Drawings - Ft Bliss Panera.pdf

PDF 15 MB Posted

Attached to
Ft. Bliss, Texas- Convert Boston Market to Panera Bread
Solicitation number
GNFR-FC-BLS-24-22616
Issued by

About this file

The provided document appears to be a set of drawings related to the federal contract opportunity to convert the existing Boston Market located at Fort Bliss, Texas to a Panera Bread restaurant.

The contract opportunity, identified as GNFR-FC-BLS-24-22616, is being solicited by the Department of Defense and involves a 2,144 SF conversion project. The project's purpose is to convert the existing Boston Market (Building 1613) into a Panera Bread location. Interested parties are instructed to refer to the provided link for details on how to participate in the solicitation, and any amendments will be posted on the website and must be acknowledged when submitting a proposal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARMY & AIR FORCE EXCHANGE SERVICES

CONVERT BOSTON MARKET

TO

PANERA BREAD

FREEDOM CROSSING AT FT BLISS TX

BUILDING B1613

EXCHANGE

TM

PROJECT NUMBER: 3770-23-011

07.24.24

FOR SOLICITATION

ARCHITECT OF RECORD

JODY PATRICK COLE

JODY PATRICK

COLE

A4627

S

T

E

O

F K

A

T

O

O

A

H

M

A

L

L

C

E

N

E

D C

H

E

C

I

S

AR

I

T

T

07.24.24

AutoCAD SHX Text

ARCHITECTURAL

AutoCAD SHX Text

BLEU TRACE ARCHITECTURE

AutoCAD SHX Text

JODY P COLE, AIA

AutoCAD SHX Text

ARCHITECT OF RECORD

AutoCAD SHX Text

PO BOX 602

AutoCAD SHX Text

JENKS OK 74037

AutoCAD SHX Text 918.605.7537

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

CHARLIE CALVERT, PE

AutoCAD SHX Text

ENGINEER OF RECORD

AutoCAD SHX Text McCOY AND HOWARD

AutoCAD SHX Text

413 MAIN STREET

AutoCAD SHX Text

MT VERON IL

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

CHARLIE CALVERT, PE

AutoCAD SHX Text

ENGINEER OF RECORD

AutoCAD SHX Text McCOY AND HOWARD

AutoCAD SHX Text

413 MAIN STREET

AutoCAD SHX Text

MT VERON IL

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

CHARLIE CALVERT, PE

AutoCAD SHX Text

ENGINEER OF RECORD

AutoCAD SHX Text McCOY AND HOWARD

AutoCAD SHX Text

413 MAIN STREET

AutoCAD SHX Text

MT VERON IL

AutoCAD SHX Text

AAFES GENERAL MANAGER

AutoCAD SHX Text

JOANNE CALAHAN

AutoCAD SHX Text

EXCHANCE GENERAL MANAGER

AutoCAD SHX Text

FT BLISS FIRE MARSHAL

AutoCAD SHX Text

AAFES PROJECT MANAGER

AutoCAD SHX Text

BRENT DELATTE

AutoCAD SHX Text

PROJECT MANAGER

AutoCAD SHX Text

DELATTEB@AAFES.COM

AutoCAD SHX Text 214.312.2023

AutoCAD SHX Text

AAFES KO

AutoCAD SHX Text

NIKISHA KNOWLTON

AutoCAD SHX Text

CONTRACT OFFICER

AutoCAD SHX Text

KNOWTONN@AAFES.COM

AutoCAD SHX Text 214-312-4570

GENERAL

INFORMATION G100

SHEET TITLE: SHEET NUMBER:

PROJECT TITLE:

SCALE:

DATE:

REVIEWED BY:

DRAWN BY: SEAL:

AS NOTED

JPC

ARCHITECT OF RECORD

JODY PATRICK COLE

JPC

REV. # DESCRIPTIONDATE

DESIGN PROJECT NUMBER:

EXCHANGE

TM

DESIGN CONTRACT NUMBER:

7300472359

2440 WEST 81ST STREET

TULSA OKLAHOMA 74132

918.605.7537 bleu trace architecture, pllcbta

JODY PATRICK

COLE

A4627

S

T

E

O

F K

A

T

O

O

A

H

M

A

L

L

C

E

N

E

D C

H

E

C

I

S

AR

I

T

T

PANERA BREAD

TENANT CONVERSION

3770-23-011

1613 PLEASONTON ROAD

SUITE TBD

FT BLISS FREEDOM CROSSING

EL PASO TX

KEY PLAN

07.24.24

FOR SOLICITATION07.24.24

07.24.24

AutoCAD SHX Text

ARCHITECTURAL

AutoCAD SHX Text D101 DEMOLITION FLOOR PLAN AND DETAILS DEMOLITION FLOOR PLAN AND DETAILS D130 DEMOLITION REFLECTED CEILING PLAN DEMOLITION REFLECTED CEILING PLAN D410 DEMOLITION INTERIOR ELEVATIONS DEMOLITION INTERIOR ELEVATIONS D411 DEMOLITION INTERIOR ELEVATIONS DEMOLITION INTERIOR ELEVATIONS A101 FLOOR PLAN AND DETAILS FLOOR PLAN AND DETAILS A120 WALL FINISH AND KEYNOTE PLANS WALL FINISH AND KEYNOTE PLANS A121 FLOOR FINISH PLAN AND DETAILS FLOOR FINISH PLAN AND DETAILS A130 REFLECTED CEILING PLAN AND DETAILS REFLECTED CEILING PLAN AND DETAILS A301 WALL TYPES AND DETAILS WALL TYPES AND DETAILS A410 INTERIOR ELEVATIONS AND DETAILS INTERIOR ELEVATIONS AND DETAILS A411 INTERIOR ELEVATIONS AND DETAILS INTERIOR ELEVATIONS AND DETAILS A601 FINISH SCHEDULE AND NOTES AND DETAILS FINISH SCHEDULE AND NOTES AND DETAILS A701 EQUIPMENT PLAN EQUIPMENT PLAN A710 EQUIPMENT SCHEDULE EQUIPMENT SCHEDULE A720 EQUIPMENT INTERIOR ELEVATIONS EQUIPMENT INTERIOR ELEVATIONS A721 EQUIPMENT INTERIOR ELEVATIONSEQUIPMENT INTERIOR ELEVATIONS

AutoCAD SHX Text

GENERAL

AutoCAD SHX Text G000 TITLE SHEET TITLE SHEET G100 GENERAL INFORMATION GENERAL INFORMATION G101 GENERAL INFORMATIONGENERAL INFORMATION

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

SHEET INDEX

AutoCAD SHX Text

PLUMBING

AutoCAD SHX Text P100 FLOOR PLANS - PLUMBING FLOOR PLANS - PLUMBING P200 FLOOR PLANS - PLUMBING FLOOR PLANS - PLUMBING P300 SYMBOLS AND SCHEDULES - PLUMBINGSYMBOLS AND SCHEDULES - PLUMBING

AutoCAD SHX Text E001 SYMBOLS AND SCHEDULES - ELECTRICAL SYMBOLS AND SCHEDULES - ELECTRICAL ED101 DEMOLITION FLOOR PLAN - LIGHTING DEMOLITION FLOOR PLAN - LIGHTING ED201 DEMOLITION FLOOR PLAN - POWER DEMOLITION FLOOR PLAN - POWER E101 FLOOR PLAN - LIGHTING FLOOR PLAN - LIGHTING E201 FLOOR PLAN - POWER FLOOR PLAN - POWER E202 PANERA EQUIPMENT SCHEDULE - ELECTRICAL PANERA EQUIPMENT SCHEDULE - ELECTRICAL E300 RISER DIAGRAM AND PANEL SCHEDULES - RISER DIAGRAM AND PANEL SCHEDULES - ELECTRICAL

AutoCAD SHX Text

3PL

AutoCAD SHX Text

THIRD PARTY LOGISTICS

AutoCAD SHX Text A/C

AutoCAD SHX Text

AIR CONDITIONING

AutoCAD SHX Text

ACT

AutoCAD SHX Text

ACOUSTICAL CEILING TILE

AutoCAD SHX Text

ADJ

AutoCAD SHX Text

ADJUSTABLE

AutoCAD SHX Text

AFF

AutoCAD SHX Text

ABOVE FINISHED FLOOR

AutoCAD SHX Text

AMP

AutoCAD SHX Text

AMPERE

AutoCAD SHX Text

AOR

AutoCAD SHX Text

ARCHITECT OF RECORD

AutoCAD SHX Text

BLDG

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

BOH

AutoCAD SHX Text

BACK OF HOUSE

AutoCAD SHX Text

CAB

AutoCAD SHX Text

CABINET

AutoCAD SHX Text

CBS

AutoCAD SHX Text

COLD BEVERAGE STATION

AutoCAD SHX Text

CKT

AutoCAD SHX Text

CIRCUIT

AutoCAD SHX Text

CL

AutoCAD SHX Text

CENTER LINE

AutoCAD SHX Text

CLG

AutoCAD SHX Text

CEILING

AutoCAD SHX Text

CLR

AutoCAD SHX Text

CLEAR OR CLEARANCE

AutoCAD SHX Text

COL

AutoCAD SHX Text

COLUMN

AutoCAD SHX Text

COMP

AutoCAD SHX Text

COMPARTMENT

AutoCAD SHX Text

CONST

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

CONT

AutoCAD SHX Text

CONTINUOUS

AutoCAD SHX Text

CTR

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

CW

AutoCAD SHX Text

COLD WATER

AutoCAD SHX Text

CX

AutoCAD SHX Text

COMMISSIONING

AutoCAD SHX Text

CXA

AutoCAD SHX Text

COMMISSIONING AGENT

AutoCAD SHX Text

DEG

AutoCAD SHX Text

DEGREE

AutoCAD SHX Text

DET

AutoCAD SHX Text

DETAIL

AutoCAD SHX Text

DIA

AutoCAD SHX Text

DIAMETER

AutoCAD SHX Text

DIM

AutoCAD SHX Text

DIMENSION

AutoCAD SHX Text

DISP

AutoCAD SHX Text

DISPENSER

AutoCAD SHX Text

DM

AutoCAD SHX Text

STARBUCKS DESIGN MANAGER

AutoCAD SHX Text

DN

AutoCAD SHX Text

DOWN

AutoCAD SHX Text

DT

AutoCAD SHX Text

DRIVE THRU

AutoCAD SHX Text

DWG

AutoCAD SHX Text

DRAWING

AutoCAD SHX Text

EA

AutoCAD SHX Text

EACH

AutoCAD SHX Text

EL

AutoCAD SHX Text

ELEVATION

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

EM

AutoCAD SHX Text

EMERGENCY

AutoCAD SHX Text

EQ

AutoCAD SHX Text

EQUAL

AutoCAD SHX Text

EQUIP

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ESP

AutoCAD SHX Text

ESPRESSO

AutoCAD SHX Text

EXIST

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

EXT

AutoCAD SHX Text

EXTERIOR

AutoCAD SHX Text

FC

AutoCAD SHX Text

FIXTURE CONTRACTOR

AutoCAD SHX Text

FF&E

AutoCAD SHX Text

FURNITURE, FIXTURE, AND

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text F&I

AutoCAD SHX Text

FURNISH AND INSTALL

AutoCAD SHX Text

FLR

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

FOH

AutoCAD SHX Text

FRONT OF HOUSE

AutoCAD SHX Text

FRP

AutoCAD SHX Text

FIBERGLAS REINFORCED PANEL

AutoCAD SHX Text

FT

AutoCAD SHX Text

FOOT/FEET

AutoCAD SHX Text

FW

AutoCAD SHX Text

FILTERED WATER

AutoCAD SHX Text

GC

AutoCAD SHX Text

GENERAL CONTRACTOR

AutoCAD SHX Text

GFCI

AutoCAD SHX Text

GROUND FAULT CIRCUIT

AutoCAD SHX Text

INTERRUPTER

AutoCAD SHX Text

GND

AutoCAD SHX Text

GROUND

AutoCAD SHX Text

GWB

AutoCAD SHX Text

GYPSUM WALLBOARD

AutoCAD SHX Text

HC

AutoCAD SHX Text

HOLLOW CORE

AutoCAD SHX Text

HDW

AutoCAD SHX Text

HARDWARE

AutoCAD SHX Text

HM

AutoCAD SHX Text

HOLLOW METAL

AutoCAD SHX Text

HORIZ

AutoCAD SHX Text

HORIZONTAL

AutoCAD SHX Text

HR

AutoCAD SHX Text

HOUR

AutoCAD SHX Text

HS

AutoCAD SHX Text

HAND SINK

AutoCAD SHX Text

HT

AutoCAD SHX Text

HEIGHT

AutoCAD SHX Text

HVAC

AutoCAD SHX Text

HEATING, VENTILATING,

AutoCAD SHX Text

AND AIR CONDITIONING

AutoCAD SHX Text

HW

AutoCAD SHX Text

HOT WATER

AutoCAD SHX Text

ID

AutoCAD SHX Text

INSIDE DIAMETER

AutoCAD SHX Text

LC

AutoCAD SHX Text

LICENSEE

AutoCAD SHX Text

LEED

AutoCAD SHX Text

LEADERSHIP IN ENERGY

AutoCAD SHX Text

AND ENVIRONMENTAL

AutoCAD SHX Text

DESIGN

AutoCAD SHX Text

LV

AutoCAD SHX Text

LOW VOLTAGE

AutoCAD SHX Text

MAX

AutoCAD SHX Text

MAXIMUM

AutoCAD SHX Text

MECH

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

MEP

AutoCAD SHX Text

MECHANICAL, ELECTRICAL

AutoCAD SHX Text

AND PLUMBING

AutoCAD SHX Text

MFR

AutoCAD SHX Text

MANUFACTURER

AutoCAD SHX Text

MIN

AutoCAD SHX Text

MINIMUM

AutoCAD SHX Text

MOP

AutoCAD SHX Text

MOBIL ORDER & PAY

AutoCAD SHX Text

MS

AutoCAD SHX Text

MOP SINK

AutoCAD SHX Text

NIC

AutoCAD SHX Text

NOT IN CONTRACT

AutoCAD SHX Text

NL

AutoCAD SHX Text

NIGHT LIGHT

AutoCAD SHX Text

NTS

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

OA

AutoCAD SHX Text

OVERALL

AutoCAD SHX Text

OC

AutoCAD SHX Text

ON CENTER

AutoCAD SHX Text

OD

AutoCAD SHX Text

OUTSIDE DIAMETER

AutoCAD SHX Text

PC

AutoCAD SHX Text

PLUMBING CONTRACTOR

AutoCAD SHX Text

PDM

AutoCAD SHX Text

STARBUCKS PROJECT

AutoCAD SHX Text

DEVELOPMENT MANAGER

AutoCAD SHX Text

PLAM

AutoCAD SHX Text

PLASTIC LAMINATE

AutoCAD SHX Text

PLC

AutoCAD SHX Text

PLACE

AutoCAD SHX Text

POS

AutoCAD SHX Text

POINT OF SALE

AutoCAD SHX Text R

AutoCAD SHX Text

RADIUS

AutoCAD SHX Text

REF

AutoCAD SHX Text

REFERENCE

AutoCAD SHX Text

REQD

AutoCAD SHX Text

REQUIRED

AutoCAD SHX Text

REV

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

RND

AutoCAD SHX Text

ROUND

AutoCAD SHX Text

SC

AutoCAD SHX Text

SOLID CORE

AutoCAD SHX Text

SF

AutoCAD SHX Text

SQUARE FEET

AutoCAD SHX Text

SHT

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

SIM

AutoCAD SHX Text

SIMILAR

AutoCAD SHX Text

SPEC

AutoCAD SHX Text

SPECIFICATION

AutoCAD SHX Text

SQ

AutoCAD SHX Text

SQUARE

AutoCAD SHX Text

SS

AutoCAD SHX Text

SOLID SURFACE

AutoCAD SHX Text

SST

AutoCAD SHX Text

STAINLESS STEEL

AutoCAD SHX Text

SUSP

AutoCAD SHX Text

SUSPENDED

AutoCAD SHX Text

TEL

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

TEMP

AutoCAD SHX Text

TEMPORARY

AutoCAD SHX Text

TW

AutoCAD SHX Text

TEMPERED WATER

AutoCAD SHX Text

TYP

AutoCAD SHX Text

TYPICAL

AutoCAD SHX Text

UC

AutoCAD SHX Text

UNDER COUNTER

AutoCAD SHX Text

UNO

AutoCAD SHX Text

UNLESS NOTED OTHERWISE

AutoCAD SHX Text

VCT

AutoCAD SHX Text

VINYL CEILING TILE

AutoCAD SHX Text

VD

AutoCAD SHX Text

VENDOR DIRECT

AutoCAD SHX Text

VERT

AutoCAD SHX Text

VERTICAL

AutoCAD SHX Text

VIF

AutoCAD SHX Text

VERIFY IN FIELD

AutoCAD SHX Text

WH

AutoCAD SHX Text

WATER HEATER

AutoCAD SHX Text

WP

AutoCAD SHX Text

WEATHER PROOF

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text FA001 SYMBOLS, SCHEDULES, AND GENERAL NOTES - SYMBOLS, SCHEDULES, AND GENERAL NOTES - FIRE ALARM FAD101 DEMOLITION FLOOR PLAN - FIRE ALARM DEMOLITION FLOOR PLAN - FIRE ALARM FA101 FLOOR PLAN - FIRE ALARM FLOOR PLAN - FIRE ALARM FP100 FLOOR PLANS - SPRINKLERFLOOR PLANS - SPRINKLER

AutoCAD SHX Text

SCOPE OF WORK

AutoCAD SHX Text

STRUCTURAL

AutoCAD SHX Text

NO STRUCTURAL SHEETS INCLUDED IN THIS PROJECT

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text M100 DEMOLITION FLOOR PLAN - MECHANICAL DEMOLITION FLOOR PLAN - MECHANICAL M200 FLOOR PLAN - MECHANICAL FLOOR PLAN - MECHANICAL M300 SYMBOLS AND SCHEDULES - MECHANICALSYMBOLS AND SCHEDULES - MECHANICAL

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text

SUBSTRATE

AutoCAD SHX Text

CLASS C

AutoCAD SHX Text

SEALANTS

AutoCAD SHX Text

CLASS C

AutoCAD SHX Text

FLAME SPREAD OF ALL FINISHES SHALL COMPLY WITH UFC 3-600-01 AND NFPA 101

AutoCAD SHX Text

FLAME SPREAD REQUIREMENTS

AutoCAD SHX Text 2021 INTERNATIONAL EXISTING BUILDING CODE 2021 INTERNATIONAL PLUMBING CODE 2021 INTERNATIONAL MECHANICAL CODE 2014 NFPA 70, NATIONAL ELECTRICAL CODE 2021 INTERNATIONAL FIRE CODE NFPA 101 LIFE SAFETY CODE 2015 ARCHITECTURAL BARRIERS ACT (ABA) UNIFIED FACILITIES CRITERIA UFC 1-200-01 DOD BUILDING CODE (2022) UFC 3-410-01 HEATING, VENTILATING, AND AIR CONDITIONING UFC 3-420-01 PLUMBING SYSTEMS UFC 3-430-05 NATURAL GAS AND LPG DISTRIBUTION PIPELINES UFC 3-501-01 ELECTRICAL ENGINEERING UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES

AutoCAD SHX Text

BUILDING CODE SUMMARY

AutoCAD SHX Text TYPE II-B CONSTRUCTION - TABLE 601 FULLY FIRE SPRINKLERED - SECTION 903 - SECTION 903

AutoCAD SHX Text

TYPE OF CONSTRUCTION:

THE SCOPE OF WORK FOR THIS PROJECT INCLUDES CONVERTING A BOSTON MARKET TO A PANERA RESTAURANT. THE PANERA WILL RECEIVE NEW FINISHES, FOOD TENANT DEMOLITION 1. REMOVE FLOOR FINISHES REMOVE FLOOR FINISHES 2. REMOVE WALL FINISHES REMOVE WALL FINISHES 3. REMOVE WALL FRAMING REMOVE WALL FRAMING 4. REMOVE CEILING FINISHES REMOVE CEILING FINISHES 5. REMOVE FRAMED SOFFITS REMOVE FRAMED SOFFITS 6. REMOVE EXHAUST HOODS AND ASSOCIATED DUCTING AND REMOVE EXHAUST HOODS AND ASSOCIATED DUCTING AND ROOF MOUNTED EXHAUST FANS 7. REMOVE MAKEUP AIR SYSTEM, DUCTING, AND ROOF REMOVE MAKEUP AIR SYSTEM, DUCTING, AND ROOF MOUNTED EQUIPMENT 8. REMOVE ANSUL SYSTEM REMOVE ANSUL SYSTEM 9. REMOVE GAS PIPING REMOVE GAS PIPING 10. REMOVE LIGHTING REMOVE LIGHTING 11. REMOVE ALL BRANCH ELECTRICAL CIRCUITING BACK TO REMOVE ALL BRANCH ELECTRICAL CIRCUITING BACK TO PANEL NEW CONSTRUCTION 1. NEW FLOOR FINISHES NEW FLOOR FINISHES 2. NEW FRAMED WALLS NEW FRAMED WALLS 3. NEW CEILING FINISHES NEW CEILING FINISHES 4. NEW CASEWORK NEW CASEWORK 5. NEW EQUIPMENT NEW EQUIPMENT 6. MINOR ROOF REPAIRS FOR NEW ROOF PENETRATIONS MINOR ROOF REPAIRS FOR NEW ROOF PENETRATIONS 7. REPLACE WALK-IN COOLER WITH NEW WALK-IN FREEZER REPLACE WALK-IN COOLER WITH NEW WALK-IN FREEZER INCLUDING NEW REMOTE ROOF MOUNTED CONDENSER 8. ADJUSTED HVAC BRANCH DUCTWORK/DIFFUSERS ADJUSTED HVAC BRANCH DUCTWORK/DIFFUSERS 9. NEW LED LIGHTING THROUGHOUT NEW LED LIGHTING THROUGHOUT 10. NEW BRANCH ELECTRICAL CIRCUITING NEW BRANCH ELECTRICAL CIRCUITING 11. ADJUSTED FIRE SPRINKLER PENDANTS AT NEW ADJUSTED FIRE SPRINKLER PENDANTS AT NEW WALLS/CEILING 12. RELOCATE FIRE ALARM HORN/STROBES AS NEEDEDRELOCATE FIRE ALARM HORN/STROBES AS NEEDED

GENERAL

INFORMATION G101

SITE VERIFICATION REQUIREMENTS:

GENERAL REQUIREMENTS:

DEMOLITION REQUIREMENTS:

SHEET TITLE: SHEET NUMBER:

PROJECT TITLE:

SCALE:

DATE:

REVIEWED BY:

DRAWN BY: SEAL:

AS NOTED

JPC

ARCHITECT OF RECORD

JODY PATRICK COLE

JPC

REV. # DESCRIPTIONDATE

DESIGN PROJECT NUMBER:

EXCHANGE

TM

DESIGN CONTRACT NUMBER:

7300472359

2440 WEST 81ST STREET

TULSA OKLAHOMA 74132

918.605.7537 bleu trace architecture, pllcbta

JODY PATRICK

COLE

A4627

S

T

E

O

F K

A

T

O

O

A

H

M

A

L

L

C

E

N

E

D C

H

E

C

I

S

AR

I

T

T

PANERA BREAD

TENANT CONVERSION

3770-23-011

1613 PLEASONTON ROAD

SUITE TBD

FT BLISS FREEDOM CROSSING

EL PASO TX

KEY PLAN

07.24.24

FOR SOLICITATION07.24.24

07.24.24

AutoCAD SHX Text

PARTIAL SECTION INDICATOR

AutoCAD SHX Text

INTERIOR ELEVATION INDICATOR

AutoCAD SHX Text

COLUMN LINE INDICATOR

AutoCAD SHX Text

HEIGHT ELEVATION INDICATOR

AutoCAD SHX Text

PLAN ELEVATION INDICATOR

AutoCAD SHX Text

ENLARGED DETAIL INDICATOR

AutoCAD SHX Text

PARTITION TYPE INDICATOR

AutoCAD SHX Text

DOOR INDICATOR

AutoCAD SHX Text

WINDOW INDICATOR

AutoCAD SHX Text 2-A2

AutoCAD SHX Text 8-A3

AutoCAD SHX Text A6

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text 100'-0"

AutoCAD SHX Text

FF EL

AutoCAD SHX Text 100'-0"

AutoCAD SHX Text

AutoCAD SHX Text %%uDETAIL NAME

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DETAIL INDICATOR

AutoCAD SHX Text

SYMBOLS LEGEND

AutoCAD SHX Text

AutoCAD SHX Text A2

AutoCAD SHX Text

AutoCAD SHX Text A2

AutoCAD SHX Text

(MASTER LIST - ALL SYMBOLS MAY NOT BE USED)

AutoCAD SHX Text

FINISH MATERIAL TAG

AutoCAD SHX Text

DATUM POINT

AutoCAD SHX Text

KEYNOTE

AutoCAD SHX Text

FULL SECTION INDICATOR

AutoCAD SHX Text

EXTERIOR ELEVATION INDICATOR

AutoCAD SHX Text

1. THE ARCHITECT HAS MADE A SCOPE VISIT WITH MEASUREMENTS AND PHOTOGRAPHS OF EXISTING CONDITIONS AND THE ARCHITECTURAL DRAWINGS THE ARCHITECT HAS MADE A SCOPE VISIT WITH MEASUREMENTS AND PHOTOGRAPHS OF EXISTING CONDITIONS AND THE ARCHITECTURAL DRAWINGS INDICATE EXISTING VISUAL CONDITIONS VERIFIED IN THE FIELD. 2. ANY DISCREPANCY WITH THE EXISTING SITE CONDITIONS AND/OR THE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING ANY DISCREPANCY WITH THE EXISTING SITE CONDITIONS AND/OR THE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER FOR CLARIFICATION AND INSTRUCTION. THESE CONSTRUCTION DOCUMENTS HAVE BEEN DESIGNED AND DRAWN BASED ON VISUAL INSPECTION OF SYSTEMS ASSUMING EXISTING BUILDING CONDITIONS MATCH THE ORIGINAL DRAWINGS. THE GENERAL CONTRACTOR, IMMEDIATELY UPON ARRIVAL AT THE SITE, SHALL VERIFY ALL EXISTING DIMENSIONS,. IF DISCREPANCIES ARE FOUND BETWEEN WHAT IS SHOWN ON THE DRAWINGS AND EXISTING FIELD CONDITIONS, CONTACT THE CONTRACTING OFFICE IMMEDIATELY TO DETERMINE WHAT ACTION SHOULD BE TAKEN TO MATCH EXISTING CONDITIONS. 3. ALL UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING UTILITIES ALL UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING UTILITIES (WHETHER SHOWN OR NOT). THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER OF THE DISCOVERY OF EXISTING UTILITIES NOT SHOWN OR NOTED ON DRAWINGS. 4. THE CONTRACTOR SHALL VERIFY EXACT LOCATIONS OF UTILITIES PRIOR TO ANY DEMOLITION. THE CONTRACTOR SHALL VERIFY EXACT LOCATIONS OF UTILITIES PRIOR TO ANY DEMOLITION. 5. REPORT ANY DISCREPANCIES FOUND IN THE FIELD IMMEDIATELY TO CONTRACTING OFFICER PRIOR TO MAKING ANY MODIFICATIONS OR ORDERING OF REPORT ANY DISCREPANCIES FOUND IN THE FIELD IMMEDIATELY TO CONTRACTING OFFICER PRIOR TO MAKING ANY MODIFICATIONS OR ORDERING OF ANY MATERIALS.

AutoCAD SHX Text

1. ALL WORK SHALL BE DONE IN A SAFE AND WORKMANLIKE MANNER AND IN STRICT ACCORDANCE WITH THE LOCAL AND/OR STATE (IF APPLICABLE) ALL WORK SHALL BE DONE IN A SAFE AND WORKMANLIKE MANNER AND IN STRICT ACCORDANCE WITH THE LOCAL AND/OR STATE (IF APPLICABLE) BUILDING CODES, UFC, NATIONAL ELECTRIC CODE, ADA-ADAAGS AND OTHER ADOPTED ACCESSIBILITY STANDARDS, OSHA, AND ALL APPLICABLE CODES, REGULATIONS, ORDINANCES AND AUTHORITIES HAVING JURISDICTION. 2. INTERNAL COMBUSTION ENGINES MAY BE USED INSIDE THE ENCLOSED BUILDING ONLY WHEN POWERED BY PROPANE. THERE WILL BE NO ADDITIONAL INTERNAL COMBUSTION ENGINES MAY BE USED INSIDE THE ENCLOSED BUILDING ONLY WHEN POWERED BY PROPANE. THERE WILL BE NO ADDITIONAL COMPENSATION OR EXTENSION OF CONTRACT TIME IF EQUIPMENT IS REMOVED FROM SITE BY CONTRACTING OFFICER DUE TO USE OF OTHER FUELS INSIDE THE ENCLOSED BUILDING. a. PROPANE POWERED EQUIPMENT USED INSIDE THE ENCLOSED BUILDING SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE PROPANE POWERED EQUIPMENT USED INSIDE THE ENCLOSED BUILDING SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE POWERED EQUIPMENT USED INSIDE THE ENCLOSED BUILDING SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE POWERED EQUIPMENT USED INSIDE THE ENCLOSED BUILDING SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE EQUIPMENT USED INSIDE THE ENCLOSED BUILDING SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE EQUIPMENT USED INSIDE THE ENCLOSED BUILDING SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE USED INSIDE THE ENCLOSED BUILDING SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE USED INSIDE THE ENCLOSED BUILDING SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE INSIDE THE ENCLOSED BUILDING SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE INSIDE THE ENCLOSED BUILDING SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE THE ENCLOSED BUILDING SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE THE ENCLOSED BUILDING SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE ENCLOSED BUILDING SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE ENCLOSED BUILDING SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE BUILDING SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE BUILDING SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE SHALL HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE HAVE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE CATALYTIC CONVERTERS ON MUFFLERS AND SHALL BE CONVERTERS ON MUFFLERS AND SHALL BE CONVERTERS ON MUFFLERS AND SHALL BE ON MUFFLERS AND SHALL BE ON MUFFLERS AND SHALL BE MUFFLERS AND SHALL BE MUFFLERS AND SHALL BE AND SHALL BE AND SHALL BE SHALL BE SHALL BE BE BE MAINTAINED AND OPERATED TO ENSURE COMPLIANCE WITH LOCAL, STATE, AND FEDERAL INDOOR AIR QUALITY REGULATIONS. b. PROVIDE STORAGE AND HANDLING OF PROPANE FUELS IN COMPLIANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS. PROVIDE STORAGE AND HANDLING OF PROPANE FUELS IN COMPLIANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS. 1) NO PROPANE SHALL REMAIN INSIDE BUILDING EXCEPT DURING OPERATION OF PROPANE EQUIPMENT. NO PROPANE SHALL REMAIN INSIDE BUILDING EXCEPT DURING OPERATION OF PROPANE EQUIPMENT. 2) EQUIPMENT SHALL BE RE-FUELED OUTSIDE THE BUILDING. EQUIPMENT SHALL BE RE-FUELED OUTSIDE THE BUILDING. 3. CORDS FOR ELECTRICAL EQUIPMENT SHALL BE SIZED ADEQUATELY FOR VOLTAGE, CURRENT LOAD, AND LENGTH, WHETHER TO GENERATOR OR CORDS FOR ELECTRICAL EQUIPMENT SHALL BE SIZED ADEQUATELY FOR VOLTAGE, CURRENT LOAD, AND LENGTH, WHETHER TO GENERATOR OR EXISTING POWER SUPPLY (AS REQUIRED BY NEC). 4. ROUTE EQUIPMENT CORDS AND HOSES IN COMPLIANCE WITH APPLICABLE OSHA REQUIREMENTS. ROUTE EQUIPMENT CORDS AND HOSES IN COMPLIANCE WITH APPLICABLE OSHA REQUIREMENTS. 5. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELVES WITH THIS KNOWLEDGE DOES NOT RELIEVE THEM OF ANY RESPONSIBILITY FOR PERFORMING THEIR WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. 6. THE EXISTING BUILDING SHALL BE PROTECTED FROM MOISTURE, DUST AND DEBRIS. INSTALL DUST PARTITIONS OR DRAPES AS REQUIRED AND/OR THE EXISTING BUILDING SHALL BE PROTECTED FROM MOISTURE, DUST AND DEBRIS. INSTALL DUST PARTITIONS OR DRAPES AS REQUIRED AND/OR AS DIRECTED BY CONTRACTING OFFICER TO KEEP DUST AND MOISTURE FROM THE OPERATING AREAS OF THE STORE. 7. ANY DAMAGE TO AAFES PROPERTY, WHICH OCCURS DURING THE PROCESS OF CONSTRUCTION SHALL BE REPAIRED/REPLACED AT NO ADDITIONAL ANY DAMAGE TO AAFES PROPERTY, WHICH OCCURS DURING THE PROCESS OF CONSTRUCTION SHALL BE REPAIRED/REPLACED AT NO ADDITIONAL COST TO AAFES; THIS INCLUDES ALL MERCHANDISE. CONTRACTOR SHALL PAY THE COST FOR ALL DAMAGED MERCHANDISE. 8. THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE EXISTING BUILDING SECURITY AT ALL TIMES. THIS INCLUDES KEEPING THE BUILDING THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE EXISTING BUILDING SECURITY AT ALL TIMES. THIS INCLUDES KEEPING THE BUILDING SECURE FROM PERSONS, ENVIRONMENTAL ELEMENTS OR HAZARDS. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN THE INTEGRITY OF ALL EXISTING SECURITY SYSTEMS. THE CONTRACTOR SHALL NOT MODIFY ANY OF THE EXISTING SECURITY SYSTEM AND COMPONENTS. 9. THE CONTRACTOR SHALL KEEP THE WORK AREA CLEAN AND FREE OF DEBRIS AND REMOVE ALL TRASH AND DEBRIS FROM THE CONSTRUCTION AREA THE CONTRACTOR SHALL KEEP THE WORK AREA CLEAN AND FREE OF DEBRIS AND REMOVE ALL TRASH AND DEBRIS FROM THE CONSTRUCTION AREA DAILY. NO FLAMMABLE MATERIALS OR LIQUIDS MAY BE STORED IN THE EXISTING BUILDING. CONSTRUCTION DEBRIS SHALL BE REMOVED FROM THE WORK AREA DAILY. 10. REMOVE AND INSTALL ANY EXISTING EQUIPMENT, FIXTURES, FURNISHINGS, ACCESSORIES, SERVICES, FINISHES OR SURFACES AS REQUIRED, SHOWN OR REMOVE AND INSTALL ANY EXISTING EQUIPMENT, FIXTURES, FURNISHINGS, ACCESSORIES, SERVICES, FINISHES OR SURFACES AS REQUIRED, SHOWN OR NOT SHOWN, FOR THE INSTALLATION OF NEW CONSTRUCTION. PROVIDE FURRING FOR CONDUITS AND PIPING, SHOWN OR NOT, AND FINISH OUT FURRING TO MATCH ADJACENT EXISTING FINISHES. 11. WHEN EQUIPMENT, FIXTURES, FURNISHINGS, ACCESSORIES, SERVICES, FINISHES OR SURFACES ARE TEMPORARILY REMOVED OR RELOCATED IN ORDER WHEN EQUIPMENT, FIXTURES, FURNISHINGS, ACCESSORIES, SERVICES, FINISHES OR SURFACES ARE TEMPORARILY REMOVED OR RELOCATED IN ORDER TO PERFORM WORK, THE CONTRACTOR IS RESPONSIBLE FOR RETURNING THEM TO THEIR ORIGINAL POSITION, RECONNECTION OF SERVICES AND APPROPRIATE MEANS OF ATTACHMENT UNLESS SPECIFICALLY DIRECTED TO DO OTHERWISE. 12. REPAIR, RE-ROUTE, AND EXTEND ALL SERVICES, PIPING, CONDUIT OF EXISTING ITEMS AND EQUIPMENT AS REQUIRED DURING THE CONSTRUCTION REPAIR, RE-ROUTE, AND EXTEND ALL SERVICES, PIPING, CONDUIT OF EXISTING ITEMS AND EQUIPMENT AS REQUIRED DURING THE CONSTRUCTION PROCESS TO MAINTAIN NORMAL STORE OPERATIONS AND AS REQUIRED FOR THE INSTALLATION OF NEW CONSTRUCTION. THIS INCLUDES ALL ITEMS SHOWN OR NOT SHOWN ON THE DRAWINGS. RESET EXISTING EQUIPMENT, FIXTURES, FURNISHINGS, ACCESSORIES OR RELATED ITEMS AS REQUIRED FOR PROPER OPERATION. 13. WHERE EXISTING FINISHES ARE TO REMAIN, CLEAN, REPAIR, PATCH AND REPAINT AS NECESSARY TO BLEND IN WITH ADJACENT WORK. WHERE EXISTING FINISHES ARE TO REMAIN, CLEAN, REPAIR, PATCH AND REPAINT AS NECESSARY TO BLEND IN WITH ADJACENT WORK. 14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE TIMELY ORDERING OF MATERIALS TO PROHIBIT DELAYS OF THE CONSTRUCTION SCHEDULE OF THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE TIMELY ORDERING OF MATERIALS TO PROHIBIT DELAYS OF THE CONSTRUCTION SCHEDULE OF THIS PROJECT. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE DELIVERY OF MATERIALS IN A TIMELY MANNER. 15. THE GENERAL CONTRACTOR SHALL RESPOND TO ALL REQUIREMENTS OF THE ARCHITECT/ENGINEER FOR VERIFICATIONS, RESPONSES, AND THE GENERAL CONTRACTOR SHALL RESPOND TO ALL REQUIREMENTS OF THE ARCHITECT/ENGINEER FOR VERIFICATIONS, RESPONSES, AND SUBMISSIONS. 16. DURING ENTIRE CONSTRUCTION PERIOD, PROVIDE ONE U.L. LISTED 2A:20BC DRY CHEMICAL FIRE EXTINGUISHER, OR ONE STANDARD U.L. LISTED DURING ENTIRE CONSTRUCTION PERIOD, PROVIDE ONE U.L. LISTED 2A:20BC DRY CHEMICAL FIRE EXTINGUISHER, OR ONE STANDARD U.L. LISTED 2-1/2 GALLON WATER (E-10) AND ONE U.L. LISTED 10BC CARBON DIOXIDE FIRE EXTINGUISHER MOUNTED TOGETHER IN EACH 3000 SQ. FT. OF WORK AREA OR FRACTION THEREOF (MINIMUM OF TWO AVAILABLE IN ALL CONSTRUCTION AREAS AT ALL TIMES). 17. THE PROJECT SPECIFICATIONS FOR THIS REPOSITIONING PROJECT ARE A PART OF THESE CONSTRUCTION DOCUMENTS AND MUST BE REFERRED TO THE PROJECT SPECIFICATIONS FOR THIS REPOSITIONING PROJECT ARE A PART OF THESE CONSTRUCTION DOCUMENTS AND MUST BE REFERRED TO FOR COMPLETE DOCUMENTATION. 18. IF MODIFICATION TO SPRINKLER SYSTEM IS REQUIRED THE GENERAL CONTRACTOR SHALL HIRE A LICENSED SPRINKLER CONTRACTOR. CONTRACTOR TO IF MODIFICATION TO SPRINKLER SYSTEM IS REQUIRED THE GENERAL CONTRACTOR SHALL HIRE A LICENSED SPRINKLER CONTRACTOR. CONTRACTOR TO SUBMIT SIGNED AND SEALED SPRINKLER DRAWINGS FOR APPROVAL PRIOR TO ANY ALTERATION OF THE AUTOMATIC SPRINKLER SYSTEM EXCEEDING 25 PENDANT LOCATIONS PER UFC 3-600-01. COORDINATE SPRINKLER WORK WITH THE FT BLISS FIRE MARSHAL. FT BLISS FIRE MARSHAL. FIRE MARSHAL. 19. MUD AND DEBRIS TRACKED ONTO OWNER PAVING OR CITY STREETS TO BE CLEANED IMMEDIATELY. MUD AND DEBRIS TRACKED ONTO OWNER PAVING OR CITY STREETS TO BE CLEANED IMMEDIATELY. 20. BUILDING COMPONENTS AFFECTED BY THE SCOPE OF WORK AND ALLOWED TO REMAIN SHALL BE SECURED TO PREVENT FALLING, LOOSENING, OR BUILDING COMPONENTS AFFECTED BY THE SCOPE OF WORK AND ALLOWED TO REMAIN SHALL BE SECURED TO PREVENT FALLING, LOOSENING, OR CREATING DAMAGE OF ANY KIND IN THE FUTURE.

AutoCAD SHX Text

1. ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE MANNER AND IN STRICT ACCORDANCE WITH OSHA REGULATIONS. ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE MANNER AND IN STRICT ACCORDANCE WITH OSHA REGULATIONS. 2. THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF DEMOLITION. THE WORK INCLUDES, BUT IS NOT LIMITED TO, THE DEMOLITION AND REMOVAL THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF DEMOLITION. THE WORK INCLUDES, BUT IS NOT LIMITED TO, THE DEMOLITION AND REMOVAL OF WALLS, DOORS, FIXTURES, AND ELECTRICAL ITEMS INCLUDING CONDUITS AS SHOWN ON DRAWING OR AS REQUIRED FOR THE INSTALLATION OF THE NEW WORK FOR A COMPLETE JOB. 3. WHEN UTILITIES ARE REMOVED, CAP AND SEAL A MINIMUM OF 8" BELOW FINISH FLOOR OR A MINIMUM OF 6" ABOVE FINISH CEILING. WHEN UTILITIES ARE REMOVED, CAP AND SEAL A MINIMUM OF 8" BELOW FINISH FLOOR OR A MINIMUM OF 6" ABOVE FINISH CEILING. 4. NOTES INDICATING DEMOLITION WORK ARE NOT CONFINED SOLELY TO THE DEMOLITION PLANS. THE GENERAL CONTRACTOR SHALL REVIEW ALL NOTES INDICATING DEMOLITION WORK ARE NOT CONFINED SOLELY TO THE DEMOLITION PLANS. THE GENERAL CONTRACTOR SHALL REVIEW ALL CONSTRUCTION DOCUMENTS, INCLUSIVE OF SCHEDULES AND SPECIFICATIONS, TO DETERMINE FULL EXTENT OF DEMOLITION WORK. 5. DUST BARRIERS REQUIRED. ANY DUST AND/OR DEBRIS OUTSIDE OF THE CONSTRUCTION AREA MUST BE CLEANED IMMEDIATELY. DUST BARRIERS REQUIRED. ANY DUST AND/OR DEBRIS OUTSIDE OF THE CONSTRUCTION AREA MUST BE CLEANED IMMEDIATELY.

AutoCAD SHX Text

EQUIPMENT TAG

AutoCAD SHX Text P1

AutoCAD SHX Text

1. REQUIRED ACCESSIBLE ELEMENTS SHALL BE IDENTIFIED BY THE INTERNATIONAL SYMBOL OF ACCESSIBILITY REQUIRED ACCESSIBLE ELEMENTS SHALL BE IDENTIFIED BY THE INTERNATIONAL SYMBOL OF ACCESSIBILITY AT THE FOLLOWING LOCATIONS: A. TOILETS ROOMS TOILETS ROOMS 2. TACTILE SIGNAGE SHALL BE LOCATED 48 INCHES MINIMUM ABOVE THE FINISH FLOOR OR GROUND SURFACE, TACTILE SIGNAGE SHALL BE LOCATED 48 INCHES MINIMUM ABOVE THE FINISH FLOOR OR GROUND SURFACE, MEASURED FROM THE BASE OF THE LOWEST TACTILE CHARACTER AND 60 INCHES MAXIMUM ABOVE THE FINISH FLOOR OR GROUND SURFACE, MEASURED FROM THE BASELINE OF THE HIGHEST TACTILE CHARACTER. A. WHERE A TACTILE SIGN IS PROVIDED AT A DOOR, THE SIGN SHALL BE LOCATED ALONGSIDE THE DOOR WHERE A TACTILE SIGN IS PROVIDED AT A DOOR, THE SIGN SHALL BE LOCATED ALONGSIDE THE DOOR AT THE LATCH SIDE. B. WHERE A TACTILE SIGN IS PROVIDED AT DOUBLE DOORS WITH ONE ACTIVE LEAF, THE SIGN SHALL BE WHERE A TACTILE SIGN IS PROVIDED AT DOUBLE DOORS WITH ONE ACTIVE LEAF, THE SIGN SHALL BE LOCATED ON THE INACTIVE LEAF. C. WHERE A TACTILE SIGN IS PROVIDED AT DOUBLE DOORS WITH TWO ACTIVE LEAFS, THE SIGN SHALL BE WHERE A TACTILE SIGN IS PROVIDED AT DOUBLE DOORS WITH TWO ACTIVE LEAFS, THE SIGN SHALL BE LOCATED TO THE RIGHT OF THE RIGHT HAND DOOR. D. WHERE THERE IS NO WALL SPACE AT THE LATCH SIDE OF A SINGLE DOOR OR AT THE RIGHT SIDE OF WHERE THERE IS NO WALL SPACE AT THE LATCH SIDE OF A SINGLE DOOR OR AT THE RIGHT SIDE OF DOUBLE DOORS, SIGNS SHALL BE LOCATED ON THE NEAREST ADJACENT WALL. E. SIGNS CONTAINING TACTILE CHARACTERS SHALL BE LOCATED SO THAT A CLEAR FLOOR SPACE OF 18 SIGNS CONTAINING TACTILE CHARACTERS SHALL BE LOCATED SO THAT A CLEAR FLOOR SPACE OF 18 INCHES MINIMUM BY 18 INCHES MINIMUM, CENTERED ON THE TACTILE CHARACTERS, IS PROVIDED BEYOND THE ARC OF ANY DOOR SWING BETWEEN THE CLOSED POSITION AND 45 DEGREE OPEN POSITION. EXCEPTION: SIGNS WITH TACTILE CHARACTERS SHALL BE PERMITTED ON THE PUSH SIDE OF DOORS WITH CLOSERS AND WITHOUT HOLD-OPEN DEVICES. 3. CHARACTER AND SYMBOLS OF SIGNS SHALL BE IN CONTRAST WITH THEIR BACKGROUND AND SHALL BE CHARACTER AND SYMBOLS OF SIGNS SHALL BE IN CONTRAST WITH THEIR BACKGROUND AND SHALL BE EGGSHELL, MATTE, OR OTHER NON-GLARE MATERIALS OR FINISHES. 4. ACCESSIBLE SIGNAGE SHALL USE GRADE 2 BRAILLE AND MUST COMPLY WITH ANSI A117.1 SECTION 703.4ACCESSIBLE SIGNAGE SHALL USE GRADE 2 BRAILLE AND MUST COMPLY WITH ANSI A117.1 SECTION 703.4

AutoCAD SHX Text

DOOR

AutoCAD SHX Text

FF

AutoCAD SHX Text

SIGN, REF NOTE 3

AutoCAD SHX Text

SIGN

SIGNAGE LEGEND

SHEET TITLE: SHEET NUMBER:

PROJECT TITLE:

SCALE:

DATE:

REVIEWED BY:

DRAWN BY: SEAL:

AS NOTED

JPC

ARCHITECT OF RECORD

JODY PATRICK COLE

JPC

REV. # DESCRIPTIONDATE

DESIGN PROJECT NUMBER:

EXCHANGE

TM

DESIGN CONTRACT NUMBER:

7300472359

2440 WEST 81ST STREET

TULSA OKLAHOMA 74132

918.605.7537 bleu trace architecture, pllcbta

JODY PATRICK

COLE

A4627

S

T

E

O

F K

A

T

O

O

A

H

M

A

L

L

C

E

N

E

D C

H

E

C

I

S

AR

I

T

T

PANERA BREAD

TENANT CONVERSION

3770-23-011

1613 PLEASONTON ROAD

SUITE TBD

FT BLISS FREEDOM CROSSING

EL PASO TX

07.24.24

FOR SOLICITATION07.24.24

07.24.24

D101

DEMOLITION

FLOOR PLAN

AND DETAILS

AutoCAD SHX Text EXISTING CONDITIONS ARE DEVELOPED FROM ASBUILT PLANS (WHEN AVAILABLE), FIELD MEASUREMENTS, AND VISIBLE CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS.

AutoCAD SHX Text

AutoCAD SHX Text

DEMOLITION FLOOR PLAN

AutoCAD SHX Text 1/4"=1'-0"

AutoCAD SHX Text

SHEET NOTES

AutoCAD SHX Text

1. PROVIDE NECESSARY DUST PROTECTION PROVIDE NECESSARY DUST PROTECTION PROVIDE NECESSARY DUST PROTECTION DURING CONSTRUCTION 2. COORDINATE DUMPSTER LOCATION WITH COORDINATE DUMPSTER LOCATION WITH AAFES STORE MANAGER FOR APPROVAL BY FT BLISS DPW 3. REMOVE DEBRIS FROM THE PROJECT SITE REMOVE DEBRIS FROM THE PROJECT SITE EACH DAY AND MAINTAIN A CLEAN AND ORDERLY PROJECT SITE 4. PROVIDE WALK-OFF MAT IN HALLWAY PROVIDE WALK-OFF MAT IN HALLWAY 5. KEEP HALLWAY AND HAUL ROUTE CLEAN AND KEEP HALLWAY AND HAUL ROUTE CLEAN AND FREE FROM DEBRIS 6. REMOVE ALL QUARRY TILE FLOORING AS REMOVE ALL QUARRY TILE FLOORING AS SHOWN 7. REMOVE ALL QUARRY TILE WALL BASE AT REMOVE ALL QUARRY TILE WALL BASE AT WALLS TO RECEIVE NEW FINISHES 8. REMOVE WALL FINISHES TO FRAMING AT REMOVE WALL FINISHES TO FRAMING AT EXISTING WALLS TO RECEIVE NEW FINISHES 9. THE SLAB DEMOLITION SHOWN FOR THE SLAB DEMOLITION SHOWN FOR REFERENCE ONLY AND HAS BEEN COORDINATED WITH THE PLUMBING DRAWINGS FOR SANITARY LINE DEMOLITION AND INSTALLATION FOR NEW SANITARY LINES. CONTRACTOR SHALL MAKE FINAL DETERMINATIONS ON SLAB REMOVAL AS NEEDED 10. CONTRACTOR SHALL REMOVE SLAB AS CONTRACTOR SHALL REMOVE SLAB AS NEEDED TO EXTEND SANITARY VENT PIPING AS NEEDED 11. EXISTING FLOOR CLEANOUT TO REMAIN SHALL EXISTING FLOOR CLEANOUT TO REMAIN SHALL HAVE THE HEIGHT ADJUSTED TO FINISH FLUSH WITH THE NEW FLOOR TILE http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf http://www.kclcad.com/emailstaging.asp?M=314-24-1-24L&R=ME&TID=&VC=13&AL=True&VER=4:9:30&P=EG20.27.pdf…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .