Drawings Expand Steam Distribution System.pdf
PDF 5 MB Posted
- Solicitation number
- 36C24622R0063
About this file
This solicitation is for an expand steam distribution system project at the Hunter Holmes McGuire VA Medical Center in Richmond, Virginia. The solicitation number is 36C24622R0063 and is being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.
The project involves replacing the existing condensate storage tank, deaerator tank, condensate transfer pumps, boiler feedwater pumps, and all associated piping, fittings, and valves. The new equipment will be placed in a new location with the required mechanical piping connections extended from the existing location. New electrical breakers and motor circuits will also be installed. The intent is to replace aging equipment and improve steam distribution operations without disrupting steam services to the facility.
The response due date is not provided. Pricing terms and any set asides or incumbent contractors are also not stated. The federal agencies involved are the Department of Veterans Affairs and Veterans Health Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24622R0063 0003.docx | DOCX document | |
| Pre Bid Question Response Memo.pdf | ||
| Site visite sign in expand steam 9-1-2022.pdf | ||
| 36C24622R0063 0002.docx | DOCX document | |
| 36C24622R0063 0001.docx | DOCX document | |
| Expand steam parking and meeting start location.pdf | ||
| Attachment A - Base Proposal Item Price Breakdown.xlsx | XLSX spreadsheet | |
| 36C24622R0063_1.docx | DOCX document | |
| Specifications Expand Steam Distribution System.pdf | ||
| Attachment B - Corp Experience Form.docx | DOCX document | |
| Attachment C - Past Performance Questionnaire.docx | DOCX document | |
| Safety Handbook.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE:
EXPAND STEAM DISTRIBUTION
Watson Engineering, P.C.
1112 State Route 434 Owego, NY 13827
(607)223-4334 RICHMOND, VA
652-19-104
BUILDING 501
07/14/2020
C U s e rs
\m a tt
\O n e D ri v e \D e s k to p \R ic h m o n d
S te a m m p l2
(R e c o v e ry rv t
/1
/2
:1
:5
P
M
T-100
TITLE SHEET
JWE MPL
EXPAND STEAM DISTRIBUTION SYSTEM
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
CONTRACT NO: 36C24619C0110
PROJECT DATA PROJECT DESCRIPTIONDRAWING INDEX
PROJECT ADDRESS:
HUNTER HOLMES MCGUIRE VA MEDICAL CENTER, RICHMOND VA
PROJECT DESCRIPTION:
THE INTENT OF THIS PROJECT IS TO REPLACE THE EXISTING CONDENSATE STORAGE TANK, DEAERATOR TANK, CONDENSATE TRANSFER PUMPS, BOILER FEEDWATER PUMPS, AND ALL ASSOCIATED PIPING, FITTINGS, AND VALVES AT THE RICHMOND, VA VAMC CAMPUS. EACH PIECE OF EQUIPMENT WILL BE DEMOLISHED AND REMOVED FROM THE SPACE, AS WELL AS THE CONNECTING PIPING AND ELECTRICAL FEEDS. THE NEW EQUIPMENT WILL BE PLACED IN A NEW LOCATION AND THE REQUIRED MECHANICAL PIPING CONNECTIONS WILL BE EXTENDED FROM THE EXISTING LOCATION TO THE NEW LOCATION. NEW ELECTRICAL BREAKERS AND STARTERS WILL BE INSTALLED IN THE EXISTING MOTOR CONTROL CENTER, AND MOTOR BRANCH CIRCUITS WILL BE PROVIDED TO EACH NEW PUMP. A NEW FLOOR DRAIN SHALL BE INSTALLED AT THE LOCATION OF THE NEW EQUIPMENT, AND SHALL BE CONNECTED TO THE EXISTING SANITARY SEWER
PIPING BELOW THE SLAB.
AREA MAP LOCATION MAP
DRAWING INDEX
SHEET
NUMBER SHEET NAME
T-100 TITLE SHEET
G-100 GENERAL NOTES
G-101 PHASING PLAN
M-001 MECHANICAL SYMBOLS AND ABBREVIATIONS
MD101 MECHANICAL DEMOLITION PLAN - BOILER ROOM LOWER LEVEL
MD102 MECHANICAL DEMOLITION PLAN - MEZZANINE LEVEL
M-101 MECHANICAL PLAN - BOILER ROOM LOWER LEVEL
M-102 MECHANICAL PLAN - MEZZANINE LEVEL
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
ED101 ELECTRICAL DEMOLITION PLAN - BOILER ROOM LOWER LEVEL
ED102 ELECTRICAL DEMOLITION PLAN - BOILER ROOM MEZZANINE LEVEL
E-101 ELECTRICAL PLAN - BOILER ROOM LOWER LEVEL
E-102 ELECTRICAL PLAN - BOILER ROOM MEZZANINE LEVEL
E-601 ELECTRICAL DETAILS AND MOTOR CIRCUIT DESIGN
PD101 PLUMBING DEMOLITION PLAN - BOILER ROOM LOWER LEVEL
P-101 PLUMBING PLAN - BOILER ROOM LOWER LEVEL
SEISMIC ANALYSIS:
SS: 0.237
S1: 0.056
SMS: 0.379
SM1: 0.134
SDS: 0.252
SD1: 0.089
SEISMIC DESIGN CATEGORY: C
FA: 1.6
FV: 2.4
CRS: 0.943
CR1: 0.932
PGA: 0.142
FPGA: 1.516
PGAM: 0.215
TL: 8
SSRT: 0.237
SSUH: 0.251
SSD: 1.5
S1RT: 0.056
S1UH: 0.06
S1D: 0.6
PGAD: 0.5
SEISMIC BRACING WILL BE REQUIRED
REVISION NO. DESCRIPTION DATE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE:
EXPAND STEAM DISTRIBUTION
Watson Engineering, P.C.
1112 State Route 434 Owego, NY 13827
(607)223-4334 RICHMOND, VA
652-19-104
BUILDING 501
07/14/2020
C U s e rs
\m a tt
\O n e D ri v e \D e s k to p \R ic h m o n d
S te a m m p l2
(R e c o v e ry rv t
/1
/2
:1
:3
P
M
G-100
GENERAL NOTES
JWE MPL
1. UNLESS SPECIFICALLY NOTED AS EXISTING, ALL ITEMS, EQUIPMENT, AND WORK SHOW IS NEW AND SHALL BE FURNISHED AND INSTALLED BY
THE CONTRACTOR.
2. DURING THE EXECUTION OF THIS CONTRACT, THE SITE AND BUILDINGS WILL BE OCCUPIED AND IN USE. WORK DONE UNDER THIS CONTRACT SHALL BE PERFORMED WITHOUT INCONVENIENCE TO THE OWNER INSOFAR AS POSSIBLE. ALL WORK SHALL BE COORDINATED WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE AND IS SUBJECT TO HIS CONTINUOUS APPROVAL.
3. THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR ALL CHARACTERISTICS OF THE EQUIPMENT THAT HE INTENDS TO INSTALL. IF THERE ARE ANY DIFFERENCES IN THE EQUIPMENT SHOWN ON THE DESIGN DRAWINGS AND THE EQUIPMENT TO BE INSTALLED, THE CONTRACTOR SHALL MAKE ALL CHANGES AND ADJUSTMENTS TO ACCOMMODATE THE PROPOSED EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER. THIS APPLIES TO ALL SUPPORT SERVICES AND FACILITIES NECESSARY TO PROPERLY INSTALL THE EQUIPMENT TO FUNCTION ADEQUATELY AS PART OF THE SYSTEMS FOR WHICH THEY WERE DESIGNED AND SELECTED. THESE CHARACTERISTICS INCLUDE SUCH THINGS AS WEIGHT, DIMENSIONS, ELECTRICAL, MECHANICAL, PLUMBING, AND UTILITY SERVICES, ETC. ACCOMMODATING SERVICES INCLUDE SUCH THINGS AS DIMENSIONS, LOCATIONS, AND SIZES OF SUPPORTING MEMBERS, PIPE, CONNECTION SIZES, ELECTRICAL SERVICE SIZE AND PROTECTION, ELECTRICAL CONNECTION LOCATION, UTILITY AND PLUMBING CONNECTION SIZES AND LOCATIONS, ETC. ALL REQUIRED CHANGES TO THE CONTRACT DRAWINGS AND SPECIFICATIONS SHALL BE DESIGNED AND STAMPED BY REGISTERED ENGINEERS IN THE APPROPRIATE DISCIPLINE EMPLOYED BY THE CONTRACTOR AND SHALL BE INCLUDED AS PART OF THE EQUIPMENT SUBMITTALS. ALL CHANGES SHALL BE SUBJECT TO
THE APPROVAL OF THE PROJECT A/E AND THE CONTRACTING OFFICER’S REPRESENTATIVE.
