER
AG
E
B.
P
AU
L
J.
K
ED
ZI
ER
SK
I
AN
SI
D 3"
M
AR
C H
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
SP
IL
LW
AY
B R
ID
G
E
PA
IN
TI
N G
AN
D
C O
N C
R
ET
E R
EP
AI
R
BA
R R
E
FA
LL
S
D
AM
H U
BB
AR
D
ST
O N
, M
AS
SA
C
H U
SE
TT
S
C O
N -B
F-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SCALE: 3" = 1' - 0"
EXPANSION JOINT SECTION VIEWB3
PREMOLDED EXPANSION JOINT FILLER NOTES:
1. EXISTING STEEL JOINT BRACKETS DO NOT MATCH REFERENCE DRAWINGS FROM
BRIDGE CONSTRUCTION. CONTRACTOR SHALL INSPECT CONDITIONS PRIOR TO
CONSTRUCTION AND ENSURE PREMOLDED EXPANSION JOINT FILLER CAN BE
INSTALLED TO MATCH EXISTING CONDITIONS AT THE BRIDGE JOINTS.
2. CONTRACTOR SHALL FIELD VERIFY THE EXPANSION JOINT DIMENSIONS ON BOTH
THE NORTH AND SOUTH SIDES OF THE BRIDGE PRIOR TO SELECTING PREMOLDED
EXPANSION JOINT FILLER.
3. FULLY REMOVE EXISTING PREMOLDED EXPANSION JOINT FILLER FROM THE BRIDGE
JOINT. CLEAN EXISTING METAL PRIOR TO INSTALLATION OF NEW PREMOLDED
EXPANSION JOINT.
4. NEW PREMOLDED EXPANSION JOINT FILLER SHALL MEET THE REQUIREMENTS OF
ASTM D3542.
5. THE PREMOLDED EXPANSION JOINT FILLER SHALL BE SELECTED AND INSTALLED IN
ACCORDANCE WITH THE MANUFACTURER'S GUIDANCE. PREMOLDED EXPANSION
JOINT FILLER SHALL BE INSTALLED SUCH THAT IT SHALL PERMANENTLY BE IN
COMPRESSION BETWEEN THE TWO SIDES OF THE EXPANSION JOINT, WITH AN
INITIAL WIDTH NO LESS THAN 1/8" AND NO MORE THAN 1/4" WIDER THAN THAN THE
WIDTH OF THE JOINT AT INSTALLATION.
6. THE PREMOLDED EXPANSION JOINT FILLER SHALL BE ATTACHED TO THE EXISTING
STEEL ANGLES AT THE EXPANSION JOINT BY USE OF AN ADHESIVE LUBRICANT.
ADHESIVE LUBRICANT SHALL COMPLY WITH ASTM D4070. THE ADHESIVE LUBRICANT
SHALL BE APPLIED IN ACCORDANCE WITH MANUFACTURER'S GUIDANCE, INCLUDING
STEEL PREPARATION.
0'-4"±
WIDTH VARIES
WITH BRIDGE
EXPANSION
EXISTING INTERIOR LEDGES
FOR PLACEMENT OF PREMOLDED
EXPANSION JOINT
NEW PREMOLDED EXPANSION JOINT FILLER
TO BE INSTALLED
SCALE: 3" = 1' - 0"
EXPANSION JOINT PARTIAL PLAN VIEWG3
0'-4"±
WIDTH VARIES
WITH BRIDGE
EXPANSION
BRIDGE DECKABUTMENT BACKWALL
BRIDGE DECKABUTMENT BACKWALL
PATTERNED
JOINT PLATE
PATTERNED
JOINT PLATE
NEW PREMOLDED EXPANSION JOINT FILLER
TO BE INSTALLED
BRIDGE DECK CURB
B3 S-502
6"0 3" 1'
6"0 3" 1'
STEEL PLATE
1/
4"
1/
4"
1 1/4"±
NEW PREMOLDED EXPANSION JOINT FILLER
TO BE INSTALLED
E6CD9LAJ
Text Box
W912WJ25Q0027
E6EPPJHK
S-503
R
U C
TR
U
AL
D
ET
AI
LS
C
O N
C R
ET
E
R
EP
AI
R
D
ET
AI
L
L.
B
EV
ER
AG
E
L.
B
EV
ER
AG
E
B.
P
AU
L
J.
K
ED
ZI
ER
SK
I
AN
SI
D N
.T .S
M
AR
C H
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
SP
IL
LW
AY
B R
ID
G
E
PA
IN
TI
N G
AN
D
C O
N C
R
ET
E R
EP
AI
R
BA
R R
E
FA
LL
S
D
AM
H U
BB
AR
D
ST
O N
, M
AS
SA
C
H U
SE
TT
S
C O
N -B
F-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SCALE: N.T.S.
MINIMUM 2" DEEP CONCRETE REPAIR DETAILG2
1 3/4" CLEAR
1/4" DIA STEEL PINS
2X2, W1.4XW1.4 WWF
NEW POLYMER-
MODIFIED CONCRETE
EXISTING CONCRETE
1" DEEP SAWCUT
AROUND EDGE OF REPAIR
0'-2" MINIMUM
TYPICAL REPAIR PATCH MINIMUM 2" DEEP
1. SAWCUT PERIMETER OF REPAIR A MINIMUM OF 1 INCH DEEP.
2. REMOVE ALL CONCRETE TO A MINIMUM DEPTH OF 2 INCHES.
3. FOR ALL REINFORCING STEEL THAT IS EXPOSED GREATER THAN 50% OF ITS
CIRCUMFERENCE, THE CONCRETE SHALL BE UNDERCUT BY A MINIMUM OF 1 INCH.
4. PLACE STEEL PINS AT MAXIMUM OF 12 INCHES ON CENTER. PINS SHALL
HAVE A MINIMUM EMBEDDED DEPTH OF 6" INTO SOUND CONCRETE. PINS SHALL
HAVE A MINIMUM DIAMETER OF 1/4". PINS SHALL BE SECURED IN PLACE WITH
CONCRETE, EPOXIES, OR MORTARS IN ACCORDANCE WITH SPECIFICATION SECTION
03 01 00.
5. FASTEN 2X2, W1.4XW1.4, WELDED WIRE FABRIC (WWF) TO STEEL
PINS. ONLY USE WWF WHEN THE REPAIR AREA EXCEEDS 1.0 SQUARE FEET.
PROVIDE MINIMUM CONCRETE COVER OF 1 3/4 IN FOR THE WWF.
6. REPLACE REINFORCING STEEL IF LESS THAN 75% OF THE ORIGINAL REBAR
SECTION REMAINS AT ANY POINT ALONG THE EXPOSED REBAR. PROVIDE A
NEW BAR HAVING SECTION GREATER THAN THE MAXIMUM SECTION AREA
LOSS (#3 MINIMUM).
7. FOR ANY REPLACEMENTS TO THE EXISTING REINFORCEMENT, PROVIDE A LAP
SPLICE AS INDICATED IN THE “BAR SPLICE CHART”.
8. REMOVE ALL LOOSE CONCRETE AND LEACHATES FROM THE EXISTING CONCRETE
SURFACE PRIOR TO CONCRETE PREPARATION AND PLACEMENT. PREPARE
SURFACE TO ICRI CSP 5.
9. ENSURE REPAIR AREA IS SATURATED SURFACE DRY.
10. APPLY CORROSION INHIBITOR/BONDING AGENT TO EXPOSED PINS, WWF, EXISTING
REINFORCEMENT, AND CONCRETE SUBSTRATE.
11. INSTALL FORMS.
12. PLACE POLYMER-MODIFIED CONCRETE.
13. REFER TO DRAWING S-302 FOR REPAIR LOCATIONS.
BAR SIZE LAP SPLICE LENGTH
#3 1'-0"
BAR SPLICE CHART
#4
#5
#6
#7
#8
1'-3"
1'-7"
1'-11"
2'-3"
2'-6"
1. WHEN EXISTING REINFORCEMENT IS EXPOSED DURING CONCRETE REMOVAL OR
REPAIR, CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S
REPRESENTATIVE TO DETERMINE IF REPLACEMENT OF REINFORCEMENT IS
NECESSARY. THE CONTRACTING OFFICER'S REPRESENTATIVE SHALL DETERMINE
WHETHER TO REPLACE OR SPLICE EXISTING REINFORCEMENT.
SPLICE NOTE:
1 1/2" CLEAR
E6CD9LAJ
Text Box
W912WJ25Q0027
E6EPPJHK
| G-001.pdf |
| Sheets and Views |
| G-001 |
| G-101.pdf |
| Sheets and Views |
| - |
| S-101.pdf |
| Sheets and Views |
| S-101 |
| S-301.pdf |
| Sheets and Views |
| S-301 |
| S-302.pdf |
| Sheets and Views |
| S-302 |
| S-501.pdf |
| Sheets and Views |
| S-501 |
| S-502.pdf |
| Sheets and Views |
| S-502 |
| S-503.pdf |
| Sheets and Views |
| S-503 |
Reference Drawings.pdf
| Text1: 3/13/25 | |
| Text2: 13MAR2025 | |
| Text3: | |
| 2025-03-13T11:38:47-0400 | |
| JACOBS.LAUREN.ASHLEY.1137790927 |
| 2025-03-13T12:23:43-0400 | |
| TESSIER.MATTHEW.E.1377053253 |
| 2025-03-13T15:57:51-0400 | |
| MARGOLIS.DAVID.I.1228573805 |
File details come from the government source that posted it. Updated .