4. PRELIMINARY AIR BALANCE REPORT. AT THE BEGINNING OF THE WORK IMMEDIATELY AFTER RECEIVING NOTICE TO PROCEED, THE CONTRACTOR SHALL MEASURE AND SUBMIT A PRELIMINARY BALANCE REPORT IN COMPLIANCE WITH THE SPECIFICATIONS FOR THE TERMINAL UNITS IN THE AREA OF WORK OF THIS PROJECT. MEASURE ALL SUPPLY, RETURN, AND EXHAUST AIR QUANTITIES. MEASURE AHU IN FULL COOLING, MAX AIR FLOW, AT THE AHU, AND MAX AIR FLOW AT ALL ZONES AND ALL DIFFUSERS; MEASURE THE DISCHARGE STATIC PRESSURE AT THE AHU AND THE SUCTION STATIC PRESSURE AT THE AHU. THEN EACH ZONE SHALL BE SET TO FULL REHEAT AND THE AIR QUANTITY MEASURED AT EACH OUTLET AND THE WATER FLOWS AND TEMPERATURES MEASURED AT EACH REHEAT BOX. THE EXISTING MECHANICAL DRAWINGS WILL BE PROVIDED BY THE FACILITY ENGINEERING DEPARTMENT AT THE VA. SUBMIT A BLANK AIR BALANCE REPORT FOR APPROVAL
PRIOR TO BEGINNING THE PRELIMINARY AIR BALANCE.
5. BEFORE ANY DEMOLITION OR CONSTRUCTION WORK IS BEGUN, THE CONTRACTOR AND THE CONTRACTING OFFICER’S REPRESENTATIVE SHALL SURVEY THE EXISTING CEILINGS TO BE REMOVED AND REPLACED FOR THEIR EXISTING CONDITION. THIS SURVEY WILL BE USED BY THE CONTRACTING OFFICER’S REPRESENTATIVE AT JOB COMPLETION TO DETERMINE WHICH RE-INSTALLED CEILING COMPONENTS MUST BE
REPLACED WITH NEW.
6. REQUEST APPROVAL FROM THE CONTRACTING OFFICER’S REPRESENTATIVE SEVEN DAYS IN ADVANCE FOR THE SHUTDOWN OF ANY EXISTING
SYSTEM.
7. FINAL ADVANCE NOTICE OF 48 HOURS SHALL BE GIVEN TO THE CONTRACTING OFFICER’S REPRESENTATIVE PRIOR TO THE PROPOSED
SHUTDOWN OF ANY SYSTEM.
8. THE CLOSING AND OPENING OF VALVES SHALL BE WITNESSED BY THE CONTRACTING OFFICER’S REPRESENTATIVE; NOTIFY LOCAL
AUTHORITIES AS REQUIRED.
9. PROVIDE ADEQUATE FIRE PROTECTION IN THE ENTIRE CONSTRUCTION AREA FOR THE DURATION OF THE CONSTRUCTION PERIOD. REFER TO
SPECIFICATION DIVISION 1, “GENERAL REQUIREMENTS”, “FIRE SAFETY REQUIREMENTS”.
10. THE ENTIRE EXISTING FIRE PROTECTION SYSTEM SHALL BE RESTORED TO FULL OPERATION AT THE END OF EACH WORKING DAY. ALL EXISTING FIRE ALARMS AND FIRE EXITS AND ANY OTHER ASPECT OF THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN IN FULL OPERATION. THE COST OF RESPONSE TO ANY FALSE ALARM AS CHARGED BY ANY LOCAL FIRE DEPARTMENT SHALL BE PAID BY THE CONTRACTOR.
11. THE GENERAL NOTES ON THIS SHEET APPLY TO ALL THE DRAWING DISCIPLINES.
12. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS POSSIBLE, ALTHOUGH NO ATTEMPT WAS MADE TO SHOW EVERY OFFSET, FITTING, BEAM, PIPE SUPPORT, ETC. CHANGES REQUIRED TO FIT EQUIPMENT, PIPING, AND DUCTWORK SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE
OWNER. ANY MAJOR DISCREPANCIES SHALL BE CLARIFIED PRIOR TO SUBMITTAL OF BID.
13. THE WORK INCLUDES ALL ITEMS OF THE SPECIFICATIONS.
14. VISIT THE SITE AND BE FULLY COGNIZANT OF ALL CONDITIONS PRIOR TO SUBMITTING BID. REPORT ANY DISCREPANCIES TO THE ENGINEER
PRIOR TO SUBMITTAL OF BID.
15. DO NOT BEGIN FABRICATION, CUT ANY MEMBERS, OR BEGIN INSTALLATION UNTIL THE SUBMITTALS AND SHOP DRAWINGS HAVE BEEN
APPROVED. ANY WORK CONSTRUCTED OR INSTALLED PRIOR TO THE APPROVAL OF SUBMITTALS AND SHOP DRAWINGS SHALL BE AT THE CONTRACTOR’S RISK AND SHALL BE REMOVED AND REINSTALLED OR RECONSTRUCTED AT THE CONTRACTOR’S EXPENSE AT THE REQUEST OF THE CONTRACTING OFFICER’S REPRESENTATIVE TO THE COMPLETE SATISFACTION OF THE CONTRACTING OFFICER’S REPRESENTATIVE.
16. DO NOT PENETRATE OR CUT ANY STRUCTURAL MEMBERS NOT SPECIFICALLY SHOWN ON THE DRAWINGS (E.G., JOISTS, BEAMS, ETC.). IF STRUCTURAL MEMBERS CONFLICT WITH ROUTING, CONTACT THE CONTRACTING OFFICER’S REPRESENTATIVE FOR DIRECTION BEFORE PROCEEDING. EXERCISE CAUTION IN CUTTING CONCRETE FLOORS AND WALLS TO AVOID EXISTING UTILITIES WHICH MAY BE LOCATED IN AND
UNDER CONCRETE SURFACES.
17. THE CONTRACTOR SHALL PROVIDE NEW OPENINGS IN WALLS, FLOOR, AND ROOF, AND PATCH EXISTING OPENINGS IN CONJUNCTION WITH THE DEMOLITION AND INSTALLATION OF THE NEW BUILDING COMPONENTS, INCLUDING MECHANICAL, PLUMBING, ELECTRICAL, AND GENERAL CONTRACTOR’S ITEMS. ALL NECESSARY FRAMING, COUNTER-FLASHING, ETC. SHALL BE INCLUDED.
18. FOR ALL FLOOR, WALL, AND ROOF PENETRATION, VERIFY THE LOCATION OF THE (E) STRUCTURAL MEMBERS PRIOR TO DRILLING AND CUTTING, RELOCATE OPENINGS AS REQUIRED AND OFFSET DUCTS, PIPES, CONDUIT, ETC. AS APPROPRIATE. REVIEW THE STRUCTURAL DRAWINGS IN THE
ENGINEERING OFFICE.
19. WHERE THERE IS A CONFLICT ON THE PLANS, SPECIFICATIONS, NOTES, GENERAL NOTES, REFERENCES, PUBLICATIONS, CODES, ETC. WITH RESPECT TO MATERIALS, PRODUCTS, METHODS, WORKMANSHIP, PROCEDURE, EXECUTION, ETC. THE MOST STRINGENT OR BENEFICIAL TO THE OWNER AS DETERMINED BY THE CONTRACTING OFFICER’S REPRESENTATIVE SHALL BE UTILIZED OR INSTALLED. NO RELIEF OR EXTRA PAYMENT SHALL BE MADE TO THE CONTRACTOR BECAUSE OF THE INTERPRETATION OF THE CONTRACTING OFFICER’S REPRESENTATIVE.
20. ALL WORK SHALL BE DONE WITH COMPLETE COMPLIANCE WITH THE PUBLISHED EDITIONS OF THE APPLICABLE CODES AND STANDARDS WHETHER STATUTORY OR NOT. ALL WORK SHALL BE INSTALLED TO COMPLY WITH THE UNIFORM BUILDING MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE CODES, NATIONAL ELECTRICAL CODE, UNDERWRITER’S LABORATORY, INC., AMERICAN NATIONAL STANDARD INSTITUTE, INC., NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION, BASIC ELECTRICAL REGULATIONS, AND CODES AND STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA). IF ANY PART OF THE INSTALLATION DOES NOT MEET CODE, NOTIFY THE CONTRACTING OFFICER’S REPRESENTATIVE PRIOR TO BEGINNING THE INSTALLATION. IF ANY PART OF THE PROJECT CANNOT BE INSTALLED TO CONFORM WITH THE PLANS AND/OR SPECIFICATIONS, NOTIFY THE CONTRACTING OFFICER’S REPRESENTATIVE PRIOR TO BEGINNING THE INSTALLATION.
21. ALL EXISTING DUCTWORK, PIPING, CONDUIT, AND MECHANICAL, PLUMBING, AND ELECTRICAL EQUIPMENT NOT TO BE REUSED OR REMAIN IN SERVICE SHALL BE REMOVED FROM THE FACILITY. THE CONTRACTING OFFICER’S REPRESENTATIVE HAS THE OPTION TO RECLAIM ANY DEMOLISHED MATERIALS OR EQUIPMENT FOR THE GOVERNMENT, IN WHICH CASE IT SHALL BE DELIVERED TO THE LOCATION DESIGNATED BY
THE CONTRACTING OFFICER’S REPRESENTATIVE.
22. FOR EACH PHASE AND BEFORE INTERRUPTING EACH (E) UTILITY, DETERMINE, IN ADVANCE, IF ANY DOWNSTREAM SERVICE BEYOND THE CONSTRUCTION AREA OF THE PHASE, WILL BE INTERRUPTED AND PROVIDE A TEMPORARY SERVICE BYPASSING THE CONSTRUCTION AREA.
DETERMINE ALL SUCH TEMPORARY SERVICES PRIOR TO SUBMITTING BID. THERE WILL BE NO FUTURE CONSIDERATION TO THE CONTRACTOR FOR ANY TEMPORARY SERVICES REQUIRED. PREPARE A DETAILED SHOP DRAWING SHOWING ALL OF THE EXISTING UTILITIES IN THEIR
RELOCATED LOCATION AND ALL THE NEW HVAC SYSTEMS.
23. THE FLOOR AREAS BELOW OVERHEAD WORK, WHERE WELDING “HOT WORK” IS TO BE PERFORMED, SHALL BE CLEARED TO A MINIMUM DISTANCE OF 36 FEET BEYOND THE POINT DIRECTLY BELOW THE OVERHEAD “HOT WORK”. ALL FLAMMABLE MATERIALS SHALL BE CLEARED TO A
DISTANCE 50 FEET BEYOND THE POINT DIRECTLY BELOW THE OVERHEAD “HOT WORK”.
24. EXISTING DUCTWORK, DOMESTIC COLD WATER PIPING, DOMESTIC HOT WATER PIPING, CHILLED AND HEATING HOT WATER PIPING, WASTE, VENT, FIRE SPRINKLER LINES, FIRE ALARM EQUIPMENT, ELECTRICAL CONDUIT, TELEPHONE CONDUIT, COMMUNICATION CONDUIT, PNEUMATIC TUBING, ETC., MAY HAVE TO BE RELOCATED TO FACILITATE THE INSTALLATION OF THE NEW WORK. THE CONTRACTOR SHALL DETERMINE ALL EXISTING SERVICES THAT REQUIRE RELOCATION PRIOR TO SUBMITTING HIS BID AND INCLUDE ALL COSTS IN THE BID. THERE WILL BE NO EXTRA
COMPENSATION TO THE CONTRACTOR FOR THIS WORK.
25. THE CONTRACTOR IS HEREBY NOTIFIED THAT SOME WORK MAY BE REQUIRED OUTSIDE OF THE AREAS SHOWN ON THESE DRAWINGS. THIS COULD INCLUDE CONTROL MODIFICATIONS OR CONNECTIONS AT REMOTE LOCATIONS, CONTROL PANELS, CPU’S, ETC.
26. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO INDICATE ALL OFFSETS, TRANSITIONS, FITTINGS, AND ACCESSORIES THAT MAY BE REQUIRED. COORDINATE ALL THE WORK OF ALL THE TRADES TO INSURE ALL DUCTS, PIPES, CONDUITS, ETC. DO NOT CONFLICT
AND CLEAR STRUCTURAL AND ARCHITECTURAL MEMBERS.
27. THE CONTRACTOR SHALL PAY FOR ALL DAMAGE, INCLUDING WATER DAMAGE, TO PROPERTY AND EQUIPMENT CAUSED BY HIS WORK
THROUGHOUT THE CONSTRUCTION AND WARRANTEE PERIOD.
28. ALL CEILING DEMOLITION WORK SHALL BE DONE AFTER NORMAL WORKING HOURS. THE INSTALLATION OF THE NEW CEILING SHALL BE DONE AFTER NORMAL WORKING HOURS. THE WORK AREA SHALL BE CLEANED BEFORE THE START OF EACH WORKING DAY.
29. REMOVE T-BARS AND 2X4 CEILING PANELS AS REQUIRED FOR THE DEMOLITION AND THE INSTALLATION OF THE NEW WORK. REINSTALL EXISTING OR REPLACE WITH NEW AS REQUIRED TO THE SATISFACTION OF THE CONTRACTING OFFICER’S REPRESENTATIVE. FOR ANY HARD CEILING AREA, CUT AND DEMOLISH ENOUGH OF THE HARD CEILING TO DO THE WORK REQUIRED. REBUILD AND PATCH THE DEMOLISHED.
FINISH AND PAINT TO MATCH EXISTING TO THE SATISFACTION OF THE CONTRACTING OFFICER’S REPRESENTATIVE.
30. ALL VALVES, VOLUME DAMPERS, CONTROL DEVICES, VAR, ETC. SHALL BE INSTALLED IN AN ACCESSIBLE LOCATION.
31. ALL UL LISTED EQUIPMENT SHALL BE INSTALLED AS PER LISTING OR LABELING. MAXIMUM FUSE SIZES MEANS FUSE PROTECTION REQUIRED.
32. PATCH AND PAINT TO MATCH EXISTING, ALL SURFACES DAMAGED BY THE DEMOLITION AND ALL OPENINGS NOT TO BE REUSED.
33. REPAIR DAMAGE TO CEILING, WALLS, ETC. TO THE SATISFACTION OF THE CONTRACTING OFFICER’S REPRESENTATIVE.
34. WHEN A DETAIL OR NOTE IS IDENTIFIED AS TYPICAL, THE CONTRACTOR IS TO APPLY THE DETAIL OR NOTE TO EVERY SIMILAR CONDITION, WHETHER OR NOT THE REFERENCED DETAIL OR NOTE IS REPEATED OR REFERENCED.
35. WHERE NO CONSTRUCTION DETAIL IS INDICATED, SUCH WORK SHALL BE SIMILAR TO COMPARABLE WORK DETAILED OR NOTED ELSEWHERE OR
TO MATCH EXISTING CONDITIONS, SUBJECT TO THE APPROVAL OF THE CONTRACTING OFFICER’S REPRESENTATIVE.
36. ALL HOLES, VOIDS, AND DAMAGED OR UNEVEN SURFACES WHICH ARE CAUSED BY THE CONTRACTOR’S WORK AND WHICH REMAIN EXPOSED IN
THE WALL, FLOOR, CEILING, OR OTHER SURFACES SHALL BE PATCHED, REPAIRED, AND BROUGHT FLUSH WITH THE ADJACENT CONSTRUCTION.
SUCH SURFACES, NOT CONCEALED BY THE NEW CONSTRUCTION, SHALL MATCH IN EVERY RESPECT THE EXISTING NON-DAMAGED CONSTRUCTION. REMOVE EXISTING UTILITIES BACK BEHIND EXISTING SURFACES AND CAP SO AS NOT TO INTERFERE WITH NEW PATCHES.
37. WHEREVER NEW WALL, FLOOR, OR CEILING FINISHES ARE INDICATED, THE CONTRACTOR SHALL BRING EXISTING ELECTRICAL, MECHANICAL, PLUMBING, AND OTHER BUILDING COMPONENTS FLUSH WITH THE NEW FINISHED SURFACES IF APPROPRIATE.
38. THE DEMOLITION SHALL INCLUDE ALL ASSOCIATED ANCHORAGES, HANGERS, SUPPORTS, BRACES, FASTENERS, MASTIC, MORTAR, LATH, AND RELATED ITEMS. THE EXISTING SUBSTRATE, INCLUDING CONCRETE, MASONRY, METAL FRAMING AND FURRING SHALL BE REPAIRED WHERE
DAMAGE BY THE CONTRACTOR’S WORK.
39. PROVIDE ALL VALVES, INSTRUMENTS, FITTINGS, ETC. AS SHOWN ON THE PIPING DIAGRAMS, SCHEMATICS, ETC. IT IS NOT POSSIBLE TO SHOW ALL VALVES, INSTRUMENTS, ETC. ON THE PLANS, HOWEVER, SELECTED VALVES HAVE BEEN SHOWN FOR REFERENCE. ALL VALVES SHALL BE
ACCESSIBLE FROM THE FLOOR OR FROM FIXED PLATFORMS.
40. ALL NEW FIRE ALARM DEVICES INSTALLED IN HVAC EQUIPMENT SUCH AS SMOKE DETECTORS, SMOKE DAMPERS, FIRE/SMOKE DAMPERS, ETC.
SHALL BE CONNECTED TO THE MAIN FIRE ALARM PANEL.
41. ALL EQUIPMENT AND MATERIALS SUBJECT TO THE WEATHER THAT ARE NOT FACTORY PAINTED SHALL BE FIELD PAINTED AND WEATHER PROOFED WITH PRIMER, AND TWO COATS OF EXTERIOR PAINT. SEE THE SPECIFICATIONS. MATCH THE COLOR OF THE EXISTING BUILDING EXTERIOR. THE COLOR AND QUANTITY OF THE PAINT IS SUBJECT TO THE APPROVAL OF THE CONTRACTING OFFICER’S REPRESENTATIVE.
SUBMITTAL REQUIRED.
42. THE CONTROLS CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MAKING THE CONTROL SYSTEM COMPLETE AND FULLY OPERABLE. THE CONNECTION TO THE EXISTING CONTROL SYSTEM SHALL BE COMPLETE SUCH THAT ALL NEW MONITORING AND CONTROL POINTS ARE RECOGNIZED BY THE EXISTING CONTROL SYSTEM AND THAT ALL NEW POINTS CAN BE READ, ACTUATED, AND RESET FROM THE EXISTING FRONT END, AND VICE-VERSA. THE ENGINEER SHALL BE NOTIFIED WHEN EACH PHASE OF THE SYSTEM HAS BEEN COMPLETELY CHECKED OUT, ADJUSTED, CALIBRATED, AND PUT INTO FINAL WORKING CONDITION WITH ALL THE TROUBLESHOOTING COMPLETED. A SUBSEQUENT JOBSITE MEETING WILL BE SCHEDULED WITH TWO WEEKS NOTICE AT WHICH TIME THE CONTROLS CONTRACTOR WILL DEMONSTRATE THE OPERATION OF THE CONTROL SYSTEMS TO ALL CONCERNED. IF ANY ITEMS OF THE CONTROL SEQUENCE CANNOT BE SUCCESSFULLY DEMONSTRATED OR REQUIRE FURTHER TROUBLESHOOTING, A SUBSEQUENT CONTROLS INSPECTION WILL BE REQUIRED AND WILL BE AT THE CONTRACTOR’S EXPENSE. THIS PROVISION SHALL BE A CONDITION OF FINAL ACCEPTANCE. THE CONTRACTOR SHALL BE PREPARED TO DEMONSTRATE ALL ITEMS IN THE SEQUENCE OF OPERATION. SUBSEQUENT CONTROLS DEMONSTRATIONS AND VERIFICATIONS WILL BE REQUIRED AT THE
COMPLETION OF THE PROJECT.
GENERAL NOTES
M
M
SW
CTPD
LPSHPR/MPR
HPR/MPR
LPR
CW
SW
CPD
OFL
V T
R
L P
R
H P
R /M
P R
O F
L
CW
SW
C T
P S
C T
P D
F W
P S
F W
P D
-1
F W
P D
-2
O F
L
NOTE:
FOR COMPLETE PIPING SEE
REFERENCED
DETAILS.
FROM
STEAM LINE
DRIP TRAPS
EMERGENCY
MAKE-UP
NORMAL
MAKE-UP
FROM
DISTRIBUTION
SYSTEM
FROM
STEAM LINE
DRIP TRAPS
EMERGENCY
MAKE-UP
EMERGENCY
FROM PRV
STATION SEE
STEAM PIPING
DIAGRAM
TANK
BYPASS
FEEDWATER DEAERATOR
(FOR DETAIL SEE DETAIL 5 SHEET M-501)
CONDENSATE STORAGE TANK
(FOR DETAIL SEE DETAIL 5 SHEET M-501)
BOILER AND ECONOMIZER
BOILER AND ECONOMIZER
BOILER AND ECONOMIZER
BOILER FEEDWATER PUMPS
(FOR DETAIL SEE SPEC
SECTION 23 21 11-07 AND
DETAIL 5 THIS SHEET)
CONDENSATE TRANSFER PUMPS
(1 OPERATING, 1 STANDBY,
FOR DETAIL SEE DETAIL 1 THIS SHEET)
GRAVITY FLOW TO
CONDENSATE
STORAGE TANK
GRAVITY
FLOW
FIRE HOSE
CONNECTION
NC NC
OSD
NC
OSD
NC
OSD
NC
NC
NC
NC
NOTE
1: DEAERATOR OVERFLOW ONLY
PERMITTED TO GO TO
CONDENSATE TANK IF THE
CONDENSATE TANK IS A ASME
CODE TANK WITH SAME MAWP
AS THE DEAERATOR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE:
EXPAND STEAM DISTRIBUTION
Watson Engineering, P.C.
1112 State Route 434 Owego, NY 13827
(607)223-4334 RICHMOND, VA
652-19-104
BUILDING 501
07/14/2020
C U s e rs
\m a tt
\O n e D ri v e \D e s k to p \R ic h m o n d
S te a m m p l2
(R e c o v e ry rv t
/1
/2
:4
:1
P
M
G-101
PHASING PLAN
JWE MPL
1. WORK SHALL BE PERFORMED SUCH THAT THE FACILITY EXPERIENCES NO DOWN TIME OF STEAM SYSTEM. CONTRACT SHALL PROVIDE
NECESSARY RENTAL STEAM EQUIPMENT TO ENSURE NO DOWN TIME.
2. ALL NEW WORK INCLUDING PLACEMENT OF NEW EQUIPMENT, PIPING, GAUGES, ETC. SHALL BE DONE PRIOR TO DEMOLITION OF THE EXISTING
SYSTEM.
3. NEW PIPING SHALL BE ROUTED AND CONNECTED TO THE EXISTING SYSTEM SUCH THAT THERE IS NO STEAM SYSTEM DOWN TIME.
4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING A WORK PLAN TO THE COR.
PHASING NOTES
NTS
PROPOSED PIPING DIAGRAM
KEY NOTES
1 DEMOLISH EXISTING PIPING DOWN STREAM OF VALVE AND CONNECT TO NEW SYSTEM.
2 OPEN VALVES ALLOWING FLOW TO NEW SYSTEM. CLOSE VALVES TO OLD SYSTEM AND DEMOLISH REMAINING
COMPONENTS.
YR YEAR
W WATTS
WAG WASTE ANETHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
DB DECIBELS
Db DRY-BULB TEMPERATURE
DD-1 DESIGN DEVELOPMENT (SUBMISSION1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
CD-2 CONSTRUCTION
DOCUMENTS (SUBMISSION2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING
COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO
COOLING TOWER)
CWS CONDENSER WATER SUPPLY
(FROM COOLING TOWER)
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL
DAMPER,MODULATING
ACD-TP AUTOMATIC CONTROL
DAMPER,TWO POSITION
AD ACCESS DOOR
AF AIR FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE
DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION
DOCUMENTS (SUBMISSION1)
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL
TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
COMBINATION FIRE SMOKE
DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING
ONLY
FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT
EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FREEZESTAT
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN
(STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY
(STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING)
PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC &
ATMOSPHERIC ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
M METER, SI UNIT
M/s METERS PER SECOND
(OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN
(STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
L LITER
L/h LITERS PER HOUR (OR LITERS/HOUR)
L/m LITERS PER MINUTE (OR LITERS/MINUTE)
L/s LITERS PER SECOND (OR LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUID PROPANE GAS
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
J INTENTIALLY LEFT BLANK
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
T&PCV TEMPERATURE AND PRESSURE CONTROL
VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SWHX STEAM TO WATER HEAT EXCHANGER
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD REFRIGERANT AIR DRYER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
F/S DPR
FCUH
FSTAT
HPS
HPR
MPS
MPR
LPS
LPR
ZW/SW ZEOLITE WATER/SOFTENED WATER
FWPD FEEDWATER PUMP DISCHARGE
FWPS FEEDWATER PUMP SUCTION
CTPD CONDENSATE TRANSFER PUMP DISCHARGE
CTPS CONDENSATE TRANSFER PUMP SUCTION
VR VACUUM CONDENSATE RETURN
TC TUBE CLEANER WATER SUPPLY
BO BOILER BLOWOFF
CBD CONTINUOUS BLOW DOWN
BWS BOILER WATER SAMPLE
FWS FEEDWATER SAMPLE (FROM DEAERATOR)
OFL OVERFLOW
CW COLD WATER (CITY WATER)
HW HOT WATER
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HIGH PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
CONDENSATE PUMP DISCHARGE
DRAIN LINE
VENT LINE
EXISTING PIPE TO BE REMOVED
PC
D
V
RECIRCULATION LINER
CFP CHEMICAL FEED
VTR VENT THROUGH ROOF
CPD CONDENSATE PUMP DISCHARGE
CONNECT TO EXISTING
LIMIT OF DEMOLITION
# KEYED NOTE
DIRECTION OF PIPE PITCH (DOWN)
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTIRC REDUCER
TOP CONNECTION, 45 OR 90 DEG
BOTTOM CONNECTION, 45 OR 90 DEG
SIDE (TEE) CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
INVERTED BUCKET TRAP SET INCLUDING PIPING
ACCESSORIES
FLOAT AND THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
THERMOSTATIC TRAP SET INCLUDING PIPING
ACCESSORIES
THERMOMETER
PRESSURE GAUGE
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
MANUAL AIR VENT
QUICK COUPLE HOSE CONNECTOR
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
GATE VALVE - WITH 3/4" HOSE ADAPTER
CHECK VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
FLEXIBLE CONNECTION
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
MODULATING CONTROL BUTTERFLY VALVE
TWO-POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO-POSITION CONTROL VALVE
PRESSURE REGULATING VALVE
PRESSURE SAFETY VALVE
AUTOMATIC BALANCING CONTROL VALVE
WATER BALANCE DEVICE
CIRCUIT SETTER VALVE
GATE VALVE WITH GLOBE VALVED BY-PASS
PLUG VALVE
CONTROL VALVE - FLOAT OPERATED
PRESSURE REDUCING VALVE
WATER LEVEL CONTROLLER
MAGNETIC FLOW METER
OSD OPEN SITE DRAIN
GATE/BALL VALVE (NORMALLY CLOSED)
NC NC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE:
EXPAND STEAM DISTRIBUTION
Watson Engineering, P.C.
1112 State Route 434 Owego, NY 13827
(607)223-4334 RICHMOND, VA
652-19-104
BUILDING 501
07/14/2020
C U s e rs
\m a tt
\O n e D ri v e \D e s k to p \R ic h m o n d
S te a m m p l2
(R e c o v e ry rv t
/1
/2
:1
:4
P
M
M-001
MECHANICAL SYMBOLS AND
ABBREVIATIONS
JWE MPLREVISION NO. DESCRIPTION DATE
501-CTP-1
501-CTP-2
501-BFP-1
501-BFP-2
501-BFP-3
BOILER
CHILLER CHILLER CHILLER
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G
8"ø HWHR
8"ø HWHS
"ø
2"ø CW
"ø
C W
"ø
Z W
1/2"ø BWS 1/2"ø BWS 1/2"ø BWS
2"ø CW
4"ø G
12"ø HPS (135)
6"ø HPS (135)
6"ø HPS (135)
8"ø HPS (135)
16"ø MPS (30)
8"ø MPS (30)
8"ø HPS (135)
6"ø HPS (135)
1 1/2"ø FOR
1 1/2"ø FOS
3"ø FOR
3"ø FOS
3"ø FOS 3"ø FOR
1 1/2"ø FOS
1 1/2"ø FOR
3"ø FOS 3"ø FOR
1 1/2"ø FOS 1 1/2"ø FOR
/2 "ø
B F
-2
/2 "ø
B F
-1
"ø
T C
2"ø BF-2 2"ø BF-1 2"ø TC
2"ø TC 2"ø BF-1 2"ø BF-2
2"ø TC 2"ø BF-1 2"ø BF-2
"ø
T C
/2 "ø
B F
-1
/2 "ø
B F
-21
/2 "ø
F O
R
/2 "ø
F O
S
"ø
F O
R
"ø
F O
S
"ø
B O
2"ø BO
"ø
C W
"ø
G
2"ø CW
4"ø G 6"ø G 4"ø G
AC-1
AC-2
1 1/2"ø FOR
1 1/2"ø FOS
"ø
H P
R
"ø
F O
S
"ø
F O
R
/2 "ø
F O
S
2"ø MPS (30)
3"ø FOR
4"ø FOS
4"ø FOS
2"ø FOS
2"ø FOS
1 1/2"ø FOS
BOILER
BOILER
3/4"ø CF 3/4"ø CF
3/4"ø CF3/4"ø CF
3/4"ø CF 3/4"ø CF
1 1/2"ø HPS (135)
1 1/2"ø HPS (135)
1 1/2"ø HPS (135)
1 1/2"ø A
1 1/2"ø A
1 1/2"ø A
4"ø A
4"ø A
4"ø A
MAC-1
MAC-2
2"ø PR 2"ø PR
CNV-2
CNV-3
CNV-1
T-1
501-HWP-3
501-HWP-1
501-HWP-2
"ø
H P
R
VP-3
VP-2
V P
-1
KEY NOTES
1 DEMOLISH EXISTING CONDENSATE TRANSFER PUMPS, EQUIPMENT PADS, AND ALL ASSOCIATED PIPING BACK TO THE LIMITS SHOWN - REFER TO SHEET MD102 FOR CONTINUATION OF PIPING
2 DEMOLISH EXISTING BOILER FEED WATER PUMPS, STEAM TURBINE, AND ALL ASSOCIATED
PIPING BACK TO THE LIMITS SHOWN - REFER TO SHEET MD102 FOR CONTINUATION OF PIPING
3 DEMOLISH EXISTING CONDENSATE TRANSFER TANK (T-1), EQUIPMENT PAD, AND ALL ASSOCIATED PIPING BACK TO THE LIMITS SHOWN - REFER TO SHEET MD102 FOR CONTINUATION OF PIPING
4 DEMOLISH EXISTING MEDICAL AIR COMPRESSORS, DESSICANT AIR DRYERS, AND ALL
ASSOCITAED PIPING BACK TO THE LIMITS SHOWN; EQUIPMENT PAD SHALL REMAIN
5 DEMOLISH EXISTING MEDICAL AND LAB VACUUM PUMPS , AND ALL ASSOCITAED PIPING BACK TO THE LIMITS SHOWN - REFER TO SHEET MD102 FOR CONTINUATION OF PIPING; EQUIPMENT PADS
SHALL REMAIN
6 DEMOLISH EXISTING HOT WATER REHEAT PUMPS (501-HWP-1, 501-HWP-2, 501-HWP-3) AND ALL
ASSOCIATED PIPING BACK TO THE LIMITS SHOWN; EQUIPMENT PADS SHALL REMAIN
7 DEMOLISH EXISTING STEAM TO HOT WATER CONVERTERS (CNV-1, CNV-2) AND ALL
ASSOCIATED PIPING BACK TO THE LIMITS SHOWN
8 EXISTING STEAM TO HOT WATER CONVERTER (CNV-3) SHALL REMAIN
9 EXISTING WATER SOFTENER EQUIPMENT TO REMAIN
10 EXISTING FLASH TANK TO REMAIN
11 DEMOLISH EXISTING SAMPLE COOLER EQUIPMENT, AND ALL ASSOCIATED PIPING BACK TO
THE LOCATIONS INDICATED
N
MAIN HOSPITAL
BLDG 500
UTILITY PLANT
BLDG 501
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE:
EXPAND STEAM DISTRIBUTION
Watson Engineering, P.C.
1112 State Route 434 Owego, NY 13827
(607)223-4334 RICHMOND, VA
652-19-104
BUILDING 501
07/14/2020
C U s e rs
\m a tt
\O n e D ri v e \D e s k to p \R ic h m o n d
S te a m m p l2
(R e c o v e ry rv t
/1
/2
:1
:5
P
M
MD101
MECHANICAL DEMOLITION PLAN -
BOILER ROOM LOWER LEVEL
JWE MPL
1/8" = 1'-0"
Mechanical Demolition Plan - Boiler Room Lower Level
NOTES:
1. ANY FLOORING AFFECTED BY DEMOLITION SHALL BE
REFINISHED APPROPRIATELY FOR FOOT TRAFFIC.
1" = 300'-0"
KEY PLAN
REVISION NO. DESCRIPTION DATE
3 95% COMMENT REVISIONS 07/14/2020
KEY NOTES
1 DEMOLISH EXISTING DEAERATOR FEEDWATER HEATER TANK (H-1) AND ALL
ASSOCIATED PIPING BACK TO THE LIMITS SHOWN - REFER TO SHEET MD101 FOR
CONTINUATION OF PIPING; EXISTING PLATFORM SHALL REMAIN
2 EXISTING COMPRESSED AIR INTAKE UP THRU ROOF TO REMAIN
3 DEMOLISH EXISTING DESSICANT AIR DRYERS, STORAGE TANK, AND ASSOCIATED
PIPING BACK TO THE LIMITS SHOWN - REFER TO SHEET MD101 FOR
CONTINUATION OF PIPING
N
MAIN HOSPITAL
BLDG 500
UTILITY PLANT
BLDG 501
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G
1 1/4"ø LPR
2"ø LPS (5)
/4 "ø
L P
R
/4 "ø
L P
S
) 8
"ø M
P S
8"ø MPS (30) 8"ø MPS (30)
8"ø HPS (135)
"ø
H P
S
"ø
M P
S
1 1/2"ø LPR
2"ø LPS (5)
"ø
L P
S
/2 "ø
L P
R
"ø
L P
R
1 1/4"ø LPR
2"ø LPS (5)
/2 "ø
M P
S
6"ø G
4"ø G
4"ø G
3"ø LPS (5)
"ø
H P
S
"ø
M P
S
6"ø HPS (135)
6"ø HPS (135)
6"ø HPS (135)
3/4"ø CF
3/4"ø CF
3/4"ø CF
"ø
G "ø
G "ø
G
/2 "ø
H P
S
"ø
H P
S
"ø
H P
S
2 1/2"ø MV 2 1/2"ø LV
"ø
M P
S
6"ø MPS (30)
2"ø PR
8"ø HPS (135)
/2 "ø
L P
S
/4 "ø
L P
R
2 1/2"ø MPS (30)
1 1/2"ø MPS (30)
2"ø MPS (30)
1 1/2"ø HPS (135)
1 1/2"ø HPS (135)
1 1/2"ø HPS (135)
H-1
BOILER
BOILER
BOILER
1 1/2"ø A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE:
EXPAND STEAM DISTRIBUTION
Watson Engineering, P.C.
1112 State Route 434 Owego, NY 13827
(607)223-4334 RICHMOND, VA
652-19-104
BUILDING 501
07/14/2020
C U s e rs
\m a tt
\O n e D ri v e \D e s k to p \R ic h m o n d
S te a m m p l2
(R e c o v e ry rv t
/1
/2
:1
:5
P
M
MD102
MECHANICAL DEMOLITION PLAN -
MEZZANINE LEVEL
JWE MPL
1" = 300'-0"
KEY PLAN
1/8" = 1'-0"
Mechanical Demolition Plan - Mezzanine Level
CHILLER CHILLER CHILLER
BOILER
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G
BOILER
BOILER
AC-2
AC-1
8"ø MPS (30)
8"ø HWHR
8"ø HWHS
CNV-1CNV-3
501-HWP-1
501-HWP-3
8"ø HWHS
1 1/2"ø A
4"ø A
MAC-1
MAC-2
M A
C -3
1 1/2"ø A
2"ø CW
"ø
C W
"ø
Z W
1/2"ø BWS 1/2"ø BWS 1/2"ø BWS
2"ø CW
4"ø G
12"ø HPS (135)
6"ø HPS (135)
6"ø HPS (135)
8"ø HPS (135)
16"ø MPS (30)
8"ø MPS (30)
8"ø HPS (135)
6"ø HPS (135)
1 1/2"ø FOR
1 1/2"ø FOS
3"ø FOR
3"ø FOS
3"ø FOS 3"ø FOR
1 1/2"ø FOS
1 1/2"ø FOR
3"ø FOS 3"ø FOR
1 1/2"ø FOS 1 1/2"ø FOR
/2 "ø
B F
-2
/2 "ø
B F
-1
"ø
T C
2"ø BF-2 2"ø BF-1 2"ø TC
2"ø TC 2"ø BF-1 2"ø BF-2
2"ø TC 2"ø BF-1 2"ø BF-2
"ø
T C
/2 "ø
B F
-1
/2 "ø
B F
-21
/2 "ø
F O
R
/2 "ø
F O
S
"ø
F O
R
"ø
F O
S
"ø
B O
2"ø BO
"ø
C W
"ø
G
2"ø CW
4"ø G 6"ø G 4"ø G
1 1/2"ø FOR
1 1/2"ø FOS
"ø
H P
R
"ø
F O
S
"ø
F O
R
/2 "ø
F O
S
2"ø MPS (30)
3"ø FOR
4"ø FOS
4"ø FOS
2"ø FOS
2"ø FOS
1 1/2"ø FOS
3/4"ø CF 3/4"ø CF
3/4"ø CF3/4"ø CF
3/4"ø CF 3/4"ø CF
1 1/2"ø HPS (135)
1 1/2"ø HPS (135)
1 1/2"ø HPS (135)
1 1/2"ø A
1 1/2"ø A
4"ø A
4"ø A
4"ø A
2"ø PR 2"ø PR
2"ø ZW
2"ø CW
"ø
Z W
"ø
C W
2"ø ZW
/2 "ø
B F
-1
/2 "ø
B F
-2
1 1/4"ø V 6"ø HPS (135)
2"ø PR
1 1/4"ø V
2"ø LPR
"ø
C W
"ø
H P
R
A V
-1
AV-3
AV-2
1/2"ø ZW
2"ø LPS (5)
/2 "ø
T C
KEY NOTES
1 PROVIDE NEW COMBINATION DEAERATOR AND CONDENSATE STORAGE TANK (DT-1) SKID PACKAGE - BASIS OF DESIGN EQUIPMENT SHALL BE "CLEAVER BROOKS DUO-SD-2200" AND SHALL INCLUDE CONDENSATE TRANSFER PUMPS (501-CTP-1,2) AND BOILER FEEDWATER PUMPS (501-BFP-1,2,3)
2 PROVIDE NEW MEDICAL AIR COMPRESSOR (MAC-3) TO MATCH EXISTING COMPRESSORS (MAC-1,2) - BASIS OF DESIGN EQUIPMENT SHALL BE "KOBELCO K40573A"; CONNECT TO EXISTING COMPRESSED AIR
SYSTEMS AT THE LOCATIONS INDICATED
3 PROVIDE NEW VACUUM PUMPS (VP-1,2,3) ON EXISTING EQUIPMENT PADS TO REPLACE EXISTING - BASIS OF DESIGN EQUIPMENT SHALL BE "SULLAIR VS16-400/1 - 30HP HSP"; CONNECT TO EXISTING MEDICAL AND LAB VACUUM SYSTEMS AT THE LOCATIONS INDICATED - REFER TO SHEET M-102 FOR CONTINUATION OF PIPING
4 PROVIDE NEW HOT WATER REHEAT PUMPS (501-HWP-1,3) ON EXISTING EQUIPMENT PADS TO REPLACE EXISTING - BASIS OF DESIGN PUMPS SHALL BE "BELL & GOSSETT e-1510-4AD" BASE MOUNTED END SUCTION PUMP; CONNECT TO EXISTING HYDRONIC SUPPLY AND RETURN SYSTEMS AT THE LOCATIONS INDICATED; EQUIPMENT PADS SHALL BE EXTENDED, AS NEEDED, TO PROVIDE A MINIMUM OF 6" BEYOND
THE FOOTPRINT OF EACH PUMP ON ALL SIDES.
5 PROVIDE NEW STEAM TO HOT WATER CONVERTER (CNV-1) TO REPLACE EXISTING - BASIS OF DESIGN CONVERTER SHALL BE "BELL & GOSSETT QSU-223-2" SHELL AND TUBE HEAT EXCHANGER; CONNECT TO
EXISTING STEAM AND CONDENSATE RETURN SYSTEMS AT THE LOCATIONS INDICATED
6 PROVIDE 1/2" SOFT (ZEOLITE) WATER TO NEW WATER SAMPLING EQUIPMENT FOR ADDITIONAL TESTING
7 EXISTING FLASH TANK TO REMAIN
8 PROVIDE NEW WATER SAMPLING EQUIPMENT TO UPGRADE THE EXISTING SYSTEM - BASIS OF DESIGN
EQUIPMENT SHALL BE "CHEMSCAN TITRATOR/ISE ANALYZER"
N
MAIN HOSPITAL
BLDG 500
UTILITY PLANT
BLDG 501
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE:
EXPAND STEAM DISTRIBUTION
Watson Engineering, P.C.
1112 State Route 434 Owego, NY 13827
(607)223-4334 RICHMOND, VA
652-19-104
BUILDING 501
07/14/2020
C U s e rs
\m a tt
\O n e D ri v e \D e s k to p \R ic h m o n d
S te a m m p l2
(R e c o v e ry rv t
/1
/2
:1
:4
P
M
M-101
MECHANICAL PLAN - BOILER
ROOM LOWER LEVEL
JWE MPL
1/8" = 1'-0"
Mechanical Plan - Boiler Room Lower Level
1" = 300'-0"
KEY PLAN
REVISION NO. DESCRIPTION DATE
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G
1 1/4"ø LPR
2"ø LPS (5)
/4 "ø
L P
R
/4 "ø
L P
S
) 8
"ø M
P S
8"ø MPS (30) 8"ø MPS (30)
8"ø HPS (135)
"ø
H P
S
"ø
M P
S
1 1/2"ø LPR
2"ø LPS (5)
"ø
L P
S
/2 "ø
L P
R
"ø
L P
R
1 1/4"ø LPR
2"ø LPS (5)
/2 "ø
M P
S
6"ø G
4"ø G
4"ø G
3"ø LPS (5)
"ø
H P
S
"ø
M P
S
6"ø HPS (135)
6"ø HPS (135)
6"ø HPS (135)
3/4"ø CF
3/4"ø CF
3/4"ø CF
"ø
G "ø
G "ø
G
/2 "ø
H P
S
"ø
H P
S
"ø
H P
S
2 1/2"ø MV
2 1/2"ø LV
"ø
M P
S
6"ø MPS (30)
2"ø PR
8"ø HPS (135)
/2 "ø
L P
S
/4 "ø
L P
R
2 1/2"ø MPS (30)
1 1/2"ø MPS (30)
2"ø MPS (30)
1 1/2"ø HPS (135)
1 1/2"ø HPS (135)
1 1/2"ø HPS (135)
2 1/2"ø MV
2 1/2"ø LV
2 1/2"ø MV
2 1/2"ø LV
"ø P
R
"ø
H P
S
"ø
P R
6"ø HPS (135)
"ø
H P
S
1 1/4"ø V
1 1/4"ø V
1 1/2"ø A
4"ø A
"ø
L P
R
"ø
P R
"ø
L P
R
"ø
L P
R
2"ø LPS (5)
N
MAIN HOSPITAL
BLDG 500
UTILITY PLANT
BLDG 501
KEY NOTES
1 PROVIDE NEW DESSICANT AIR DRYER SYSTEM TO REPLACE
EXISTING - BASIS OF DESIGN EQUIPMENT SHALL BE "QUINCY QHD
230" WITH A "SAMUEL PRESSURE VESSEL SPVG A10130" VERTICAL
AIR RECEIVER; CONNECT TO EXISTING COMPRESSED AIR
SYSTEMS AT THE LOCATIONS SHOWN - REFER TO SHEET M-101
FOR CONTINUATION OF PIPING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE:
EXPAND STEAM DISTRIBUTION
Watson Engineering, P.C.
1112 State Route 434 Owego, NY 13827
(607)223-4334 RICHMOND, VA
652-19-104
BUILDING 501
07/14/2020
C U s e rs
\m a tt
\O n e D ri v e \D e s k to p \R ic h m o n d
S te a m m p l2
(R e c o v e ry rv t
/1
/2
:1
:4
P
M
M-102
MECHANICAL PLAN - MEZZANINE
LEVEL
JWE MPL
1/8" = 1'-0"
Mechanical Plan - Mezzanine Level
1" = 300'-0"
KEY PLAN
SW
CTPD
CONTROLLER
MAGNETIC
WATER LEVEL
TRANSMITTER
WATER LEVEL
CONTROL SCHEMATIC
LPS
HPR/MPR
F W
P S
O F
L
FROM PRV
STATION SEE
STEAM PIPING
DIAGRAM
FEEDWATER DEAERATOR
AND STORAGE TANK
T O
F L O
O R
D R
A
IN
EMERGENCY
MAKE-UP
FROM
CONDENSATE
TRANSFER
PUMPS
CTPD
CV-3
CV-4
NC
1/2"
NCNCNCNC
1"
MAGNETIC LEVEL
TRANSMITTER
INTEGRAL
LOW LEVEL
ALARM SW
GAGE GLASS
INTEGRAL
HIGH LEVEL
ALARM SW
OFL
CONTROL
SWITCH
D
OSD
NC
2"
F W
S
C F
P
1/4" 1"
T O
S A
M P
L E
C O
O L E
R
T O
B O
IL
E
R F
E E
D E
R P
U M
P S
F R
O M
C H
E M
IC
A
L P
U M
P
30-300°F
VALVE LOCKED
OPEN
OFL PIPE IN TANK-INLET 6" BELOW
LOW LEVEL ALARM SET POINT
CV-5
SW
R
FROM BOILER
FEED WATER
PUMPS
30-300°F 30"VAC-30PSI
M F
G R
[1 m m
[1 m m
TOP OF
TANK
OFL
LINE
INTEGRAL
HIGH LEVEL
ALARM
INTEGRAL LOW LEVEL ALARM
EMERGENCY
MAKE-UP
[1 m m
NORMAL WATER
LEVEL
C/L OF
TANK
CV-3
CV-4
OFL
OFL
CONTROLLER
OFL
CONTROL
SWITCH
OVERFLOW CONTROL
SCHEMATIC
CV-5
SAFETY DEVICE MANUAL
CAN BE 1/3 OF TANK
B Y
D A
NOTE:
AN INDEPENDENT CONDUCTIVITY METER SHALL BE WIRED TO SOLENOID FOR BOILER ALARM TESTING.
V T
R
L P
R
H P
R /M
P R
CW
SW
C T
P
S CTPDEMERGENCY MAKE-UP (TANK BY
PASSED)
CONDENSATE STORAGE
TANK
CONDENSATE
TRANSFER PUMPS
NC
OSD
NC O
F
L
V
TO FEEDWATER
DEAERATOR
R
CPD
FROM DISTRIBUTION
SYSTEMS
30-300°F
30-300°F
30-300°F
OSD
NC
NC
NC
NC NC
NC
NC
NC
R
R
30"VAC-30PSI
0-60PSI
TANK
BYPASS
NC
2"
D
1"
1/2"
FLEX
CONN.
STRAINER
RECIRCULATION ORIFICE
(SEE DETAIL ON 23 21
11-07)
MAGNETIC LEVEL
TRANSMITTER
INTEGRAL
LOW LEVEL
ALARM SW
GAGE GLASS
INTEGRAL
HIGH LEVEL
ALARM SW
SW
CW
CONTROLLER
MAGNETIC
WATER LEVEL
TRANSMITTER
CONTROL
SCHEMATIC
0-100PSI
0-100PSI
EMERGENCY
MAKE-UP
NORMAL
MAKE-UP
CW
SW M
NC NC
CV-2
M
NC NC
CV-1
FIRE HOSE
CONNECTION
F R
O M
S T
E A
M T
R A
P S
M
IN
T H
R O
U G
H R
O O
F
F R
O M
S T
E A
M T
R A
P S
[1 m m
[1 m m
[1 m m
[1 m m
TOP OF
TANK
OFL
LINE
INTEGRAL HIGH LEVEL ALARM
NORMAL MAKE-UP
INTEGRAL
LOW LEVEL
ALARM
EMERGENCY
MAKE-UP
BOTTOM OF
TANK
CV-1
CV-2
OFL PIPE IN
TANK INLET 12"
FROM BOTTOM
OF TANK
M
O F
T A
N K
D
IA
M
M
SW
CTPD
LPSHPR/MPR
HPR/MPR
LPR
CW
SW
CPD
OFL
V T
R
L P
R
H P
R /M
P R
O F
L
CW
SW
C T
P S
C T
P D
F W
P S
F W
P D
-1
F W
P D
-2
O F
L
NOTE:
FOR COMPLETE PIPING SEE
REFERENCED DETAILS.
FROM
STEAM LINE
DRIP TRAPS
EMERGENCY
MAKE-UP
NORMAL
MAKE-UP
FROM
DISTRIBUTION
SYSTEM
FROM
STEAM LINE
DRIP TRAPS
EMERGENCY
MAKE-UP
EMERGENCY
FROM PRV
STATION SEE
STEAM PIPING
DIAGRAM
TANK
BYPASS
FEEDWATER DEAERATOR
(FOR DETAIL SEE DETAIL 3 SHEET M-501)
CONDENSATE STORAGE TANK
(FOR DETAIL SEE DETAIL 4 SHEET M-501)
BOILER AND ECONOMIZER
BOILER AND ECONOMIZER
BOILER AND ECONOMIZER
BOILER FEEDWATER PUMPS
(FOR DETAIL SEE SPEC
SECTION 23 21 11-07 AND
DETAIL 2 THIS SHEET)
CONDENSATE TRANSFER PUMPS
(1 OPERATING, 1 STANDBY,
FOR DETAIL SEE DETAIL 4 THIS SHEET)
GRAVITY FLOW TO
CONDENSATE
STORAGE TANK
GRAVITY
FLOW
FIRE HOSE
CONNECTION
NC NC
OSD
NC
OSD
NC
OSD
NC
NC
NC
NC
NOTE
1: DEAERATOR OVERFLOW ONLY
PERMITTED TO GO TO
CONDENSATE TANK IF THE
CONDENSATE TANK IS A ASME
CODE TANK WITH SAME MAWP
AS THE DEAERATOR.
R
F W
P S
FROM FEEDWATER
DEAERATOR
TO FEEDWATER DEAERATOR
WITH BYPASS TO
CONDENSATE STORAGE TANK
R
FWPS
30"VAC-30PSI 0-300PSI
30-300°F
F W
P D
-1
F W
P D
-2
BOILER FEEDWATER
PUMP NO. 1
(TYPICAL)
F W
P S
R
F W
P D
-1
F W
P D
-2
BOILER FEEDWATER
PUMP NO. 2
F W
P S
R
F W
P D
-1
F W
P D
-2
BOILER FEEDWATER
PUMP NO. 3
FWPD-1
FWPD-2
TO
BOILERS
NOTE:
CAPACITY OF EACH
PUMP APPROX.
125% OF ONE
BOILER
FLEX
CONNECTION
RECIRCULATION
ORIFICE SEE
DETAIL THIS SHEET
[9 m m
] XXS PIPE
300 PSI
[2000kPA]
FITTINGS
PLUG
TO
TANK
COUPLING
UNION
COUPLING
ORIFICE
PUMP
DISCHARGE
DETAIL - PUMP
RECIRCULATION ORIFICE
ASSEMBLY
EMERGENCY BOILER
CONNECTION TO
OUTSIDE OF BUILDING
M
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE:
EXPAND STEAM DISTRIBUTION
Watson Engineering, P.C.
1112 State Route 434 Owego, NY 13827
(607)223-4334 RICHMOND, VA
652-19-104
BUILDING 501
07/14/2020
C U s e rs
\m a tt
\O n e D ri v e \D e s k to p \R ic h m o n d
S te a m m p l2
(R e c o v e ry rv t
/1
/2
:1
:4
P
M
M-501
MECHANICAL DETAILS
JWE MPL
NTS
FEEDWATER DEAERATOR FLOW DIAGRAM
NTS
CONDENSATE STORAGE AND TRANSFER FLOW DIAGRAM
NTS
BASIC FLOW DIAGRAM - CONDENSATE AND BOILER
FEEDWATER
NTS
BOILER FEEDWATER PUMPS FLOW DIAGRAM
GENERAL NOTES:
1. THE PROPOSED SYSTEM IS A COMBINED DEAERATOR AND CONDENSATE STORAGE TANK SYSTEM. THEREFORE THE TYPICAL CONNECTIONS BETWEEN THE DEARATOR AND CONDENSATE STORAGE TANK AS SHOWN ON THESE DETAILS ARE INTEGRAL TO THE NEW SYSTEM. THE DETAILS ARE SPLIT APART TO SHOW
AN OVERALL SYSTEM FLOW ARRANGEMENT AND FUNCTIONALITY.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FULLY INTEGRATING EQUIPMENT CONTROLS POINTS INTO THE EXISTING BOILER PLANT AUTOMATION SYSTEM AS REQUIRED BY THE MANUFACTURER AND, AT A MINIMUM, COORDINATING BOTH INTEGRAL AND, IF NECESSARY, EXTERNAL CONTROLS POINTS, AS DESCRIBED IN DETAILS 3 AND 4 OF DRAWING M501 AND THE SPECIFICATIONS. AT A MINIMUM THE FOLLOWING SHALL BE FULLY CONTROLLED EITHER INTEGRALLY BY THE DEAERATOR/CONDENSATE TANK SKID PACKAGE CONTROLS SYSTEM OR EXTERNALLY VIA THE BOILER PLANT AUTOMATION SYSTEM:
FEEDWATER DEARATOR STORAGE TANK WATER LEVEL, CONDENSATE TANK WATER LEVEL, FEEDWATER DEAERATOR STEAM PRESSURE, FEEDWATER DEAERATOR HIGH/LOW WATER LEVEL, CONDENSATE TANK HIGH/LOW WATER LEVEL, FEEDWATER DEAEARATOR STEAM HIGH/LOW PRESSURE, ALL CONTROL VALVE ACTUATION, FEEDWATER PUMP START/STOP, FEEDWATER PUMP SPEED, AND FEEDWATER PUMP SPEED REFERENCE VIA A PRESSURE TRANSDUCER WITHIN THE FEEDWATER HEADER (135 PSIG, ADJ), AND CONDENSTATE TRANSFER PUMP START/STOP, PUMP SPEED, AND PUMP SPEED REFERENCE VIA FLOAT
SWITCH.
C
B
D E EE E F F H
J
A
M L
X YWV
K
T N P R S
Column 1 Column 2
A Manway
B Manual Vent Valve
C Water Inlet
D Steam Inlet
E Spare, Vacuum Breaker, Relief Valve
F Condensate
G Vent
H Water Inlet
J Manway
K Disconnect
L OverFlow
M Overflow
N Thermometer
P Thermometer
Q High Temperature Return
R Chemical Feed
S Scution / Recirculation
T Control Panel
V Thermometer
W Chemical Feed
X Drain
Y Sample
Z Diffuser
X
Z Q
G
A
A
BB
SECTION A-A (BASE NOT POURED WITH SLAB)
SECTION A-A (BASE POURED WITH FLOOR SLAB)
PLAN
TYPICAL ANCHOR
BOLT NUT & WASHER
SECTION B-B
EQUIPMENT BASE
PLATE
PROVIDE #3 BARS 12"
[300mm] O.C. EACH WAY IN
THE BASE & DOWEL BASE TO
FLOOR
EQUIPMENT BASE
PLATE
PROVIDE DOUBLE SLAB
REINFORCING IN BASE AREA
WELD HEAD TO PLATE
OR BEND OVER END 5D
FLOOR
PIPE SLEEVE (5D, 3"
[75mm] MIN.)
ANCHOR
BOLT (TYP)
CONCRETE
BASE
NOTE:
L & W DIMENSIONS
SHALL BE 6" [150mm]
GREATER THAN THE
EQUIPMENT BASE
PLATE.
[400mm]
M
IN
[1 m m
M
IN
[1 m m
TYPICAL ANCHOR
BOLT NUT & WASHER
[2 m m
L /1
L /1
D 1
16"
2D
L
W
D
5D
CONC.
PIERS
TANK
SADDLES
ANCHOR BOLTS
(TYPICAL)
PLAN
SLOTTED HOLE
LENGTH = BOLT
SIZE +0.5"
[15mm] EACH SIDE
3/8" [10mm]
THK. STEEL
PLATE BOLTED
TO PIER
TANK
SADDLE
CONCRETE
PIER
SADDLE
BEAM
ALTERNATE
FOR TANKS
SUPPORTED
BY STEEL
BEAMS
REINFORCEMENT
PLATES
BOLTS
ELEVATION
REBAR
ANCHORBOLT
FLOOR
5 FT
THRU [20]
6 8 10
[32][25] [40]
[65]
[50]
[75]
-1312 14 -16 -
[125][100]
[150]
[250]
[200]
[300]
[400]
[350]
[450]
[600]
[500]
20 241814 16128 1064 532 2 1/21 1/21 1 1/4
[9100] [9600][8500][7600] [8200][7000][5800] [6700][5200][4100] [4900][3700][3000] [3400][2700][2100]
--- --[4900] -[4100][3700] [4000] -[3000][2400][1800][1500]
THRU 3/4
[2100] [2100]
[2100]
[2700]
[2400]
SIDE VIEW TRAPEZE HANGER FOR UP
TO 1000 LB. [453KG] UNIFORM LOAD
ADJUSTABLE CLEVIS
HANGER
TYPE 1 - SEE
SPECIFICATIONS
ADJUSTABLE CLEVIS
HANGER
TYPE 43 - SEE
SPECIFICATIONS
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN.
[mm]
FT.
[mm]
FT.
[mm]
[2 m m
M A
X
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" [200mm] MIN.)
BAND
1-5/8" [43mm] 12 GAUGE CHANNEL OR 2"x2"x1/4" [50x50x6.4mm] ANGLE
1/2" [15mm] DIA.
HANGER RODS WITH
36" [900mm] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH
COMPRESSIVE STRENGTH
INSULATION (9 PSF MIN.
DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER
ROD
NOTES:
SEE SPECIFER FOR DETAILED
HANGER REQUIREMENTS
STEEL EXPANSION SHIELD FOR
EXISTING CONSTRUCTION AND
INSERTS FOR NEW CONSTRICTION
THIS TYPE SHALL BE USED ONLY IN
SLABS OR BEAMS OF 4" [100mm]
MIN DEPTH
3/8" [10mm] MIN DIA EXPANSION
BOLTS FOR EXISTING CONSTRUCTION
AND INSERTS FOR NEW CONSTRUCTION
CONCRETE
FLOOR SLAB
CLIP
ANGLE
NUTS &
WASHERS
3/8" [10mm] MIN
DIA HANGER RODS
FOR PIPES UNDER 2" [50mm] IN SIZE USE 1 1/2"x1 1/2"x1/4" [40x40x6.4mm] ANGLE. ALL PIPES 2" [50mm] & LARGER USE 3"x3"x1/4" [75x75x6.4mm] ANGLE
TURNBUCKLE
3/8" [10mm] MIN
DIA HANGER RODS
3/8" [10mm] MIN
DIA INSERTS NEW
CONSTRUCTION ONLY.
NOTES:
1. DEAERATOR TANKS AND CONDENSATE STORAGE TANKS HAE OVERFLOW SYSTEMS TO PREVENT
OVERFILLING. THE DEAERATOR OVERFLOW IS SHOWN IN THE FIGURE BELOW. THE OVERFLOW
SYSTEM ON THE CONDENSATE TANK ALSO HELPS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .